ITP For Fire Protection System
ITP For Fire Protection System
Co
ontract No: CP
PC02 R
Rev: 0
Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:
S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
A M
MATERIAL RE
ECEIVING
• Materials as per Approved
A
Carbon Steel pipess & fittings (Grooveed, &
C Project Sp
pecification, Material Submittaal. Not
Witne Witn
T
Threaded Ends), Reducers,
R Pipe Unio
ons, Approved d Material • Check material cerrtificates. Hold Applicc
1. Submittall, QCS 2010, • Material free of daamage & (H) ss
able
ess Approv
ved or Approved as noted
n
C
Couplings, Pipe Flaanges, Pipe Sleevees, Pipe (W) (W) RFI
S
Supports, etc. NFPA & QCDD label details and quantities
q as (N/A) (
(AJJV-RFI-00….)
per P.O. AJJV- MRIR-001
F
Form No AJJV-IITP-F-002 Rev. 01
Page 1 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001
Co
ontract No: CP
PC02 R
Rev: 0
Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:
S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
• Materials as per Approved
A
Project Sp
pecification, Material Submittaal. Hold Not ved or Approved as noted
Approv n
Witne Witn
Approved d Material • Check material cerrtificates. Applicc RFI
5. F Department Connections
Fire (H) ss ess
Submittall, QCS 2010, • Material free of daamage & (W)
able
(W)
(
(AJJV-RFI-00….)
NFPA & QCDD. label details and quantities
q as (N/A) A
AJJV- MRIR-001
per P.O.
• Materials as per Approved
A
Fire Protection Acccessories/ Instrumeents i.e.
F Project Sp
pecification, Material Submittaal. Not ved or Approved as noted
Approv n
Witne Witn
S
Sprinklers, Drain valve/
v Test point, Pressure Approved d Material • Check material cerrtificates. Hold Applicc RFI
6. ss ess
G
Gages, Water floww switches, Supervissory, Submittall, QCS 2010, • Material free of daamage, (H)
(W)
able
(W)
(
(AJJV-RFI-00….)
e
etc. NFPA & QCDD. Labels details and quantities (N/A) A
AJJV- MRIR-001
as per P.O.
• Materials as per Approved
A
Project Sp
pecification, Material Submittaal. Not Approv
ved or Approved as noted
n
Witne Witn
Approved d Material • Check material cerrtificates. Hold Applicc
7. F
FM-200 System ss ess RFI
Submittall, QCS 2010, • Material free of daamage, (H)
(W)
able
(W) (
(AJJV-RFI-00….)
NFPA & QCDD. Labels details and quantities (N/A) A
AJJV- MRIR-001
as per P.O.
F
Form No AJJV-IITP-F-002 Rev. 01
Page 2 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001
Co
ontract No: CP
PC02 R
Rev: 0
Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:
S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
B I
INSTALLATIO
ON
F
Form No AJJV-IITP-F-002 Rev. 01
Page 3 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001
Co
ontract No: CP
PC02 R
Rev: 0
Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:
S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
Project Sp
pecification,
1. Check installation
n as per
QCS 2010 0, NFPA, Not ved or Approved as noted
Approv n
approved drawing g. Hold Witne
QCDD Sttandard, Applicc Patro RFI
2. P Sleeves
Pipe Approved d Method
2. Check correct matterial & (H) ss
able l (P) (
(AJJV-RFI-00….)
sizes as per approv
ved (W)
Statementt and (N/A) AJJJV-MECH-FIR-002
drawing.
Approved d Drawing.
Project Sp
pecification, 1. Check painting ap
pplication
Approv
ved or Approved as noted
n
QCS 2010 0, NFPA, as per approved prrocedure Not
Hold Witne RFI
QCDD Sttandard, and manufacturer Applicc Patro
3. P Painting
Pipe Approved d Method instruction. (H) ss
able l (P)
(
(AJJV-RFI-00….)
(W) AJJJV-MECH-FIR-002
Statementt and 2. Check paint dry th
hickness as (N/A)
Approved d Drawing. per approved proccedure.
F
Form No AJJV-IITP-F-002 Rev. 01
Page 4 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001
Co
ontract No: CP
PC02 R
Rev: 0
Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:
S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
1. Check locations ass specified
in the approved drrawing
Project Sp
pecification, 2. Check type of valvve &
Patro
QCS 2010 0, NFPA, instruments installled FM Approv
ved or Approved as noted
n
Hold Witne Not l/
QCDD Sttandard, approved and or UL
U listed as RFI
4. V
Valves Approved d Method per approved drawwing. (H) ss Applicc Revi
(
(AJJV-RFI-00….)
(W) able ew
Statementt, Approved 3. Check each installlation as AJJJV-MECH-FIR-002
(N/A) (P/R)
Drawing per approved proccedure &
manufacturer instrruction.
Project Sp
pecification,
1. Check type, range and Patro
QCS 2010 0, NFPA, Not ved or Approved as noted
Approv n
proved
location as per app Hold Witne l/
QCDD Sttandard, Applicc RFI
5. P
Pressure Gages Approved d Method
drawing. (H) ss
able
Revi
(
(AJJV-RFI-00….)
2. Check each installlation as (W) ew
Statementt, Approved (N/A) AJJJV-MECH-FIR-002
per manufacturer instruction.
i (P/R)
Drawing
Project Sp
pecification, 1. Check each installlation/
Patro
QCS 2010 0, NFPA, location, type and Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, temperature ratingg correct as Applicc RFI
6. S
Sprinklers Approved d Method per approved draw wing. (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved 2. Check all installation as per (N/A) AJJJV-MECH-FIR-002
(P/R)
Drawing manufacturer instrruction.
F
Form No AJJV-IITP-F-002 Rev. 01
Page 5 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001
Co
ontract No: CP
PC02 R
Rev: 0
Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:
S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
Project Sp
pecification,
Patro
QCS 2010 0, NFPA, 1. Check exact locatiion as per Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, approved drawing g. Applicc RFI
7. D
Drain Valve/ Test Point.
P Approved d Method 2. Check installation
n as per (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved manufacturer instrruction. (N/A) AJJJV-MECH-FIR-002
(P/R)
Drawing
Project Sp
pecification,
Patro
QCS 2010 0, NFPA, 1. Check installation
n as per Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, manufacturer instrruction. Applicc RFI
8. F
Flow Switch & Sup
pervisory Switch Approved d Method 2. Check location as per (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved approved drawing g. (N/A) AJJJV-MECH-FIR-002
(P/R)
Drawing
Project Sp
pecification,
Patro
QCS 2010 0, NFPA, 1. Check installation
n as per Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, manufacturer instrruction. Applicc RFI
9. F Water Hose Reel
Fire R Approved d Method 2. Check location/ ellevation as (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved per approved drawwing. (N/A) AJJJV-MECH-FIR-004
(P/R)
Drawing
Project Sp
pecification, 1. Check location/ ellevation as
Patro
QCS 2010 0, NFPA, per approved drawwing. Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, 2. Check type and raating as per Applicc RFI
10. P
Portable Fire Extin
nguisher & Blankett Approved d Method approved drawing g. (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved 3. Check installation
n as per (N/A) AJJJV-MECH-FIR-001
(P/R)
Drawing manufacturer instrruction.
F
Form No AJJV-IITP-F-002 Rev. 01
Page 6 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001
Co
ontract No: CP
PC02 R
Rev: 0
Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:
S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
Project Sp
pecification,
Patro
QCS 2010 0, NFPA, 1. Check location/ ellevation as Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, per approved drawwing. Applicc RFI
11. F Department Connections
Fire Approved d Method 2. Check installation
n as per (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved manufacturer instrruction. (N/A) AJJJV-MECH-FIR-004
(P/R)
Drawing
1. Check system insttallation as
per approved draw wing.
2. Check system supp ports as
per manufacturer instruction.
i
Project Sp
pecification, 3. Check nozzles corrrect size
Patro
QCS 2010 0, NFPA, and location as perr approved Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, drawing. Applicc RFI
12. F
FM-200 System Approved d Method 4. Check detectors ty ype and (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved location as per appproved (N/A) AJJJV-MECH-FIR-005
(P/R)
Drawing drawing.
5. Check control pan nel
installation as per approved
drawing and manu ufacturer
instruction.
1. Check system insttallation as
per approved draw wing.
2. Check system supp ports as
Project Sp
pecification,
per manufacturer instruction.
i Patro
QCS 2010 0, NFPA, Not Approv
ved or Approved as noted
n
3. Check nozzles corrrect size Hold Witne l/
QCDD Sttandard, Applicc RFI
13. A
Aerosol System Approved d Method
and location as perr approved (H) ss
able
Revi
(
(AJJV-RFI-00….)
drawing. (W) ew
Statementt, Approved (N/A) AJJJV-MECH-FIR-005
4. Check detectors ty ype and (P/R)
Drawing
location as per appproved
drawing.
5. Check control pan nel
F
Form No AJJV-IITP-F-002 Rev. 01
Page 7 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001
Co
ontract No: CP
PC02 R
Rev: 0
Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:
S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
installation as per approved
drawing and manu ufacturer
instruction.
Project Sp
pecification, 1. Check location as per
Patro
QCS 2010 0, NFPA, approved drawing g. Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD, Standard,
S 2. Check installation
n as per Applicc RFI
14. F Hydrants
Fire Approved d Method manufacturer instrruction. (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved 3. Check Fire Hydran nt (N/A) AJJJV-MECH-FIR-004
(P/R)
Drawing accessibility.
Project Sp
pecification,
1. Check location/ ellevation as Patro
QCS 2010 0, NFPA, Not Approv
ved or Approved as noted
n
per approved drawwing. Hold Witne l/
QCDD Sttandard, Applicc RFI
15. F Water Pump/ Motor/
Fire M Controllers Approved d Method
2. Check alignment. (H) ss
able
Revi
(
(AJJV-RFI-00….)
3. Check grouts and anchor (W) ew
Statementt, Approved (N/A) AJJJV-MECH-FIR-001
bolt tightening. (P/R)
Drawing
Approv
ved or Approved as noted
n
1. Check each identiffication
Project Sp
pecification, RFI
correct as per apprroved Patro
QCS 2010 0, NFPA, Not (
(AJJV-RFI-00….)
drawing and data sheet.
s Hold Witne l/
IIdentification (Tagging/ Labeling/Flo
ow QCDD Sttandard, Applicc AJJJV-MECH-FIR-001
16. Approved d Method
2. Check installation
n as per (H) ss
able
Revi
AJJJV-MECH-FIR-002
D
Direction) approved procedurre. (W) ew
Statementt, Approved (N/A) AJJJV-MECH-FIR-004
3. Check flow directiion correct (P/R)
Drawing AJJJV-MECH-FIR-005
as per approved drrawing.
C TESTING
F
Form No AJJV-IITP-F-002 Rev. 01
Page 8 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001
Co
ontract No: CP
PC02 R
Rev: 0
Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:
S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
1. Check/ ensure insttallation
completed/ acceptted.
2. Check test medium m/ pressure
applied & holding g time as
per approved proccedure.
Project Sp
pecification,
3. Check & verify prressure ved or Approved as noted
Approv n
QCS 2010 0, NFPA, Not
gauges with valid calibration Hold Witne Witn RFI
QCDD Sttandard, Applicc
1. P
Piping Leak Test Approved d Method
certificates. (H) ss
able
ess (
(AJJV-RFI-00….)
4. Ensure isolation orr removal (W) (W) AJJJV-MECH-FIR-002
Statementt, Approved (N/A)
of any instrumentss that are AJJJV-MECH-FIR-003
Drawing
not to be part of prressure
test.
5. Check and verify all
a joints
for any leakages.
F
Form No AJJV-IITP-F-002 Rev. 01
Page 9 of 11
Client Project Management Engineer's Representative Contractor
Inspection Comments:
Inspection Comments:
Inspection Comments: