Factory Name
Address
Department
MDB/DB/SDB No: Daily Checklist for LT Panel Month: ……………..……../2023
Capacity:
Staff doing inspection should fill each box as he/she finds that item is functioning OK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
SI Checking Point
1 Voltage while Checking
2 Current while Checking
3 Check Insulating Mat
4 Check panel Door Locked or not?
5 Check Panel Ammeter, Voltmeter, Lamp
functioning
6 Check panel in front accessible condition
7 Check Single line diagram
8 Check panel body and door earthing
9 Check phase separator in each Circuit
Breaker
10 Check panel cooling fan functioning
11 Check Ampere per phase
12 Check Voltage L-L, L-N
13 Check Busbar Temperature
14 Check Temperature of all outgoing
15 Check Earthing to neutral voltage
14 Comment / Observation
Signature of the staff