Fixing of HOV Valve

The document is a job safety analysis for fixing a HOV (high-overhead valve). It lists three team members and was prepared by Mr. S. Shanmugaraj, reviewed by Mr. Aspak Bagban, and approved by Mr. Ravinder Verma. It outlines two steps: obtaining a permit to work and replacing the HOV. Hazards identified include unauthorized work, invalid permits, lack of competency, poor communication, and haste. Control measures include obtaining the proper permit, ensuring competency, conducting safety briefings, and supervision to adhere to safety standards.

Uploaded by

visutsi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

Fixing of HOV Valve

The document is a job safety analysis for fixing a HOV (high-overhead valve). It lists three team members and was prepared by Mr. S. Shanmugaraj, reviewed by Mr. Aspak Bagban, and approved by Mr. Ravinder Verma. It outlines two steps: obtaining a permit to work and replacing the HOV. Hazards identified include unauthorized work, invalid permits, lack of competency, poor communication, and haste. Control measures include obtaining the proper permit, ensuring competency, conducting safety briefings, and supervision to adhere to safety standards.

Uploaded by

visutsi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Project: Fixing of HOV

JOB SAFET ANALYSIS


Ref No.: IOTL//Maint/
Rev No.: 0

Page no:-
Removal of ROSOV and fixing of HOV
Permite
No:-

TEAM MEMBERS : Mr. Ravinder Verma, Mr. S.Shanmugaraj , Mr. Aspak Bagban

Prepared by: Mr. S.Shanmugaraj Sign: ___________ Reviewed by: Mr. Aspak Bagban Sign: ___________

Approved by: Mr. Ravinder Verma Sign: ___________ Date:28/09/2015

Step Description of Control Measures/ Responsible


Hazard
No. Task Step Preventive Measures Person

1 Work start-up  Unauthorized work  Obtain a hot work permit before starting the job PTW applicant
& obtaining Supervisor
PTW  Invalid permit  Get the permit validated for the specific day PTW holder

 Lack of competency  Supervisor must ensure that all work activities are
carried out by competent personnel
 Lack or poor  Conduct Toolbox meeting, review the Method
communication statement and Job safety analysis to all craftsmen
involved in the work activities.
 Haste or shortcut  Responsible person will conduct inspection,
monitor the work activities and have to ensure
safety standards and procedures are strictly
adhered to.
Project: Fixing of HOV
JOB SAFET ANALYSIS
Ref No.: IOTL//Maint/
Rev No.: 0

Page no:-
Removal of ROSOV and fixing of HOV
Permite
No:-

Step Description of Control Measures/ Responsible


Hazard
No. Task Step Preventive Measures Person
2 HOV
Replacement Fire & explosion. Use standard tools
Product spillage. Drain the product from the pipe line in a barrel MrSubot Kumar
Product movement by closing the Mov and then open the bolt nuts of
due to active pump. ROSOV.
Product Spill on eye LOTO of motor mandatory.
Use goggles while executing the job.