Reciprocating Compressor Testing
Reciprocating Compressor Testing
Industry LLC
Home
General
Third Party Inspection
Vendor Inspection
Factory Acceptance Test
Inspection and Test Plan
Commodity Inspection
Industrial Inspection
Quality Control
Plant Inspection
Coating Inspection
Pre-Shipment Inspection
Vendor List
Fix Equipment
Pressure Vessel
Heat Exchanger
Piping System
Industrial Valve
Steam Boiler
Storage Tank
Process Heater
Rotary Equipment
Centrifugal Pump
Centrifugal Compressor
Reciprocating Compressor
Gas Turbine
Steam Turbine
Fan & Blower
E & I Equipment
Electric Generator
Electric Motor
Power Transformer
Control Panel
Switchgear
Power Cable
I4I Academy
I4I Academy Courses
Aramco API Classroom
API CPD Hours
API SIFE Training
API 510 Training
API 570 Training
API 653 Training
API 571 Training
ASME Training Course
ASME IX Training
Quality Control Training
CWI Endorsement Training
I4I Academy Contact
Get in Touch
About Us
Contact Us
Blog
Privacy Policy
Like 2.2K
The reciprocating compressor testing article
provides information about reciprocating
compressor mechanical running test,
Home aerodynamic testing, hydrostatic testing,
gas leakage test, bar-over test and vibration
analysis and testing. You may want to
GENERAL review the reciprocating compressor
inspection procedure and inspection and
Third Party test plan.
Inspection
Vendor
Inspection
Factory
Acceptance Test
Inspection and
Test Plan
Commodity
Inspection
Industrial
Inspection
Reciprocating
Quality Control
Compressor Mechanical
Plant Inspection
Running Test
Coating
Inspection The API Std. 618 requires that reciprocating
Pre-Shipment compressor to be subjected to the 4 hours
Inspection unloaded running test after successful
inspection and testing that are done before
Vendor List and during assembly. To perform an
unloaded running test, the reciprocating
compressor cylinder valves shall not be
FIX installed for the mechanical running test.
EQUIPMENT The mechanical running test is considered a
routine test in the reciprocating compressor
Pressure Vessel testing.
Heat Exchanger
The test shall be performed based on
Piping System manufacturer approved test procedure. The
Industrial Valve compressor is brought to the rated speed
and then runs for 30 minutes to get lube oil
Steam Boiler temperature, viscosity, bearing temperatures
Storage Tank and vibration amplitudes stabilized.After
operating parameter stabilization, the test
Process Heater
technician records the parameters in each
10 or 15 minutes as per requirements.
ROTARY
EQUIPMENT
Centrifugal Pump
Centrifugal
Compressor
Reciprocating
Compressor
Gas Turbine
Steam Turbine
The following parameter is recorded
Fan & Blower periodically in this 4 hours:
ASME Training
Course If specified, the lube oil and cooling water
consoles also shall be subjected to the 4
ASME IX Training hours mechanical running test as per
Quality Control requirements of API 614.
Training
CWI Reciprocating
Endorsement
Training
Compressor Aerodynamic
Performance Test
I4I Academy
Contact
The reciprocating compressor aerodynamic
performance testing is not routine test in
GET IN the reciprocating compressor testing and is
identified as an optional test in API 618. If
TOUCH the performance test was a purchase order
requirement, then is performed based on
About Us
ISO 1217 and with cylinder valves installed
Contact Us in the closed loop system.
Blog
The manufacturer shall provide tables or
Privacy Policy curves of power and capacity vs. suction
pressure with the parameter of discharge
We will be updating pressure at the end of the test. These curves
and growing this or tables shall be verified aginst estimated
site with more and curves or tables and make sure that
more of industrial measured values are within acceptance
inspection related range.
articles.
Please subscribe to Rod load and gas load charts and similarly
my monthly shall be checked against estimated values.
newsletter so you The starting torque Vs. Speed curve also
don't miss a thing. shall be verified and verified against
estimated value.
Email
The efficiency value shall not be less than
specified value. The power consumption
also shall be checked not to be more than
Enter Your First 3% of rated value.
Name (optional)
Reciprocating
I am at least 16 Compressor Hydrostatic
years of age.
Test
I have read and
As per API 618, the cylinder, cooling water
accept the privacy
policy. jacket and piping system shall be subjected
to the hydrostatic testing. The hydrostatic
I understand testing shall be than at 1.5 times maximum
that you will use allowable working pressure and the
my information to pressure shall be held for minimum 30
send me a
minutes.
newsletter.
Subscribe
Reciprocating
Compressor Gas Leakage
Test
The API 618, requires helium leak test if the
"service gas" molar mass equal or less than
12 or "service gas" has a mol percentage of
Hydrogen Sulfide (H2S) equal or more than
0.1%.This information can be found in
reciprocating compressor datasheet.
The helium leakage test shall be done after
hydrostatic testing, and the test pressure
shall be the same amount of compressor
maximum allowable working pressure.
Reciprocating
Compressor Bar-Over
Test
Reciprocating compressor bar-over test
includes measurements of piston end
clearance and piston rod vertical and
horizontal runout measurement.
Reciprocating
Compressor Vibration
Analysis and Testing
The API 618, requires following vibration
limits at compressor skid, cylinder, distance
pieces, crankcase and cylinder flange
pressure pulsation vibration. The vibration
testing is one of important item in
reciprocating compressor testing that is
performed in mechanical running test part.
Compressor Testing
Motor
Pressure gauge
Temperature gauge
Suction/Discharge Valves
Surge Drum
Gas Piping
Drum/Piping Support
Instrument
Bearing Temperature
Measurement @ Reciprocating Compressor
Testing
Shaft Seals
Seal Type
Seal Medium
Related Articles:
Like 2.2K
New! Comments
Have your say about what you just read!
Leave me a comment in the box below.
9 comments
Add a comment...
Mohammad Abdalwahed
very good article.
Like · Reply · Mark as spam · 10y
Enzo Campeggio
helpful
Like · Reply · Mark as spam · 6y
Hani Khattab
Excellent report
Dana Petroleum Field General Manager
Like · Reply · Mark as spam · 5y
Vipin Tolia
Dear Respected sir ,
Vipin Tolia
Dear Respected sir ,
Santosh Palekar
Very good & informative article.
Like · Reply · Mark as spam · 1y
Getachew Habtewold
very nice article
Like · Reply · Mark as spam · 1y