0% found this document useful (0 votes)
59 views

Gas Connection Process 2021

Uploaded by

Awlia Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
59 views

Gas Connection Process 2021

Uploaded by

Awlia Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 1
New Domestic & Commercial Gas Connection Application Processing Step 1: Application forms are available for Customers at Customer Facilitation Centers (CFCs), SSGC Website and Mobile App. Duly completed form along-with requisite documents are required to be submitted at CFC. Step 2: Customer Registration in CC&B (Customer care & billing system) Step 3: Scrutiny of Documents Step 4: Physical survey of SITE Step 5: Approval of application, if feasible Step 6: Generation of New Gas Connection Charges Bill / Quotation / issuance to Customer Step 7: Payment by customer Step 8: Field Activity creation for installation of service and or gas meter Step 9: Installation of service connection and or gas meter. © Customer is updated on progress of application through SMS. ‘* Documents check List (To be attached by the customer / applicant with Application Form) a) | Completely Filled Ap b) | Copy of CNIC of Applicant Copy of Nearest / Neighbor Gas Bill (if Approval letter, Drawing & Completion Plan, | c) | not available, please provide nearest | d) |NOC from relevant authority (where Customer No. / Meter No.) applicable) Attested copy of property / ownership e) | documents, in case of tenant, tenancy | f) agreement along with landlord NOC Original NOC from Society / relevant authority (if applicable) Trade Licence / relevant documents & Gas Load Requirement 8) | (for Commercial Connection Application only)

You might also like