I. Grand Summary of the Project
1 I roject Name' Project Proposal for the Establishment °fa FLI.01 Station and Motel [Wilding in
Addis ;hobo
Proitet Owner The proposed legal struclure of the business entity Is registered as Molianed Umer
Usmiin.,
Nationality Ethiopian
Project Addis Ababa Civic Sub-City.
location
Project This profile envisages the emablishmgni of fuel station used for LPG lilting business
Composition centers for all type of car in the city, Gasoline (Benzene) LPG (Liquefied petroleum
Gas). Gas Oil (Naphtha) and kern :Y=4 Aviation Inc! (Avgas and Jet A-1). ln addition
to ihe provision or Fuels. Lubricants. and Dthcr speda.lized products providing area
like Modern cur. ‘vasli and Lubricant change.. A150 MOW', Office. grease & lib shop,
5llriermarket. restaurant St. cafeteria building will big- added by leasIng out our
premises to the onmpanies that offer services..
Premises The local kind area of lhe Service including the open space Es 5,000 m2.
Required
Fina.nciall The total capital of the psalm is estimaied 10 be Birr 32.0400,000.00 ETIll among this,
Source (3cr i,,) 9400,000.00 E-113 is Morticed by the contribution of the promoter and the
ivrrAriing balance of Birr 221400,000.no j701.ii is to be rimmed by hanks.
Project The capital or this project including working capital is estirnoted at Ilia' 32_00 ETB
Capital million_ Fromi the total investrnm cost the highest share is for fixed investment cost
(Bin 29.-1-1 million or 927.0. And the rest is for pre operation com and initial working
capital la hich is acce Lin( for Birr 2.56 rnilliOn. or( %)..
Employment The local Imo power required for the envisioned project will be 28 empl'oyees at full I
Opporrunity cirociiy_
Technology Tlio machinery ICquirment and tcchnoloo of establishment of th..2 Fuel Suclimi arid \
Lold Bujidin Can be secured from local and foreign. countries.
Marl et Share Bawd on the cash dow stalement, th! calcubled MR of the prig it ig D.1% and the rh:L
present value at 14.5'''-ii discount nth" is iVirr 6,399.999.99s _
Project lirovitie. service and source of rornue. employment opportunity, save/generate the
benellit5 liar country foreign exchange, benefit for the local community stimulate the local econnnly
the city & and itchnology transfer.
country
SN Activities Date
I Land request processing . Janit...Lr - Mardi. 2021
2 Land approval 3,1-hrdi. 21121
Site clearing. and Inc Ling April.- Jun. af21
Fence Wad., April- _ILI lys 202 I
Site DeVelarrile1111. . April- July, 2021
sank loan processing March-April. 202 I
13tul Id I ng and ecrns4ruulion work Jun. 21)21- April 20!2
Preparation far seri,: i cc Jun- DoiJiiirrther 2012
Service execui 1 cal January, 2023
The prOpOalt1 pre feasibility is bated nn ilia assumption of 7(.11 deht and 30Th
equity. The project seems to be viable with the following? returns on in
I
1 Goverrimen1 21244M 33745 1 35(11.fri 2.n5ci1 3114-171i. 41115 7 42[7144) 14107
2
46Yr I 4K1..1211
)70011
Mats IIIMIALMItharli 4594 4777 -tubil 1ml 5.174 1 1:1m1.1 5:4L2 1 tg.445. 01n1_ 0535 0111.14)
UN 1 tg3 1710 L 7X 7 1
1. 15 4 1
liql1.1. 24]1 I :Cm111 1 :1 75 23 52 352 4-46
7
1571 1034 L701.1 17044 1.1:I1 Lill 1Z 1 kINA :(Fhpl. Z151. =7 B26
-1 t'D
I Aid illeparigawnon 75U3 7140 X 117
I "2 77NLP 0 131 041Th 1
41i7n. ickr I Lull I 11 ur4
h (mu 3 -I0
-110 42fi -1-13 -1-ri I - 011 ..10•11 51 4 4 1
: :kli 5111 :541
14 rivWc.CAn ] 7-1573 14(14:13 204135 "12.45 75 231IIPr.I 27:1.50. :41.1:ri: :I..: 7415 1571 30 L Ete -12Nta7
7 L'#}
14..1.11 3qm 17 411526 411+13.'s7 3 10.0o 5277r, 01.1.- 05s-010.1 711_1 77n h51111: 14'750
14711 0 lam!
Sow-co Ln mry f Trunsprci
6.3. Market Supply
Total number of petrol stations that are fully operational in the city is quite low for meeting the
growing demand for petroleum products. Apart from these, stations are many other stations that are
not functioning while a few others are spring up. There has been a tremendous growth in the
downstream petroleum sector over the years. There are 710,000 vehicles in Ethiopia with more than
70 percent of them (410,000) registered in Addis Ababa. However, the number of fuel stations in the
capital stood at only 100. "Most of the fuel stations are very old and have small storage capacity,"
sources said. "Securing plots of land to construct fuel stations is a big hurdle," they said. The above
growth rates present an opportunity for the new entrants to earn profits by setting up new petrol
filling to meet the growing demand.
7. Regulations and Licenses
7.1. License
Obtaining a license from Ministry of Petroleum and Natural Resources and Department of Petroleum
Resources (DPR) are pre-requisites for setting up the motor Fuel filling station? o Licensing . Bid
documents will be prepared and can be collected from the Ministry (MOMPNG). - The notice will stay
at least for 45 days The beginning and ending dates will be specified. • Evaluation will follow based on
the score cards set at beginning, The winner will be notified officially to all bidders. • Signing date will
be fixed with the winner, . Signing ceremony with the Minister and authorized company
representative will be followed, o If there is only one interest Negotiation will be carried out between
the company team and Ministry of Mines team,
. When agreement is reached on various fiscal terms and articles of the PPSA. report will be submitted
the Ministers offices (MOM). The PSA will be endorsed to the Council of Ministers, • • The Council of
Ministers, chaired by the PM will approve the PPSA. . After the approval of the Council, the Minister
and the authorized company representative will sign the agreement.
7.2. Guidelines for Setting up of motor-fuel filling satiation Basic principle of the governing
consideration is to minimize as much as possible interference to normal flow of traffic on the road by
vehicles using the amenity and also to ensure safety. General conditions of inactive:-
1. The clear distance between two adjacent fuel filling station (these will also include fuel filling -cum-
services station) should not be less than 300 meters,
2. Fuel filling station should be well distribution on both sides of the road, so that vehicles do not have
to cut across the traffic to reach a fuel filling station. The fuel filling station on opposite sides shall be
staggered.
3. Sitting of fuel filling stations near existing check barriers should be avoided. They should be at least
1 km away from the check barrier.
4. The distance between the tangent point of the curves of the side road and the fuel filling station
measured in a direction parallel to the center line of the road should not be less than 100 meters and
the station should be located only in the outbound direction. However on expressway and arterial
road having dual carriageway. The distance from the junction should not be less than 300 meter.
7.3. Income Tax The income of the petrol filling station is not exempted from the income tax. The
investor has to pay tax on his/her income according to the nature of the business entity. The current
project is being operated as a private owned company. So the income tax is payable at the prevailing
rate.
8. Project Cost
The details of the cost of project are as follows
Table-9 project costs
Total 32,000,000.00
8.1. Project
Financing The total cost of the project is Birr 32.00 million including the working capital of
Birr 754,780. The sponsors of the project will contribute 30% or 9,600,000 ETB and the bank
will finance the remaining amount of Birr 70% will 22,400,000.
8.2. Location For setting up a fuel filling location is the prime factor. As per the
requirements of the federal government, the filling station must be situated in a
commercial area. Fuel filling station is not allowed to be installed in the residential areas.
5000 m2 of land with at least 75 feet front opening is required for installing fuel filling
station. The amount for land leas has been allocated for acquired of premises of
commercial land in in Addis Ababa around Bole sub- city based on the current leas cost of
the city. In these report prices of commercial land in Addis Ababa has been considered
however prices may considerably vary in the other places.
8.3. Building 17
There are certain civil works required to be carried out at the proposed location. The civil
works will be carried out on an area of 3,500 m2. The rest of the area will be floored with
concrete. Civil work includes the following. > Motel Building.
8.4. Equipment
The following equipment is required for a fuel station > Gas compressor The purpose of compressor is
to compress the fuel enabling it to discharge the petrol for refueling. This compressor requires an
input pressure of 8 or 15 PSIGS from the main gas supply with the outfit pressure of 3,625 PSIG with
this discharge pressure the equipment can refuel 50 vehicles per hour. Electric control panel, electric
control panel is required to operate the gas compressor priority panel for vehicle priority during rush
hours the compressor is directly connected to the dispenser by passing the storage cascades/cylinders
with the help of priority panel. This are enable as to facilitating the refueling of vehicles at a faster
rate. Fuel dispenser high floe dual hose gas is flied into the vehicles with the help of dispenser.
This dual hose dispenser is in capable of handling two vehicles at a time. There are various forging
manufactures providing the fuel filling station equipment in this pre-feasibility report a German origin
compressor has been selected this equipment is selected because of its low electrically consumption
higher outlet pressure. It is low. maintenance, durable working, longer periods between overhauls
and good market repute and presence.
8.5. Suppliers
Products will be sourced directly from an oil company accredited marketers with reliable and
high quality products and delivery time suppliers such as capital Oil Libya, Total and like
petroleum and host of other will also highly recommended.
8.6. Furniture and Fixtures
Furniture and fixtures mainly include table's chairs sofas fans & lights carpet curtains and fire
extinguishers. It is estimated that the furtive and fixtures of Birr 480,000 would be purchased.
The average number of cars in the first years is estimated at 302 cars per day starting from
220 cars per day in the first month and going up to 290 cars per day in the 12th month in the
second years. It has increased to 303 cars per day after second year. Number of cars in Addis
Ababa is increasing at a rate of 20% till fifth year because the project would be in its growth
stage. An increase of 5% has been considered from sixth year, because at that time the
project would be at its maturity stage.
9.2.2. Accounting Profit
Depreciation on the assets has been charged at the following rates are for the calculation of
accounting profit.
Table 13 Depreciation rates Description Building Fuel plant & equipment Motel & Office
equipment Furniture & fixture
Description Depreciation Rates
Building 5%
Fuel plant & equipment 10511
Motel & Office equipment 20%
Furniture & fixtuN 1051,
9.2.3. Taxable Profit
For the purpose of calculating taxable profit depreciation is calculated on the rates as per the
income tax law which is as follows,
Table -14 Tax adjustments
Land IN
Buildin2 5%
Fuel plant & equipment 105i
Motel & Unice equipment 10%
Furniture& fixture 10%