Man-Hour Estimation Example
Man-Hour Estimation Example
681334801.xls
Rev. Date Description Prepared by Verified by Approved by
681334801.xls
Revision C2
ASHTART REVAMPING PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 2/14
681334801.xls
681334801.xls
Revision C2
ASHTART REVAMPING PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 4/14
NOTES
10. All quantities of special parts for cable trays have been estimated on the basis of Document No.
DW-02A-13B-25-25805 "Main Electrical Cable Routing" Rev.B1. The estimated quantities shall be
increased by 40% (instead of 10%) spares. All the weights and prices of cable trays and special parts
include covers. As only top layers of cable trays have covers, the total lenght of covers correspond
to only half of the total lenght of the cable trays. For this reason only half of the weight of covers is
considered for each piece of cable tray. cable trays and theire nuts shall be SS316
11. The quantities of cable tray supports shall be estimated through the following formula:
(No. of 3 m long Straight Sections cable tray module) x 3m / (Maximum distance between supports)
with a maximum distance between supports assumed equal to 1.5m for each single layer of cable
trays.
12. MCT quantities shall be define during the detail engineering and most of them shall be
supplied under the new electrical room tender. 20% of each reference installed shall be
purchased to be used as spare part during offshore installation
13. 7 m long steel conduits have been estimated for each user.
14. Prices and weights of cable glands are estimated values. As it is asked in all tenders that
final equipement shall be delivered with associated cable gland, only a spare quantities
shall be purchase (~10 of each size)
15. Prices and weights of steel conduits are estimated values.
16. Consumable materials (cable tie, terminal lug,cable tag, bolt ,etc) are estimated.
17 Quantities of necessary bolts, nuts, washers, bends and accessories for fixing to brackets
shall be defined by Vendor and their prices shall be considered included in cable trays
prices. All materials shall be in accordance with AISI 316L All upper cable trays shall be
provided with covers
18 Cable ties number shall be 3 per meter in vertical position & 1 per meter in horizantal
position. Material shall be SS316 for HV cables & LV cables with cross section greater than
120 mm². for other cross section they shall be weather resistant polypropylene (black)
GENERAL NOTES
This document includes only bulk materials for the main electrical cable routes. The
equipment has already been quoted: quantities and prices will be issued by Cost Estimator
Department. This document is to be considered valid only for budget estimation of the bulk
materials and is not intended for installation purposes. Manhour are not included in the
prices.
681334801.xls
This document includes only bulk materials for the main electrical cable routes. The
equipment has already been quoted: quantities and prices will be issued by Cost Estimator
Department. This document is to be considered valid only for budget estimation of the bulk
materials and is not intended for installation purposes. Manhour are not included in the
prices.
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 7/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
3x16 mm² Cross section Meter 1,630 0.99 1,609 0.21 342
MCT Piece
MCT Piece 8
3x6 mm² Cross section Meter 570 0.49 278 0.20 114
MCT Piece
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 7/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
1.12
Cable tie Piece
MCT Piece
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 8/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
MCT Piece
7x2,5 mm² Cross section Meter 3,880 0.53 2,068 0.18 698
MCT Piece
3x2,5 mm² Cross section Meter 2,760 0.28 773 0.18 497
MCT Piece
3G2,5 mm² Cross section Meter 3,000 0.28 840 0.18 540
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 8/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
1.15
Cable tie Piece
MCT Piece
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 9/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
7x1,5 mm² Cross section Meter 3,140 0.36 1,130 0.18 565
MCT Piece
1 x95 mm² Cross section (Flexible CL5) Meter 1,000 1.22 1,220 0.15 150
MCT Piece
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 9/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 10/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
Number 30 4 120
4&7 Termination for Cable 6/10kV 1x240mm2 pieces 60 2.00 120 4.00 240.0 1.00 60.0
Gland
MCT
Number 24 4 96
Gland
MCT
Number 12 4 48
4&8 Termination for Cable 6/10kV 1x70mm2 pieces 18 4.00 72.0 1.00 18.0
Gland
MCT
Number 6
Gland
MCT
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€/pieces)
3.1.2 Plane 90° Bend - Dimensions 600x100 mm pieces 10.00 8.42 84 1.0 10
3.1.3 Plane 45° Bend - Dimensions 600x100 mm pieces 10.00 7.04 70 1.0 10
3.1.4 "T" Junction - Dimensions 600x100 mm pieces 10.00 20.40 204 1.0 10
3.1.5 Vertical Convex 90° Bend - Dimensions 600x100 mm pieces 10.00 7.78 78 1.0 10
3.1.6 Vertical Concave 90° Bend - Dimensions 600x100 mm pieces 5.00 9.11 46 1.0 5
3.1.7 Hinged Horizontal Joint for 600x100 mm Elements pieces 70.00 0.38 27 1.0 70
3.1.8 Hinged Vertical Joint for 600x100 mm Elements pieces 80.00 0.31 25 1.0 80
3.1.9 Splice Plates 600mm (two pcs. for connecting two cable trays sections) pieces 200 0.35 70
3.1.9 Splice Plates 400mm (two pcs. for connecting two cable trays sections) pieces 140
3.2.1 Straight Element - Lenght 3 m - Dimensions 300x100 mm pieces 100 10.97 1,097 2.5 250
3.2.2 Plane 90° Bend - Dimensions 300x100 mm pieces 10.00 4.72 47 1.0 10
3.2.3 Plane 45° Bend - Dimensions 300x100 mm pieces 10.00 4.59 46 1.0 10
3.2.4 "T" Junction - Dimensions 300x100 mm pieces 10.00 13.59 136 1.0 10
3.2.5 Vertical Convex 90° Bend - Dimensions 300x100 mm pieces 5.00 5.64 28 1.0 5
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 11/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€/pieces)
3.2.6 Vertical Concave 90° Bend - Dimensions 300x100 mm pieces 5.00 6.58 33 1.0 5
3.2.7 Plane Reducing Section from 600x100 mm to 300x100mm pieces 5.00 4.88 24 1.0 5
3.2.8 Hinged Horizontal Joint for 300x100 mm Elements pieces 20.00 0.38 8 1.0 20
3.2.9 Hinged Vertical Joint for 300x100 mm Elements pieces 30.00 0.31 9 1.0 30
3.2.10 Splice Plates 300mm (two pcs. for connecting two cable trays sections) pieces 200 0.35 70
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 12/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
3.3.1 Straight Element - Lenght 3 m - Dimensions 200x100 mm pieces 70 10.07 705 2.0 140
3.3.5 Plane Reducing Section from 300x100 mm to 200x100mm pieces 10 3.46 35 1.0 10
3.3.6 Hinged Horizontal Joint for 200x100 mm Elements pieces 10 0.38 4 1.0 10
3.27 Hinged Vertical Joint for 200x100 mm Elements pieces 10 0.31 3 1.0 10
3.3.7 Splice Plates 200mm (two pcs. for connecting two cable trays sections) pieces 140 0.35 49
0
3.4.1 Straight Element - Lenght 3 m - Dimensions 100x100 mm pieces 40 2 80
3.4.6 Splice Plates 100mm (two pcs. for connecting two cable trays sections) pieces 80 1 80
3.5 11 3m long Unistrut 50x50mm with Holes pieces 1,500 1.77 2,648
3.6 11 Support for cable tray (cantilever arms) pieces 1,500 3.05 4,575
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 12/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 13/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
pieces 50
pieces 50
Compression type lug suitable for 10 mm2 earth wire pieces 500
pieces 50
Compression type lug suitable for 16 mm2 earth wire pieces 500
pieces 10
Compression type lug suitable for 25 mm2 earth wire pieces 200
pieces 11
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 13/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
BULK MATERIALS MATERIALS INSTALLATION CHECKS & TESTS AVAILABLE SUPPLY PRICES
UNIT UNIT
ITEM TOTAL RATE RATE TOTAL PRICE
NOTES TAG DESCRIPTION UNIT QTY. MASS MH MH PRICE
No. MASS (kg) (MH/unit) (MH/unit) (€)
(kg) (€)
Compression type lug suitable for 25 mm2 earth wire pieces 200
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 14/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
16 CONSUMABLE
681334801.xls
Revision C2
ASHTART REVAMPIN PROJECT
4/10/2009
MT-02A-13B-25-25650 Page: 14/14
MATERIAL TAKE-OFF FOR POWER DISTRIBUTION SYSTEM
681334801.xls