100% found this document useful (1 vote)
676 views3 pages

Workmen Camp Inspection Report

The document is a workmen camp inspection report for a construction project. It details inspection of various aspects of the workmen camp including access and egress, general facilities, living areas, kitchen, and utilities. Over 20 points are checked such as cleanliness, safety, availability of drinking water, first aid, pest control measures, condition of rooms and facilities, and disposal of garbage. The inspector and contractor representatives sign off on the report after documenting observations and necessary measures.

Uploaded by

shamshad ahamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
676 views3 pages

Workmen Camp Inspection Report

The document is a workmen camp inspection report for a construction project. It details inspection of various aspects of the workmen camp including access and egress, general facilities, living areas, kitchen, and utilities. Over 20 points are checked such as cleanliness, safety, availability of drinking water, first aid, pest control measures, condition of rooms and facilities, and disposal of garbage. The inspector and contractor representatives sign off on the report after documenting observations and necessary measures.

Uploaded by

shamshad ahamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
  • Access & Egress Inspections
  • Living Area and Kitchen Inspections
  • Utilities Area Inspections

Rohan Builders(I) Pvt.

Ltd
Project - Pragati,Mondelez Malanpur
WORKMEN CAMP INSPECTION REPORT
Name of Site :
Inspected By :
Date & Time :

SL. OBSERVATION
POINTS MEASURES
NO.
ACCESS & EGRESS

Are the entry roads / walkways / passages to camp kept


1.
clear?

Are the walkways & roads are even and free from water
2.
logging?

3. Is the entry inside workmen camp restricted?

4. Is Illumination level OK in access / egress?

GENERAL
Are dustbin / garbage bins allocated for each & every
1.
row?
2. Is the garbage being disposed off on regular basis?

3. Are the drinking water facilities & quantity is adequate?

4. Drinking water tank cleaning at regular interval.

5. Is the Workmen camp constructed with Non-Fire Hazard


Material?

6. Is the workmen camp constructed with materials, which


are not readily flammable?

7. Are Fire Extinguishers & Fire Buckets available and


maintained regularly?

8. Are First-aid facilities available?

9. Availability of First aider at first aid facility for 24 hrs

10. Availability of sickness register/absenteeism register and


analysis

11. Emergency numbers displayed at conspicuous location.

Page 1 of 3
Rohan Builders(I) [Link]
Project - Pragati,Mondelez Malanpur
WORKMEN CAMP INSPECTION REPORT
SL. OBSERVATION
POINTS MEASURES
NO.

12. Whether pest control measures adopted?

LIVING AREA
1. Whether smooth finished Flooring provided?
2. Separate space for cooking, bathing, washing, toilet and
recreation facilities
Whether each room is having minimum space of 4 to 5.5
3. sq.m/ occupant and minimum 1 meter space shall be
maintained between beds
4. Condition of the Side walls / Roof Sheet
5. Whether the electrical connections provided are safe.
6. Is the ventilation of the rooms adequate?
7. Is the illumination of the rooms adequate?
8. Are the doors and windows in good condition?
9. Is the general hygienic condition of the rooms adequate?

KITCHEN
1. Are kitchens kept clean and tidy?

2. Is the water supply adequate for cooking?

3. Is the garbage of kitchen being disposed off every day?


Availability of separate area with rough finished flooring
4.
and drainage for cleaning of kitchen Utensils
Are gas cylinders & other flammable materials kept in
5. safe area (away from fire)?
Are suitable regulator, Connecting tube & connections
6. with the cylinder O.K
UTILITIES AREA
Is the Wash area - Water tanks constructed as per the
1. Design Drawing?

2. Are adequate toilets available?


Are the toilets are being cleaned on regular basis?
3.

4. Are the septic tanks and soak pit working properly?


Is area around bathrooms cleaned & kept dry and non
5.
slippery?
6. Is proper drainage provided?

Page 2 of 3
Rohan Builders(I) [Link]
Project - Pragati,Mondelez Malanpur
WORKMEN CAMP INSPECTION REPORT
SL. OBSERVATION
POINTS MEASURES
NO.

7. Is water tank cleaned regularly?

Any Other Information

EHS In-Charge (Contractor): HR/Admin in-Charge (Contractor):

Name: Name :

Signature: Signature :