0% found this document useful (0 votes)
66 views3 pages

Poroject Proposal Water Sytem

This document is a project proposal from Salvador C. Resol National High School for the installation of a school water system. The proposal requests 100,000 PHP from the provincial school board fund. It outlines the identifying information, rationale, objectives, activities, budget, and approval process for the project. The project will install a deep well water pump, pipes, valves, and other materials to provide a sustainable water supply for drinking and the school garden. It is expected to improve hygiene, the learning environment, and access to water on campus.

Uploaded by

rose lima guita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views3 pages

Poroject Proposal Water Sytem

This document is a project proposal from Salvador C. Resol National High School for the installation of a school water system. The proposal requests 100,000 PHP from the provincial school board fund. It outlines the identifying information, rationale, objectives, activities, budget, and approval process for the project. The project will install a deep well water pump, pipes, valves, and other materials to provide a sustainable water supply for drinking and the school garden. It is expected to improve hygiene, the learning environment, and access to water on campus.

Uploaded by

rose lima guita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Republic of the Philippines

DEPARTMENT OF EDUCATION
Region VI-Western Visayas
DIVISION OF NEGROS OCCIDENTAL
SALVADOR C. RESOL NATIONAL HIGH SCHOOL
Brgy. Gatuslao, Candoni,Neg. Occ.

PROJECT PROPOSAL

I. IDENTRIFYING INFORMATION

Project Title: Installation of School Water System.

Proponent: ROSE LIMA M. GUITA


Teacher In Charge
Proponent Area: Salvador C. Resol National High School
Brgy. Gatuslao, Candoni Neg. Occ.

Project Manager: ROSE LIMA M. GUITA, 09100572577

Implementation Period: One (1) year

Project Beneficiaries: Learners, teachers and stakeholders of Salvador C. Resol National


High School

Percent of Woman: 55%

Amount Requested: Php 100,000.00 (One Hundred Thousand pesos only).

Fund Source: Special Education Fund 2021

II. RATIONALE:
Schools are one of the most important institutions in a community and we
should see to it that it is always safe not only its facilities but also the clientele who
benefited- students/learners.
The provision of water at schools is one of the highly effective practices in
increasing access and learning outcomes. In addition to the necessity of water to
maintain personal and environmental hygiene, reducing student dehydration in schools
has been associated with improved cognitive abilities. (unicef)
Relative to DepEd Order NO. 10, “ Policy and Guidelines on the Comprehensive
Water, Sanitation and Hygiene in Schools (WinS) Program.” This is to improve success to
adequate water supply, functional toilets and effective hygiene promotion. The Salvador
C. Resol National High School is a newly established secondary in the district of Candoni
situated at Brgy. Gatuslao, Candoni Negros Occidental. The school has its site and luckily
a recipient of Provincial School Board Fund amounting to One Hundred Thousand Pesos
(Php. 100,000.00). Therefore, the school administrator, faculty, parents and students
agreed to allocate this amount for the installation of school water system.
III. OBJECTIVES:
1. To access sustainable and safe for drinking water in school.
2. To sustain the water supply needed in Gulayan Sa Paaralan
3. To maintain and motivating learning environment.

IV. ACTIVITIES
Installation of School Water System
1. Preparation
1.1 Conference with the teachers
1.2 Preparation of Project Proposal
1.3 Submission of Project Proposal
1.4 Canvassing of Materials
1.5 Purchasing Materials
1.6 Prepare papers for liquidation
2. Implementation
2.1 Delivery of materials
2.2 Construction of the project

V. RESULTS CHAIN FINANCIAL ASPECTS


BUDGETARY ALLOCATION/SOURCE OF FUND
Provincial School Board Fund- 100,000.00

Quantity Unit Materials Description Unit Price Total Cost

1 unit Deepwell Water Pump ( 1Hp) 18,000.00 18,000.00

2 pcs Galvanized Iron Pipe (#2) sched.40 2,400.00 4,800.00

Galvanized Iron Pipe (#1 &1/2)


2 pcs 1,800.00 3,600.00
sched.40
Galvanized Iron Pipe (#1 &1/2)
2 pc 1,200.00 2,400.00
sched.40
Galvanized Iron Ripley (#3/4,
3 pcs 65.00 195.00
3mts.)sched.40

3 pcs Galvanized Iron T (#3/4,sched.40 75.00 225.00


1 pc GI Ball Valve (#3/4,sched.40 400.00 400.00
1 Pc GI Check Valve # 1 400.00 400.00
2 Pcs GI Coupling # 2 155.00 310.00
2 Pcs GI Coupling # 1 & 1/4 95.00 190.00
2 Pc GI Coupling # 1 90.00 180.00
1 roll Heavy Duty Black Hose 1,500.00 1,500.00
10 pcs Tapelone 30.00 300.00
2 Box TW Wire 3,500.00 7,000.00
1 Pc Koten Safety Breaker 60Am 600.00 600.00
5 Pcs Steel Faucit 90.00 450
1 pcs Drum 1,700.00 1700
    TOTAL AMOUNT 42,250.00
       
Labor cost for the Installation of School Water System (35%) 22,750.00
Sub Total 65,000.00
Labor Cost for the Drilling of the water source 35,000.00
GRAND TOTAL 100,000.00

VI. PROJECT MONITORING AND EVALUATION


The office of the Teacher In Charge shall monitor and supervise the proper
implementation, conduct of the activity and disbursement of funds following government
accounting and auditing rules and regulations.

Prepared by: Noted by:

ROSE LIMA M. GUITA,MAED CLEOPATRA C. ALEGRADO, Ed.D.


Teacher In Charge PSDS- Candoni

Reviewed by:

DINAH N. SALAZAR
Administrative Officer V-Budget Officer

Recommending Approval:

LYNEE A. PEÑAFLOR, Ph.D. MARSETTE D. SABBALUCA, CESO VI


Asst. Schools Division Superintendent Schools Division Superintendent

Approved:

HON. EUGENIO JOSE LACSON


Provincial Governor
Negros Occidental

You might also like