0% found this document useful (0 votes)
165 views8 pages

Well Stimulation Vessel

This document provides information on the Well Stimulation Vessel Tadbir Petro Energy. It includes: - Details on its dimensions, capacities, equipment, and certifications for well testing and stimulation services. - It can accommodate 50 personnel and is equipped with a 25-ton crane, hydraulic gangway, and connections for well testing and stimulation via coflexip hoses. - Propulsion and machinery details are provided, including twin main engines totaling 5,444 brake horsepower, generators, a bow thruster, and capacities for cargo, fuel, and water.

Uploaded by

Hossein ramezani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
165 views8 pages

Well Stimulation Vessel

This document provides information on the Well Stimulation Vessel Tadbir Petro Energy. It includes: - Details on its dimensions, capacities, equipment, and certifications for well testing and stimulation services. - It can accommodate 50 personnel and is equipped with a 25-ton crane, hydraulic gangway, and connections for well testing and stimulation via coflexip hoses. - Propulsion and machinery details are provided, including twin main engines totaling 5,444 brake horsepower, generators, a bow thruster, and capacities for cargo, fuel, and water.

Uploaded by

Hossein ramezani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Tadbir Petro Energy (TPE)

Well Stimulation Vessel

www.tadbirpe.com
[email protected]
At a Glance
Designed, built and certified for Well Testing & Well Stimulation Services
Equipments can be mounted and interconnected on main deck according
to JTR
Vessel connection to WHP is via high pressure Coflexip hoses
Hydraulic quick disconnect for emergency release of Coflexip hoses
Burner boom attached to a hydraulic king post on forecastle deck
Wellhead is controlled from the vessel’s ESD panel
Fire fighting class-1 capabilities
Designated storage area on main deck for dangerous cargo (perforation
explosives)
25 t offshore telescopic crane on main deck
Hydraulic gangway for personnel transfer between vessel and platform
Extended accommodation for 50 personnel

Main Particulars
Port of registry:Port Klang (Malaysia)
Year built:2009
Dimension:60.8 m x 14.8 m x 5.75 m
Draft – light:4.75 m / 4.30 m (loaded)
DWT:900 tons
Classification:
A1
Offshore support vessel
Fire fighting vessel class-1
Well stimulation
Well Testing and Servicing Vessel

Capacities
Fuel oil : 500 m3
Fresh water : 250 m3
FW water ballast : 150 m3
Mud : 120 m3 (750 bbls) 2 x 60 m3 tank equipped with
Raw acid : agitators
Brine : 96 m3 (600 bbl) 2 x 48 m3 tank
120 m3/ (750 bbl) 2 x 60 m3 tank

Machineries
Deck cargo : 200 tons (5t/ m2)
Clear deck space : 360 m2 (zone-ii certified)
Speed : 10 knots
Endurance : 21 days
Main engine : 2 x 2,722 bhp
Machineries (cont.)
Mooring lines : 4 x 1200 m
Mooring anchors : 4x3t
Deck crane : 25 t-4 m / 4 t-25 m
Hydraulic gangway : 500 kg swl
Generators : 3 x 400kw/415v/3p/60hz
Emergency gen-set: 1 x 86kw/415v/3p/60hz
Propulsion : cpp fixed nozzles
Bow thruster : 1 x 8t thrust
Anchor : 2 x 1590 kg
Anchor chain : 880 m
Tow line : 1 x 190

Accommodation
Single bed room Two beds room Four beds room
50 pax
20 pax 2 rooms 3 rooms 3 rooms
Marine & catering crew

4 pax 2 rooms 1 room Nil


Client personnel Upper forecastle deck Forecastle deck
Sharing one bathroom With attached bathroom

26 pax 2 rooms 6 rooms 3 rooms


Service companies personnel Upper forecastle deck Forecastle deck Lower deck
Sharing one bathroom Each two rooms share one bathroom
Share one public bathroom

Total: 6 rooms 10 rooms 6 rooms

Facilities
Hospital : single bed maindeck
Client office : 3 desks upper forecastle deck
Well services office
: 3 desks forecastle deck
Recreation room: 12 pax maindeck
Mess room : 20 pax maindeck
Prayer room : 5 pax lower deck
OFFSHORE SUPPORT MAIN MACHINERY & PROPULSION
WELL STIMULATION VESSEL MAIN ENGINE : 2 X 2,722 BHP EACH@1000RPM
TOTAL 5,444 BHP
VESSEL NAME : M.V. TANJUNG GELANG GENERATORS : 3 X 400KW/415V/3P/60HZ
CALL SIGN : TBA GEN-EMERGENCY : 1 X 86KW/415V/3P/60HZ
IMO NO. : TBA PROPULSION : CPP IN FIXED NOZZLES
OFFICIAL NO. : TBA ALTERNATOR :
BOW THRUSTER : 1 X 8T THRUST
GENERAL ANCHOR & CRANES
PORT OF REGISTRY : PORT KELANG ANCHOR : 2 X 1590 KG AC-14
YEAR BUILT : 2007 CHAIN : 880M AND 36MM DIA. GRADE 3
CLASSIFICATION : ABS + A1(E) OFFSHORE MOORING LINES: 4 X 220M AND 8 STRANDS PP.
SUPPORT WELL STIMULATION TOW LINE : 1 X 190M L AND 35 T BREAKING
VESSEL STRENGTH
DIMENSION : 60.8 M X 14.8 M X 5.75 M DECK CRANE : 25 T SWL
DRAFT – LIGHT : 4.75 M / LOADED: 4.30 M CARGO PUMP CAPACITY
3
GRT / NRT : TBA/TBA FUEL OIL : 2 X 10 M /HR AT 20 M HEAD
3
DWT : 900 TONS CARGO FUEL OIL : 50 M /HR AT 60 M HEAD
CARGO CAPACITY FRESH WATER : 50 M3/HR AT 60 M HEAD
3
FUEL OIL : 500 M3 LIQUID MUD : 50 M /HR AT 60 M HEAD
3
FRESH WATER : 250 M3 BASE OIL : 100 M /HR AT 90 M HEAD
3
LIQUID MUD : 120 M3 BALLAST : 60 M /HR AT 30 M HEAD
ACID( 2 TANK) : 96 M3 SEWAGE TREATMENT : APPROVED TYPE FOR 50 MEN
BRINE : 120 M3 FIRE FIGHTING (FIFI 1) & ANTI-POLLUTION
FW WATER BALLAST : 150 M3 PUMP : 2 X 1500 M3/HR AT 12-14 BAR
2 3
DECK CARGO : 200 TONS (5T M ) MONITOR : 2 X 1200 M /HR WITH REMOTE
2
CLEAR DECK SPACE : 360 M CONTROL AT WHEELHOUSE
REFRIGERATED STORAGE FOAM TANK : 10 M3
CHILLER / COOLED ROOM : 8 M3 OIL DISPERSANT TANK : 10 M3
ACCOMMODATION (FULLY AIR-CONDITIONED) DIRTY BILGE TANK : 5 M3
CREW CABIN (NUMBER/BEDS) 50 PAX SPRINKLER SYSTEM FIFI CLASS 1 REQUIREMENTS
PASSENGER CABINS (NUMBER/BEDS) OIL DISPERSANT BOOM : 2 X RETRACTABLE
6 X 4 MEN 6 X 1 (FINAL ARRANGEMENT TBC) FUEL OIL CONSUMPTION
10 X 2 MEN TBA
HOSPITAL ENDURANCE
NAVIGATION & COMMUNICATION 21 DAYS
ALL ROUND VIEW WHEELHOUSE
FORWARD AND AFT CONTROL
ALL DATA STATED HEREIN HAVE BEEN COMPILED WITH ALL POSSIBLE CARE.
RADARS, ECHO SOUNDER, AUTOPILOT, GYRO, HOWEVER NO GUARANTEE IS GIVEN OF THE CORRECTNESS HEREOF.
MAGNETIC COMPASS, D.F., DGPS,GPS, GMDSS AREA A1, Updated16/1/2008
A2, A3
INTERCOM / PA SYSTEM, E-MAIL
ISPS/AIS/SSAS, & ONE MINI M
2 X JOY STICK REMOTE CONTROL SYSTEM FITTED AT
FWD AND AFT CONSOLES
DECK EQUIPMENT
CAPSTAN : 2 X 5T AT 15M/MIN
STERN GATE : SWING TYPE
FOUR POINT MOORING : 4 ELECTRO (2 FWD, 2 AFT)
SPEED
10 KNOT
SURFACE WELL TEST EQUIPMENT

Item No Description Qty Remarks


1 COFLEXIP LINES 1 Standard
(Size: 3” - Working Pressure: 10,000 psi – Length 90’) 1 Optional
-20 to 130 deg-C operating temperature

2 HYDRAULIC QUICK DISCONNECT COUPLINGS 1 Standard


(Size: 3” - Working Pressure: 10,000 psi) 1 Optional

3 EMERGENCY SHUT DOWN VALVE. 1 Standard


(Size: 3” - Working Pressure: 10,000 psi)
Standalone Surface Safety Valve (SSV), 5,000psi WP, 3" ID

4 WELL HEAD CONTROL PANEL, 1 Standard


(Working Pressure: 10,000 psi)
Pilot emergency shut down system to shut in well, connected to flow wing valve, remote
actuator c/w high & low Pilot with three remote stations

5 DATA HEADER 1 Standard


10,000 psi WP, NACE MP-01-75, fitted with four ports for sensors, chemical injection,
sampling and thermowells

6 CHOKE MANIFOLD 1 Standard


(Size: 3” - Working Pressure: 5,000 psi)
3" ID, 10,000 psi WP, 250 F, NACE MP-01-75, fitted with one positive choke, complete
with full range of fixed chokes 4/64" to 128/64" in 4/64" interval to 48/64" then in 8/64"
intervals to 72/64”, one adjustable choke with spare tips and seat and face
7 3-PHASE TEST SEPARATOR 1 Standard
A compact Skid mounted 10ft x 42" vessel fitted with suitably sized meter for anticipated
flow rates, set of orifice plates and selection of spares to allow in field repairs as required.
Relief and safety valve included. 1440psi WP, 212F max WT

8 HIGH PRESSURE TRIPLEX PUMPING UNIT 1 Standard


(Size: 500 HP - Max. Pressure: 10,000 psi)
9 SMOKELESS BURNER HEADS WITH BOOM 1 Standard
(Size: 60’ - Working Pressure: 1,440 psi)

10 OIL MANIFOLD 1 Standard


Oil manifold (and 3 way 3" gas manifold)
2" 5 way 1440 psi WP NACE, MR-01-75.
Note: oil and gas manifold may also be as an integral items to the interconnecting pipe
network onboard the vessel

11 PIPE FITTINGS Set Standard


Set of piping, elbows, crossovers and swivels to connect all surface test equipment.
Additional pipe work to be supplied to connect from X-mass tree flow wing to Coflexip on
platform.

12 CHEMICAL INJECTION PUMP 1 Standard


(Size: 3/8” Plunger - Capacity: 56 gal/day - Pressure: 10,000 psi)
13 TEST ANCILLARY
− Well test workshop and spares container 1 Standard
− Burner air compressor, 750 scf/min @ 120psi, zone 2 rated with safety shut down & 1
relief valve.*
14 SURFACE RECORDER
1 Standard
(Working Pressure: 10,000 psi)
15 DATA ACQUISITION SURFACE SYSTEM
Computerized production monitoring and acquisition system 1 Standard

16 SURGE TANK
Surge tank: , 100 bbl, 100 psi WP, NACE MR-01-75 with vent and relief outlets, twin 1 Standard
compartment
u

j -sl
•• !

! l
:::::::::=-1 --,- -
�j
ii1 J I I
I •• -
�.1•
L�
I
' r- @: '·�..

• �r '
,..
-L

j
•a•
-al-

.J ..!
I -"

J � .
T

r
I-+( I

I
I• \

J_[ j
i

' '
' .. ! ..
:d ur

�v�;l.
� 9

Ii
I•

You might also like