CCPP Cold Start Procedure
CCPP Cold Start Procedure
Damper Open DD 30%, keep HPD -0.150mm(CBD 20%), LPD -0.400mm(CBD 20%)
Chemical dosing pump start
Gland steam MOV 00MAW12AA001
DD open 50%.
Gland steam inlet PCV to average tank 00MAW11AA001 open 100% manually.
Average tank drain MOV 00MAW70AA703 open manually.
Drain flash tank spray TCV 00LCE14AA001 open, manually.
Set condenser level 1300 mm
DD open 100%. @ 7MW, HP 1.86 bar,
HP header drain 10LBA40AA704 closed @3.94 bar
HP superheater drain MOV 10HAH60AA702 closed @3.94 bar.
Deaerator condensate MOV 10LCA50AA001 open @ -200mm setting
GT load 10 MW from 7MW @ HP: 18bar/293 degC
Aux steam reducer 00LBG70AA001 set to 4.5 from 3.5 bar
Aux steam reducer 00LBG70AA001 set up to 7.5 gradually as is was getting closed
following outlet pressure.
Gland seal cooling fan 2 start
LP seal steam MOV 00MAW50AA001 open
Vacuum breaker closed
Vacuum pump B start
LP steam pipe drain 2 10LBA10AA709 open
LP steam header drain 00LBA10AA704 open
HP steam header drain 00LBA20AA704 open
Vacuum pump A start
Average tank drain MOV 00MAW70AA703 closed @ 170 degC/ .30 bar
Open surge tank drain in auto @0.5 bar set.
Cond. HP1 bypass water spray 00LCE17AA001 open 100%
HP1 bypass ppen 5% manuallly. Spray TCV @ 120 degC set
LP1 bypass open 5% manually. Spray TCV @60 degC set
HP1 header vent 10LBA40AA101 closed gradually
HP1/LP1 bypass put in auto @ 32bar/6.0 bar
Bypass MOV (10LBA20AA003) of HP1 steam MOV open
Bypass MOV (10LBA10AA002) of LP1 steam MOV open
HRSH1 side both drain 10LBA20AA704 & 10LBA10AA703 closed
HP1 Steam MOV 10LBA20AA001 open @ 32 bar/342 degC,
LP1 Steam MOV 10LBA10AA001 open @ 5.9 bar/226 degC,
ETS LV trip reset at 0.8 bar vacuum
FROM ST DEH-AUTO CONTROL PAGE:
ST RESET FST,RESET AST , Turbine Reset: Yes, Run: Yes . MSV open in auto
ACC Set = 100 rpm/min, AUTO: Ok, Target rpm: 600 rpm, Go: OK
ST TG will be off at while shaft start rotating
600 rpm reached the check all ST TSI parameters carefully & pushed PB
(condition- GT Load 10 ~20 MW, HPMS temp around 320 degC, pr around 22bar)
Again, RESET FST,RESET AST , Turbine Reset: Yes, Run: Yes . MSV open in auto
ACC Set = 100 rpm/min, AUTO: Ok, Target rpm: 1200 rpm, Go: OK
JOP stopped 1000 rpm
Hest soak At 1200 rpm , Heat Soak for 30/50 mins, check all ST TSI parameters carefully
Then give command for 2400 rpm, observe vibration during critical speed
Hest soak At 2400 rpm , Heat Soak for 20 mins, check all ST TSI parameters carefully
Then give command for 3000 rpm
Hest soak At 3000 rpm , Heat Soak for 10 mins, check all ST TSI parameters carefully
Startup AOP stopped, 2870 rpm
AOP stopped, 2950
FSNL
If all TSI parameters and Casing difference temperatures found ok, then go for ST
Synchcronization
Auto Syn YES
ST SYN DCS to DEH SYN - SEL
Auto Field Flushing - SEL
ON / OFF Command -ON
Auto SYN Input - SEL
Start Synchronizer -SEL
Synchronized
Remote reset Auto SYN - SEL
Remote reset manual SYN - SEL
Auto SYN - Quit
DCS to DEH SYN - DE-SEL