WIT-PE 500 ETA 18-0214 (27.03.2018) - Rebar - 1

The European Technical Assessment evaluates the Würth Injection system WIT-PE 500+ for rebar connections. The system uses injection mortar and steel rebar or anchors between 8-40mm diameter to connect rebar in existing concrete structures. The assessment found the system provides adequate mechanical resistance and stability. It also determined the system satisfies fire resistance requirements for Class A1. The applicable system for verifying performance is AVCP System 1 according to the applicable EAD document.

Uploaded by

Dattatray Gosavi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views22 pages

WIT-PE 500 ETA 18-0214 (27.03.2018) - Rebar - 1

The European Technical Assessment evaluates the Würth Injection system WIT-PE 500+ for rebar connections. The system uses injection mortar and steel rebar or anchors between 8-40mm diameter to connect rebar in existing concrete structures. The assessment found the system provides adequate mechanical resistance and stability. It also determined the system satisfies fire resistance requirements for Class A1. The applicable system for verifying performance is AVCP System 1 according to the applicable EAD document.

Uploaded by

Dattatray Gosavi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 22

European Technical ETA-18/0214

Assessment of 27 March 2018


English translation prepared by DIBt - Original version in German language

General Part

Technical Assessment Body issuing the Deutsches Institut für Bautechnik


European Technical Assessment:

Trade name of the construction product Würth Injection system WIT-PE 500+
for rebar connection

Product family Injection system for post-installed


to which the construction product belongs rebar connections

Manufacturer Adolf Würth GmbH & Co. KG


Reinhold-Würth-Straße 12-17
74653 Künzelsau
DEUTSCHLAND

Manufacturing plant Werk 3

This European Technical Assessment 22 pages including 3 annexes which form an integral part
contains of this assessment

This European Technical Assessment is EAD 330087-00-0601


issued in accordance with Regulation (EU)
No 305/2011, on the basis of

Z18696.18 8.06.01-124/18
European Technical Assessment
ETA-18/0214 Page 2 of 22 | 27 March 2018
English translation prepared by DIBt

The European Technical Assessment is issued by the Technical Assessment Body in its official language.
Translations of this European Technical Assessment in other languages shall fully correspond to the
original issued document and shall be identified as such.
Communication of this European Technical Assessment, including transmission by electronic means,
shall be in full. However, partial reproduction may only be made with the written consent of the issuing
Technical Assessment Body. Any partial reproduction shall be identified as such.
This European Technical Assessment may be withdrawn by the issuing Technical Assessment Body, in
particular pursuant to information by the Commission in accordance with Article 25(3) of Regulation
(EU) No 305/2011.

Z18696.18 8.06.01-124/18
European Technical Assessment
ETA-18/0214 Page 3 of 22 | 27 March 2018
English translation prepared by DIBt

Specific Part

1 Technical description of the product

The subject of this European Technical Assessment is the post-installed connection, by


anchoring or overlap connection joint, of reinforcing bars (rebars) in existing structures made of
normal weight concrete, using the "Würth Injection system WIT-PE 500+ for rebar connection"
in accordance with the regulations for reinforced concrete construction.
Reinforcing bars made of steel with a diameter from 8 to 40 mm or the tension anchor ZA from
sizes M12 to M24 according to Annex A and injection mortar C-RE 385 are used for rebar
connections. The rebar is placed into a drilled hole filled with injection mortar and is anchored
via the bond between rebar, injection mortar and concrete.
The product description is given in Annex A.

2 Specification of the intended use in accordance with the applicable European


assessment Document

The performances given in Section 3 are only valid if the anchor is used in compliance with the
specifications and conditions given in Annex B.
The verifications and assessment methods on which this European Technical Assessment is
based lead to the assumption of a working life of the rebar connection of at least 50 years. The
indications given on the working life cannot be interpreted as a guarantee given by the
producer, but are to be regarded only as a means for choosing the right products in relation to
the expected economically reasonable working life of the works.

3 Performance of the product and references to the methods used for its assessment

3.1 Mechanical resistance and stability (BWR 1)

Essential characteristic Performance


Amplification factor lb, Bond resistance fbd See Annex C 1

3.2 Safety in case of fire (BWR 2)

Essential characteristic Performance


Reaction to fire Rebar connections satisfy requirements for
Class A1
Resistance to fire See Annex C 2 and C 3

4 Assessment and verification of constancy of performance (AVCP) system applied, with


reference to its legal base

In accordance with European Assessment Document EAD No. 330087-00-0601, the applicable
European legal act is: [96/582/EC].
The system(s) to be applied is (are): 1

Z18696.18 8.06.01-124/18
European Technical Assessment
ETA-18/0214 Page 4 of 22 | 27 March 2018
English translation prepared by DIBt

5 Technical details necessary for the implementation of the AVCP system, as provided for
in the applicable European Assessment Document
Technical details necessary for the implementation of the AVCP system are laid down in the
control plan deposited with Deutsches Institut für Bautechnik.

Issued in Berlin on 27 March 2018 by Deutsches Institut für Bautechnik

Dr.-Ing. Lars Eckfeldt beglaubigt:


p.p. Head of Department Baderschneider

Z18696.18 8.06.01-124/18
Page 5 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 6 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 7 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 8 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 9 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 10 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 11 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 12 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 13 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 14 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 15 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 16 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 17 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 18 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 19 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 20 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 21 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18
Page 22 of European Technical Assessment
ETA-18/0214 of 27 March 2018

English translation prepared by DIBt

Z18698.18 8.06.01-124/18