1. Executive Summary
Clients plan a Data Warehouse Program to significantly overhaul and upgrade the scope and depth of its current reporting and data mining applications. The objective is to equip a much larger user community, whose information needs and requirements have multiplied, with the tools and capabilities for extracting customer centric knowledge from a comprehensive data warehouse. Two key aspects of the project involve: a) Re-designing the data model/schema to cater to the integration of data from all channels and sources and provide customer focused data b) Putting into place and executing a robust and efficient test strategy to avoid costly production time errors, This document consists of two sections: Section 2 lists out some specific capabilities which qualify Thinksoft as an organization best suited to perform the Validation and testing for the DWH initiative. Section 3 sets out in brief the Thinksoft initial draft approach to this assignment.
BI Testing V 1.0
Confidential
Page No. 2 of 13
BI Testing V 1.0
Confidential
Page No. 3 of 13
BI Testing V 1.0
Confidential
Page No. 4 of 13
Data Volume
Data Integrity
Data Mapping document Extensive coverage of Business rules and logic in data simulation
Different data snapshots Data in Different sources gets updated or cycles at different times (eg. Daily, weekly, monthly etc.)
Effective planning of the incremental feeds from different sources Optimize on the data feeds from different sources based on requirements
BI Testing V 1.0
Confidential
Page No. 5 of 13
Challenge
Issues
Thinksoft Solution
History of data
Decision would be taken in the Test Planning phase after reviewing the reporting requirements of the business users
Expected data values arrived at based on the details from Data Mapping and Data guidelines document
Incorrect data mapping in the ETL procedures would impact the reports
Verify data elements and values from Source data warehouse reports
BI Testing V 1.0
Confidential
Page No. 6 of 13
Thinksoft Solution Defined Scope Ensure 100% coverage for the scope identified
BI Testing V 1.0
Confidential
Page No. 7 of 13
BI Testing V 1.0
Confidential
Page No. 8 of 13
4. Validations relating to the Primary key, Surrogate keys etc. 5. Verifications relating to consolidation of data obtained from multiple sources at customer level i.e. verification of de-duplication process 6. Verification of Error logs for the following cases: Missing feed files Duplicate upload of the same file Header footer mismatch
7. Verification of roll back procedures adopted while the upload/extraction of data files 8. Verification of audit trail generated for each upload/extraction of source data 9. Processing of Reject records as per specifications
3.4.2. Approach
1. Review of the various data sources and mode of transmission to the data warehouse, Feed file formats and layouts
BI Testing V 1.0
Confidential
Page No. 9 of 13
2. Review data elements in the logical model (star schema) including primary and surrogate keys. 3. Review the mapping of the data elements in the source to target. This would be clearly documented in a Data Mapping document and sign-off obtained 4. Plan for specific source data values to emulate real time data 5. Unit, System and Integration testing should be complete and results verified by the client before the commencement of ETL testing by Thinksoft 6. Thinksoft Test Data Planning would include deciding on the adequacy of data, requirement of historical data etc. depending on the reporting requirements. This would be documented in the Dataguidelines document 7. Data generation for source feed files using Thinksofts proprietory tool - Data Builder 8. Define batch upload and extraction requirements. This would be based on the Batch run requirements, intervals and incremental processing for each data source 9. Populate the target tables by extracting the relevant data from the source files by the ETL programs 10. Random selection of rows from source and comparing them with the data stored in the data warehouse 11. Execute simple SQL Queries to extract rows from the data warehouse based on predefined conditions and to compare them against the source values 12. Data transformations from source to the data warehouse would be verified using the details from data mapping and data guidelines document 13. If no testing or validations is possible on certain data elements (may be due to some difficulties in testing) an explanation and impact of not testing would be documented.
3. Verification of data items involving computations, units in which the data items are displayed etc. 4. Verification of data items that are not directly available from the data warehouse schema 5. End-to-End testing involving verification of data elements from the Source file to the way it is represented in the reports 6. Verification of Reports for the following: Functionality Layout Header Footer Business rules
7. Cosmetic checking for display, fonts, colour and format 8. Verification of graphs as applicable 9. Excel will be used for report extraction and verification
3.5.2. Approach
1. Review the user requirements and reporting needs 2. Define the scope for functional testing by identifying the business critical and commonly used reports and features. This need to be signed-off by the client. 3. Review the mapping of the data elements in the source to the fields/columns available in the reports. 4. Review the data requirements to complete these reports 5. Data required for testing reports would be generated and uploaded into the test data warehouse as part of the ETL testing 6. Execute SQL queries/views to obtain the resultant data from the backend for the verification of reports 7. Functional testing for reports would commence only when data warehouse is fully loaded with the sufficient data as per testing needs and Daily load procedures are operational
BI Testing V 1.0
Confidential
Page No. 11 of 13
8. Reports verification would be done based on thorough checking for select few rows 9. End to End testing checking would be done for select data elements for specific data set. This would be documented and tracked separately
3.6.2. Approach
1. Expected Performance benchmarks will be obtained from client for defining performance testing goals 2. Performance testing is recommended at two stages during the testing project Stage I - After functional testing completion, using the test bed to assess if system meets the minimum performance expectations at this level of data volumes. Stage II Performance testing will be repeated in the production environment before roll out, with production data subsets, to assess if system meets the expected performance criteria with increased data volumes .
3. In each of these stages Performance Testing would be done : During upload of feed files at the ETL end Response time for front end User queries/reports
BI Testing V 1.0
Confidential
Page No. 12 of 13
This voluminous data would be generated using an automated Data Generation Tool, Thinksofts Data Builder. Verification on successful upload of data by doing a sample verification Verification of Exception Logs from the ETL Process Compare the actual upload time against the benchmark advised by the client
o o o
Performance at User Front-End: Appropriate Performance Measurement tool, compatible with the data warehouse front end applications, would be identified for Performance testing o o o o Critical and Commonly used business reports to be identified Data Planning and upload for the reports identified Simulate multiple and concurrent users Measure performance for CPU Usage, Memory Usage, SQL Statistics, Response time at different user level and load for Standard and Complex Reports o Random Verification of the outputs