The document contains a list of 30 recipients of housing assistance. It includes their names and indicates which stages of construction were completed for each recipient, including foundation, walls, columns, roof, and windows. Most recipients had the foundation, walls, roof, and windows completed. A few entries note that doors and/or windows were not yet installed. The bottom row summarizes that 2 recipients had foundations built, 28 had walls constructed, 19 had columns, 28 had roofs, 21 had windows, and 16 had 100% of the work completed.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
25 views
Progress Chandra
The document contains a list of 30 recipients of housing assistance. It includes their names and indicates which stages of construction were completed for each recipient, including foundation, walls, columns, roof, and windows. Most recipients had the foundation, walls, roof, and windows completed. A few entries note that doors and/or windows were not yet installed. The bottom row summarizes that 2 recipients had foundations built, 28 had walls constructed, 19 had columns, 28 had roofs, 21 had windows, and 16 had 100% of the work completed.