Training Activity Matrix
Training Activity Matrix
June 6, 2022
Venue
Training Facilities/Tools Date &
Trainee (Workstation/ Remarks
Activity and Equipment Time
Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
Caing, CBLM
Jaymark D. Worksheet Training June 6, 2022
Assemble
Screwdriver 8:00 am
computer Resource Ongoing
Coronel, (standard) to
hardware Center
Ryan L. Working tables 5:00 PM
Dalangon, CBLM
Install operating
Cloed B. Worksheet Training June 6, 2022
system and
Working tables 8:00 am
drivers for Resource Ongoing
Deniega, Desktop to
peripherals/ Center
Dave L. Computer 5:00 PM
devices.
Dinoy, CBLM
Lucricio C. Worksheet
Install the Training June 6, 2022
computer Working tables Resource 8:00 am
Tagab, Desktop Ongoing
application Center to
Mark Computer
software 5:00 PM
Anthony C.
Jocson, CBLM
Roland A. Worksheet Contextual June 6, 2022
Conduct testing
Working tables Learning 8:00 am
and Ongoing
Kilat, Desktop Laboratory to
documentation
Joshua T. Computer 5:00 PM
CBLM
Dalangon,
Worksheet
Crissel G. June 6, 2022
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access Duga, to
Annie Rose Computer
5:00 PM
S. Wireless Access
Point
CBLM
Edinan,
Configure Monamae
Worksheet
Practical Work
June 6, 2022
Working tables 8:00 am
network A. Area Ongoing
Desktop to
services
Computer 5:00 PM
CBLM
Inspect and test Suson,
Worksheet Practical Work
June 6, 2022
the computer Glyza Mae 8:00 am
Working tables Area Ongoing
systems and M. to
networks Desktop 5:00 PM
Computer
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
June 7, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
June 7, 2022
Assemble Suson, Glyza Worksheet Training
Mae M. 8:00 am
computer Screwdriver Resource Ongoing
hardware to
(standard) Center
Working tables
5:00 PM
Install Caing, CBLM
operating Jaymark D. Worksheet June 7, 2022
Training
system and Working tables 8:00 am
drivers for Coronel, Ryan
Resource Ongoing
Desktop to
peripherals/ L. Center
Computer 5:00 PM
devices.
Dalangon, CBLM
Install the Cloed B. Worksheet Training June 7, 2022
computer Working tables Resource 8:00 am
Ongoing
application Deniega, Dave Desktop Center to
software L. Computer 5:00 PM
Dinoy, CBLM
Conduct Lucricio C. Worksheet Contextual June 7, 2022
testing and Working tables Learning 8:00 am
Ongoing
documentati Tagab, Mark Desktop Laboratory to
on Anthony C. Computer 5:00 PM
Install Jocson, CBLM Practical June 7, 2022 Ongoing
network Roland A. Worksheet Work Area 8:00 am
cables Working tables to
Kilat, Joshua Desktop 5:00 PM
T. Computer
Crimping tools
Hub / Switch
LAN Cable
tester
RJ 45
CBLM
Set Worksheet
Ontolan, Vhen
router/Wi-Fi/ June 7, 2022
B. Working tables
wireless Practical Work
Hub / Switch 8:00 am
access Area Ongoing
point/repeate
Potato, Johnrel ADSL Router to
T. with Wi-Fi 5:00 PM
r
configuration Wireless Access
Point
Potato, CBLM
Inspect and June 7, 2022
Juhnriel T. Worksheet
test the Practical Work
Working tables 8:00 am
configured Area Ongoing
computer
Tagab, Mark Desktop to
Anthony C. Computer 5:00 PM
networks
CBLM
Tagab,
Worksheet
Alexander C. June 7, 2022
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access Tome, Geryl to
D. Computer
5:00 PM
Wireless Access
Point
Dalangon, CBLM
Crissel G. Worksheet June 7, 2022
Configure Practical Work
Working tables 8:00 am
network Area Ongoing
services
Duga, Annie Desktop to
Rose S. Computer 5:00 PM
Perform CBLM
testing, Worksheet Contextual June 7, 2022
Edinan,
documentati Working tables Learning 8:00 am
Monamae A. Ongoing
on and pre- Desktop Laboratory to
deployment Computer 5:00 PM
practices
Plan and Ladiero, CBLM Contextual June 7, 2022 Ongoing
prepare for Quenie A. Worksheet Learning 8:00 am
maintenance Working tables Laboratory to
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 5 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Desktop
and repair 5:00 PM
Computer
CBLM
Maintain June 7, 2022
Lumigan, Worksheet Training
computer 8:00 am
Arnelyn S. Working tables Resource Ongoing
systems and
Center to
networks Desktop
5:00 PM
Computer
CBLM
Diagnose June 7, 2022
Magno, Worksheet Training
faults of 8:00 am
Kimberly V. Working tables Resource Ongoing
computer to
Desktop Center
systems 5:00 PM
Computer
CBLM
Rectify/ June 7, 2022
Worksheet
correct Manaban, Practical Work
Working tables 8:00 am
defects in Rosemarie A. Area Ongoing
computer Desktop to
systems Computer 5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
June 8, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
June 8, 2022
Assemble Manait, Worksheet Training
Angelica Mae 8:00 am
computer Screwdriver Resource Ongoing
hardware V. to
(standard) Center
Working tables
5:00 PM
Install CBLM
operating Suson, Glyza Worksheet June 8, 2022
Training
system and Mae M. Working tables 8:00 am
drivers for
Resource Ongoing
Desktop to
peripherals/ Center
Computer 5:00 PM
devices.
Caing, CBLM
Install the Jaymark D. Worksheet Training June 8, 2022
computer Working tables Resource 8:00 am
Ongoing
application Coronel, Ryan Desktop Center to
software L. Computer 5:00 PM
Dalangon, CBLM
Conduct Cloed B. Worksheet Contextual June 8, 2022
testing and Working tables Learning 8:00 am
Ongoing
documentati Deniega, Dave Desktop Laboratory to
on L. Computer 5:00 PM
Install Dinoy, CBLM Practical June 8, 2022 Ongoing
network Lucricio C. Worksheet Work Area 8:00 am
cables Working tables to
Tagab, Mark Desktop 5:00 PM
Anthony C. Computer
Crimping tools
Hub / Switch
LAN Cable
tester
RJ 45
CBLM
Set Worksheet
router/Wi-Fi/ Lemera, June 8, 2022
Working tables
wireless Arman T. Practical Work
Hub / Switch 8:00 am
access Area Ongoing
point/repeate Naigar, ADSL Router to
r Vernen Cea L. with Wi-Fi 5:00 PM
configuration Wireless Access
Point
Ontolan, Vhen CBLM
Inspect and June 8, 2022
B. Worksheet
test the Practical Work
Working tables 8:00 am
configured Area Ongoing
computer
Potato, Johnrel Desktop to
T. Computer 5:00 PM
networks
CBLM
Potato,
Worksheet
Juhnriel T. June 8, 2022
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access Tagab, Mark to
Anthony C. Computer
5:00 PM
Wireless Access
Point
Tagab, CBLM
Alexander C. Worksheet June 8, 2022
Configure Practical Work
Working tables 8:00 am
network Area Ongoing
services
Tome, Geryl Desktop to
D. Computer 5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
June 9, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
Manaban, CBLM
June 9, 2022
Assemble Rosemarie A. Worksheet Training
8:00 am
computer Screwdriver Resource Ongoing
hardware to
(standard) Center
Working tables
5:00 PM
Install Manait, CBLM
operating Angelica Mae Worksheet June 9, 2022
Training
system and V. Working tables 8:00 am
drivers for
Resource Ongoing
Desktop to
peripherals/ Center
Computer 5:00 PM
devices.
Suson, Glyza CBLM
Install the Training June 9, 2022
Mae M. Worksheet
computer Resource 8:00 am
Working tables Ongoing
application Center to
software Desktop
5:00 PM
Computer
Caing, CBLM
Conduct Jaymark D. Worksheet Contextual June 9, 2022
testing and Working tables Learning 8:00 am
Ongoing
documentati Coronel, Ryan Desktop Laboratory to
on L. Computer 5:00 PM
CBLM
Worksheet
Working tables
Dalangon,
Desktop
Cloed B. June 9, 2022
Install Computer Practical
8:00 am
network
Deniega, Dave
Crimping tools Work Area Ongoing
cables to
L. Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 10 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Dinoy, CBLM
Lucricio C. Worksheet June 9, 2022
Practical Work
Set network Working tables 8:00 am
Area Ongoing
configuration Tagab, Mark Desktop to
Anthony C. Computer 5:00 PM
CBLM
Set Worksheet
Jocson,
router/Wi-Fi/ June 9, 2022
Roland A. Working tables
wireless Practical Work
Hub / Switch 8:00 am
access Area Ongoing
point/repeate
Kilat, Joshua ADSL Router to
T. with Wi-Fi 5:00 PM
r
configuration Wireless Access
Point
Lemera, CBLM
Inspect and June 9, 2022
Arman T. Worksheet
test the Practical Work
Working tables 8:00 am
configured Area Ongoing
computer
Naigar, Desktop to
Vernen Cea L. Computer 5:00 PM
networks
CBLM
Ontolan, Vhen Worksheet June 9, 2022
B. Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access to
Potato, Johnrel Computer
T. 5:00 PM
Wireless Access
Point
Potato, CBLM
Juhnriel T. Worksheet June 9, 2022
Configure Practical Work
Working tables 8:00 am
network Area Ongoing
services
Tagab, Mark Desktop to
Anthony C. Computer 5:00 PM
CBLM
Maintain June 9, 2022
Edinan, Worksheet Training
computer Monamae A. 8:00 am
Working tables Resource Ongoing
systems and to
Desktop Center
networks 5:00 PM
Computer
CBLM
Diagnose June 9, 2022
Ladiero, Worksheet Training
faults of Quenie A. 8:00 am
Working tables Resource Ongoing
computer
Center to
systems Desktop
5:00 PM
Computer
CBLM
Rectify/ Lumigan, June 9, 2022
Worksheet
correct Arnelyn S. Practical Work
Working tables 8:00 am
defects in Area Ongoing
computer Desktop to
systems Computer 5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM June 10,
Assemble Magno, Worksheet Training 2022
computer Kimberly V. Screwdriver Resource 8:00 am Ongoing
hardware (standard) Center to
Working tables 5:00 PM
Install CBLM June 10,
operating Manaban, Worksheet Training 2022
system and Rosemarie A. Working tables Resource 8:00 am Ongoing
drivers for Desktop
peripherals/ Center to
Computer
devices. 5:00 PM
CBLM June 10,
Install the Manait, Training
Worksheet 2022
computer Angelica Mae Resource
application
Working tables 8:00 am Ongoing
V. Desktop Center
software to
Computer 5:00 PM
CBLM June 10,
Conduct Suson, Glyza Contextual
Worksheet 2022
testing and Mae M. Learning
documentati
Working tables 8:00 am Ongoing
Desktop Laboratory
on to
Computer 5:00 PM
CBLM
Worksheet
Working tables
Caing, Desktop June 10,
Install Jaymark D. Computer Practical 2022
network Crimping tools Work Area 8:00 am Ongoing
cables Coronel, Ryan Hub / Switch to
L. LAN Cable 5:00 PM
tester
RJ 45
UTP cable
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
June 13, 2022
Assemble Lumigan, Worksheet Training
Arnelyn S. 8:00 am
computer Screwdriver Resource Ongoing
hardware to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
June 13, 2022
system and Magno, Worksheet Training
Kimberly 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ V. to
Desktop Center
devices. 5:00 PM
Computer
CBLM
Install the Training June 13, 2022
Manaban, Worksheet
computer Rosemarie Resource 8:00 am
Working tables Ongoing
application A. Center to
software Desktop
Computer
5:00 PM
CBLM
Contextual June 13, 2022
Conduct testing Manait, Worksheet
Angelica Learning 8:00 am
and Working tables Ongoing
documentation Mae V. Laboratory to
Desktop
Computer
5:00 PM
CBLM
Suson, Worksheet
Glyza Mae Working tables
M. Desktop June 13, 2022
Computer Practical
Install network 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network Caing, CBLM Practical Work June 13, 2022 Ongoing
CBLM
Worksheet
Set router/Wi- Dalangon, June 13, 2022
Working tables
Fi/ wireless Cloed B. Practical Work
Hub / Switch 8:00 am
access Area Ongoing
point/repeater Deniega, ADSL Router to
configuration Dave L. with Wi-Fi 5:00 PM
Wireless Access
Point
Dinoy, CBLM
Lucricio C. Worksheet June 13, 2022
Inspect and test
Working tables Practical Work
the configured 8:00 am
Tagab, Desktop Area Ongoing
computer to
Mark Computer
networks 5:00 PM
Anthony C.
CBLM
Jocson,
Worksheet
Roland A. June 13, 2022
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access Kilat, to
Joshua T. Computer
5:00 PM
Wireless Access
Point
Lemera, CBLM
Arman T. Worksheet June 13, 2022
Configure Working tables Practical Work
8:00 am
network Naigar, Desktop Area Ongoing
services Vernen Cea to
Computer 5:00 PM
L.
Ontolan, CBLM
Perform testing, June 13, 2022
Vhen B. Worksheet Contextual
documentation
Working tables Learning 8:00 am
and pre- Ongoing
Potato, Desktop Laboratory to
deployment
Johnrel T. Computer 5:00 PM
practices
Plan and prepare Potato, CBLM Contextual June 13, 2022 Ongoing
for maintenance Juhnriel T. Worksheet Learning 8:00 am
and repair Tagab, Working tables Laboratory to
Mark Desktop 5:00 PM
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 17 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Anthony C. Computer
Tagab, CBLM
Alexander Worksheet June 13, 2022
Maintain
C. Working tables Training
computer 8:00 am
Desktop Resource Ongoing
systems and
Tome, Center to
networks Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Crissel G. Worksheet June 13, 2022
Diagnose faults Working tables Training
8:00 am
of computer Duga, Desktop Resource Ongoing
systems Annie Rose Center to
Computer 5:00 PM
S.
CBLM
Rectify/correct Edinan, Worksheet June 13, 2022
Monamae Practical Work
defects in Working tables 8:00 am
A. Area Ongoing
computer Desktop to
systems Computer 5:00 PM
CBLM
Inspect and test June 13, 2022
Ladiero, Worksheet Practical Work
the computer Quenie A. 8:00 am
Working tables Area Ongoing
systems and to
networks Desktop
Computer
5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
June 14, 2022
Assemble Ladiero, Worksheet Training
Quenie A. 8:00 am
computer Screwdriver Resource Ongoing
hardware to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
June 14, 2022
system and Lumigan, Worksheet Training
Arnelyn S. 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ to
Desktop Center
devices. 5:00 PM
Computer
CBLM
Install the Training June 14, 2022
Magno, Worksheet
computer Kimberly Resource 8:00 am
Working tables Ongoing
application V. Center to
software Desktop
Computer
5:00 PM
CBLM
Contextual June 14, 2022
Conduct testing Manaban, Worksheet
Rosemarie Learning 8:00 am
and Working tables Ongoing
documentation A. Laboratory to
Desktop
Computer
5:00 PM
CBLM
Manait, Worksheet
Angelica Working tables
Mae V. Desktop June 14, 2022
Computer Practical
Install network 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network Suson, CBLM Practical Work June 14, 2022 Ongoing
Dinoy, CBLM
Lucricio C. Worksheet June 14, 2022
Working tables Practical Work
Set-up user 8:00 am
Tagab, Desktop Area Ongoing
access
Mark to
Computer
Anthony C. 5:00 PM
Wireless Access
Point
Jocson, CBLM
Roland A. Worksheet June 14, 2022
Configure Practical Work
Working tables 8:00 am
network Area Ongoing
Kilat, Desktop to
services
Joshua T. Computer 5:00 PM
Lemera, CBLM
Perform testing, Arman T. Worksheet June 14, 2022
Contextual
documentation Working tables Learning 8:00 am
and pre- Naigar, Desktop Ongoing
Laboratory to
deployment Vernen Cea Computer
practices L. 5:00 PM
Plan and prepare Ontolan, CBLM Contextual June 14, 2022 Ongoing
for maintenance Vhen B. Worksheet Learning 8:00 am
and repair Working tables Laboratory to
Potato, Desktop 5:00 PM
Johnrel T. Computer
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 20 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Potato, CBLM
Juhnriel T. Worksheet June 14, 2022
Maintain
Working tables Training
computer 8:00 am
Tagab, Desktop Resource Ongoing
systems and to
Mark Computer Center
networks 5:00 PM
Anthony C.
Tagab, CBLM
Alexander Worksheet June 14, 2022
Diagnose faults C. Working tables Training
8:00 am
of computer Desktop Resource Ongoing
systems Tome, Center to
Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Crissel G. Worksheet June 14, 2022
Rectify/correct
Working tables Practical Work
defects in 8:00 am
Duga, Desktop Area Ongoing
computer to
Annie Rose Computer
systems 5:00 PM
S.
CBLM
Inspect and test Edinan, June 14, 2022
Worksheet Practical Work
the computer Monamae 8:00 am
Working tables Area Ongoing
systems and A. to
networks Desktop
Computer
5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
June 15, 2022
Assemble Edinan, Worksheet Training
Monamae 8:00 am
computer Screwdriver Resource Ongoing
hardware A. to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
June 15, 2022
system and Ladiero, Worksheet Training
Quenie A. 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ to
Desktop Center
devices. 5:00 PM
Computer
CBLM
Install the Training June 15, 2022
Lumigan, Worksheet
computer Arnelyn S. Resource 8:00 am
Working tables Ongoing
application Center to
software Desktop
Computer
5:00 PM
CBLM
Contextual June 15, 2022
Conduct testing Magno, Worksheet
Kimberly Learning 8:00 am
and Working tables Ongoing
documentation V. Laboratory to
Desktop
Computer
5:00 PM
CBLM
Manaban, Worksheet
Rosemarie Working tables
A. Desktop June 15, 2022
Computer Practical
Install network 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network Manait, CBLM Practical June 15, 2022 Ongoing
CBLM
Dalangon,
Worksheet June 15, 2022
Cloed B.
Working tables Practical
Set-up user 8:00 am
Desktop Work Area Ongoing
access Deniega, to
Dave L. Computer
5:00 PM
Wireless Access
Point
Dinoy, CBLM
Lucricio C. Worksheet June 15, 2022
Configure Working tables Practical
8:00 am
network Tagab, Desktop Work Area Ongoing
services Mark to
Computer 5:00 PM
Anthony C.
Jocson, CBLM
Perform testing, June 15, 2022
Roland A. Worksheet Contextual
documentation
Working tables Learning 8:00 am
and pre- Ongoing
deployment
Kilat, Desktop Laboratory to
Joshua T. Computer 5:00 PM
practices
Plan and prepare Lemera, CBLM Contextual June 15, 2022 Ongoing
for maintenance Arman T. Worksheet Learning 8:00 am
and repair Naigar, Working tables Laboratory to
Vernen Cea Desktop 5:00 PM
L. Computer
Ontolan, CBLM
Maintain Vhen B. Worksheet June 15, 2022
Training
computer Working tables 8:00 am
systems and Potato,
Resource Ongoing
Desktop to
networks Johnrel T. Center
Computer 5:00 PM
Potato, CBLM
Juhnriel T. Worksheet June 15, 2022
Diagnose faults Working tables Training
8:00 am
of computer Tagab, Desktop Resource Ongoing
systems Mark to
Computer Center
Anthony C. 5:00 PM
Tagab, CBLM
Alexander Worksheet
Rectify/correct C. Working tables June 15, 2022
Practical
defects in Desktop 8:00 am
computer Tome, Work Area Ongoing
Computer to
systems Geryl D. 5:00 PM
Dalangon, CBLM
Crissel G. Worksheet June 15, 2022
Inspect and test
Working tables Practical
the computer 8:00 am
Duga, Desktop Work Area Ongoing
systems and
Annie Rose to
networks Computer 5:00 PM
S.
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Dalangon, CBLM
June 16, 2022
Assemble Crissel G. Worksheet Training
8:00 am
computer Screwdriver Resource Ongoing
hardware Duga, Annie to
(standard) Center
Rose S. Working tables
5:00 PM
Install CBLM
operating Edinan, Worksheet June 16, 2022
Training
system and Monamae A. Working tables 8:00 am
drivers for
Resource Ongoing
Desktop to
peripherals/ Center
Computer 5:00 PM
devices.
CBLM
Install the Training June 16, 2022
Ladiero, Worksheet
computer Quenie A. Resource 8:00 am
Working tables Ongoing
application Center to
software Desktop
5:00 PM
Computer
CBLM
Contextual June 16, 2022
Conduct Lumigan, Worksheet
Arnelyn S. Learning 8:00 am
testing and Working tables Ongoing
documentation Laboratory to
Desktop
Computer
5:00 PM
CBLM
Worksheet
Working tables
Magno, Desktop
Kimberly V. June 16, 2022
Computer Practical
Install network 8:00 am
Crimping tools Work Area Ongoing
cables to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network Manaban, CBLM Practical WorkJune 16, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 25 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)
Rosemarie Worksheet
A.
8:00 am
Working tables Area
configuration to
Desktop
5:00 PM
Computer
CBLM
Manait, Worksheet
Set router/Wi- Angelica June 16, 2022
Working tables
Fi/ wireless Mae V. Practical Work
Hub / Switch 8:00 am
access Area Ongoing
point/repeater ADSL Router to
configuration with Wi-Fi 5:00 PM
Wireless Access
Point
CBLM
Inspect and Suson, Glyza June 16, 2022
Worksheet
test the Mae M. Practical Work
Working tables 8:00 am
configured Area Ongoing
computer Desktop to
networks Computer 5:00 PM
CBLM
Caing,
Worksheet June 16, 2022
Jaymark D.
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access Coronel, to
Ryan L. Computer
5:00 PM
Wireless Access
Point
Dalangon, CBLM
Cloed B. Worksheet June 16, 2022
Configure Practical Work
Working tables 8:00 am
network Area Ongoing
Deniega, Desktop to
services
Dave L. Computer 5:00 PM
Ontolan, CBLM
Diagnose Vhen B. Worksheet June 16, 2022
Training
faults of Working tables 8:00 am
Resource Ongoing
computer Potato, Desktop to
Center
systems Johnrel T. Computer 5:00 PM
Potato, CBLM
Rectify/correct Juhnriel T. Worksheet June 16, 2022
Practical Work
defects in Working tables 8:00 am
Area Ongoing
computer Tagab, Mark Desktop to
systems Anthony C. Computer 5:00 PM
Tagab, CBLM
Inspect and June 16, 2022
Alexander C. Worksheet
test the Practical Work
Working tables 8:00 am
computer Area Ongoing
Tome, Geryl Desktop to
systems and
D. Computer 5:00 PM
networks
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Tagab, CBLM
Alexander Worksheet June 17, 2022
Assemble Training
C. Screwdriver 8:00 am
computer Resource Ongoing
hardware (standard) to
Tome, Center
Working tables 5:00 PM
Geryl D.
Dalangon, CBLM
Install operating June 17, 2022
Crissel G. Worksheet
system and Training
Working tables 8:00 am
drivers for Resource Ongoing
peripherals/
Duga, Desktop to
Annie Rose Center
devices. Computer 5:00 PM
S.
CBLM
Install the Training June 17, 2022
Edinan, Worksheet
computer Monamae Resource 8:00 am
Working tables Ongoing
application A. Center to
software Desktop
Computer
5:00 PM
CBLM
Contextual June 17, 2022
Conduct testing Ladiero, Worksheet
Quenie A. Learning 8:00 am
and Working tables Ongoing
documentation Laboratory to
Desktop
5:00 PM
Computer
CBLM
Worksheet
Working tables
Lumigan, Desktop
Arnelyn S. June 17, 2022
Computer Practical
Install network 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 28 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Magno, CBLM
June 17, 2022
Kimberly Worksheet Practical Work
Set network V. 8:00 am
Working tables Area Ongoing
configuration to
Desktop
Computer
5:00 PM
CBLM
Manaban, Worksheet
Set router/Wi- Rosemarie June 17, 2022
Working tables
Fi/ wireless A. Practical Work
Hub / Switch 8:00 am
access Area Ongoing
point/repeater ADSL Router to
configuration with Wi-Fi 5:00 PM
Wireless Access
Point
CBLM
Inspect and test Manait, Worksheet June 17, 2022
Angelica Practical Work
the configured Working tables 8:00 am
Mae V. Area Ongoing
computer Desktop to
networks Computer 5:00 PM
CBLM
Suson, Worksheet
Glyza Mae
June 17, 2022
Working tables Practical Work
Set-up user M. 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
Caing, CBLM
Jaymark D. Worksheet June 17, 2022
Configure Practical Work
Working tables 8:00 am
network Area Ongoing
Coronel, Desktop to
services
Ryan L. Computer 5:00 PM
Dalangon, CBLM
Perform testing, June 17, 2022
Cloed B. Worksheet Contextual
documentation
Working tables Learning 8:00 am
and pre- Ongoing
Deniega, Desktop Laboratory to
deployment
Dave L. Computer 5:00 PM
practices
Plan and prepare Dinoy, CBLM Contextual June 17, 2022 Ongoing
for maintenance Lucricio C. Worksheet Learning 8:00 am
and repair Working tables Laboratory to
Tagab, Desktop 5:00 PM
Mark Computer
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 29 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Anthony C.
Jocson, CBLM
Maintain Roland A. Worksheet June 17, 2022
Training
computer Working tables 8:00 am
Resource Ongoing
systems and Kilat, Desktop Center to
networks Joshua T. Computer 5:00 PM
Lemera, CBLM
Arman T. Worksheet June 17, 2022
Diagnose faults Working tables Training
8:00 am
of computer Naigar, Desktop Resource Ongoing
systems Vernen Cea Center to
Computer 5:00 PM
L.
Ontolan, CBLM
Rectify/correct Vhen B. Worksheet June 17, 2022
Practical Work
defects in Working tables 8:00 am
Area Ongoing
computer Potato, Desktop to
systems Johnrel T. Computer 5:00 PM
Potato, CBLM
Juhnriel T. Worksheet June 17, 2022
Inspect and test
Working tables Practical Work
the computer 8:00 am
Tagab, Desktop Area Ongoing
systems and to
Mark Computer
networks 5:00 PM
Anthony C.
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Potato, CBLM
Juhnriel T. Worksheet June 20, 2022
Assemble Screwdriver Training
8:00 am
computer Tagab, (standard) Resource Ongoing
hardware Mark to
Working tables Center
Anthony C. 5:00 PM
Tagab, CBLM
Install operating June 20, 2022
Alexander Worksheet
system and Training
C. Working tables 8:00 am
drivers for Resource Ongoing
peripherals/ Desktop to
Tome, Center
devices. Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Install the Crissel G. Worksheet Training June 20, 2022
computer Working tables Resource 8:00 am
Ongoing
application Duga, Desktop Center to
software Annie Rose Computer 5:00 PM
S.
CBLM
Edinan, Contextual June 20, 2022
Conduct testing Worksheet
Monamae Learning 8:00 am
and Working tables Ongoing
documentation A. Laboratory to
Desktop
5:00 PM
Computer
Install network CBLM Practical June 20, 2022 Ongoing
cables Ladiero, Worksheet Work Area 8:00 am
Quenie A. Working tables to
Desktop 5:00 PM
Computer
Crimping tools
Hub / Switch
LAN Cable
tester
CBLM
Manait, Worksheet
Angelica
June 20, 2022
Working tables Practical Work
Set-up user Mae V. 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Suson, Worksheet June 20, 2022
Configure Glyza Mae Practical Work
Working tables 8:00 am
network M. Area Ongoing
services Desktop to
Computer 5:00 PM
Jocson, CBLM
Roland A. Worksheet June 20, 2022
Diagnose faults Training
Working tables 8:00 am
of computer Resource Ongoing
systems
Kilat, Desktop Center to
Joshua T. Computer 5:00 PM
Lemera, CBLM
Arman T. Worksheet
Rectify/correct Working tables June 20, 2022
Practical Work
defects in Naigar, Desktop 8:00 am
Area Ongoing
computer Vernen Cea Computer to
systems L. 5:00 PM
Ontolan, CBLM
Inspect and test Vhen B. Worksheet June 20, 2022
Practical Work
the computer Working tables 8:00 am
Area Ongoing
systems and Potato, Desktop to
networks Johnrel T. Computer 5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Ontolan, CBLM
June 21, 2022
Assemble Vhen B. Worksheet Training
8:00 am
computer Screwdriver Resource Ongoing
hardware Potato, to
(standard) Center
Johnrel T. Working tables
5:00 PM
Potato, CBLM
Install operating Juhnriel T. Worksheet June 21, 2022
system and Working tables Training
8:00 am
drivers for Tagab, Desktop Resource Ongoing
peripherals/ Mark to
Computer Center
devices. Anthony C. 5:00 PM
Tagab, CBLM
Install the Alexander Worksheet Training June 21, 2022
computer C. Working tables Resource 8:00 am
Ongoing
application Desktop Center to
software Tome, Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Crissel G. Worksheet Contextual June 21, 2022
Conduct testing
Working tables Learning 8:00 am
and Ongoing
documentation
Duga, Desktop Laboratory to
Annie Rose Computer 5:00 PM
S.
Install network CBLM Practical June 21, 2022 Ongoing
cables Edinan, Worksheet Work Area 8:00 am
Monamae Working tables to
A. Desktop 5:00 PM
Computer
Crimping tools
Hub / Switch
LAN Cable
tester
CBLM
Manaban, Worksheet
Rosemarie
June 21, 2022
Working tables Practical Work
Set-up user A. 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Manait, Worksheet June 21, 2022
Configure Angelica Practical Work
Working tables 8:00 am
network Mae V. Area Ongoing
services Desktop to
Computer 5:00 PM
Jocson, CBLM
Rectify/correct Roland A. Worksheet June 21, 2022
Practical Work
defects in Working tables 8:00 am
Area Ongoing
computer Kilat, Desktop to
systems Joshua T. Computer 5:00 PM
Lemera, CBLM
Arman T. Worksheet
Inspect and test Working tables June 21, 2022
Practical Work
the computer Naigar, Desktop 8:00 am
Area Ongoing
systems and Vernen Cea Computer to
networks L. 5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Lemera, CBLM
Arman T. Worksheet June 22, 2022
Assemble Training
Screwdriver 8:00 am
computer Resource Ongoing
hardware
Naigar, (standard) to
Vernen Cea Center
Working tables 5:00 PM
L.
Install operating Ontolan, CBLM
June 22, 2022
system and Vhen B. Worksheet Training
8:00 am
drivers for Working tables Resource Ongoing
peripherals/ Potato, to
Desktop Center
devices. Johnrel T. Computer
5:00 PM
Potato, CBLM
Juhnriel T. Worksheet June 22, 2022
Install the Training
computer Working tables Resource 8:00 am
Tagab, Desktop Ongoing
application Center to
Mark Computer
software 5:00 PM
Anthony C.
Tagab, CBLM
Alexander Worksheet Contextual June 22, 2022
Conduct testing
C. Working tables Learning 8:00 am
and Ongoing
documentation Desktop Laboratory to
Tome, Computer 5:00 PM
Geryl D.
Install network Dalangon, CBLM Practical June 22, 2022 Ongoing
cables Crissel G. Worksheet Work Area 8:00 am
Working tables to
Duga, Desktop 5:00 PM
Annie Rose Computer
S. Crimping tools
Hub / Switch
LAN Cable
tester
Magno, CBLM
Kimberly Worksheet
V.
June 22, 2022
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Manaban, Worksheet June 22, 2022
Configure Rosemarie Practical Work
Working tables 8:00 am
network A. Area Ongoing
services Desktop to
Computer 5:00 PM
Jocson, CBLM
Inspect and test Roland A. Worksheet June 22, 2022
Practical Work
the computer Working tables 8:00 am
Area Ongoing
systems and Kilat, Desktop to
networks Joshua T. Computer 5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
Jocson, CBLM
June 23, 2022
Assemble Roland A. Worksheet Training
8:00 am
computer Screwdriver Resource Ongoing
hardware Kilat, to
(standard) Center
Joshua T. Working tables
5:00 PM
Lemera, CBLM
Install operating June 23, 2022
Arman T. Worksheet
system and Training
Working tables 8:00 am
drivers for Resource Ongoing
peripherals/
Naigar, Desktop to
Vernen Cea Center
devices. Computer 5:00 PM
L.
Ontolan, CBLM
Install the Training June 23, 2022
Vhen B. Worksheet
computer Resource 8:00 am
Working tables Ongoing
application Potato, Center to
software Desktop
Johnrel T. Computer
5:00 PM
Potato, CBLM
Juhnriel T. Worksheet June 23, 2022
Contextual
Conduct testing Working tables Learning 8:00 am
and Tagab, Desktop Ongoing
documentation Mark Laboratory to
Computer 5:00 PM
Anthony C.
CBLM
Worksheet
Lumigan, June 23, 2022
Working tables Practical Work
Set-up user Arnelyn S. 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
Magno, CBLM
Kimberly Worksheet June 23, 2022
Configure V. Practical Work
Working tables 8:00 am
network Area Ongoing
services Desktop to
Computer 5:00 PM
Dinoy, CBLM
Lucricio C. Worksheet June 23, 2022
Inspect and test
Working tables Practical Work
the computer 8:00 am
Tagab, Desktop Area Ongoing
systems and to
Mark Computer
networks 5:00 PM
Anthony C.
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Dinoy, CBLM
Lucricio C. Worksheet June 24, 2022
Assemble Training
Screwdriver 8:00 am
computer Resource Ongoing
hardware
Tagab, (standard) to
Mark Center
Working tables 5:00 PM
Anthony C.
Install operating Jocson, CBLM
June 24, 2022
system and Roland A. Worksheet Training
8:00 am
drivers for Working tables Resource Ongoing
peripherals/ Kilat, to
Desktop Center
devices. Joshua T. Computer
5:00 PM
Lemera, CBLM
Install the Arman T. Worksheet Training June 24, 2022
computer Working tables Resource 8:00 am
Ongoing
application Naigar, Desktop Center to
software Vernen Cea Computer 5:00 PM
L.
Ontolan, CBLM
Contextual June 24, 2022
Conduct testing Vhen B. Worksheet
Learning 8:00 am
and Working tables Ongoing
documentation Potato, Laboratory to
Desktop
Johnrel T. 5:00 PM
Computer
Potato, CBLM
Juhnriel T. Worksheet
Working tables
Tagab, Desktop
Mark June 24, 2022
Computer Practical
Install network Anthony C. 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 43 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Tagab, CBLM
Alexander Worksheet June 24, 2022
Practical Work
Set network C. Working tables 8:00 am
Area Ongoing
configuration Desktop to
Tome, Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Crissel G. Worksheet
Set router/Wi- June 24, 2022
Working tables
Fi/ wireless Duga, Practical Work
Hub / Switch 8:00 am
access Annie Rose Area Ongoing
point/repeater ADSL Router to
S. with Wi-Fi 5:00 PM
configuration
Wireless Access
Point
CBLM
Inspect and test Edinan, Worksheet June 24, 2022
Monamae Practical Work
the configured Working tables 8:00 am
A. Area Ongoing
computer Desktop to
networks Computer 5:00 PM
CBLM
Ladiero, Worksheet
Quenie A. June 24, 2022
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Worksheet June 24, 2022
Configure Lumigan, Practical Work
Working tables 8:00 am
network Arnelyn S. Area Ongoing
services Desktop to
Computer 5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
Dalangon, Worksheet June 27, 2022
Assemble Training
Cloed B. Screwdriver 8:00 am
computer Resource Ongoing
hardware (standard) to
Deniega, Center
Working tables 5:00 PM
Dave L.
Dinoy, CBLM
Install operating Lucricio C. June 27, 2022
Worksheet Training
system and
Working tables 8:00 am
drivers for Tagab, Resource Ongoing
peripherals/ Desktop to
Mark Center
devices. Computer 5:00 PM
Anthony C.
Jocson, CBLM
Install the Training June 27, 2022
Roland A. Worksheet
computer Resource 8:00 am
Working tables Ongoing
application Center to
Kilat, Desktop
software 5:00 PM
Joshua T. Computer
Lemera, CBLM
Arman T. Worksheet Contextual June 27, 2022
Conduct testing
Working tables Learning 8:00 am
and Ongoing
Naigar, Desktop Laboratory to
documentation
Vernen Cea Computer 5:00 PM
L.
Install network Ontolan, CBLM Practical June 27, 2022 Ongoing
cables Vhen B. Worksheet Work Area 8:00 am
Working tables to
Potato, Desktop 5:00 PM
Johnrel T. Computer
Crimping tools
Hub / Switch
LAN Cable
tester
RJ 45
Tagab, CBLM
Alexander Worksheet
Set router/Wi- C. June 27, 2022
Working tables
Fi/ wireless Practical Work
Hub / Switch 8:00 am
access Tome, Area Ongoing
point/repeater ADSL Router to
Geryl D. with Wi-Fi 5:00 PM
configuration
Wireless Access
Point
Dalangon, CBLM
Inspect and test Crissel G. Worksheet June 27, 2022
Practical Work
the configured Working tables 8:00 am
Duga, Area Ongoing
computer Desktop to
networks Annie Rose Computer 5:00 PM
S.
CBLM
Edinan, Worksheet
Monamae
June 27, 2022
Working tables Practical Work
Set-up user A. 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Ladiero, Worksheet June 27, 2022
Configure Quenie A. Practical Work
Working tables 8:00 am
network Area Ongoing
services Desktop to
Computer 5:00 PM
Caing, CBLM
Inspect and test June 27, 2022
Jaymark D. Worksheet Practical Work
the computer 8:00 am
Working tables Area Ongoing
systems and
Coronel, to
networks Desktop
Ryan L. 5:00 PM
Computer
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Caing, CBLM
Jaymark D. Worksheet June 28, 2022
Assemble Training
Screwdriver 8:00 am
computer Resource Ongoing
hardware
Coronel, (standard) to
Ryan L. Center
Working tables 5:00 PM
Dalangon, CBLM
Install operating June 28, 2022
Cloed B. Worksheet
system and Training
Working tables 8:00 am
drivers for Resource Ongoing
peripherals/
Deniega, Desktop to
Dave L. Center
devices. Computer 5:00 PM
Dinoy, CBLM
Lucricio C. Worksheet June 28, 2022
Install the Training
computer Working tables Resource 8:00 am
Tagab, Desktop Ongoing
application
Mark Center to
software Computer 5:00 PM
Anthony C.
Jocson, CBLM
Roland A. Worksheet Contextual June 28, 2022
Conduct testing
Working tables Learning 8:00 am
and Ongoing
Kilat, Desktop Laboratory to
documentation
Joshua T. Computer 5:00 PM
Install network Lemera, CBLM Practical June 28, 2022 Ongoing
cables Arman T. Worksheet Work Area 8:00 am
Working tables to
Naigar, Desktop 5:00 PM
Vernen Cea Computer
L. Crimping tools
Hub / Switch
LAN Cable
tester
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 49 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
RJ 45
UTP cable
Ontolan, CBLM
June 28, 2022
Vhen B. Worksheet Practical Work
Set network 8:00 am
Working tables Area Ongoing
configuration to
Potato, Desktop
Johnrel T. Computer
5:00 PM
CBLM
Potato, Worksheet
Set router/Wi- Juhnriel T. June 28, 2022
Working tables
Fi/ wireless Practical Work
Hub / Switch 8:00 am
access Tagab, Area Ongoing
point/repeater Mark ADSL Router to
configuration Anthony C. with Wi-Fi 5:00 PM
Wireless Access
Point
Tagab, CBLM
Alexander Worksheet June 28, 2022
Inspect and test
C. Working tables Practical Work
the configured 8:00 am
Desktop Area Ongoing
computer to
Tome, Computer
networks 5:00 PM
Geryl D.
CBLM
Dalangon,
Worksheet
Crissel G. June 28, 2022
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access Duga, to
Annie Rose Computer
5:00 PM
S. Wireless Access
Point
CBLM
Edinan, June 28, 2022
Worksheet
Configure Monamae Practical Work
Working tables 8:00 am
network A. Area Ongoing
services Desktop to
Computer 5:00 PM
CBLM
Inspect and test Suson, June 28, 2022
Worksheet Practical Work
the computer Glyza Mae 8:00 am
Working tables Area Ongoing
systems and M. to
networks Desktop
5:00 PM
Computer
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
June 29, 2022
Assemble Suson, Worksheet Training
Glyza Mae 8:00 am
computer Screwdriver Resource Ongoing
hardware M. to
(standard) Center
Working tables
5:00 PM
Caing, CBLM
Install operating Jaymark D. June 29, 2022
Worksheet Training
system and
Working tables 8:00 am
drivers for Coronel, Resource Ongoing
peripherals/ Desktop to
Ryan L. Center
devices. Computer 5:00 PM
Dalangon, CBLM
Install the Cloed B. Worksheet Training June 29, 2022
computer Working tables Resource 8:00 am
Ongoing
application Deniega, Desktop Center to
software Dave L. Computer 5:00 PM
Dinoy, CBLM
Lucricio C. Worksheet June 29, 2022
Contextual
Conduct testing Working tables Learning 8:00 am
and Tagab, Desktop Ongoing
documentation Mark Laboratory to
Computer 5:00 PM
Anthony C.
CBLM
Worksheet
Set router/Wi- Ontolan, June 29, 2022
Working tables
Fi/ wireless Vhen B. Practical Work
Hub / Switch 8:00 am
access Area Ongoing
point/repeater Potato, ADSL Router to
configuration Johnrel T. with Wi-Fi 5:00 PM
Wireless Access
Point
Potato, CBLM
Juhnriel T. Worksheet June 29, 2022
Inspect and test
Working tables Practical Work
the configured 8:00 am
Tagab, Desktop Area Ongoing
computer to
Mark Computer
networks 5:00 PM
Anthony C.
Tagab, CBLM
Alexander Worksheet June 29, 2022
C. Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access to
Tome, Computer
Geryl D. 5:00 PM
Wireless Access
Point
Dalangon, CBLM
Crissel G. Worksheet June 29, 2022
Configure Practical Work
Working tables 8:00 am
network Area Ongoing
services
Duga, Desktop to
Annie Rose Computer 5:00 PM
S.
Perform testing, Edinan, CBLM
Contextual June 29, 2022
documentation Monamae Worksheet
Learning 8:00 am
and pre- A. Working tables Ongoing
Laboratory to
deployment Desktop
practices Computer
5:00 PM
Plan and prepare Ladiero, CBLM Contextual June 29, 2022 Ongoing
CBLM
Inspect and test Manait, June 29, 2022
Worksheet Practical Work
the computer Angelica 8:00 am
Working tables Area Ongoing
systems and Mae V. to
networks Desktop
5:00 PM
Computer
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
June 30, 2022
Assemble Manait, Worksheet Training
Angelica 8:00 am
computer Screwdriver Resource Ongoing
hardware Mae V. to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
June 30, 2022
system and Suson, Worksheet Training
Glyza Mae 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ M. to
Desktop Center
devices. 5:00 PM
Computer
Caing, CBLM
Install the Jaymark D. Worksheet Training June 30, 2022
computer Working tables Resource 8:00 am
Ongoing
application Coronel, Desktop Center to
software Ryan L. Computer 5:00 PM
Dalangon, CBLM
Cloed B. Worksheet Contextual June 30, 2022
Conduct testing
Working tables Learning 8:00 am
and Ongoing
documentation
Deniega, Desktop Laboratory to
Dave L. Computer 5:00 PM
Dinoy, CBLM
Lucricio C. Worksheet
Working tables
Tagab, Desktop
Mark June 30, 2022
Computer Practical
Install network Anthony C. 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 55 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Jocson, CBLM
Roland A. Worksheet June 30, 2022
Practical Work
Set network Working tables 8:00 am
Area Ongoing
configuration Kilat, Desktop to
Joshua T. Computer 5:00 PM
CBLM
Lemera, Worksheet
Set router/Wi- Arman T. June 30, 2022
Working tables
Fi/ wireless Practical Work
Hub / Switch 8:00 am
access Naigar, Area Ongoing
point/repeater Vernen Cea ADSL Router to
configuration L. with Wi-Fi 5:00 PM
Wireless Access
Point
CBLM
Ontolan, June 30, 2022
Inspect and test Worksheet
Vhen B. Practical Work
the configured Working tables 8:00 am
Area Ongoing
computer
Potato, Desktop to
networks Computer 5:00 PM
Johnrel T.
Potato, CBLM
Juhnriel T. Worksheet June 30, 2022
Working tables Practical Work
Set-up user 8:00 am
Tagab, Desktop Area Ongoing
access to
Mark Computer
Anthony C. 5:00 PM
Wireless Access
Point
Tagab, CBLM Ongoing
Alexander Worksheet June 30, 2022
Configure C. Working tables Practical Work
8:00 am
network Desktop Area
services Tome, to
Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Perform testing, June 30, 2022
Crissel G. Worksheet Contextual
documentation
Working tables Learning 8:00 am
and pre- Ongoing
Duga, Desktop Laboratory to
deployment
Annie Rose Computer 5:00 PM
practices
S.
Plan and prepare Edinan, CBLM Contextual June 30, 2022 Ongoing
for maintenance Monamae Worksheet Learning 8:00 am
and repair A. Working tables Laboratory to
CBLM
Inspect and test Manaban, June 30, 2022
Worksheet Practical Work
the computer Rosemarie 8:00 am
Working tables Area Ongoing
systems and A. to
networks Desktop
5:00 PM
Computer
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
July 1, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
July 1, 2022
Assemble Manaban, Worksheet Training
Rosemarie 8:00 am
computer Screwdriver Resource Ongoing
hardware A. to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
July 1, 2022
system and Manait, Worksheet Training
Angelica 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ Mae V. to
Desktop Center
devices. 5:00 PM
Computer
CBLM
Install the Training July 1, 2022
Suson, Worksheet
computer Glyza Mae Resource 8:00 am
Working tables Ongoing
application M. Center to
software Desktop
Computer
5:00 PM
Caing, CBLM
Jaymark D. Worksheet Contextual July 1, 2022
Conduct testing
Working tables Learning 8:00 am
and Ongoing
Coronel, Desktop Laboratory to
documentation
Ryan L. Computer 5:00 PM
Dalangon, CBLM
Cloed B. Worksheet
Working tables
Deniega, Desktop
Dave L. July 1, 2022
Computer Practical
Install network 8:00 am
Crimping tools Work Area Ongoing
cables to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network Dinoy, CBLM Practical Work July 1, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 58 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Lucricio C. Worksheet
Working tables 8:00 am
Tagab, Desktop Area
configuration to
Mark Computer
Anthony C. 5:00 PM
CBLM
Jocson, Worksheet
Set router/Wi- July 1, 2022
Roland A. Working tables
Fi/ wireless Practical Work
Hub / Switch 8:00 am
access Area Ongoing
point/repeater
Kilat, ADSL Router to
Joshua T. with Wi-Fi 5:00 PM
configuration
Wireless Access
Point
Lemera, CBLM
Arman T. Worksheet July 1, 2022
Inspect and test
Working tables Practical Work
the configured 8:00 am
Naigar, Desktop Area Ongoing
computer
Vernen Cea to
networks Computer 5:00 PM
L.
CBLM
Ontolan, Worksheet July 1, 2022
Vhen B. Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access
Potato, to
Computer
Johnrel T. 5:00 PM
Wireless Access
Point
Potato, CBLM
Juhnriel T. Worksheet July 1, 2022
Configure Working tables Practical Work
8:00 am
network Tagab, Desktop Area Ongoing
services Mark to
Computer 5:00 PM
Anthony C.
Tagab, CBLM
Perform testing, Alexander Worksheet July 1, 2022
Contextual
documentation C. Working tables Learning 8:00 am
and pre- Desktop Ongoing
deployment Tome,
Laboratory to
Computer 5:00 PM
practices Geryl D.
CBLM
Inspect and test Magno, July 1, 2022
Worksheet Practical Work
the computer Kimberly 8:00 am
Working tables Area Ongoing
systems and V. to
networks Desktop
Computer
5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
July 4, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
July 4, 2022
Assemble Magno, Worksheet Training
Kimberly 8:00 am
computer Screwdriver Resource Ongoing
hardware V. to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
July 4, 2022
system and Manaban, Worksheet Training
Rosemarie 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ A. to
Desktop Center
devices. 5:00 PM
Computer
CBLM
Install the Training July 4, 2022
Manait, Worksheet
computer Angelica Resource 8:00 am
Working tables Ongoing
application Mae V. Center to
software Desktop
Computer
5:00 PM
CBLM
Contextual July 4, 2022
Conduct testing Suson, Worksheet
Glyza Mae Learning 8:00 am
and Working tables Ongoing
documentation M. Laboratory to
Desktop
Computer
5:00 PM
Caing, CBLM
Jaymark D. Worksheet
Working tables
Coronel, Desktop
Ryan L. July 4, 2022
Computer Practical
Install network 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network Dalangon, CBLM Practical Work July 4, 2022 Ongoing
Dinoy, CBLM
Lucricio C. Worksheet
Set router/Wi- July 4, 2022
Working tables
Fi/ wireless Tagab, Practical Work
Hub / Switch 8:00 am
access Mark Area Ongoing
point/repeater ADSL Router to
Anthony C. with Wi-Fi 5:00 PM
configuration
Wireless Access
Point
Jocson, CBLM
Inspect and test Roland A. Worksheet July 4, 2022
Practical Work
the configured Working tables 8:00 am
Area Ongoing
computer Kilat, Desktop to
networks Joshua T. Computer 5:00 PM
Lemera, CBLM
Arman T. Worksheet July 4, 2022
Working tables Practical Work
Set-up user 8:00 am
Naigar, Desktop Area Ongoing
access
Vernen Cea to
Computer
L. 5:00 PM
Wireless Access
Point
CBLM
Ontolan, July 4, 2022
Worksheet
Configure Vhen B. Practical Work
Working tables 8:00 am
network Area Ongoing
services Potato, Desktop to
Johnrel T. Computer 5:00 PM
Potato, CBLM
Perform testing, Juhnriel T. Worksheet July 4, 2022
Contextual
documentation Working tables Learning 8:00 am
and pre- Tagab, Desktop Ongoing
Laboratory to
deployment Mark Computer
practices Anthony C. 5:00 PM
Dalangon, CBLM
Maintain Crissel G. Worksheet July 4, 2022
Training
computer Working tables 8:00 am
Resource Ongoing
systems and Duga, Desktop to
Center
networks Annie Rose Computer 5:00 PM
S.
Edinan, CBLM
July 4, 2022
Diagnose faults Monamae Worksheet Training
8:00 am
of computer A. Working tables Resource Ongoing
systems Center to
Desktop
5:00 PM
Computer
CBLM
Rectify/correct Worksheet July 4, 2022
Ladiero, Practical Work
defects in Working tables 8:00 am
Quenie A. Area Ongoing
computer Desktop to
systems Computer 5:00 PM
CBLM
Inspect and test July 4, 2022
Lumigan, Worksheet Practical Work
the computer 8:00 am
Arnelyn S. Working tables Area Ongoing
systems and to
networks Desktop
Computer
5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
July 5, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
July 5, 2022
Assemble Lumigan, Worksheet Training
8:00 am
computer Arnelyn S. Screwdriver Resource Ongoing
hardware to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
July 5, 2022
system and Magno, Worksheet Training
Kimberly 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ V. to
Desktop Center
devices. 5:00 PM
Computer
CBLM
Install the Training July 5, 2022
Manaban, Worksheet
computer Rosemarie Resource 8:00 am
Working tables Ongoing
application A. Center to
software Desktop
Computer
5:00 PM
CBLM
Contextual July 5, 2022
Conduct testing Manait, Worksheet
Angelica Learning 8:00 am
and Working tables Ongoing
documentation Mae V. Laboratory to
Desktop
Computer
5:00 PM
CBLM
Suson, Worksheet
Glyza Mae Working tables
M. Desktop July 5, 2022
Computer Practical
Install network 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network Caing, CBLM Practical Work July 5, 2022 Ongoing
Dalangon, CBLM
Cloed B. Worksheet
Set router/Wi- July 5, 2022
Working tables
Fi/ wireless Deniega, Practical Work
Hub / Switch 8:00 am
access Dave L. Area Ongoing
point/repeater ADSL Router to
configuration with Wi-Fi 5:00 PM
Wireless Access
Point
Dinoy, CBLM
Lucricio C. Worksheet July 5, 2022
Inspect and test
Working tables Practical Work
the configured 8:00 am
Tagab, Desktop Area Ongoing
computer to
Mark Computer
networks 5:00 PM
Anthony C.
CBLM
Jocson,
Worksheet
Roland A. July 5, 2022
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access Kilat, to
Joshua T. Computer
5:00 PM
Wireless Access
Point
Lemera, CBLM
Arman T. Worksheet July 5, 2022
Configure Working tables Practical Work
8:00 am
network Naigar, Desktop Area Ongoing
services Vernen Cea to
Computer 5:00 PM
L.
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
July 6, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
July 6, 2022
Assemble Ladiero, Worksheet Training
Quenie A. 8:00 am
computer Screwdriver Resource Ongoing
hardware to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
July 6, 2022
system and Lumigan, Worksheet Training
8:00 am
drivers for Arnelyn S. Working tables Resource Ongoing
peripherals/ to
Desktop Center
devices. 5:00 PM
Computer
CBLM
Install the Training July 6, 2022
Magno, Worksheet
computer Kimberly Resource 8:00 am
Working tables Ongoing
application V. Center to
software Desktop
Computer
5:00 PM
CBLM
Contextual July 6, 2022
Conduct testing Manaban, Worksheet
Rosemarie Learning 8:00 am
and Working tables Ongoing
documentation A. Laboratory to
Desktop
Computer
5:00 PM
CBLM
Manait, Worksheet
Angelica Working tables
Mae V. Desktop July 6, 2022
Computer Practical
Install network 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network CBLM Practical Work July 6, 2022 Ongoing
Dinoy, CBLM
Lucricio C. Worksheet July 6, 2022
Working tables Practical Work
Set-up user Tagab, 8:00 am
Desktop Area Ongoing
access Mark to
Computer
Anthony C. 5:00 PM
Wireless Access
Point
Jocson, CBLM
Roland A. Worksheet July 6, 2022
Configure Practical Work
Working tables 8:00 am
network Area Ongoing
Kilat, Desktop to
services
Joshua T. Computer 5:00 PM
Lemera, CBLM
Perform testing, Arman T. Worksheet July 6, 2022
Contextual
documentation Working tables Learning 8:00 am
and pre- Naigar, Desktop Ongoing
Laboratory to
deployment Vernen Cea Computer
practices L. 5:00 PM
Ontolan, CBLM
Contextual July 6, 2022
Plan and prepare Vhen B. Worksheet
Learning 8:00 am
for maintenance Working tables Ongoing
Laboratory to
and repair Potato, Desktop
Johnrel T. Computer
5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
July 7, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
July 7, 2022
Assemble Edinan, Worksheet Training
Monamae 8:00 am
computer Screwdriver Resource Ongoing
hardware A. to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
July 7, 2022
system and Ladiero, Worksheet Training
Quenie A. 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ to
Desktop Center
devices. 5:00 PM
Computer
CBLM
Install the Training July 7, 2022
Lumigan, Worksheet
computer Resource 8:00 am
Arnelyn S. Working tables Ongoing
application Center to
software Desktop
Computer
5:00 PM
CBLM
Contextual July 7, 2022
Conduct testing Magno, Worksheet
Kimberly Learning 8:00 am
and Working tables Ongoing
documentation V. Laboratory to
Desktop
Computer
5:00 PM
CBLM
Manaban, Worksheet
Rosemarie Working tables
A. Desktop July 7, 2022
Computer Practical
Install network 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network CBLM Practical Work July 7, 2022 Ongoing
Dalangon, CBLM
Cloed B. Worksheet July 7, 2022
Working tables Practical Work
Set-up user Deniega, 8:00 am
Desktop Area Ongoing
access Dave L. to
Computer
5:00 PM
Wireless Access
Point
Dinoy, CBLM
Lucricio C. Worksheet July 7, 2022
Configure Working tables Practical Work
8:00 am
network Tagab, Desktop Area Ongoing
services Mark to
Computer 5:00 PM
Anthony C.
Jocson, CBLM
Perform testing, July 7, 2022
Roland A. Worksheet Contextual
documentation
Working tables Learning 8:00 am
and pre- Ongoing
deployment
Kilat, Desktop Laboratory to
Joshua T. Computer 5:00 PM
practices
Plan and prepare Lemera, CBLM Contextual July 7, 2022 Ongoing
for maintenance Arman T. Worksheet Learning 8:00 am
and repair Working tables Laboratory to
Naigar, Desktop 5:00 PM
Vernen Cea Computer
Ontolan, CBLM
Maintain July 7, 2022
Vhen B. Worksheet Training
computer 8:00 am
Working tables Resource Ongoing
systems and to
Potato, Desktop Center
networks 5:00 PM
Johnrel T. Computer
Potato, CBLM
Juhnriel T. Worksheet July 7, 2022
Diagnose faults Training
Working tables 8:00 am
of computer Resource Ongoing
Tagab, Desktop to
systems Center
Mark Computer 5:00 PM
Anthony C.
Tagab, CBLM
Rectify/correct Alexander Worksheet July 7, 2022
Practical Work
defects in C. Working tables 8:00 am
Area Ongoing
computer Desktop to
systems Tome, Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Inspect and test Crissel G. Worksheet July 7, 2022
Practical Work
the computer Working tables 8:00 am
Area Ongoing
systems and Duga, Desktop to
networks Annie Rose Computer 5:00 PM
S.
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
July 8, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
Dalangon, CBLM
Crissel G. Worksheet July 8, 2022
Assemble Training
Screwdriver 8:00 am
computer Resource Ongoing
hardware
Duga, (standard) to
Annie Rose Center
Working tables 5:00 PM
S.
Install operating CBLM
July 8, 2022
system and Edinan, Worksheet Training
Monamae 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ A. to
Desktop Center
devices. Computer
5:00 PM
CBLM
Install the Training July 8, 2022
Ladiero, Worksheet
computer Quenie A. Resource 8:00 am
Working tables Ongoing
application Center to
software Desktop
5:00 PM
Computer
CBLM
Contextual July 8, 2022
Conduct testing Lumigan, Worksheet
Learning 8:00 am
and Arnelyn S. Working tables Ongoing
documentation Laboratory to
Desktop
Computer
5:00 PM
CBLM
Magno, Worksheet
Kimberly Working tables
V. Desktop July 8, 2022
Computer Practical
Install network 8:00 am
Crimping tools Work Area Ongoing
cables to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network CBLM Practical Work July 8, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 73 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Manaban, Worksheet
Rosemarie
8:00 am
Working tables Area
configuration A. to
Desktop
5:00 PM
Computer
CBLM
Manait, Worksheet
Set router/Wi- Angelica July 8, 2022
Working tables
Fi/ wireless Mae V. Practical Work
Hub / Switch 8:00 am
access Area Ongoing
point/repeater ADSL Router to
configuration with Wi-Fi 5:00 PM
Wireless Access
Point
CBLM
Inspect and test Suson, Worksheet July 8, 2022
Glyza Mae Practical Work
the configured Working tables 8:00 am
M. Area Ongoing
computer Desktop to
networks Computer 5:00 PM
Caing, CBLM
Jaymark D. Worksheet July 8, 2022
Working tables Practical Work
Set-up user Coronel, 8:00 am
Desktop Area Ongoing
access Ryan L. to
Computer
5:00 PM
Wireless Access
Point
Dalangon, CBLM
Cloed B. Worksheet July 8, 2022
Configure Practical Work
Working tables 8:00 am
network Deniega, Area Ongoing
services Desktop to
Dave L. Computer 5:00 PM
Dinoy, CBLM
Perform testing, Lucricio C. Worksheet July 8, 2022
Contextual
documentation Working tables Learning 8:00 am
and pre- Tagab, Desktop Ongoing
Laboratory to
deployment Mark Computer
practices Anthony C. 5:00 PM
Lemera, CBLM
Arman T. Worksheet July 8, 2022
Maintain
Working tables Training
computer 8:00 am
Naigar, Desktop Resource Ongoing
systems and to
Vernen Cea Computer Center
networks 5:00 PM
L.
Ontolan, CBLM
July 8, 2022
Diagnose faults Vhen B. Worksheet Training
8:00 am
of computer Working tables Resource Ongoing
systems Potato, Center to
Desktop
Johnrel T. Computer
5:00 PM
Potato, CBLM
Rectify/correct Juhnriel T. Worksheet July 8, 2022
Practical Work
defects in Working tables 8:00 am
Area Ongoing
computer Tagab, Desktop to
systems Mark Computer 5:00 PM
Anthony C.
Tagab, CBLM
Inspect and test Alexander Worksheet July 8, 2022
Practical Work
the computer C. Working tables 8:00 am
Area Ongoing
systems and Desktop to
networks Tome, Computer 5:00 PM
Geryl D.
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
Tagab, CBLM
Alexander Worksheet July 11, 2022
Assemble Training
C. Screwdriver 8:00 am
computer Resource Ongoing
hardware (standard) to
Tome, Center
Working tables 5:00 PM
Geryl D.
Dalangon, CBLM
Install operating July 11, 2022
Crissel G. Worksheet
system and Training
Working tables 8:00 am
drivers for
Duga,
Resource Ongoing
peripherals/ Desktop to
Annie Rose Center
devices. Computer 5:00 PM
S.
CBLM
Install the Training July 11, 2022
Edinan, Worksheet
computer Monamae Resource 8:00 am
Working tables Ongoing
application A. Center to
software Desktop
5:00 PM
Computer
CBLM
Contextual July 11, 2022
Conduct testing Ladiero, Worksheet
Quenie A. Learning 8:00 am
and Working tables Ongoing
documentation Laboratory to
Desktop
Computer
5:00 PM
Install network Lumigan, CBLM Practical July 11, 2022 Ongoing
cables Arnelyn S. Worksheet Work Area 8:00 am
Working tables to
Desktop 5:00 PM
Computer
Crimping tools
Hub / Switch
LAN Cable
tester
RJ 45
CBLM
Suson, Worksheet
Glyza Mae
July 11, 2022
Working tables Practical Work
Set-up user M. 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
Caing, CBLM
Jaymark D. Worksheet July 11, 2022
Configure Practical Work
Working tables 8:00 am
network Coronel, Area Ongoing
services Desktop to
Ryan L. Computer 5:00 PM
Dalangon, CBLM
Perform testing, July 11, 2022
Cloed B. Worksheet Contextual
documentation
Working tables Learning 8:00 am
and pre- Ongoing
Deniega, Desktop Laboratory to
deployment
Dave L. Computer 5:00 PM
practices
Plan and prepare Dinoy, CBLM Contextual July 11, 2022 Ongoing
for maintenance Lucricio C. Worksheet Learning 8:00 am
and repair Working tables Laboratory to
Tagab, Desktop 5:00 PM
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 77 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Mark Computer
Anthony C.
Jocson, CBLM
Maintain Roland A. Worksheet July 11, 2022
Training
computer Working tables 8:00 am
Resource Ongoing
systems and Kilat, Desktop to
Center
networks Joshua T. Computer 5:00 PM
Lemera, CBLM
Arman T. Worksheet July 11, 2022
Diagnose faults Working tables Training
8:00 am
of computer Naigar, Desktop Resource Ongoing
systems Vernen Cea Center to
Computer 5:00 PM
L.
CBLM
Ontolan, July 11, 2022
Rectify/correct Worksheet
Vhen B. Practical Work
defects in Working tables 8:00 am
Area Ongoing
computer
Potato, Desktop to
systems Computer 5:00 PM
Johnrel T.
Potato, CBLM
Inspect and test Juhnriel T. Worksheet July 11, 2022
Practical Work
the computer Working tables 8:00 am
Area Ongoing
systems and Tagab, Desktop to
networks Mark Computer 5:00 PM
Anthony C.
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Potato, CBLM
Juhnriel T. Worksheet July 12, 2022
Assemble Training
Screwdriver 8:00 am
computer Resource Ongoing
hardware
Tagab, (standard) to
Mark Center
Working tables 5:00 PM
Anthony C.
Tagab, CBLM
Install operating July 12, 2022
Alexander Worksheet
system and Training
C. Working tables 8:00 am
drivers for Resource Ongoing
peripherals/ Desktop to
Tome, Center
devices. Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Install the Crissel G. Worksheet Training July 12, 2022
computer Working tables Resource 8:00 am
Ongoing
application Duga, Desktop Center to
software Annie Rose Computer 5:00 PM
S.
CBLM
Contextual July 12, 2022
Conduct testing Edinan, Worksheet
Monamae Learning 8:00 am
and Working tables Ongoing
documentation A. Laboratory to
Desktop
Computer
5:00 PM
Install network CBLM Practical July 12, 2022 Ongoing
cables Ladiero, Worksheet Work Area 8:00 am
Quenie A. Working tables to
Desktop 5:00 PM
Computer
Crimping tools
Hub / Switch
LAN Cable
tester
RJ 45
CBLM
Manait, Worksheet
Angelica
July 12, 2022
Working tables Practical Work
Set-up user Mae V. 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Suson, Worksheet July 12, 2022
Configure Glyza Mae Practical Work
Working tables 8:00 am
network M. Area Ongoing
services Desktop to
Computer 5:00 PM
Caing, CBLM
Perform testing, July 12, 2022
Jaymark D. Worksheet Contextual
documentation
Working tables Learning 8:00 am
and pre- Ongoing
Coronel, Desktop Laboratory to
deployment
Ryan L. Computer 5:00 PM
practices
Plan and prepare Dalangon, CBLM Contextual July 12, 2022 Ongoing
for maintenance Cloed B. Worksheet Learning 8:00 am
and repair Working tables Laboratory to
Deniega, Desktop 5:00 PM
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 80 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Dave L. Computer
Dinoy, CBLM
Lucricio C. Worksheet July 12, 2022
Maintain
Working tables Training
computer 8:00 am
Tagab, Desktop Resource Ongoing
systems and
Mark Center to
networks Computer 5:00 PM
Anthony C.
Jocson, CBLM
Roland A. Worksheet July 12, 2022
Diagnose faults Training
Working tables 8:00 am
of computer Resource Ongoing
Kilat, Desktop to
systems Center
Joshua T. Computer 5:00 PM
Lemera, CBLM
Arman T. Worksheet July 12, 2022
Rectify/correct
Working tables Practical Work
defects in 8:00 am
Naigar, Desktop Area Ongoing
computer to
Vernen Cea Computer
systems 5:00 PM
L.
Ontolan, CBLM
Inspect and test July 12, 2022
Vhen B. Worksheet Practical Work
the computer 8:00 am
Working tables Area Ongoing
systems and to
Potato, Desktop
networks 5:00 PM
Johnrel T. Computer
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Ontolan, CBLM
July 13, 2022
Assemble Vhen B. Worksheet Training
8:00 am
computer Screwdriver Resource Ongoing
hardware Potato, to
(standard) Center
Johnrel T. Working tables
5:00 PM
Potato, CBLM
Install operating July 13, 2022
Juhnriel T. Worksheet
system and Training
Working tables 8:00 am
drivers for
Tagab,
Resource Ongoing
peripherals/ Desktop to
Mark Center
devices. Computer 5:00 PM
Anthony C.
Tagab, CBLM
Install the Alexander Worksheet Training July 13, 2022
computer C. Working tables Resource 8:00 am
Ongoing
application Desktop Center to
software Tome, Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Crissel G. Worksheet Contextual July 13, 2022
Conduct testing
Working tables Learning 8:00 am
and Ongoing
Duga, Desktop Laboratory to
documentation
Annie Rose Computer 5:00 PM
S.
Install network CBLM Practical July 13, 2022 Ongoing
cables Edinan, Worksheet Work Area 8:00 am
Monamae Working tables to
A. Desktop 5:00 PM
Computer
Crimping tools
Hub / Switch
LAN Cable
tester
RJ 45
CBLM
Manaban, Worksheet
Rosemarie
July 13, 2022
Working tables Practical Work
Set-up user A. 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Manait, Worksheet July 13, 2022
Configure Angelica Practical Work
Working tables 8:00 am
network Mae V. Area Ongoing
services Desktop to
Computer 5:00 PM
Jocson, CBLM
Rectify/correct Roland A. Worksheet July 13, 2022
Practical Work
defects in Working tables 8:00 am
Area Ongoing
computer Kilat, Desktop to
systems Joshua T. Computer 5:00 PM
Lemera, CBLM
Arman T. Worksheet July 13, 2022
Inspect and test
Working tables Practical Work
the computer 8:00 am
Naigar, Desktop Area Ongoing
systems and
Vernen Cea to
networks Computer 5:00 PM
L.
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer
Unfreezing
All trainees
Activities
Feedback of
Training
Lemera, CBLM
Arman T. Worksheet July 14, 2022
Assemble Training
Screwdriver 8:00 am
computer
Naigar,
Resource Ongoing
hardware (standard) to
Vernen Cea Center
Working tables 5:00 PM
L.
Install operating Ontolan, CBLM
July 14, 2022
system and Vhen B. Worksheet Training
8:00 am
drivers for Working tables Resource Ongoing
peripherals/ Potato, to
Desktop Center
devices. Johnrel T. 5:00 PM
Computer
Potato, CBLM
Install the Juhnriel T. Worksheet Training July 14, 2022
computer Working tables Resource 8:00 am
Ongoing
application Tagab, Desktop Center to
software Mark Computer 5:00 PM
Anthony C.
Tagab, CBLM
Alexander Worksheet Contextual July 14, 2022
Conduct testing
C. Working tables Learning 8:00 am
and Ongoing
documentation Desktop Laboratory to
Tome, Computer 5:00 PM
Geryl D.
Install network Dalangon, CBLM Practical July 14, 2022 Ongoing
cables Crissel G. Worksheet Work Area 8:00 am
Working tables to
Duga, Desktop 5:00 PM
Annie Rose Computer
S. Crimping tools
Hub / Switch
LAN Cable
tester
CBLM
Magno, Worksheet
Kimberly
July 14, 2022
Working tables Practical Work
Set-up user V. 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Manaban, Worksheet July 14, 2022
Configure Rosemarie Practical Work
Working tables 8:00 am
network A. Area Ongoing
services Desktop to
Computer 5:00 PM
Jocson, CBLM
Inspect and test Roland A. Worksheet July 14, 2022
Practical Work
the computer Working tables 8:00 am
Area Ongoing
systems and Kilat, Desktop to
networks Joshua T. Computer 5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Jocson, CBLM
July 15, 2022
Assemble Roland A. Worksheet Training
8:00 am
computer Screwdriver Resource Ongoing
hardware Kilat, to
(standard) Center
Joshua T. Working tables
5:00 PM
Lemera, CBLM
Install operating Arman T. July 15, 2022
Worksheet Training
system and
Working tables 8:00 am
drivers for Naigar, Resource Ongoing
peripherals/ Desktop to
Vernen Cea Center
devices. Computer 5:00 PM
L.
Ontolan, CBLM
Install the Training July 15, 2022
Vhen B. Worksheet
computer Resource 8:00 am
Working tables Ongoing
application Potato, Center to
software Desktop
Johnrel T. 5:00 PM
Computer
Potato, CBLM
Juhnriel T. Worksheet Contextual July 15, 2022
Conduct testing
Working tables Learning 8:00 am
and Ongoing
documentation
Tagab, Desktop Laboratory to
Mark Computer 5:00 PM
Anthony C.
Tagab, CBLM
Alexander Worksheet
C. Working tables
Desktop
Tome, July 15, 2022
Computer Practical
Install network Geryl D. 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 88 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Dalangon, CBLM
Crissel G. Worksheet July 15, 2022
Practical Work
Set network Working tables 8:00 am
Area Ongoing
configuration Duga, Desktop to
Annie Rose Computer 5:00 PM
S.
CBLM
Edinan, Worksheet
Set router/Wi- Monamae July 15, 2022
Working tables
Fi/ wireless A. Practical Work
Hub / Switch 8:00 am
access Area Ongoing
point/repeater ADSL Router to
configuration with Wi-Fi 5:00 PM
Wireless Access
Point
CBLM
Inspect and test Ladiero, Worksheet July 15, 2022
Quenie A. Practical Work
the configured Working tables 8:00 am
Area Ongoing
computer Desktop to
networks Computer 5:00 PM
CBLM
Worksheet July 15, 2022
Lumigan, Working tables Practical Work
Set-up user 8:00 am
Arnelyn S. Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Magno, Worksheet July 15, 2022
Configure Kimberly Practical Work
Working tables 8:00 am
network V. Area Ongoing
services Desktop to
Computer 5:00 PM
Dinoy, CBLM
Lucricio C. Worksheet July 15, 2022
Inspect and test
Working tables Practical Work
the computer 8:00 am
Tagab, Desktop Area Ongoing
systems and to
Mark Computer
networks 5:00 PM
Anthony C.
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Dinoy, CBLM
Lucricio C. Worksheet July 18, 2022
Assemble Training
Screwdriver 8:00 am
computer Resource Ongoing
hardware
Tagab, (standard) to
Mark Center
Working tables 5:00 PM
Anthony C.
Install operating Jocson, CBLM
July 18, 2022
system and Roland A. Worksheet Training
8:00 am
drivers for Working tables Resource Ongoing
peripherals/ Kilat, to
Desktop Center
devices. Joshua T. Computer
5:00 PM
Lemera, CBLM
Install the Arman T. Worksheet Training July 18, 2022
computer Working tables Resource 8:00 am
Ongoing
application Naigar, Desktop Center to
software Vernen Cea Computer 5:00 PM
L.
Ontolan, CBLM
Contextual July 18, 2022
Conduct testing Vhen B. Worksheet
Learning 8:00 am
and Working tables Ongoing
documentation Potato, Laboratory to
Desktop
Johnrel T. 5:00 PM
Computer
Potato, CBLM
Juhnriel T. Worksheet
Working tables
Tagab, Desktop
Mark July 18, 2022
Computer Practical
Install network Anthony C. 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 91 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Tagab, CBLM
Alexander Worksheet July 18, 2022
Practical Work
Set network C. Working tables 8:00 am
Area Ongoing
configuration Desktop to
Tome, Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Crissel G. Worksheet
Set router/Wi- July 18, 2022
Working tables
Fi/ wireless Duga, Practical Work
Hub / Switch 8:00 am
access Annie Rose Area Ongoing
point/repeater ADSL Router to
S. with Wi-Fi 5:00 PM
configuration
Wireless Access
Point
CBLM
Inspect and test Edinan, Worksheet July 18, 2022
Monamae Practical Work
the configured Working tables 8:00 am
A. Area Ongoing
computer Desktop to
networks Computer 5:00 PM
CBLM
Ladiero, Worksheet
Quenie A. July 18, 2022
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Worksheet July 18, 2022
Configure Lumigan, Practical Work
Working tables 8:00 am
network Arnelyn S. Area Ongoing
services Desktop to
Computer 5:00 PM
Dalangon, CBLM
Inspect and test Cloed B. Worksheet July 18, 2022
Practical Work
the computer Working tables 8:00 am
Area Ongoing
systems and Deniega, Desktop to
networks Dave L. Computer 5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Dalangon, CBLM
July 19, 2022
Assemble Cloed B. Worksheet Training
8:00 am
computer Screwdriver Resource Ongoing
hardware Deniega, to
(standard) Center
Dave L. Working tables
5:00 PM
Dinoy, CBLM
Install operating July 19, 2022
Lucricio C. Worksheet
system and Training
Working tables 8:00 am
drivers for
Tagab,
Resource Ongoing
peripherals/ Desktop to
Mark Center
devices. Computer 5:00 PM
Anthony C.
Jocson, CBLM
Install the Training July 19, 2022
Roland A. Worksheet
computer Resource 8:00 am
Working tables Ongoing
application Kilat, Center to
software Desktop
Joshua T. 5:00 PM
Computer
Lemera, CBLM
Arman T. Worksheet Contextual July 19, 2022
Conduct testing
Working tables Learning 8:00 am
and Ongoing
documentation
Naigar, Desktop Laboratory to
Vernen Cea Computer 5:00 PM
L.
Ontolan, CBLM
Vhen B. Worksheet
Working tables
Potato, Desktop
Johnrel T. July 19, 2022
Computer Practical
Install network 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 94 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Potato, CBLM
Juhnriel T. Worksheet July 19, 2022
Practical Work
Set network Working tables 8:00 am
Area Ongoing
configuration Tagab, Desktop to
Mark Computer 5:00 PM
Anthony C.
Tagab, CBLM
Alexander Worksheet
Set router/Wi- C. July 19, 2022
Working tables
Fi/ wireless Practical Work
Hub / Switch 8:00 am
access Tome, Area Ongoing
point/repeater ADSL Router to
Geryl D. with Wi-Fi 5:00 PM
configuration
Wireless Access
Point
Dalangon, CBLM
Inspect and test Crissel G. Worksheet July 19, 2022
Practical Work
the configured Working tables 8:00 am
Duga, Area Ongoing
computer Desktop to
networks Annie Rose Computer 5:00 PM
S.
CBLM
Edinan, Worksheet
Monamae July 19, 2022
Working tables Practical Work
Set-up user A. 8:00 am
Desktop Area Ongoing
access to
Computer
5:00 PM
Wireless Access
Point
CBLM
Ladiero, Worksheet July 19, 2022
Configure Quenie A. Practical Work
Working tables 8:00 am
network Area Ongoing
services Desktop to
Computer 5:00 PM
Caing, CBLM
Inspect and test Jaymark D. Worksheet July 19, 2022
Practical Work
the computer Working tables 8:00 am
Area Ongoing
systems and Coronel, Desktop to
networks Ryan L. Computer 5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
Caing, CBLM
July 20, 2022
Assemble Jaymark D. Worksheet Training
8:00 am
computer Screwdriver Resource Ongoing
hardware Coronel, to
(standard) Center
Ryan L. Working tables
5:00 PM
Install operating Dalangon, CBLM
July 20, 2022
system and Cloed B. Worksheet Training
8:00 am
drivers for Working tables Resource Ongoing
peripherals/ Deniega, to
Desktop Center
devices. Dave L. 5:00 PM
Computer
Dinoy, CBLM
Install the Lucricio C. Worksheet Training July 20, 2022
computer Working tables Resource 8:00 am
Ongoing
application Tagab, Desktop Center to
software Mark Computer 5:00 PM
Anthony C.
Jocson, CBLM
Contextual July 20, 2022
Conduct testing Roland A. Worksheet
Learning 8:00 am
and Working tables Ongoing
documentation Kilat, Laboratory to
Desktop
Joshua T. Computer
5:00 PM
Lemera, CBLM
Arman T. Worksheet
Working tables
Naigar, Desktop
Vernen Cea July 20, 2022
Computer Practical
Install network L. 8:00 am
Crimping tools Work Area Ongoing
cables to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network Ontolan, CBLM Practical Work July 20, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 97 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Vhen B. Worksheet
8:00 am
Working tables Area
configuration Potato, to
Desktop
Johnrel T. 5:00 PM
Computer
Potato, CBLM
Juhnriel T. Worksheet
Set router/Wi- July 20, 2022
Working tables
Fi/ wireless Tagab, Practical Work
Hub / Switch 8:00 am
access Mark Area Ongoing
point/repeater ADSL Router to
Anthony C. with Wi-Fi 5:00 PM
configuration
Wireless Access
Point
Tagab, CBLM
Inspect and test Alexander Worksheet July 20, 2022
C. Practical Work
the configured Working tables 8:00 am
Area Ongoing
computer Desktop to
networks Tome, Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Crissel G. Worksheet July 20, 2022
Working tables Practical Work
Set-up user Duga, 8:00 am
Desktop Area Ongoing
access Annie Rose to
Computer
S. 5:00 PM
Wireless Access
Point
CBLM
Edinan, Worksheet July 20, 2022
Configure Monamae Practical Work
Working tables 8:00 am
network A. Area Ongoing
services Desktop to
Computer 5:00 PM
CBLM
Inspect and test July 20, 2022
Suson, Worksheet Practical Work
the computer Glyza Mae 8:00 am
Working tables Area Ongoing
systems and M. to
networks Desktop
Computer
5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
July 21, 2022
Assemble Suson, Worksheet Training
Glyza Mae 8:00 am
computer Screwdriver Resource Ongoing
hardware M. to
(standard) Center
Working tables
5:00 PM
Install operating Caing, CBLM
July 21, 2022
system and Jaymark D. Worksheet Training
8:00 am
drivers for Working tables Resource Ongoing
peripherals/ Coronel, to
Desktop Center
devices. Ryan L. 5:00 PM
Computer
Dalangon, CBLM
Install the Training July 21, 2022
Cloed B. Worksheet
computer Resource 8:00 am
Working tables Ongoing
application Deniega, Center to
software Desktop
Dave L. Computer
5:00 PM
Dinoy, CBLM
Lucricio C. Worksheet Contextual July 21, 2022
Conduct testing
Working tables Learning 8:00 am
and Ongoing
Tagab, Desktop Laboratory to
documentation
Mark Computer 5:00 PM
Anthony C.
Jocson, CBLM
Roland A. Worksheet
Working tables
Kilat, Desktop
Joshua T. July 21, 2022
Computer Practical
Install network 8:00 am
Crimping tools Work Area Ongoing
cables to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network Lemera, CBLM Practical Work July 21, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 100 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Arman T. Worksheet
Working tables 8:00 am
Area
configuration Naigar, Desktop to
Vernen Cea Computer 5:00 PM
L.
Ontolan, CBLM
Vhen B. Worksheet
Set router/Wi- July 21, 2022
Working tables
Fi/ wireless Potato, Practical Work
Hub / Switch 8:00 am
access Johnrel T. Area Ongoing
point/repeater ADSL Router to
configuration with Wi-Fi 5:00 PM
Wireless Access
Point
Potato, CBLM
Inspect and test Juhnriel T. Worksheet July 21, 2022
Practical Work
the configured Working tables 8:00 am
Tagab, Area Ongoing
computer Desktop to
networks Mark Computer 5:00 PM
Anthony C.
Tagab, CBLM
Alexander Worksheet
C.
July 21, 2022
Working tables Practical Work
Set-up user 8:00 am
Desktop Area Ongoing
access Tome, to
Computer
Geryl D. 5:00 PM
Wireless Access
Point
Dalangon, CBLM
Crissel G. Worksheet July 21, 2022
Configure Practical Work
Working tables 8:00 am
network Duga, Area Ongoing
services Desktop to
Annie Rose Computer 5:00 PM
S.
Perform testing, CBLM
Contextual July 21, 2022
documentation Edinan, Worksheet
Monamae Learning 8:00 am
and pre- Working tables Ongoing
deployment A. Laboratory to
Desktop
practices 5:00 PM
Computer
CBLM
Contextual July 21, 2022
Plan and prepare Ladiero, Worksheet
Quenie A. Learning 8:00 am
for maintenance Working tables Ongoing
Laboratory to
and repair Desktop
Computer
5:00 PM
Maintain Lumigan, CBLM Training July 21, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 101 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Worksheet
computer 8:00 am
Arnelyn S. Working tables Resource
systems and to
Desktop Center
networks 5:00 PM
Computer
CBLM
July 21, 2022
Diagnose faults Magno, Worksheet Training
Kimberly 8:00 am
of computer Working tables Resource Ongoing
systems V. Center to
Desktop
5:00 PM
Computer
CBLM
Rectify/correct Manaban, Worksheet July 21, 2022
Rosemarie Practical Work
defects in Working tables 8:00 am
A. Area Ongoing
computer Desktop to
systems Computer 5:00 PM
CBLM
Inspect and test July 21, 2022
Manait, Worksheet Practical Work
the computer Angelica 8:00 am
Working tables Area Ongoing
systems and Mae V. to
networks Desktop
Computer
5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
July 21, 2022
Assemble Manait, Worksheet Training
Angelica 8:00 am
computer Screwdriver Resource Ongoing
hardware Mae V. to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
July 21, 2022
system and Suson, Worksheet Training
Glyza Mae 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ M. to
Desktop Center
devices. 5:00 PM
Computer
Caing, CBLM
Install the Training July 21, 2022
Jaymark D. Worksheet
computer Resource 8:00 am
Working tables Ongoing
application Coronel, Center to
software Desktop
Ryan L. Computer
5:00 PM
Dalangon, CBLM
Contextual July 21, 2022
Conduct testing Cloed B. Worksheet
Learning 8:00 am
and Working tables Ongoing
documentation Deniega, Laboratory to
Desktop
Dave L. Computer
5:00 PM
Dinoy, CBLM
Lucricio C. Worksheet
Working tables
Tagab, Desktop
Mark July 21, 2022
Computer Practical
Install network Anthony C. 8:00 am
cables
Crimping tools Work Area Ongoing
to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
Set network Jocson, CBLM Practical Work July 21, 2022 Ongoing
Potato, CBLM
Juhnriel T. Worksheet July 21, 2022
Working tables Practical Work
Set-up user Tagab, 8:00 am
Desktop Area Ongoing
access Mark to
Computer
Anthony C. 5:00 PM
Wireless Access
Point
Tagab, CBLM
Alexander Worksheet July 21, 2022
Configure C. Practical Work
Working tables 8:00 am
network Area Ongoing
services Desktop to
Tome, Computer 5:00 PM
Geryl D.
Dalangon, CBLM
Perform testing, July 21, 2022
Crissel G. Worksheet Contextual
documentation
Working tables Learning 8:00 am
and pre- Ongoing
Duga, Desktop Laboratory to
deployment
Annie Rose Computer 5:00 PM
practices
S.
CBLM
Contextual July 21, 2022
Plan and prepare Edinan, Worksheet
Monamae Learning 8:00 am
for maintenance Working tables Ongoing
and repair A. Laboratory to
Desktop
5:00 PM
Computer
Maintain CBLM Training July 21, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 104 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Ladiero, Worksheet
computer Quenie A.
8:00 am
Working tables Resource
systems and to
Desktop Center
networks 5:00 PM
Computer
CBLM
July 21, 2022
Diagnose faults Lumigan, Worksheet Training
8:00 am
of computer Arnelyn S. Working tables Resource Ongoing
systems Center to
Desktop
5:00 PM
Computer
CBLM
Rectify/correct Magno, Worksheet July 21, 2022
Kimberly Practical Work
defects in Working tables 8:00 am
V. Area Ongoing
computer Desktop to
systems Computer 5:00 PM
CBLM
Inspect and test July 21, 2022
Manaban, Worksheet Practical Work
the computer Rosemarie 8:00 am
Working tables Area Ongoing
systems and A. to
networks Desktop
Computer
5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Unfreezing
All trainees
Activities
Feedback of
Training
CBLM
July 21, 2022
Assemble Manaban, Worksheet Training
Rosemarie 8:00 am
computer Screwdriver Resource Ongoing
hardware A. to
(standard) Center
Working tables
5:00 PM
Install operating CBLM
July 21, 2022
system and Manait, Worksheet Training
Angelica 8:00 am
drivers for Working tables Resource Ongoing
peripherals/ Mae V. to
Desktop Center
devices. Computer
5:00 PM
CBLM
Install the Training July 21, 2022
Suson, Worksheet
computer Glyza Mae Resource 8:00 am
Working tables Ongoing
application M. Center to
software Desktop
5:00 PM
Computer
Caing, CBLM
Contextual July 21, 2022
Conduct testing Jaymark D. Worksheet
Learning 8:00 am
and Working tables Ongoing
documentation Coronel, Laboratory to
Desktop
Ryan L. Computer
5:00 PM
Dalangon, CBLM
Cloed B. Worksheet
Working tables
Deniega, Desktop
Dave L. July 21, 2022
Computer Practical
Install network 8:00 am
Crimping tools Work Area Ongoing
cables to
Hub / Switch
5:00 PM
LAN Cable
tester
RJ 45
UTP cable
CBLM
Inspect and test July 21, 2022
Magno, Worksheet Practical Work
the computer Kimberly 8:00 am
Working tables Area Ongoing
systems and V. to
networks Desktop
Computer
5:00 PM
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
Evelyn L. Alegre
CSS Trainer
Evelyn L. Alegre
CSS Trainer
Prepared by:
EVELYN L. ALEGRE
CSS Trainer
OBJECTIVE:
This evaluation instrument aims to gather remarks and comments of the participants related
to the conduct of the Computer Systems Servicing NCII. This will serve as a tool in the
improvement and strengthening of the program.
Part I. Program Evaluation
INSTRUCTIONS:
Please rate the following program components in terms of the indicators provided below by
ticking (/) the column that best describes your evaluation of each program component. Your
rating will be treated confidentially.
Adjective Rating Numerical Rating
Outstanding 5
Very Good/Very Adequate 4
Good/Adequate 3
Fair/Satisfactory/Average 2
Inadequate/Unsatisfactory/Poor 1
NAME:
___________________________________________________
POSITION/DESIGNATION:
__________________________________________________
ORGANIZATION/INSTITUTION:
________________________________________________
DATE:
________________________________________________
Feedback
Please indicate your recommended training program to be offered by this Training
Institution
45
40
35
30
25
PRE TEST
20 POST TEST
15
10
5
Date Developed: Document No.
0
July 27, 2022 Issued
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 by:
Computer
System Developed by:
Page 119 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
T-TEST: Paired Two Sample for Means
Post-test Pre-test
Mean 32.68 25.68
Variance 32.06 49.81
Observations 25 25
Pearson Correlation 0.633362163
Hypothesized Mean Difference 0
df 24
t Stat 6.260990337
P(T<=t) one-tail 8.99918E-07
t Critical one-tail 1.71088208
P(T<=t) two-tail 1.79984E-06
t Critical two-tail 2.063898562