Bored Pile

This document provides specifications for cast in-situ bored pile construction work. It includes details on: 1) The piling process which involves drilling a bore hole, installing rebar cages, and pouring concrete to form the pile. 2) Measurement items for taking off quantities including the number of piles, concrete volume, boring depth, reinforcement, and load testing. 3) A piling schedule showing pile details by location. 4) Formulas for calculating reinforcement quantities. 5) Preambles specifying site conditions and the starting level for piling work.

Uploaded by

kepala anjing
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views34 pages

Bored Pile

This document provides specifications for cast in-situ bored pile construction work. It includes details on: 1) The piling process which involves drilling a bore hole, installing rebar cages, and pouring concrete to form the pile. 2) Measurement items for taking off quantities including the number of piles, concrete volume, boring depth, reinforcement, and load testing. 3) A piling schedule showing pile details by location. 4) Formulas for calculating reinforcement quantities. 5) Preambles specifying site conditions and the starting level for piling work.

Uploaded by

kepala anjing
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 34

MEASUREMENTS OF

CONSTRUCTION WORK IV
DQS281

PILING WORK :
CAST INSITU BORED PILE
Bored Piles
Rotary Bored Piles
1) Adjust the piling machine
3) Return from the drilling
on the pile axis and haul 2) Start drilling until the
level to the top of the pile
with the auger to the drilling auger is filled
hole
place.
4) Unload the dirt in the 5) Start erecting rebar 6) Start pouring the concrete
unloading area cage using a crane and finish the pile
WITH CASING

WITHOUT CASING
ENLARGE BASES
CASING
TREMIE PIPE
TAKING OFF LIST (if there is trial pile)
NO DESCRIPTION UNIT
Preambles
1 Provision of piling equipment Item
2 Maintaining of piling equipment Item

Bored Pile (Trial pile)


3 Total no of pile No
4 Total concrete length M
5 Total boring depth M
6 Extra over for boring through rock M
7 Extra over for permanent casing M
8 Extra over for placing concrete by tremie pipe M
9 Cut off head No
10 Preparing concrete pile head No
11 Forming enlarge bases No
12 Main bar reinforcement Kg
13 Helical bar reinforcement Kg
14 Preliminary load test Item
15 Integrity load testing Item
TAKING OFF LIST (if there is trial pile)
NO DESCRIPTION UNIT
CONTINUE
Bored Pile (Working pile)
3 Total no of pile No
4 Total concrete length M
5 Total boring depth M
6 Extra over for boring through rock M
7 Extra over for permanent casing M
8 Extra over for placing concrete by tremie pipe M
9 Cut off head No
10 Preparing concrete pile head No
11 Forming enlarge bases No
12 Main bar reinforcement Kg
13 Helical bar reinforcement Kg
14 Subsequent load test Item
15 Integrity load testing Item
TAKING OFF
NO
LIST (if there is no
DESCRIPTION UNIT
trial pile)
Preambles
1 Provision of piling equipment Item
2 Maintaining of piling equipment Item

Bored Pile (Working pile)


3 Total no of pile No
4 Total concrete length M
5 Total boring depth M
6 Extra over for boring through rock M
7 Extra over for permanent casing M
8 Extra over for placing concrete by tremie pipe M
9 Cut off head No
10 Preparing concrete pile head No
11 Forming enlarge bases No
12 Main bar reinforcement Kg
13 Helical bar reinforcement Kg
14 Preliminary load test Item
15 Subsequent load test Item
16 Integrity load testing Item
PILING SCHEDULE
PILE NO. OF NO. OF TOTAL CONCRET BORING DEPTH EXTRA OVER EXTRA OVER EXTRA CUT OFF PREPARING ENLARGE BASES REMARKS
CAP PILE PILE PER NO. OF E FILING (M) EXCAVATION IN ROCK PERMANENT OVER HEAD HEAD (NO)
REF. CAP PILE PILE (M) (M) CASING TREMIE (NO) (NO)
CAP VERTICAL RAKING VERTICAL RAKING (M) PIPE
(M)
JOB: STEEL ROD REINFORCEMENT IN: PAGE NO:
JOB NO: SECTION/BILL NO: DRAWING NO: FLOOR LEVEL:
SQUARED: TRANSF:
CHECKED: CHECKED:
Calculation/
Location/ Dia No. of Length Sizes of High Tensile / Mild Steel Rods H.T. / M.S. Stirrups / Links Remarks
Ref. (mm) Rods (m)
8 mm 10 mm 12 mm 16 mm 20 mm 22 mm 25 mm 28 mm 32 mm 6 mm 8 mm 10 mm 12 mm

MAIN BAR

HELICAL BAR

Total Length 0 0.00 0 0 0 0 0 0 0 0


Conversion factor (Mass per unit
weight) 0.395 0.616 0.888 1.579 2.466 2.984 3.854 4.834 6.313 0.222 0.395 0.616 0.888
TOTAL WEIGHT IN KG CARRIED TO
SUMMARY - - - - - - - - - - -
MAIN BAR FORMULA
STARTER BAR

Length
less concrete cover
add laps {50 (d)}
LAPS
50 (d) add starter bar
HELICAL BAR FORMULA
C_ x ∏ x A + d + 8 (d)
B
A
B C
C : Total length
B : Centre to centre of helical bar
A : Internal diameter
d : Diameter of reinforcement
PREAMBLES
CLAUSE DESCRIPTION

E.2.1 Ground Water Level


Ground water level was established at 3.00m below existing ground level on
9/12/2016 which shall be designated at the precontract water level.
E.2.1 Trial pit / Bore holes
3 Nos bore holes were sunk in positions shown on the location drawing.
E.1.1c Existing Services
Telephone cables cross over the site of a height of 10.00m on the North Side
of the site as shown on the location drawing.
E.2.2 Work Near Water
The work is to be carried out at a minimum distance of 40.00m from
riverbank, the normal level of which is 1.00m below ground level.
E.3.1 Starting Level
The piling work is expected starts at and measurement have been taken from
existing ground level
PROVISION OF PILING EQUIPMENT (E4.1a)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Works

Description: Unit Qty


Allow for bringing to site and removing from site all
plant required for this type of piling Item
MAINTAINING OF PILING EQUIPMENT (E4.1b)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Works
Description: Unit Qty
Allow for maintaining on site all plant required for
this type of piling Item
BORING PILE HOLE(E5.4c)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Subheading: Works
770 mm Diameter Cast-in-place concrete piles
minimum strength 25N/mm2 (working pile)
Description: Unit Qty
Total numbers of bored piles
No
CONCRETE FILING(E5.4b)
Heading: Element: Slip no.:
Cast In-situ Bored Pile (All Provisional)
Piling
Subheading: Works
770 mm Diameter Cast-in-place Concrete Piles
Minimum Strength 25n/Mm2 (Working Pile)
Description: Unit Qty
Total concrete length
M
TOTAL BORING DEPTH (E5.4c)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Subheading: Works
770 mm Diameter Cast-in-place concrete piles
minimum strength 25N/mm2 (working pile)
Description: Unit Qty
Total bored depth of a maximum 21.00 m deep
M
BORING IN ROCK (E5.6a)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Subheading: Works
770 mm Diameter Cast-in-place concrete piles
minimum strength 25N/mm2 (working pile)
Description: Unit Qty
Extra Over boring through rocks
M
PERMANENT CASING (E5.6b)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Subheading: Works
770 mm Diameter Cast-in-place concrete piles
minimum strength 25N/mm2 (working pile)
Description: Unit Qty
Extra Over 16mm thick mild steel permanent casing
M
PLACING CONCRETE BY TRIMIE PIPE (E5.6c)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Subheading: Works
770 mm Diameter Cast-in-place concrete piles
minimum strength 25N/mm2 (working pile)
Description: Unit Qty
Extra Over for placing concrete by tremie pipe
M
CUT OFF HEAD (E5.9a)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Subheading: Works
770 mm Diameter Cast-in-place concrete piles
minimum strength 25N/mm2 (working pile)
Description: Unit Qty
Cutting off top of pile to required level
No.
PREPARING CONCRETE PILE HEAD (E5.9b)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
SUB HEADING: 770 mm Diameter Cast-in-place concrete Works
piles minimum strength 25N/mm2 (working pile)

Description: Unit Qty


Preparation Bore Pile heads and reinforcement for
capping No.
FORMING ENLARGED BASES (E5.9c)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Subheading: Works
770 mm Diameter Cast-in-place concrete piles
minimum strength 25N/mm2 (working pile)
Description: Unit Qty
Forming enlarge bases with maximum 1200mm
diameter No.
REINFORCEMENT (E6)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Subheading: Works
Provide, fabricating, and placing steel rod
reinforcement caging for bored pile (working pile)
Description: Unit Qty
25 mm diameter high tensile main bar
Kg
REINFORCEMENT (E6)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Subheading: Works
Provide, fabricating, and placing steel rod
reinforcement caging for bored pile (working pile)
Description: Unit Qty
12 mm diameter mild steel bar as helical bar
Kg
PRELIMINARY LOAD TEST (E7)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Works

Description: Unit Qty


Allow for 1 number preliminary load testing on a
single770mm Diameter to a load of 800kN Item
SUBSEQUENT LOAD TEST (E7)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Works

Description: Unit Qty


Allow for 2 numbers subsequent load testing on a
single 770mm Diameter to a load of 1600kN Item
INTEGRITY LOAD TEST (E7)
Heading: Element: Slip no.:
Cast in-situ Bored Pile (All Provisional)
Piling
Works

Description: Unit Qty


Allow for provision integrity testing on 770mm,
990mm, 1330, and 1630mm Diameter bored pile by Item
vibration method including all equipment
END..