Butt Fusion Welding Procedure - Eng
Butt Fusion Welding Procedure - Eng
CONTENT
Item Page
Sample calculation 6
DVS 2207-1 Welding of Thermoplastics. Heated tool welding of pipes, pipeline components and
sheets made from PE-HD
SFS 3115:E Plastic pipe water tightness test for pressure pipeline
ขอมูลทางเทคนิค
TECHNICAL INFORMATION Quality Management Systems
Q001
Cert. No. NQ767/04
005
Cert. No. TH04/0500
8 Remove the facing tool and place it into the support. And
cleaning the faced pipe ends.
P pulling pressure
13 Measure the force or pressure for heating time F heating time = F pulling force + F table
P heating time ~ 0.01 N/mm2 F welding = F pulling force + F table
P welding = 0.15 N/mm2 P heating time = P pulling pressure + P table
P welding = P pulling pressure + P table
ขอมูลทางเทคนิค
TECHNICAL INFORMATION Quality Management Systems
Q001
Cert. No. NQ767/04
005
Cert. No. TH04/0500
15 - Fit the heating plate toll between the both pipe ends, the
pressure maintained unit the joining faces completely onto
the heating element. By this moment a bead must have been
created surrounding the whole circumference of both pipes.
TAP-TEC-BUTT WELDING-50R1
ขอมูลทางเทคนิค
TECHNICAL INFORMATION Quality Management Systems
Q001
Cert. No. NQ767/04
005
Cert. No. TH04/0500
P1 P3
P2
T1 T2 T3 T4 T5
1.1) Calculation for HDPE Pipe section area : HDPE Pipe section area (A1) = π (OD2-ID2) / 4 (mm2)
Ex 1. HDPE Pipe dia. 315 mm. PN 6.3 Wall thickness 15.0 mm.
A1 = 3.142x(3152-(315-(2x15))2) / 4
= 14,139.00 mm2
Ex 2. HDPE Pipe dia. 400 mm. PN 6.3 Wall thickness 19.1 mm.
A1 = 3.142x(4002-(400-(2x19.1))2) / 4
= 22,858.64 mm2
1.2) Calculation for Hydraulic cylinder effective area (HDPE Butt-Fusion Machine)
A2 = 2 x 3.142 x (402-302) / 4
= 1,099.70 mm.2
TAP-TEC-BUTT WELDING-50R1
A2 = 2 x 3.142 x (502-402) / 4
= 1,413.90 mm.2