0% found this document useful (0 votes)
100 views3 pages

CV H.Imran Ali

Hafiz Imran Ali is applying for the position of Field Operator at Fatima Fertilizer Company Ltd in Sadiqabad, Punjab Pakistan. He has over 7 years of experience as a Field Operator at their Ammonia Plant. He is responsible for the safe operation of the plant which includes various units like reforming, desulphurization, CO2 removal, and compression. He is skilled in areas like process safety management, turnarounds, and commissioning. He holds technical qualifications in chemical plant operation and is seeking to contribute his skills to operational performance and company growth.

Uploaded by

moj masti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views3 pages

CV H.Imran Ali

Hafiz Imran Ali is applying for the position of Field Operator at Fatima Fertilizer Company Ltd in Sadiqabad, Punjab Pakistan. He has over 7 years of experience as a Field Operator at their Ammonia Plant. He is responsible for the safe operation of the plant which includes various units like reforming, desulphurization, CO2 removal, and compression. He is skilled in areas like process safety management, turnarounds, and commissioning. He holds technical qualifications in chemical plant operation and is seeking to contribute his skills to operational performance and company growth.

Uploaded by

moj masti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Name: Hafiz Imran Ali

Address: CCR-1 Fatima Fertilizer Company Ltd


Sadiqabad, Dist.Rahim Yar Khan, Punjab Pakistan.
Mob.No: +923428850263 +923406740613
Email: [email protected]

E-mail : [email protected]
POST APPLIED FOR: QA-1031-FIELD OPERATOR - AMMONIA
OBJECTIVE:
Work as "FIELD OPERATOR" with a progressive organization where, I can utilize my skills for
improving operational performance and contributing substantially towards the growth of the organization.

EXPERIENCE SUMMARY :
I am Working At Ammonia Plant ,( NGBC Compressor Unit, Reforming/Desulphurization Unit, CO2
Removal Unit, BFW/Deaerator Unit, Compressor Unit)Having "07 Years & 10 Months
Experience" as "Field Operator" in Fatima Fertilizer Company ltd, Sadiqabad.(FFCL).

Fatima Fertilizer Company Ltd ,Sadiqabad Punjab Pakistan


Presently i am working as a process Plant Operator/Field Operator at Ammonia Plant designed by “CF
BROUN” (Re engineering by MW KELLOGG) having 1650 Matric-ton/day capacity. Plant is fully
equipped with most advanced technology controlled by DCS of YOKOGAWA JAPAN
Plant is Commissioned & start-up Complete & Now Revamping is Continue.
The Company is Certified:
OSHA/DUPONT PSM (4.3 Score)
ISO 9001:2008 for Quality Management System
ISO14001:2004 for maintaining Environmental standards
OHSAS 18001:2007 Occupational Health & Safety Assessment Series standards

AWARENESS:
PSM (PROCESS SAFETY MANAGEMENT)
HSE (HEATLH SAFETY & ENVIRONMENT)
PTW (PERMIT TO WORK SYSTEM)
LOTO/TO (LOG OUT,TAG OUT/TRY OUT)
ORA (Operator Round Automation)
EMS (ENVIRONMENTAL MANAGEMENT SYSTEM)
IMS (INTEGRATED MANAGEMENT SYSTEM)

*CCC (COMPRESSOR CONTROL CORPORATION /ANTI-SURGE CONTROL SYSTEM)


*APC (ADVANCE PROCESS CONTROL SYSTEM)
*WOODWARD 505 (TURBINE SPEED CONTROL SYSTEM)
*MARK-VI (MS-5001 GAS TURBINE CONTROL SYSTEM)
*BN-3500 (VIBRATION MANAGEMENT SYSTEM)
*ORA (Operator Round Automation)

NGBC COMPRESSOR UNIT:


Natural Gas Booster Compressor:
1 MW turbine with heavy duty centrifugal compressor.

REFORMING & SHIFT CONVERSION UNIT:


•PRE-REFORMER:It is adiabatic Reformer 20 % methane is reformed in pre-reformer.
•PRIMARY REFORMER:It is induced draft furnace consist of 260 tubes &160 burners.
•SECONDARY REFORMER:It is auto thermal reformer having 12 air nozzles for combustion.
•DESULPHURIZATION:It consists of two reactors filled with HTZ-05 catalyst.
•H.T.S.C: This reactor is filled with pyrophoric Fe3O4.
•L.T.S.C: This reactor is filled with Cu (Lk 820 Holder Topsoe) catalyst.
GAS SWEETNING/CO2 REMOVAL UNIT AGRU(CATACARB):
•CO2 Absorber:It consist of 05 packing beds of saddle rings with 30kg/cm2 operating pressure
•SEMI LEAN REGENRATOR: It consist of 03 packing beds with 1.6kg/cm2 operating pressure
•LEAN REGENRATOR: It consist of 03 packing beds with 1.7kg/cm2 operating pressure
•METHNATOR: It consist of nickel catalyst with 280˚C operating temperature
•PROCESS CONDENSATE RECOVERY: It treats condensate up to 60tons/hr.
BFW AND CHEMICAL DOSING SYSTEM/DEAERATOR UNIT:
Mechanical and Chemical Deaeration
11 stages HP BFW pumps with discharge pressure of 130Kg/cm2
Stroke Adjustment type Plunger pump for chemical Dosing.
GAS COMPRESSION UNIT:
Air Compressor: Centrifugal Multistage, Gas Turbine driven(14MW With Mark VI Control
SYSTEM),Its total capacity is 70000 Nm3/hr.
Synthesis Gas Compressor: Centrifugal multistage turbine driven compressor of 24520 KW
power.The capacities are 100,000/636,000 Nm3/hr.
Refrigeration Compressor: Centrifugal multistage turbine driven compressor of 4070 KW power.The
compressor has 60000Nm3/hr capacity.
AMMONIA RECOVERY:
•Stripper •Absorber •Condensate Pumps
ERRECTION/COMMISSIONING EXPERIENCE:
Chemical cleaning of lines and Equipment.
Steam blowing and Air blowing.
Reduction of Catalyst.
AMMONIA DBN EXPERIENCE:
”Handled all pre-commissioning and commissioning activities in DBN phase-I (2015) of ammonia plant at
Fatima Fertilizer Company Ltd to enhance the production capacity from 1500 MT/day to 1650 MT/day".
SKILL IMPROVEMENT COURSES ATTENDED:
• Steam Turbines • Reactors/Catalyst • Pumps(Centrifugal &PD)
• Fire Diluge System • Compressors • Process Control
TECHNICAL SKILLS:
• Fire Fighting • Boiler Dry Run • Safety talk emergency discussions
TURN AROUND EXPERIENCE:
•Primary Reformer, Pre-Reformer, L.T.S.C and METHANATOR skimming activity handled in Fatima
fertilizer company limited.
•Successfully coordinated ATA- 2015, ATA-2017 ATA 2019 ATA 2021 ATA 2023(Annual Turn Around)
activities of loading and unloading of catalyst,replacement of furnace damaged refractory.
•Furnace outlet Header Replacement Job ,SECONDARY REFORMER Catalyst and Checker Work
Replacement.
•Furnace inlet pigtail headers replacement job.
•Furnace Feed Coil Replacement
•Furnace Tubes and Tubes catalyst replacement.
•Pre-reformer, Desulpherizers, HTS and LTS Catalyst Replacement.
KEY ACCOUNTIBILITIES & RESPONSIBILITIES:
•Monitoring & Control over all plant safe operation.
•Take decisive actions in case of Troubleshooting, Emergency or any Process Deviations.
•To handover Safe Work Permits to maintenance crew.
•Performs system Start-Up & Shut-Down as per procedures.
•Records details of the plant operations.
•Risk Assessment and Job Safety Analysis.
•Ensure production targets are met while maintaining compliance with Life Critical
Procedures, Tenets of Operations, Consent to Operate, plant policies and procedures, Daily
Operating Instructions, Standard Operating Procedures (SOPs)
Ensure correct mitigations are in place for emergency & safety bypass permits.
Responsible for housekeeping in work area.
•Conduct detailed, quality rounds and complete e-SOMS tours in the plant, log all
abnormalities and required follow up in the Narrative log.
•Prepare and commission equipment per DOI’s and Maintenance Schedule.
•Work with Turnaround Planning to develop production plans and work packages.
•Execute Stop Work Authority and take immediate corrective actions to stop unsafe
behaviors. 
•Communicate to Shift Supervisor to inform on issues that require additional follow up.
•Report incidents and near misses and participate in investigations as required.
PERSONAL DETAIL:

Father’s Name: Liaquat Ali


Date of Birth : 31-12-1990
Religion : Islam
N. I. C. No. : 31301-6661713-9
Marital Status : Married
Nationality : Pakistani
Domicile : Rahim Yar Khan, Punjab Pakistan
TECHNICAL QUALIFICATION:
• 02 Years Apprenticeship (Chemical Plant Operator) at Pak-Arab Fertilizer Company Ltd From
September-2015 to August-2017.
• Fully Vaccination Done (Booster Dose)
ACADEMIC QUALIFICATIONS:

Qualification Division Passing Year Board/University

HIGH SCHOOL 1st Division 2011 B.I.S.E (Bahawalpur)

Matric (Science) 1st Division 2007 B.I.S.E (Bahawalpur)

You might also like