0% found this document useful (0 votes)
19 views1 page

Flowsheet Proses Sidang Kak Hurum

The document discusses an air conditioning process and includes a diagram labeling different parts like steam, air, temperature, pressure, and flow and level controls.

Uploaded by

RATNA YULYANTI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views1 page

Flowsheet Proses Sidang Kak Hurum

The document discusses an air conditioning process and includes a diagram labeling different parts like steam, air, temperature, pressure, and flow and level controls.

Uploaded by

RATNA YULYANTI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Air Pendingin

Air Proses
Keterangan
Steam
Temperatur
Udara Tekanan
60
Nomor Aliran
1
AF-
F
C Flow Control
2 60 40
14 30
AF-101
102
CF-
L
C Level Control
M 1 1
3 CF-101 30
Temperature Control
1 T
7 10 1
19 1 102 TC
C

15 CD-101 26 HE-108 120


TC
TC 90 1
F

30 F HE-101 L 30 C
TC C 1
27 30
No. KODE NAMA ALAT No. KODE NAMA ALAT
C F 1
1
F 42 18 C F
HE-105 38 C 29 C 1
1
1 EV 1
30 29
1 T-101 Tangki Akrilonitril 26 HE-107 Cooler II
L
C T-101 12
- 01
17
1
60 R-101 23 2 T-102 Tangki Metil Akrilat 27 HE-108 Heater VI
M-101 BC-
L
P-101 A/ 1 C H-101 BC-
HE-106 S-101 RD- 102 3 T-103 Tangki Dimetilformamida 28 HE-109 Cooler III
B 4
P-104 A/
F
C
T
TC
101 BP- SP-101
101
C

B 50 101 4 T-104 Tangki Penampung Limbah 29 AF-101 Air Filter I


30
1 F
F
C
1
28
5 R-101 Reaktor 30 AF-102 Air Filter II
C 15
L
3
HE-102 153
1
3 F 6 M-101 Tangki Pencampuran 31 CF-101 Centrifugal Fan I
C
T-102 60 1 C
38
7 E-101 Evaporator 32 CF-102 Centrifugal Fan II
1 14 E-101 16
HE-107 1 38

P-102 A/
8
38
22 1
8 CD-101 Kondensor 33 BC-101 Belt Conveyor I
25
1
B 13 P-105 A/ 9 S-101 Spinnert 34 BC-102 Belt Conveyor II
60
B BC- L
C BE- 10 W-101 Washer 35 BC-103 Belt Conveyor III
103 101
1
6 W-101 11 RD-101 Rotary Dryer 36 H-101 Hopper
F

40
C
12 BE-101 Bucket Elevator
HE-103
1
11
13 BP-101 Bagging Product
38 38
1
38 14 SP-101 Storage Product
1 1
20 21 24 15 P-101 A/B Pompa I
HE-104 16 P-102 A/B Pompa II
30
F
C 17 P-103 A/B Pompa III
1
5
18 P-104 A/B Pompa IV
L L T-104 19 P-105 A/B Pompa V
C
T-103 30
C

1 20 HE-101 Heater I
P-103 A/
B
9
21 HE-102 Heater II
22 HE-103 Heater III
23 HE-104 Heater IV
HE-109
24 HE-105 Cooler I
Air Pendingin Bekas
25 HE-106 Heater V
Kondensat
Tanda Tangan Keterangan
Udara

By product Nama : Hurum Maqshurah


NIM : 1604103010038
Digambar Oleh :
Nama : Chindy Mauliza Duana
NIM : 1604103010006
Nama : Prof. Dr. Ir. Sri Aprillia, M.T
Komp onen Satuan Pembimbing I
NIP : 19670412 199303 2 001
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Diperiksa Oleh
Akrilonitril kg/jam 19,53 19,53 0 0 0 0 16,09 0 0 16,09 0 14,94 1,16 14,94 14,91 0,03 14,91 0,03 0 2,35 0 0 0 0 0 0 0 0 0 Nama : Prof. Dr. Sri Mulyati, ST, M.T
Pembimbing II
Metil Akrilat kg/jam 0 0 5,58 5,58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NIP : 19730227 200001 2 001
Dimetilformamida kg/jam 0 0 0 0 100,33 100,33 65,28 35,15 35,15 65,28 100,33 165,62 0 165,62 161,59 4,03 161,59 4,03 0 0,05 0 1,65 0 1,65 0 0 0 0 0
FLOWSHEET PROSES
P oliakrilonitril kg/jam 0 0 0 0 0 0 9,38 0 0 9,38 0 9,38 0 9,38 0 9,38 0 9,38 0 0 0 9,38 0 0 9,38 0 0 0 9,47
Air kg/jam 0,10 0,10 0,29 0,29 0,10 0,10 0 0,04 0,04 0 0,10 0 0,10 0 0 0 0 0 0 0 0 0 93,75 93,66 0,09 0 0 0,09 0
PRARANCANGAN PABRIK POLYACRYLONITRIL DENGAN KAPASITAS PRODUKSI 75.000 TON/TAHUN
Nitrogen kg/jam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,78 0 4,78 0 0 0 0 0,97 0,97 0,97 0
Oksigen kg/jam 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,34 0 1,34 0 0 0 0 3,47 3,47 3,38 0 JURUSAN TEKNIK KIMIA
Tekanan atm 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00
o FAKULTAS TEKNIK UNIVERSITAS SYIAH KUALA
Temp eratur C 30,00 60,00 30,00 60,00 30,00 60,00 60,00 60,00 30,00 40,00 40,00 38,00 38,00 153,00 143,00 153,00 42,00 90,00 30,00 38,00 30,00 38,00 30,00 30,00 38,00 30,00 120,00 50,00 30,00
DARUSSALAM, BANDA ACEH
2020

You might also like