0% found this document useful (0 votes)
227 views1 page

Traffic Management Checklist

This document is a traffic management checklist for a construction project. It evaluates different traffic control measures and determines if they are in good, fair, or poor condition. Ensuring proper traffic controls is important for safety during roadwork.

Uploaded by

Ibrahim Esmat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
227 views1 page

Traffic Management Checklist

This document is a traffic management checklist for a construction project. It evaluates different traffic control measures and determines if they are in good, fair, or poor condition. Ensuring proper traffic controls is important for safety during roadwork.

Uploaded by

Ibrahim Esmat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TRAFFIC MANAGEMENT CHECKLIST

General Information

Project: Client:
Consultant: Contractor: Al Eslah General Contracting Est.
Conducted By: Date:
Poor: Absence of major control measures (high risk), works to be stopped and risk assessment to be reviewed immediately
Fair: Some minor controls are missing (medium risk), Additional control measures to be implemented
Good: All required controls are in place (Low risk), only monitoring is required

DESCRIPTION

Evaluation
Items Remarks
Good Fair Poor N/A
Advance warning signboards    
Roadwork Signboard    
Guide Signs boards    
Arrow signs boards    
Delineators    
Cones    
Tubular Flexible Posts (Bollards)    
Water Filled Plastic Barriers    
Concrete Barriers    
Longitudinal Crash worthy Barriers    
Warning Lights (Flashing Lights & Beacons)    
Street Lighting    
Temporary Traffic Lights    
Rumble Strips    
Crash Cushion (Shock Absorber)    
Buffer Zones    
Tapers    
Flaggers    
Pedestrian Walkways    
Construction Lane Access / Egress    
Fences    
Glare Screens    
Turning Radius and Lane width    

APPROVED BY:
Position Name Date Signature
HSE Officer Munir Ahmad
Project Engineer Ahmad Zeshan
Project Manager Ameen Mohamed

Document Ref: AE/ET/AAN/EHS/TMC/Form-004 Rev: 00

You might also like