Environmental Monitoring Plan Final
Environmental Monitoring Plan Final
MONITORED
3. Used oil of Generator Storing and disposal of used oil and SUNFLARE
Sets(HW no. I101) daily inspection of storage area. INDUSTRIAL
Used oil will go to our hazardous SUPPLY
waste segregation area or used oil CORPORATION
storage area before disposal by
disposal company registered in
DENR.
4. Power interruptions Recording of scheduled and Operators Every Power
unexpected power interruptions. interruption
6. Solid waste Collection and segregation of solid Utility and city Everyday
management waste government of
Non biodegradable, biodegradable San Fernando
and recyclable materials Pampanga
(SAMPLE COMPUTATION)
E = A x EF x [1-ER/100]
WHERE:
E = Emission Estimation
A = Activity Rate
EF = Emission Factor
NOx = 607 lbs / 1000 gallon of fuel NOx = 470 lbs / 1000 gallon of fuel
CO = 131 lbs / 1000 gallon of fuel CO = 108 lbs / 1000 gallon of fuel
SOx = 40 lbs / 1000 gallon of fuel SOx = 158 lbs / 1000 gallon of fuel
VOC = 49 lbs / 1000 gallon of fuel VOC = 14 lbs / 1000 gallon of fuel
RATED POWER OUTPUT/CAPACITY: 800KW or 1072.82Hp CATERPILLAR Generator set Diesel Engine(no load only warm
up)
AR = 53 gals/year
RATED POWER OUTPUT/CAPACITY: 1250KW or 1676.28 Hp CATERPILLAR Generator set Diesel Engine(no load only
warm up)
DIESEL FUEL CONSUMPTION PER QUARTER: 60 gals/year
AR = 60 gals/year
RATED POWER OUTPUT/CAPACITY: 1360KW or 1823.79 Hp CATERPILLAR Generator set Diesel Engine(no load only
warm up)
AR = 66 gals/year
Operators in their respective duty records Every power interruption either its scheduled or unexpected.
Date Duration
March 06, 2021 35 min
July 06, 2021 1hr
July 14, 2021 1hr
October 16, 2021 2hr
October 24, 2021 1hr
March 02, 2022 3 min
March 04, 2022 4 min
May 23, 2022 1hr & 5 mi
INTRODUCTION
The Environmental Management Bureau issued Memorandum circular No.003 Series of 2022 “AMENDING
SECTION 5 OF MC 2016 – 008 RELATIVE TO ISSUANCE OF PERMIT TO OPERATE (PTO) TO ALL STAND BY
GENERATOR SET(GS) WITHOUT REQUIRING SOURCE EMISSIOM TESTING”. Section 2 of the said memorandum
states “ Stand by GS is not required to conduct Source emission testing. Operating not more than 3 hours per
day” . VENTORILLO MANAGEMENT CORPORATION with CNC no. (CNC-O3PA-0602-17-040) and PERMIT TO
OPERATE (PTO) issued on March 16, 2020 until expiry date March 30, 2025 For the emission, discharge or
release of air pollutants from the following installation processes or activities of three (3) units (800KW, 1250KW
& 1360KW) “CATERPILLAR” Stand by Diesel Generator Set all equipped with muffler/silencer leading to smoke
stack; and three (3) units Diesel Storage tank with total capacity of 81,000 liters provided with individual venting
system. With at least 20 min a month or 4 hours per year running time just for warm up purposes. As per
Memorandum Circular No.003 series of 2022 VENTORILLO MANAGEMENT CORPORATION is qualified and
covered under section 2, and required to submit updated Environmental Monitoring Plan within 30 days from
the effectivity of this Memorandum Circular to EMB region 3.
And instead of source emission testing as a permitting requirement we shall include in the OPMS the approved
estimation methods such as calculation using internationally recognized Emission Factors , the Schedule and
duration of preventive maintenance and monthly records of power interruption.