1 SATIP-M-001-01 STL STEEL - Rev1

This document outlines Saudi Aramco's typical inspection plan for structural steel projects. It lists inspection tasks and assigns responsibility for each task between Saudi Aramco and contractors. Key tasks include reviewing documentation, receiving and storing materials, installation including welding and bolting, and pre-commissioning including punchlisting. Quality control procedures are identified for each task. Saudi Aramco is responsible for initial oversight, with contractors taking on more responsibility after demonstrating competency.

Uploaded by

Charles Jacob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views2 pages

1 SATIP-M-001-01 STL STEEL - Rev1

This document outlines Saudi Aramco's typical inspection plan for structural steel projects. It lists inspection tasks and assigns responsibility for each task between Saudi Aramco and contractors. Key tasks include reviewing documentation, receiving and storing materials, installation including welding and bolting, and pre-commissioning including punchlisting. Quality control procedures are identified for each task. Saudi Aramco is responsible for initial oversight, with contractors taking on more responsibility after demonstrating competency.

Uploaded by

Charles Jacob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

SATIP No. APPROVED DATE DISCIPLINE: Civil


SAUDI ARAMCO TYPICAL INSPECTION PLAN
STRUCTURAL STEEL--Piperack, Steel Supports & Miscellaneous Steel
SATIP-M-001-01 25-May-05 MECHANICAL- Structural Steel
Structures
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Procedure for Tightening of High Strength


1.1
Bolted connections
SAIC-M-2001 RHI RH1
Procedure for Localized Heating for repair
1.2
of warpage
SAIC-M-2002 RH1 RH1

2.0 MATERIAL RECEIVING

2.1 Structural Steel Shapes and Plates SAIC-M-2003 SAIC-M-2003 H1 W2 S.ARAMCO shall be notified for the first batch of deliveries.

2.2 Bolts, Nuts and Washers SAIC-M-2021 SAIC-M-2021 H1 W2 S.ARAMCO shall be notified for the first batch of deliveries.

2.3 Fabricated Steel Structures SAIC-M-2004 SAIC-M-2004 H1 W2 S.ARAMCO shall be notified for the first batch of deliveries.

2.4 Storage, Handling & Preservation SAIC-M-2005 SAIC-M-2005 H1 S

3.0 INSTALLATION

Inspection of Support Foundation prior to


3.1 SAIC-M-2006 SAIC-M-2006 H1 W1
Structural or Equipment Installation

3.2 Field Weld connection inspection Refer to SATIP-M-001-04

SAIC-M-2007
3.3 Structural Alignment prior to Grouting SAIC-M-2007 W1 S
SATR-M-2001

3.4 Grouting Refer to SATIP-Q-010-01

3.5 Repair/Correction of Errors SAIC-M-2008 SAIC-M-2008 W1 W1

Pre-Installation Procedure Verification


3.6 Testing of Turn-of-Nut Method (ASTM SATR-M-2002 SATR-M-2002 H1 H1
A325 or ASTM A490 Bolts)

Pre-Installation Procedure Verification


Testing of DIRECT TENSIONING
3.7 SATR-M-2003 SATR-M-2003 H1 H1
INDICATOR (ASTM A325 or ASTM A490
Bolts)

Pre-Installation Procedure Verification


3.8 Testing of Calibration Wrench (ASTM SATR-M-2004 SATR-M-2004 H1 H1
A325 or ASTM A490 Bolts)

Page 1 of 2
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)
SATIP No. APPROVED DATE DISCIPLINE: Civil
SAUDI ARAMCO TYPICAL INSPECTION PLAN
STRUCTURAL STEEL--Piperack, Steel Supports & Miscellaneous Steel
SATIP-M-001-01 25-May-05 MECHANICAL- Structural Steel
Structures
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

S.ARAMCO shall be notified for the INITIAL bolt tightening


3.9 Final bolt tightening inspection and testing SAIC-M-2009 SAIC-M-2009 W1 W2
activities.

3.10 Access Structures SAIC-M-2010 SAIC-M-2010 W1 W1

3.11 Painting/Coating and touch up Refer to applicable SATIP-H series

4.0 PRE-COMMISSIONING

Structural Re-Instatement/Final SAIC-M-2011


4.1 SAIC-M-2011 H1 S
Punchlisting SATR-A-2011

4.2 Mechanical Completion Punch listing SA-6133 H1

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels
1 of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.

4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
W1 100% Witness Inspection/Test H2 Sample Hold Point for QC Inspection or Test RH1 100% Review and Approval of Documents
W2 Sample Witness Inspection/Test R1 100% Review of Documents RH2 Sample Review and Approval of Documents
H1 100% Hold Point for QC Inspection or Test R2 sample Review of Documents S Surveillance

Page 2 of 2