Bored Pile
Bored Pile
CONSTRUCTION WORK IV
DQS281
PILING WORK :
CAST INSITU BORED PILE
Bored Piles
Rotary Bored Piles
1) Adjust the piling machine
3) Return from the drilling
on the pile axis and haul 2) Start drilling until the
level to the top of the pile
with the auger to the drilling auger is filled
hole
place.
4) Unload the dirt in the 5) Start erecting rebar 6) Start pouring the concrete
unloading area cage using a crane and finish the pile
WITH CASING
WITHOUT CASING
ENLARGE BASES
CASING
TREMIE PIPE
TAKING OFF LIST (if there is trial pile)
NO DESCRIPTION UNIT
Preambles
1 Provision of piling equipment Item
2 Maintaining of piling equipment Item
MAIN BAR
HELICAL BAR
Length
less concrete cover
add laps {50 (d)}
LAPS
50 (d) add starter bar
HELICAL BAR FORMULA
C_ x ∏ x A + d + 8 (d)
B
A
B C
C : Total length
B : Centre to centre of helical bar
A : Internal diameter
d : Diameter of reinforcement
PREAMBLES
CLAUSE DESCRIPTION