0% found this document useful (0 votes)
102 views

Technical Specifications 20feb2020

The document outlines the technical specifications for the proposed construction and improvement of a temporary office at the AAI Building in Brgy. Ibo, Lapu-Lapu City. It details the materials, site preparation work including excavation and concrete pouring, structural steel installation, carpentry, painting, plumbing, electrical, and mechanical works. All work must follow applicable standards and codes and be supervised by licensed professionals.

Uploaded by

paul remodo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views

Technical Specifications 20feb2020

The document outlines the technical specifications for the proposed construction and improvement of a temporary office at the AAI Building in Brgy. Ibo, Lapu-Lapu City. It details the materials, site preparation work including excavation and concrete pouring, structural steel installation, carpentry, painting, plumbing, electrical, and mechanical works. All work must follow applicable standards and codes and be supervised by licensed professionals.

Uploaded by

paul remodo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

PROJECT TITLE : PROPOSED CONSTRUCTION/IMPROVEMENT OF MEZ

TEMPORARY OFFICE AT AAI BUILDING

LOCATION : BRGY. IBO, MEZ 1, LAPU-LAPU CITY

TECHNICAL SPECIFICATIONS

I. MATERIALS SPECIFICATION

A. All structural steel shall conform to ASTM A36 Steel.


B. Painting of new structural surfaces
a. One coat rust converter
b. Two coats of Epoxy Red Oxide Primer
c. Boysen paint shall be used; one galloon shall cover 250 sq.ft.
C. Concrete shall be of class “A” (1:2:4 mix); shall attain a minimum
compressive strength of 3,000 psi in 28 days.
D. Plastering mortar (10mm thk. Minimum) shall be of 01 part cement to 02
parts screened sand work to finish.
E. Reinforcing bars shall be specified in the approved drawings.

II. SITE PREPARATION AND CONCRETE WORKS

A. Site Preparation
Project Engineering will establish the desired elevations and will monitor the
building foundation layout.

B. Excavation
The proposed site shall be excavated according to the outline of the
structures footing as shown on the plans or as established by Project
Engineering; shall be of sufficient sizes to permit the placing and subsequent
removal of side forms where necessary. Excavations shall be protected that
these do not endanger life or property.

C. Concrete Works and Concrete


Concreting involves primarily the pouring of the reinforced concrete footings
and pedestal. Portland cement shall be used. Concrete proportions shall be
of class “A” (1:2:4 mix). Concrete shall attain a minimum compressive
strength of 3,000 psi in 28 days.
Washed sand shall be used; shall have the approval of Project Engineering as
to quality.
Gravel shall be of acceptable quality, ¾”diameter minimum.
PEZA-MEZ reserves the right to reject materials not suited for the
construction Disapproved materials shall immediately be hauled away from
the construction site at the expense of the contractor.
Structural footings shall be reinforced and constructed as per approved
drawings and specifications.

D. REINFORCING BARS
Deformed reinforcing bars shall be used for footings and pedestals. Sizes
shall be as designed as shown on the approved plans. Reinforcing bars shall
be kept clean and free from rust, straight and free from distortion, place and
held in position as indicated.

E. FORMS
Forms shall be approved type; shall be straight and free from warp and
bends. Forms shall be constructed of sufficient strength to withstand pouring
forces and vibrations. Wooden and/or steel forms shall be used and shall be
set exactly to the required alignment and grade as shown on the approved
plans or as determined by Engineer at the construction site.
Forms shall be removed in such a manner as to ensure the complete safety of
the structure.

F. CURING AND PROTECTION OF CONCRETE


As soon as the concrete has sufficiently set, to prevent the marring of the
surface, the pavement shall be cured by either:
a. Covering with wet burlap or canvass, which shall be kept wet for a period
of five (5) days with clean water.
b. Covering with a layer of sand, which shall be kept wet for a period of 5
days.

III. STRUCTURAL STEEL AND METAL WORKS

A. STRUCTURAL STEEL
Description
The work under this section shall consist of furnishing all labor, tools,
materials, construction plant, and other items necessary to provide structural
steel as covered herein and set forth on the drawing.

Compliance with Quality Requirements


The contractor is required to furnish a mill certificate from the steel
manufacturer certifying that these materials meet the requirement specified
herein. The contractor is also required to submit sample of materials for
approval before fabrication as follows:
a. For all steel pipes 30 centimeters long
b. Steel Plates 50mm x 50mm square
c. Deformed bars 1.00 meter long
d. Channel Section 30 centimeters long
e. Welding electrode 01-pc per box

Materials
Materials shall conform to the respective requirements specified herein as
shown:

a. Structural steel shall conform to ASTM A-36


b. High strength bolts, including nuts and washers shall be ASTM 325
c. Welding Electrodes and rods shall conform to AWS A5.1

Storage and Protection


Materials shall be delivered, stored, handled and installed in manner to
protect these from damage during the entire construction period.

Fabrications
a. Fabrication and assembly shall be done in the shop to the greatest extent
possible. All materials shall be cleaned and straight. If straightening or
flattening is necessary, it shall be done by a process and in a manner that
will not damage the materials.
b. Shearing, flame cutting shall be done carefully and accurately. Flame-cut
edges of members shall have all nicks removed. Holes shall not be
enlarged by flame-cut. Gas cutting shall be done by the use of a
mechanically guided torch.
c. Welding on structural steel works shall be done in accordance with the
standards of American Welding Society AWD Code D.1. Welding works
shall only be performed by certified welders.
d. Bolted connections: Holes for bolts shall be 1.5mm larger than the
nominal diameter of the bolt. Holes shall be cleaned cut without torn or
rugged edged. Bolt holes shall be at right angles to the member. Bolted
parts shall fit solidly together when assembled and shall not be separated
by gaskets or any other interposed compressible materials. Contact
surfaces within frictions type joints shall be from oil or paint.
e. Match markings. Members and component parts of structure shall be
matched marked to ensure accurate assembly and erection.
f. All structural steel work shall be painted, 01 coat rust converter and 02
coats epoxy primer).
g. All welded portions shall be inspected and approved by the Project
Engineer.
Erection
a. Erection shall be in accordance with the applicable specifications and
standards of the AISC Steel Manual.
b. Anchorage: Anchor bolts and other connections between the structural
steel and foundations shall be provided and shall be properly located and
built into the connecting work.
c. Structural Steel Paintings: All exposed surface of steel works shall be
painted. Surfaces where the coat has been damaged shall be retouched
using the same system as the original painting.

IV. CARPENTRY AND JOINERY WORKS

Unless otherwise specified, the Contractor shall furnish all materials,


tools, equipment and labor required for the completion and satisfactory
performance of work in strict compliance with this specifications and
plans/drawings.

Lumber shall be of approved quality of the respective kinds required for


the various parts of the work, well-seasoned, thoroughly dry and free
from large, loose or unsound knots, cracks and other imperfections
thereby impairing its strength, durability and appearance

Framing lumber shall be of rough dimensions. All exposed woodwork


shall be smoothly dressed and well sandpapered. All joints and
connections shall be glued and nailed.

Rough lumber for framing and siding boards shall air dried or sun dried.
Dressed lumber for exterior and interior finishing, for doors and
windows, cabinets and flooring boards shall be kiln dried.

Plywood shall conform to the requirements of the Philippine Trade


Standards 631-02.

V. PAINTING

All types of paint material, varnish and other related product shall be
subject to random tests as to material composition by the Owner.

Paint to be used shall be as specified by the Owner.

Tinting colors shall be first grade quality. Use same brand of paint and
tinting color to effect good paint body.
Prior to application of paint, for new interior and exterior walls, apply
surface to be painted with concrete neutralizer diluted with water.
Glazing putty shall be alkyd type product for filling minor surface
unevenness.

VI. PLUMBING WORKS

This work shall consist of furnishing all labor, tools, equipment and
materials necessary to complete installation, testing and operation of the
plumbing system in accordance with the specifications and all applicable
drawings.

VII. ELECTRICAL WORKS:

All electrical installations indicated on the Plan shall conform with the
Latest edition of the Phil. Electrical Code, rules and regulations of
Local and
National Authority concerned in the enforcement of the Electrical
Laws,
Municipal Ordinances and Government a gencies having jurisdiction
over the Project.

All electrical materials and equipment be used in this project shall be new
And approved type for both location and purpose they intended.

All electrical installations shall be done under the direct supervision of a


Duly licensed Electrical Engineer or Master Electrician.

VIII. MECHANICAL WORKS:

All mlectrical installations indicated on the Plan shall conform with the
Latest edition of the Phil. Mechanical Code, rules and regulations of
Local and National Authority concerned in the enforcement of
the Laws, Municipal Ordinances and Government agencies having
jurisdiction over the Project.

All mechanical installations shall be done under the direct supervision of


a Duly licensed Mechanical Engineer.
IX. CLEARING OF THE CONSTRUCTION SITE:

Excavation void and construction gaps around the structure shall be filled
and compacted. The area shall be left cleared and cleaned every end of the
day and after the completion of the contractual work. All construction debris
and waste materials and any materials not suited for the construction shall
be hauled to the designated area. Dumping of waste and debris inside the
zone is strictly prohibited.

X. OTHER REQUIREMENTS:

The contractor will be required to field out one full time Civil Engineer to
supervise this particular project and to look after the safety of the workplace
and the workers. The contractor will be required to submit together with
their Bid Proposal a PERT CPM of the Project and/or Gantt chart.