SKYDECK Panel Slab Formwork
Contents
Overview Tables
Overview 1 With Drophead SFK 28
With Prophead SSK 29
Introduction Panel system, striking guide values 30
Standard configuration 2 Infill areas 31
Intended use 2 Slab Props PEP 20 32
Safety instructions 3 Slab Props PEP 30 33
Additional PERI product information 3 Slab Props MULTIPROP 34
A2 System components 5
A3 Shuttering 6
A4 Infills
Longitudinal infills 10
Transverse infills 11
Edge Beam SRT, Triangular Frame SDR 12
Combihead SCK 13
A5 Shuttering of columns
1 Recessed panels 16
2 Recessed panels 17
3 Recessed panels 18
Recessed main beams 19
A6 Guardrails
On open building edges 20
On casting segments 21
A7 Striking 22
A9 System dimensions 25
Key
Important safety
Instructions Hints Visual Check Site Tips
Overview
1 3
1 Drophead SFK
2 Main Beam SLT 225 4
3 Panel SDP
4 Cover Strip SAL
Introduction
Standard configuration
General full concrete strength has been System dimensions
The structures presented in these as- reached. The on-site material require- With Drophead SFK, Main Beam SLT 225
sembly instructions are shown in the ments are therefore clearly reduced. 230 x 150 cm, slab thickness max. 40 cm
form of examples with only one compo- (presented in the following)
nent size. They are valid accordingly for Main components 230 x 75 cm, slab thickness max. 80 cm
all component sizes contained in the Drophead SFK 115 x 75 cm, slab thickness max. 95 cm
standard configuration. Prophead SSK (with centre support)
Combihead SCK
Features With Drophead SFK, Main Beam SLT 150
PERI SKYDECK is a panel slab form- Panel SDP in the following sizes: 155 x 150 cm, slab thickness max. 48 cm
work system used for constructing slab 150 x 75, 150 x 50, 150 x 37.5, 75 x 75, 155 x 75 cm, slab thickness max. 95 cm
thicknesses up to 95 cm. Depending on 75 x 50, 75 x 37.5 cm
the slab thickness and concrete With Prophead SSK, Main Beam SLT 225
strength, the SKYDECK drophead al- Main Beam SLT in the following 225 x 150 cm, slab thickness max. 40 cm
lows striking to take place after only 1 lengths: 225 x 75 cm, slab thickness max. 80 cm
day (see table containing minimum con- 225, 150, 375 cm 112.5 x 75 cm, slab thickness max. 95 cm
crete strength and guide values). with centre support)
The panels and main beams are made Cover Strip in the following lengths:
of aluminium which means they are 150, 75, 50, 37.5 cm With Prophead SSK, Main Beam SLT 150
very light. 150 x 150 cm, slab thickness max. 51 cm
Accessories for infill areas, shuttering Technical Data 150 x 75 cm, slab thickness max. 95 cm
around columns and the slab edges are Permissible slab thicknesses and availa-
also available. ble prop loads: see PERI Tables.
Due to early striking, the panels and
main beams can be used for the new
concreting cycle.
Only the props with dropheads and the
cover strips remain in position until the
Intended use
1. PERI products are exclusively techni- 4. The components are to be inspected In particular, the following apply if noth-
cal working materials which are intend- before each use to ensure that they are ing else is specified:
ed for commercial use by technically in perfect condition and function cor- – timber components: Strength Class
competent users only. rectly. C24 for Solid Wood EN 338.
– scaffold tubes: galvanised steel tub-
2. These assembly instructions serve as 5. Changes to PERI components are ing with minimum dimensions Ø 48.3
the basis for the project-related risk as- not permitted and represent a misappli- x 3.2 mm according to EN 12811-
sessment and the instructions for the cation with associated safety risks. 1:2003 4.2.1.2.
provision and use of the system by the – scaffold tube couplings according to
contractor (user). However, they do not 6. Safety instructions and permissible EN 74.
replace these. loads must be observed.
8. Deviations from the standard config-
3. Only PERI original components may 7. Components provided by the contrac- uration may only be carried out after a
be used. The use of other products and tor must conform with the characteris- separate risk assessment has been
spare parts represents a misapplication tics required in these assembly instruc- done by the contractor (user). On this
with associated safety risks. tions as well as all valid construction basis, appropriate measures for the
guidelines and standards. working safety and stability are to be
implemented.
Introduction
Safety instructions
General Storage and transportation System-specific
1. Deviations from the standard configu- 1. Do not drop the components. 1. Retract components only when the
ration and/or intended use present a concrete has sufficiently hardened and
potential safety risk. 2. Store and transport components so the person in charge has given the go-
that no unintentional change in their po- ahead for striking to take place.
2. All country-specific laws, standards sition is possible. Detach lifting gear 2. Anchoring is to take place only if the
and other safety regulations are to be from the lowered units only if these are anchorage has sufficient concrete
taken into account when are products in a stable position and no unintentional strength.
are used. change is possible. 3. During striking, do not tear off the
formwork elements with the crane.
3. During unfavourable weather condi- 3. When moving, components are to be 4. The existing prop loads (see tables)
tions, suitable precautions and meas- picked up and set down so that any un- must be safely transferred by means of
ures are to be implemented in order to intentional toppling over, falling apart, sufficiently load-bearing slab props or
guarantee working safety and stability. slipping or rolling are avoided. tower systems.
5. The SKYDECK platforms are classi-
4. The contractor (user) must ensure 4. Use only suitable load-carrying equip- fied in Load Class 2 (permissible load
the stability throughout all phases of ment to move the components as well 150 kg/m²). They are available as work
construction. He has to ensure and veri- as the designated load-bearing points. and safety scaffold.
fy that all loads which occur are safely 6. When storing heavy items on the
transferred. 5. During the lifting and moving proce- formwork, the load-bearing capacity
dure, ensure all loose parts are re- must be taken into consideration.
5. The contractor (user) has to provide moved or secured. 7. Cantilevers may only be accessed af-
safe working areas for site personnel ter bracing has been mounted.
which are to be reached via safe access 6. During the moving procedure, always 8. The horizontal fixed position of the
means. Areas of risk must be cordoned use a guide rope. slab formwork must be guaranteed.
off and clearly marked. Hatches and This is provided through circumferential
openings on accessible working areas 7. Move components only on clean, flat walls and pre-concreted beams. Other-
must be kept closed during working op- and sufficiently load-bearing surfaces. wise the transfer of the horizontal loads
erations. must be guaranteed by means of other
measures supplied by the contractor, e.
6. For better comprehensibility, detailed g. bracing.
representations are partly incomplete. Load assumptions for horizontal loads
The safety installations which have pos- in accordance with DIN EN 12812.
sibly not been shown in these detailed 9. For use within Falsework Group III, a
descriptions must nevertheless be site record, according to A 10, must be
available. made.
Transportation
PERI pallets and stacking devices are
suitable for lifting with a crane or forklift.
They can also be moved with the PERI
pallet lifting trolley.
All pallets and stacking devices can be
lifted using both the longitudinal and
front sides.
Stacking:
2 loaded pallets, one on top of the other.
Fig. 3 Fig. 2
A2 System components
Slab Props
Dropheads, propheads or combiheads
fit on props with a hole diameter ø 38 –
40 mm.
With hole diameters > 40 mm, the
heads must be bolted diagonally using 1.1
2 bolts ISO 4016 M 12 x 40-4.6 Mu,
galv., Item no. 035440.
1, 6, 7
For prop loads over 33.3 kN, bolting on
the drophead is not required with the Fig. 4
use of MULTIPROP slab props.
Fig. 5
x = 33
x = 41
x = 41
(Fig. 4)
3. Secure with hammer blow = shutter-
ing position.
4. Insert drophead (1), prophead (6) or
combihead (7) into the prop. The self-
locking coupling is secured automatically.
(Fig. 5)
The prop is ready for use.
x = 41
A3 Shuttering
Start field
2.1
1. Position prop with prophead (6) in
one corner of the room (spacing: see
Fig. 12). 2
6
2. Secure with tripod.
3. Position prop with drophead (1). 1.2
Spacing 2.275 m.
4. Insert Main Beam SLT 225 (2) into Fig. 9a
the beam support of the prophead and
drophead. (Fig. 9a, 9b, 9c)
5. Secure with tripod.
6. Position second pair of props at a
distance of 1.50 m from the wall.
7. Insert Main Beam SLT 225 (2) in the
beam support. 1.2
(Fig. 10)
Fig. 9 Fig. 9b Fig. 9c
12,5 cm
nection (2.1) enclose the head of the
beam support (1.2).
1,50 m
1,375 m
Insert panels
1. Spray the edge of the panel with re-
lease agent.
2. Insert panel (3). In so doing, the rack
of the main beam fixes the panel in po-
sition. (Fig. 11) 25 cm 2,025 m
(Fig. 12)
A3 Shuttering
Assembly
1. Push tie rod with Wingnut Pivot Plate
through the available tie hole.
2. Place Main Beam SLT into the Wall Fig. 15
Holder SWH or push Wall Holder in
6 1
SWH into the edge of the panel.
3. Tighten Wall Holder SWH with Wing-
nut Pivot Plate on the wall. 2
4. Remove tripod.
(Fig. 14)
Transverse field
1. Position prop with prophead (6).
Spacing 1.50 m.
2. Secure with tripod.
3. Position prop with drophead (1).
Spacing 2.275 m.
4. Insert Main Beam SLT 225 (2) into
the beam support of the prophead and
drophead. (Fig. 15)
5. Secure with tripod.
6. Insert panel (3).
(Fig. 16) Fig. 16 Fig. 17
3
The transverse field is complete.
(Fig. 17)
8
Working in a transverse direction is rec-
ommended.
Use tripods again in the next field.
A3 Shuttering
Longitudinal field
Fig. 19
Fig. 20
A3 Shuttering
Standard field
Due to the recurring assembly se- 3
quence, always continue in the same
way.
50 mm
4
A4 Infills
1 6/7
9 9
10 10
15
15
Fig. 28 Fig. 29
A4 Infills
≤ 1,50 m
Transverse infills
75 cm ≤ 75 cm
2 3 3
0 – 12 cm
<6 12 – 24 cm 24 – 75 cm
12 11 9
20 20
1 SPKK per SLT 1 SPKK per SLT
15
A4 Infills
9.1
Secure filler plates with nails!
9
Installation
Install in a vertical position or turned by b d
180°.
The locking pin (9.1) secures the Edge
Beam SRT (9)
a to the Main Beam SLT in a longitudi-
7 9
nal direction.
b to the Prophead SSK in a transverse
direction. Fig. 34
c in the End Support SSL (10) in a longi-
tudinal direction. c
d to the Combihead SCK (7) in a longi- 9
tudinal and transverse direction.
(Fig. 34) 10
13
Fig. 36
A4 Infills
Combihead SCK
Use of longitudinal and transverse infills 2.1
up to 25 cm.
The cantilever of the head plate is in
longitudinal infills ≤ 19 cm, in trans- 7.1
verse infills ≤ 12.5 cm.
The non-movable and non-twisting
Combihead (7) is a secure support for: 7
– Main Beam SLT 225 (2), 2/2.5
7.1
– SLT 150 (2.5) (Fig. 37) Fig. 37
– Panel SDP (3) (Fig. 38)
– Edge Beam SRT (9) and Filler Timber
SPH (11) or timber provided by the
contractor with
b = 3.8 - 8 cm and h = 9.8 cm
(Fig. 39) 3
– End Support SSL (10) (Fig. 40)
9/11
Exceptions
1. If the infill ≤ the cantilever, then turn
the head plate by 90°.
2. If used with the end support, then
turn the head plate by 180°.
3. If the cantilever goes under the cover
strip, then turn the head plate by 90°.
Fig. 40
Installation
The cantilever is pointing towards the
wall. (Fig. 41)
Fig. 41
A4 Infills
0 – 5 cm 5,1 – 12,4 cm
Fig. 44 Fig. 45
**
Fig. 46
Tip for Fig. 44
Mount End Support before assembling
the beam and then pivot upwards to-
gether with the beam. with Drophead 5 100 – 149,9 cm
7/6/1 7, 9
10
15
Fig. 47
A4 Infills
0 – 5 cm 5,1 – 12,4 cm
12
Fig. 48 Fig. 49
Fig. 50 Fig. 51
75 – 99,9 cm
100 – 149,9 cm
**
Fig. 52 Fig. 53
Width of influence*
1 recessed panel
Maximum column dimensions
x = 55 cm, y = 138 cm.
y
x
Fig. 54 Fig. 55
Alternative:
Place filler timber or timber supplied by
the contractor horizontally, d = 49 mm
(11*).
y
x
Turn Edge Beam SRT 150-2 by 180°
(9a*). (Fig. 55)
For formlining with 27 mm: d = 47 mm.
11*
9a*
2 recessed panels
Maximum column dimensions
x = 65 cm, y = 138 cm. 9b*
y
x
Fig. 56
x
filler plates are provided with additional
support.
Fig. 57
3 recessed panels
Maximum column dimensions
x = 138 cm, y = 142 cm.
y
x
Edge Beam SRT-2 150 (9a) or
Filler Timber SPH (11a).
(Fig. 58)
9b 9a/11a
Fig. 58
**
9a
Fig. 60
A6 Guardrails
16c
16a
20
16a
20
16c 16b
Fig. 61
A6 Guardrails
On a casting segment
With SKYDECK Guardrail Holder SGH 18
and Guardrail post SGP
Assembly
1. Continuous mounting of guardrail
holders (17) between the panels (spac-
ing max. 1.55 m).
2. Mount on main beam after last panel.
3. Counter position the last outside
guardrail holder (17.1). 17
(Fig. 62a)
4. Insert guardrail posts (18).
5. Insert guardrail boards and secure by
nailing. (Fig. 62)
Fig. 62
For example: casting segment/stop
end.
For ensuring the tightness of the panel
joints, the panels on the last main
beam can be secured with Panel
Wedge Clips SPKK (20).
17 17.1 17
Fig. 62a
20 20 20
A7 Striking
Lowering
– Lower droipheads over large area.
– Release wedge by means of hammer
whilst paying attention to direction of
wedge.
Edge infills
Striking takes place firstly on the trans-
verse infills and then the longitudinal in-
fills.
– Remove props and store in pallets.
– Dismantle system supplements such
as filler timbers, edge beams, end
supports and combiheads, and store
in pallets.
– Remove filler plates.
(Fig. 64)
Fig. 64
A7 Striking
Panels
Always begin in the corner where both
infills meet.
Main beam
– take down Main Beam SLT and store
in pallet.
(Fig. 66)
Remaining areas
– Remove props on walls and store in
pallets.
– Remove filler areas around in-situ col-
umns.
Cleaning
Clean SKYDECK components before
the nerxt use and spray once again
with PERI Bio Clean.
See A8.
1 4
Fig. 67
Maintenance tips
1. Concrete vibrator rubber end cap re-
duces the risk of damage to the form-
lining.
2. Spacers used for the reinforcement
with large contact surfaces prevent im-
pressions forming on the formlining.
3. When placing heavy itemson the
formlining, use support timbers in order
to prevent any impressions on and
damage to the formlining surface.
4. Spray the components with PERI Bio
Clean before every use and clean the
rear of the formwork with water imme- Fig. 68
diately after concreting.
(Fig. 70)
5. Spray moving parts, if required, with
PERI Bio Clean.
6. For damage-free transportation, suit-
able PERI pallets and stacking devices
are available.
(Fig. 68)
Fig. 70
A9 System dimensions
137.5 steel 028380 – Inset beam at wall beginning with 150 cm panel
span.
201.5 alu 028460 – Inset prop at wall beginning under SLT 225 with
prophead or combihead.
MRK 150
MRK 225
225 cm
MRK 201,5
MRK 201,5
MRK 201,5
MRK 201,5
MRK 201,5
MRK 201,5
201,5 cm
201,5 cm
375 cm
MRK 150
MRK MRK MRK 137,5 MRK 150
62,5 75
MRK 225
MRK 225
MRK 230
MRK 230
225 cm
230 cm
Check whether above assumptions and/or specifications apply on the construction site
Check to be carried out on the construction site
Load
*Load according to DIN 4421: When calculating the prop load, the
Dead load g = 0.20 kN/m2 actual extension length may be used.
The exact extension length of the prop
Concrete load b = 26 kN/m3 x d (m) when using the SKYDECK Drophead is:
actual height minus 0.41 m.
Live load p = 0.20 x b With a prop load of over 33.3 kN, bolt-
1.5 ≤ p ≤ 5.0 kN/m2 ing on the Drophead (2 bolts M 12x40
Total load q = g + b + 0.9 x p mm Mu DIN 601) can only be omitted
when using MULTIPROP props.
28
SKYDECK Panel Slab Formwork
Load
*Load according to DIN 4421: When calculating the prop load, the
Dead load g = 0.20 kN/m2 actual extension length may be used.
The exact extension length of the prop
Concrete load b = 26 kN/m3 x d (m) when using the SKYDECK Prophead is:
actual height minus 0.33 m.
Live load p = 0.20 x b
1.5 ≤ p ≤ 5.0 kN/m2
Total load q = g + b + 0.9 x p
29
SKYDECK Panel Slab Formwork
Panel System
150
0,40 12,47 14,0 6 Live load p = 0,20 x b
1,5 ≤ p ≤ 5,0 kN/m2
0,45 14,01 15,8 6
Total load q = g + b + 0,9 x p
0,48 14,93 16,8 6
0,50 15,54 17,5 6
** Tolerances to DIN 18202.
0,51 15,85 17,8 6
Assuming perfect levelling.
30
SKYDECK Panel Slab Formwork
Case 1 Case 2 EB
B
B max. 100 mm
Panel 150 or 75
Combihead
Filler Timber SPH SCK
or Edge Beam Filler Timber
SRT-2 SPH or Edge
Beam SRT-2
31
SKYDECK Panel Slab Formwork
PEP 20
L = 1.51 – 2.60 m L = 1.71 – 3.00 m L = 1.96 – 3.50 m L = 2.21 – 4.00 m L = 2.71 – 5.00
Extension
Outer Tube Inner Tube Outer Tube Inner Tube Outer Tube Inner Tube Outer Tube Inner Tube Outer Tube Inner Tube
Bottom Bottom Bottom Bottom Bottom Bottom Bottom Bottom Bottom Bottom
1.60 35.0 35.0
1.70 35.0 35.0
1.80 35.0 35.0 35.0 35.0
1.90 35.0 35.0 35.0 35.0
2.00 33.5 35.0 35.0 35.0 35.0 35.0
2.10 31.9 35.0 32.2 35.0 35.0 35.0
2.20 30.9 35.0 30.5 35.0 35.0 35.0
2.30 29.8 35.0 29.0 35.0 35.0 35.0 35.0 35.0
2.40 28.6 35.0 27.8 35.0 35.0 35.0 35.0 35.0
2.50 27.1 32.9 26.9 35.0 35.0 35.0 35.0 35.0
2.60 24.8 29.4 26.1 35.0 33.8 35.0 35.0 35.0
2.70 24.9 31.7 32.4 35.0 35.0 35.0
2.80 23.3 28.5 31.2 35.0 35.0 35.0 35.0 35.0
2.90 21.6 25.7 30.2 35.0 35.0 35.0 35.0 35.0
3.00 20.0 23.2 29.2 35.0 35.0 35.0 35.0 35.0
3.10 27.5 34.6 33.6 35.0 35.0 35.0
3.20 25.7 31.5 32.5 35.0 35.0 35.0
3.30 24.1 28.8 31.2 35.0 35.0 35.0
3.40 22.4 26.4 29.6 35.0 35.0 35.0
3.50 20.7 24.1 27.8 33.9 35.0 35.0
3.60 26.1 31.2 35.0 35.0
3.70 24.5 28.9 35.0 35.0
3.80 23.0 26.8 35.0 35.0
3.90 21.6 24.8 35.0 35.0
4.00 20.1 22.8 34.2 35.0
4.10 32.3 35.0
4.20 30.6 35.0
4.30 28.9 34.0
4.40 27.4 31.9
4.50 26.0 29.9
4.60 24.6 28.1
4.70 23.4 26.4
4.80 22.1 24.9
4.90 20.9 23.4
5.00 20.0 21.8
All PEP 20 Props conform with DIN EN All PEP 20 Props clamped in the Table *For the N and G Props the application
1065 class D with a permissible load for Swivel Head or UNIPORTAL Head fitted Inner Tube at Bottom is only possible
the entire extension range of minimum to PERI tableforms have a permissible with PERI Slab Tables or SKYDECK
20 kN. load of minimum 30 kN over the entire (bolted head).
extension range.
32
SKYDECK Panel Slab Formwork
PEP 30
PEP 30 – 150 PEP 30 – 250 PEP 30 – 300 PEP 30 – 350 PEP 30 – 400
PEP 30 G 300* PEP 30 G 350*
Length [m]
L = 0.96 – 1.50 m L = 1.46 – 2.50 m L = 1.71 – 3.00 m L = 1.96 – 3.50 m L = 2.21 – 4.00 m
Extension
Outer Tube Inner Tube Outer Tube Inner Tube Outer Tube Inner Tube Outer Tube Inner Tube Outer Tube Inner Tube
Bottom Bottom Bottom Bottom Bottom Bottom Bottom Bottom Bottom Bottom
1.00 35.0 35.0
1.10 35.0 35.0
1.20 35.0 35.0
1.30 34.9 35.0
1.40 34.2 35.0
1.50 33.5 35.0 40.0 40.0
1.60 40.0 40.0
1.70 40.0 40.0
1.80 40.0 40.0 40.0 40.0
1.90 38.5 40.0 40.0 40.0
2.00 36.8 40.0 40.0 40.0 40.0 40.0
2.10 35.3 40.0 40.0 40.0 40.0 40.0
2.20 34.4 40.0 40.0 40.0 40.0 40.0
2.30 33.3 40.0 40.0 40.0 40.0 40.0 40.0 40.0
2.40 32.1 37.6 40.0 40.0 40.0 40.0 40.0 40.0
2.50 30.1 34.8 39.9 40.0 40.0 40.0 40.0 40.0
2.60 38.8 40.0 40.0 40.0 40.0 40.0
2.70 37.4 40.0 40.0 40.0 40.0 40.0
2.80 35.8 40.0 40.0 40.0 40.0 40.0
2.90 33.2 37.2 40.0 40.0 40.0 40.0
3.00 30.4 33.8 40.0 40.0 40.0 40.0
3.10 40.0 40.0 40.0 40.0
3.20 37.6 40.0 40.0 40.0
3.30 35.0 37.6 40.0 40.0
3.40 32.3 34.6 40.0 40.0
3.50 30.0 31.6 40.0 40.0
3.60 40.0 40.0
3.70 40.0 40.0
3.80 37.4 40.0
3.90 34.8 37.0
4.00 32.2 33.9
All PEP 30 Props conform with DIN EN All PEP 30 Props clamped in the Table *For the N and G Props the application
1065 class E with a permissible load for Swivel Head or UNIPORTAL Head fitted Inner Tube at Bottom is only possible
the entire extension range of minimum to PERI tableforms have a permissible with PERI Slab Tables or SKYDECK
30 kN. load of minimum 40 kN (PEP 30-150 = (bolted head).
35 kN) over the entire extension range.
33
SKYDECK Panel Slab Formwork
34
35
SKYDECK Panel Slab Formwork
Item no. Weight kg
Panel SDP L B
061000 15,500 Panel SDP 150 x 75 1500 750
061011 11,700 Panel SDP 150 x 50 1500 500
061020 9,780 Panel SDP 150 x 37.5 1500 375
061010 8,560 Panel SDP 75 x 75 750 750
061013 6,350 Panel SDP 75 x 50 750 500
061030 5,250 Panel SDP 75 x 37.5 750 375
Panel with 9 mm formlining.
B
L
120
21
99
061100 15,500 Main Beam SLT 225
For standard fields.
2250
240
2244
13
82 266
3750 240
1042 1042
3744
297 450 750 375 375 750 450 297
13
82 266
36
SKYDECK Panel Slab Formwork
Item no. Weight kg
061110 9,690 Main Beam SLT 150
For filler areas.
1500
190
1494
13
80
78 53
22 / 27
1500 / 750
1488 / 738
49
98 / 93
37
SKYDECK Panel Slab Formwork
Item no. Weight kg
Dropheads SFK
061210 6,180 Drophead SFK
061035 6,050 Drophead SFK/27
With self-locking coupling. Supports main beam as
well as cover strip or formlining. Lowering range 6
cm. For 21 or 27 mm formlining.
40 250
258 / 253
390
549
60
061200 3,860 Prophead SSK
With self-locking coupling. Supports panel, main
beam, edge beam and filler timber.
50
250
260
161
161
305
250
38
SKYDECK Panel Slab Formwork
Item no. Weight kg
Filler Timbers SPH
061049 3,350 Filler Timber SPH 150
061036 5,020 Filler Timber SPH 225
061050 3,080 Filler Timber SPH 150/27
061040 4,620 Filler Timber SPH 225/27
For compensations with 21 or 27 mm formlining.
1500 / 2250
49
98 / 93
Triangular Frames SDR
061021 8,650 Triangular Frame SDR 150 x 75
061022 5,340 Triangular Frame SDR 75 x 75
061015 7,870 Triangular Frame SDR 150 x 75/27
061016 4,900 Triangular Frame SDR 75 x 75/27
For compensations on inclined walls. For compen-
sations with 21 or 27 mm formlining.
1102
202 100
39
SKYDECK Panel Slab Formwork
Item no. Weight kg
061023 2,140 End Support SSL
For transition to compensation. For connecting to
the Drophead SKF.
102
160
165 86
121
50 33
116
116 80
330 86
70
2325 - 3750
40
SKYDECK Panel Slab Formwork
Item no. Weight kg
061310 0,996 Tension Sleeve SAO Technical Data
For bracing cantilevered main beams. Permissible tension load 3.0 kN.
62
125
143 70
1006
1220
1288
1490 1433
2240
2990
41
SKYDECK Panel Slab Formwork
Item no. Weight kg
061250 4,760 Guardrail Holder SGH, Alu
For assembling a guardrail with SKYDECK.
5
300
368
245
1500
1640
300
Accessories
061260 6,120 Guardrail Post SGP
2500
42
SKYDECK Panel Slab Formwork
Item no. Weight kg
028100 1,830 Base Plate RS Complete with
For mounting the RS Push-Pull Props. 1 pc. 018050 Pin Ø 16 x 65/86, galv.
1 pc. 018060 Cotter Pin 4/1, galv.
Ø13
85
Ø21
10
150 90
2110
250
1550
2310
1510 640
1630 760
43
SKYDECK Panel Slab Formwork
Item no. Weight kg
061510 110,000 Pallet Lifting Trolley 1500 mm Technical Data
For moving pallets and crate pallets. Length of forks 1500 mm, support width of forks
520 mm, lifting range 85 - 195 mm, permissible
load 2.0 t.
Safety instructions
Lifting equipment according to BGV D8.
3240
2800
1429
3900 1224
1800 750
44
SKYDECK Panel Slab Formwork
Item no. Weight kg
102031 363,000 Stripping Cart ASW 465, complete Complete with
Mobile working scaffold. Height adjustable in 1 pc. 102033 Steel Traverse 140/220 ASW
30 cm increments. Platform height: max. 4.65 1 pc. 102025 Folding Base Unit 160/190 ASW
m.Packed in: Ring Pallet USP 104, Item no. 6 pcs. 102035 Vertical Frames 70/90 ASW
100678, with 1 x lashing strap, Item no. 100707 2 pcs. 102026 Entry Platforms 190 ASW
and 4 pcs. Scaffold Tube, Item no. 026411. 1 pc. 102030 Toe Board Set 70/190 ASW
4 pcs. 102027 Double Handrails 190 ASW
3 pcs. 102028 Diagonal Braces 210 ASW
2 pcs. 102029 Horizontal Braces 190 ASW
8 pcs. 102037 Wind Securing Clip 60 ASW
12 pcs. 102807 Ballast 10 kg ASW
Technical Data
Load-carrying equipment according to BGR 500.
Permissible load: 100 kg/m².
102033
102034
102035
102025
102027
102026
102028
102029
102037 102807
102030
45
PERI International 42
19
20
22 32
34
18
38
11
52
6
21
01 PERI GmbH 1
5
Rudolf-Diesel-Strasse
89264 Weissenhorn 17 46
info @ peri.com 30
www.peri.com 2
3 16
13
29
28
9
53
24 48
4 41
61
12
33
50
44
36
43
7 23
50 51 10
37
39 40 57 54
49 60 56
47 59
58 35 55
14
15
62 26
27
31
45
25
Additional Systems
Plywood
Formwork Girders
Stopend Systems
Pallets
Transportation Containers
PERI GmbH
Formwork Scaffolding Engineering
P.O. Box 1264
89259 Weissenhorn
Germany
Tel +49 (0)73 09.9 50- 0
Fax +49 (0)73 09.9 51- 0
[email protected]
www.peri.com