Commissioning Checklist Condensing Unit
Commissioning Checklist Condensing Unit
Installer Performed by
Company name Company
Contact person Technician
Certificate
End customer Date
Name
Street – N°
Zip code – City
Country
Installation
Model name Refrigerant type R32 Standard weight kg
Serial number Additional weight kg
Construction year
Reference installation Total weight kg
Precommissioning
N2 Test data available Yes No Vacuum test data available Yes No
Visual inspection
Piping limits within limits Yes No Logbook available and complete? Yes No
Piping insulation state OK Not OK Airco energy audit requested? Yes No
Air side outdoor unit correct Yes No Vibrations/frictions Yes No
Presence of installation mistakes Yes No Noise Yes No
Sales selection data available Yes No
Electrical system
L1 L2 L3 230 V AC
Main voltage 400 V AC V V V Control voltage V
Operation check
Evaporating °t target °C
Installation capacity %
OnOff/Inv Freq. L1 (A) L2 (A) L3 (A) DC °C(*) DC SH(*) Abnormal noise Crankcase heater
Compressor 1 °C K No Yes OK Not OK
Compressor 2 °C K No Yes OK Not OK
(*) DC °t=discharge temperature / DC SH=discharge super heat
Outdoor unit
Inlet temperature °C Fan state OK Not OK
Outlet temperature °C
Approach temperature K
Electrical checks
Electrical connections OK Not OK Electrical insulation Winding resistance
Contactor contacts OK Not OK Compressor 1 OK Not OK OK Not OK
Compressor 2 OK Not OK OK Not OK
Regulation checks
Low pressure switch OK Not OK High pressure switch OK Not OK