0% found this document useful (0 votes)
49 views

Excavation Checklist

The document is a checklist for surveying and earthworks excavation for the Fortius Origin project. It lists 10 items to check for surveying, including establishing reference lines, grids, benchmarks, and structural element locations according to drawings. It also lists 10 items for earthworks excavation, such as clearing the area, layout according to plans, working spaces, founding strata preparation, dressing, dewatering, disposal of earth, barricading of deep excavations, and inspection records. Representatives from the vendor, consultant, and project management consultant are required to sign off on the checklist upon completion of the work.

Uploaded by

Arc Fortius
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Excavation Checklist

The document is a checklist for surveying and earthworks excavation for the Fortius Origin project. It lists 10 items to check for surveying, including establishing reference lines, grids, benchmarks, and structural element locations according to drawings. It also lists 10 items for earthworks excavation, such as clearing the area, layout according to plans, working spaces, founding strata preparation, dressing, dewatering, disposal of earth, barricading of deep excavations, and inspection records. Representatives from the vendor, consultant, and project management consultant are required to sign off on the checklist upon completion of the work.

Uploaded by

Arc Fortius
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

CHECKLIST FOR SURVEYING QAP/SYN/ -001

PROJECT: Fortius Origin ZONE / BUILDING: DATE:


FLOOR / LEVEL:
GRID:
Vendor Consultant PMC
Sl# Description NA Y N Sign Y N Sign Y N Sign

1. Identification of REFERENCE BASE LINES &


PERMANENT BENCHMARKS

2. Establishment of MAIN GRID LINES in both


directions. Is it as per drawings?

3. Establishment of BENCHMARKS and SUB-BASE LINES.


Is it as per drawings?

4. Location of INDIVIDUAL STRUCTURAL ELEMENTS. Is


it as per drawings?

5. Check for MARKING OF BMs, CLs & GRIDLINES on


survey pillars. Is it as per specifications/ Drawing?

6. Check for PROTECTION of SURVEY PILLAR. Is it OK?

7. Establishment of block levels (5m x 5m grid). Is it


OK?
8. Preparation of EGL Map.

9. Check for control of survey work in the vertical


direction.

COMMENTS / CORRECTIVE ACTION PROPOSED:

Vendor Rep Signature: Colliers Civil / Services Rep Signature:


NAME: NAME:
DATE: DATE:

Consultant Rep Signature:


NAME:
DATE:
CHECKLIST FOR EARTHWORKS–EXCAVATION QAP/SYN/ -002

PROJECT: Fortius Origin ZONE / BUILDING: DATE:


FLOOR / LEVEL:
GRID:
Vendor Consultant PMC
Sl# Description NA Y N Sign Y N Sign Y N Sign

1. Is the AREA to be excavated clean and cleared


of all obstructions?
2. Is the LAYOUT, ALIGNMENT AND SIZE of
Excavation marked on the ground as per
excavation plan?
3. Are adequate WORKING SPACES provided all
round?
4. Check whether FOUNDING STRATA is suitable
for laying PCC i.e., free from any soft pockets.
(if NO, remove soft pockets and fill with Lean
Concrete/Sand)
5. Check for DRESSING of the excavated area. Is
it OK?
6. Check for STABILITY of Side Slopes. Is it
acceptable?
7. Check for DEWATERING of waterlogged area.
Is it OK?
8. Check for DISPOSAL of excavated earth to
specified area.
9. Check whether BARRICADING & CAUTION
SIGNS are provided for deep excavations.
10. Are JOINT INSPECTION RECORDS complete
ORIGINAL GROUND LEVEL:
FOUNDING LEVEL:
DEPTH OF EXCAVATION:

COMMENTS / CORRECTIVE ACTION PROPOSED:

Vendor Rep Signature: Colliers Civil / Services Rep Signature:


NAME: NAME:
DATE: DATE:

Consultant Rep Signature:


NAME:
DATE: