100% found this document useful (1 vote)
223 views120 pages

Training Activity Matrix

The document is a daily training activity matrix that outlines the schedule for trainees on June 6, 2022. It details the various training activities, locations, equipment used, and names of trainees. Activities included assembling computer hardware, installing operating systems and software, setting up networks and wireless access, and testing and maintaining computer systems. The full day of activities from 8:00am to 5:00pm was aimed at providing hands-on experience for the trainees.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
223 views120 pages

Training Activity Matrix

The document is a daily training activity matrix that outlines the schedule for trainees on June 6, 2022. It details the various training activities, locations, equipment used, and names of trainees. Activities included assembling computer hardware, installing operating systems and software, setting up networks and wireless access, and testing and maintaining computer systems. The full day of activities from 8:00am to 5:00pm was aimed at providing hands-on experience for the trainees.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 120

DAILY TRAINING ACTIVITY MATRIX

June 6, 2022
Venue
Training Facilities/Tools Date &
Trainee (Workstation/ Remarks
Activity and Equipment Time
Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Caing,  CBLM
Jaymark D.  Worksheet Training June 6, 2022
Assemble
 Screwdriver 8:00 am
computer Resource Ongoing
Coronel, (standard) to
hardware Center
Ryan L.  Working tables 5:00 PM

Dalangon,  CBLM
Install operating
Cloed B.  Worksheet Training June 6, 2022
system and
 Working tables 8:00 am
drivers for Resource Ongoing
Deniega,  Desktop to
peripherals/ Center
Dave L. Computer 5:00 PM
devices.
Dinoy,  CBLM
Lucricio C.  Worksheet
Install the Training June 6, 2022
computer  Working tables Resource 8:00 am
Tagab,  Desktop Ongoing
application Center to
Mark Computer
software 5:00 PM
Anthony C.

Jocson,  CBLM
Roland A.  Worksheet Contextual June 6, 2022
Conduct testing
 Working tables Learning 8:00 am
and Ongoing
Kilat,  Desktop Laboratory to
documentation
Joshua T. Computer 5:00 PM

Install network Lemera,  CBLM Practical June 6, 2022 Ongoing


cables Arman T.  Worksheet Work Area 8:00 am
 Working tables to
Naigar,  Desktop 5:00 PM
Vernen Cea Computer
L.  Crimping tools
 Hub / Switch
 LAN Cable

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 1 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools Date &
Trainee (Workstation/ Remarks
Activity and Equipment Time
Area)
tester
 RJ 45
 UTP cable
Ontolan,  CBLM
Vhen B.  Worksheet Practical Work
June 6, 2022
Set network 8:00 am
 Working tables Area Ongoing
configuration to
Potato,  Desktop 5:00 PM
Johnrel T. Computer
 CBLM
Potato,  Worksheet
Set router/Wi- Juhnriel T.
 Working tables June 6, 2022
Fi/ wireless Practical Work
 Hub / Switch 8:00 am
access Tagab, Area Ongoing
 ADSL Router to
point/repeater Mark
with Wi-Fi 5:00 PM
configuration Anthony C.
 Wireless Access
Point
Tagab,  CBLM
Alexander  Worksheet
Inspect and test
C. Practical Work
June 6, 2022
the configured  Working tables 8:00 am
 Desktop Area Ongoing
computer to
Tome, Computer
networks 5:00 PM
Geryl D.

 CBLM
Dalangon,
 Worksheet
Crissel G. June 6, 2022
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access Duga, to
Annie Rose Computer
5:00 PM
S.  Wireless Access
Point
 CBLM
Edinan,
Configure Monamae
 Worksheet
Practical Work
June 6, 2022
 Working tables 8:00 am
network A. Area Ongoing
 Desktop to
services
Computer 5:00 PM

Perform testing,  CBLM Ongoing


documentation Ladiero,  Worksheet
Contextual June 6, 2022
Learning 8:00 am
and pre- Quenie A.  Working tables Laboratory to
deployment  Desktop 5:00 PM
practices Computer
Plan and prepare Lumigan,  CBLM Contextual June 6, 2022 Ongoing
for maintenance Arnelyn S.  Worksheet Learning 8:00 am
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 2 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools Date &
Trainee (Workstation/ Remarks
Activity and Equipment Time
Area)
 Working tables
Laboratory to
and repair  Desktop 5:00 PM
Computer
 CBLM
Maintain Magno,
 Worksheet Training
June 6, 2022
computer Kimberly 8:00 am
 Working tables Resource Ongoing
systems and V. to
 Desktop Center
networks 5:00 PM
Computer
 CBLM
Manaban,
 Worksheet
June 6, 2022
Diagnose faults Training
Rosemarie 8:00 am
of computer  Working tables Resource Ongoing
A. to
systems  Desktop Center
5:00 PM
Computer
 CBLM
Rectify/correct Manait,  Worksheet
Practical Work
June 6, 2022
defects in Angelica  Working tables 8:00 am
Area Ongoing
computer Mae V.  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test Suson,
 Worksheet Practical Work
June 6, 2022
the computer Glyza Mae 8:00 am
 Working tables Area Ongoing
systems and M. to
networks  Desktop 5:00 PM
Computer

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 3 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 7, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
June 7, 2022
Assemble Suson, Glyza  Worksheet Training
Mae M. 8:00 am
computer  Screwdriver Resource Ongoing
hardware to
(standard) Center
 Working tables
5:00 PM
Install Caing,  CBLM
operating Jaymark D.  Worksheet June 7, 2022
Training
system and  Working tables 8:00 am
drivers for Coronel, Ryan
Resource Ongoing
 Desktop to
peripherals/ L. Center
Computer 5:00 PM
devices.
Dalangon,  CBLM
Install the Cloed B.  Worksheet Training June 7, 2022
computer  Working tables Resource 8:00 am
Ongoing
application Deniega, Dave  Desktop Center to
software L. Computer 5:00 PM
Dinoy,  CBLM
Conduct Lucricio C.  Worksheet Contextual June 7, 2022
testing and  Working tables Learning 8:00 am
Ongoing
documentati Tagab, Mark  Desktop Laboratory to
on Anthony C. Computer 5:00 PM
Install Jocson,  CBLM Practical June 7, 2022 Ongoing
network Roland A.  Worksheet Work Area 8:00 am
cables  Working tables to
Kilat, Joshua  Desktop 5:00 PM
T. Computer
 Crimping tools
 Hub / Switch
 LAN Cable
tester
 RJ 45

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 4 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 UTP cable
Lemera,  CBLM
Arman T.  Worksheet June 7, 2022
Practical Work
Set network  Working tables 8:00 am
Area Ongoing
configuration Naigar,  Desktop to
Vernen Cea L. Computer 5:00 PM

 CBLM
Set  Worksheet
Ontolan, Vhen
router/Wi-Fi/ June 7, 2022
B.  Working tables
wireless Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeate
Potato, Johnrel  ADSL Router to
T. with Wi-Fi 5:00 PM
r
configuration  Wireless Access
Point
Potato,  CBLM
Inspect and June 7, 2022
Juhnriel T.  Worksheet
test the Practical Work
 Working tables 8:00 am
configured Area Ongoing
computer
Tagab, Mark  Desktop to
Anthony C. Computer 5:00 PM
networks

 CBLM
Tagab,
 Worksheet
Alexander C. June 7, 2022
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access Tome, Geryl to
D. Computer
5:00 PM
 Wireless Access
Point
Dalangon,  CBLM
Crissel G.  Worksheet June 7, 2022
Configure Practical Work
 Working tables 8:00 am
network Area Ongoing
services
Duga, Annie  Desktop to
Rose S. Computer 5:00 PM

Perform  CBLM
testing,  Worksheet Contextual June 7, 2022
Edinan,
documentati  Working tables Learning 8:00 am
Monamae A. Ongoing
on and pre-  Desktop Laboratory to
deployment Computer 5:00 PM
practices
Plan and Ladiero,  CBLM Contextual June 7, 2022 Ongoing
prepare for Quenie A.  Worksheet Learning 8:00 am
maintenance  Working tables Laboratory to
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 5 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Desktop
and repair 5:00 PM
Computer
 CBLM
Maintain June 7, 2022
Lumigan,  Worksheet Training
computer 8:00 am
Arnelyn S.  Working tables Resource Ongoing
systems and
Center to
networks  Desktop
5:00 PM
Computer
 CBLM
Diagnose June 7, 2022
Magno,  Worksheet Training
faults of 8:00 am
Kimberly V.  Working tables Resource Ongoing
computer to
 Desktop Center
systems 5:00 PM
Computer
 CBLM
Rectify/ June 7, 2022
 Worksheet
correct Manaban, Practical Work
 Working tables 8:00 am
defects in Rosemarie A. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

Inspect and  CBLM


Manait, June 7, 2022
test the  Worksheet Practical Work
Angelica Mae 8:00 am
computer  Working tables Area Ongoing
systems and
V. to
 Desktop
networks 5:00 PM
Computer

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 6 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 8, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
June 8, 2022
Assemble Manait,  Worksheet Training
Angelica Mae 8:00 am
computer  Screwdriver Resource Ongoing
hardware V. to
(standard) Center
 Working tables
5:00 PM
Install  CBLM
operating Suson, Glyza  Worksheet June 8, 2022
Training
system and Mae M.  Working tables 8:00 am
drivers for
Resource Ongoing
 Desktop to
peripherals/ Center
Computer 5:00 PM
devices.
Caing,  CBLM
Install the Jaymark D.  Worksheet Training June 8, 2022
computer  Working tables Resource 8:00 am
Ongoing
application Coronel, Ryan  Desktop Center to
software L. Computer 5:00 PM
Dalangon,  CBLM
Conduct Cloed B.  Worksheet Contextual June 8, 2022
testing and  Working tables Learning 8:00 am
Ongoing
documentati Deniega, Dave  Desktop Laboratory to
on L. Computer 5:00 PM
Install Dinoy,  CBLM Practical June 8, 2022 Ongoing
network Lucricio C.  Worksheet Work Area 8:00 am
cables  Working tables to
Tagab, Mark  Desktop 5:00 PM
Anthony C. Computer
 Crimping tools
 Hub / Switch
 LAN Cable
tester
 RJ 45

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 7 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 UTP cable
Jocson,  CBLM
Roland A.  Worksheet June 8, 2022
Practical Work
Set network  Working tables 8:00 am
Area Ongoing
configuration Kilat, Joshua  Desktop to
T. Computer 5:00 PM

 CBLM
Set  Worksheet
router/Wi-Fi/ Lemera, June 8, 2022
 Working tables
wireless Arman T. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeate Naigar,  ADSL Router to
r Vernen Cea L. with Wi-Fi 5:00 PM
configuration  Wireless Access
Point
Ontolan, Vhen  CBLM
Inspect and June 8, 2022
B.  Worksheet
test the Practical Work
 Working tables 8:00 am
configured Area Ongoing
computer
Potato, Johnrel  Desktop to
T. Computer 5:00 PM
networks

 CBLM
Potato,
 Worksheet
Juhnriel T. June 8, 2022
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access Tagab, Mark to
Anthony C. Computer
5:00 PM
 Wireless Access
Point
Tagab,  CBLM
Alexander C.  Worksheet June 8, 2022
Configure Practical Work
 Working tables 8:00 am
network Area Ongoing
services
Tome, Geryl  Desktop to
D. Computer 5:00 PM

Perform Dalangon,  CBLM


testing, Crissel G.  Worksheet Contextual June 8, 2022
documentati  Working tables Learning 8:00 am
Ongoing
on and pre- Duga, Annie  Desktop Laboratory to
deployment Rose S. Computer 5:00 PM
practices
Plan and Edinan,  CBLM Contextual June 8, 2022 Ongoing
prepare for Monamae A.  Worksheet Learning 8:00 am
maintenance  Working tables Laboratory to
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 8 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Desktop
and repair 5:00 PM
Computer
 CBLM
Maintain June 8, 2022
Ladiero,  Worksheet Training
computer 8:00 am
Quenie A.  Working tables Resource Ongoing
systems and
Center to
networks  Desktop
5:00 PM
Computer
 CBLM
Diagnose June 8, 2022
Lumigan,  Worksheet Training
faults of 8:00 am
Arnelyn S.  Working tables Resource Ongoing
computer to
 Desktop Center
systems 5:00 PM
Computer
 CBLM
Rectify/ June 8, 2022
 Worksheet
correct Magno, Practical Work
 Working tables 8:00 am
defects in Kimberly V. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

Inspect and  CBLM


June 8, 2022
test the Manaban,  Worksheet Practical Work
8:00 am
computer Rosemarie A.  Working tables Area Ongoing
systems and to
 Desktop
networks 5:00 PM
Computer

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 9 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 9, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Manaban,  CBLM
June 9, 2022
Assemble Rosemarie A.  Worksheet Training
8:00 am
computer  Screwdriver Resource Ongoing
hardware to
(standard) Center
 Working tables
5:00 PM
Install Manait,  CBLM
operating Angelica Mae  Worksheet June 9, 2022
Training
system and V.  Working tables 8:00 am
drivers for
Resource Ongoing
 Desktop to
peripherals/ Center
Computer 5:00 PM
devices.
Suson, Glyza  CBLM
Install the Training June 9, 2022
Mae M.  Worksheet
computer Resource 8:00 am
 Working tables Ongoing
application Center to
software  Desktop
5:00 PM
Computer
Caing,  CBLM
Conduct Jaymark D.  Worksheet Contextual June 9, 2022
testing and  Working tables Learning 8:00 am
Ongoing
documentati Coronel, Ryan  Desktop Laboratory to
on L. Computer 5:00 PM

 CBLM
 Worksheet
 Working tables
Dalangon,
 Desktop
Cloed B. June 9, 2022
Install Computer Practical
8:00 am
network
Deniega, Dave
 Crimping tools Work Area Ongoing
cables to
L.  Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 10 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Dinoy,  CBLM
Lucricio C.  Worksheet June 9, 2022
Practical Work
Set network  Working tables 8:00 am
Area Ongoing
configuration Tagab, Mark  Desktop to
Anthony C. Computer 5:00 PM

 CBLM
Set  Worksheet
Jocson,
router/Wi-Fi/ June 9, 2022
Roland A.  Working tables
wireless Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeate
Kilat, Joshua  ADSL Router to
T. with Wi-Fi 5:00 PM
r
configuration  Wireless Access
Point
Lemera,  CBLM
Inspect and June 9, 2022
Arman T.  Worksheet
test the Practical Work
 Working tables 8:00 am
configured Area Ongoing
computer
Naigar,  Desktop to
Vernen Cea L. Computer 5:00 PM
networks

 CBLM
Ontolan, Vhen  Worksheet June 9, 2022
B.  Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access to
Potato, Johnrel Computer
T. 5:00 PM
 Wireless Access
Point
Potato,  CBLM
Juhnriel T.  Worksheet June 9, 2022
Configure Practical Work
 Working tables 8:00 am
network Area Ongoing
services
Tagab, Mark  Desktop to
Anthony C. Computer 5:00 PM

Perform Tagab,  CBLM


testing, Alexander C.  Worksheet Contextual June 9, 2022
documentati  Working tables Learning 8:00 am
Ongoing
on and pre- Tome, Geryl  Desktop Laboratory to
deployment D. Computer 5:00 PM
practices
Plan and Dalangon,  CBLM Contextual June 9, 2022 Ongoing
prepare for Crissel G.  Worksheet Learning 8:00 am
maintenance  Working tables Laboratory to
and repair Duga, Annie  Desktop 5:00 PM
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 11 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Rose S. Computer

 CBLM
Maintain June 9, 2022
Edinan,  Worksheet Training
computer Monamae A. 8:00 am
 Working tables Resource Ongoing
systems and to
 Desktop Center
networks 5:00 PM
Computer
 CBLM
Diagnose June 9, 2022
Ladiero,  Worksheet Training
faults of Quenie A. 8:00 am
 Working tables Resource Ongoing
computer
Center to
systems  Desktop
5:00 PM
Computer
 CBLM
Rectify/ Lumigan, June 9, 2022
 Worksheet
correct Arnelyn S. Practical Work
 Working tables 8:00 am
defects in Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

Inspect and  CBLM


June 9, 2022
test the Magno,  Worksheet Practical Work
Kimberly V. 8:00 am
computer  Working tables Area Ongoing
systems and to
 Desktop
networks Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 12 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 10, 2022


Venue
Training Facilities/Tools Date &
Trainee (Workstation/ Remarks
Activity and Equipment Time
Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM June 10,
Assemble Magno,  Worksheet Training 2022
computer Kimberly V.  Screwdriver Resource 8:00 am Ongoing
hardware (standard) Center to
 Working tables 5:00 PM
Install  CBLM June 10,
operating Manaban,  Worksheet Training 2022
system and Rosemarie A.  Working tables Resource 8:00 am Ongoing
drivers for  Desktop
peripherals/ Center to
Computer
devices. 5:00 PM
 CBLM June 10,
Install the Manait, Training
 Worksheet 2022
computer Angelica Mae Resource
application
 Working tables 8:00 am Ongoing
V.  Desktop Center
software to
Computer 5:00 PM
 CBLM June 10,
Conduct Suson, Glyza Contextual
 Worksheet 2022
testing and Mae M. Learning
documentati
 Working tables 8:00 am Ongoing
 Desktop Laboratory
on to
Computer 5:00 PM
 CBLM
 Worksheet
 Working tables
Caing,  Desktop June 10,
Install Jaymark D. Computer Practical 2022
network  Crimping tools Work Area 8:00 am Ongoing
cables Coronel, Ryan  Hub / Switch to
L.  LAN Cable 5:00 PM
tester
 RJ 45
 UTP cable

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 13 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools Date &
Trainee (Workstation/ Remarks
Activity and Equipment Time
Area)
Dalangon,  CBLM June 10,
Cloed B.  Worksheet Practical Work 2022
Set network
configuration
Deniega, Dave  Working tables Area 8:00 am Ongoing
L.  Desktop to
Computer 5:00 PM
 CBLM
Set  Worksheet
Dinoy, June 10,
router/Wi-Fi/
Lucricio C.  Working tables
wireless Practical Work 2022
 Hub / Switch
access Area 8:00 am Ongoing
Tagab, Mark  ADSL Router
point/repeate to
Anthony C. with Wi-Fi
r 5:00 PM
configuration  Wireless Access
Point
Jocson,  CBLM June 10,
Inspect and
Roland A.  Worksheet
test the Practical Work 2022
 Working tables
configured Area 8:00 am Ongoing
Kilat, Joshua  Desktop
computer to
T. Computer
networks 5:00 PM
 CBLM
Lemera, June 10,
 Worksheet
Arman T.
 Working tables Practical Work 2022
Set-up user
access Naigar,  Desktop Area 8:00 am Ongoing
Vernen Cea L. Computer to
 Wireless Access 5:00 PM
Point
Ontolan, Vhen  CBLM June 10,
B.  Worksheet
Configure Practical Work 2022
 Working tables
network Area 8:00 am Ongoing
Potato, Johnrel  Desktop
services to
T. Computer
5:00 PM
Perform Potato,  CBLM June 10,
testing, Juhnriel T.  Worksheet Contextual 2022
documentati  Working tables Learning
8:00 am Ongoing
on and pre- Tagab, Mark  Desktop Laboratory
deployment Anthony C. to
Computer
practices 5:00 PM
Plan and Tagab,  CBLM Contextual June 10, Ongoing
prepare for Alexander C.  Worksheet Learning 2022
maintenance  Working tables Laboratory 8:00 am
and repair Tome, Geryl  Desktop to
D. Computer
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 14 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools Date &
Trainee (Workstation/ Remarks
Activity and Equipment Time
Area)
5:00 PM
Dalangon,  CBLM June 10,
Maintain Crissel G.  Worksheet Training 2022
computer  Working tables Resource 8:00 am Ongoing
systems and Duga, Annie  Desktop Center to
networks Rose S. Computer
5:00 PM
 CBLM June 10,
Diagnose Edinan,  Worksheet Training 2022
faults of Monamae A.
computer
 Working tables Resource 8:00 am Ongoing
 Desktop Center to
systems
Computer 5:00 PM
 CBLM June 10,
Rectify/ Ladiero,  Worksheet
correct Quenie A. Practical Work 2022
 Working tables
defects in Area 8:00 am Ongoing
computer  Desktop
to
systems Computer
5:00 PM
Inspect and  CBLM June 10,
test the Lumigan,  Worksheet Practical Work 2022
computer Arnelyn S.  Working tables Area 8:00 am Ongoing
systems and  Desktop to
networks Computer 5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 15 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 13, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
June 13, 2022
Assemble Lumigan,  Worksheet Training
Arnelyn S. 8:00 am
computer  Screwdriver Resource Ongoing
hardware to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
June 13, 2022
system and Magno,  Worksheet Training
Kimberly 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ V. to
 Desktop Center
devices. 5:00 PM
Computer
 CBLM
Install the Training June 13, 2022
Manaban,  Worksheet
computer Rosemarie Resource 8:00 am
 Working tables Ongoing
application A. Center to
software  Desktop
Computer
5:00 PM
 CBLM
Contextual June 13, 2022
Conduct testing Manait,  Worksheet
Angelica Learning 8:00 am
and  Working tables Ongoing
documentation Mae V. Laboratory to
 Desktop
Computer
5:00 PM
 CBLM
Suson,  Worksheet
Glyza Mae  Working tables
M.  Desktop June 13, 2022
Computer Practical
Install network 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network Caing,  CBLM Practical Work June 13, 2022 Ongoing

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 16 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Jaymark D.  Worksheet
 Working tables 8:00 am
Area
configuration Coronel,  Desktop to
Ryan L. Computer 5:00 PM

 CBLM
 Worksheet
Set router/Wi- Dalangon, June 13, 2022
 Working tables
Fi/ wireless Cloed B. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater Deniega,  ADSL Router to
configuration Dave L. with Wi-Fi 5:00 PM
 Wireless Access
Point
Dinoy,  CBLM
Lucricio C.  Worksheet June 13, 2022
Inspect and test
 Working tables Practical Work
the configured 8:00 am
Tagab,  Desktop Area Ongoing
computer to
Mark Computer
networks 5:00 PM
Anthony C.

 CBLM
Jocson,
 Worksheet
Roland A. June 13, 2022
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access Kilat, to
Joshua T. Computer
5:00 PM
 Wireless Access
Point
Lemera,  CBLM
Arman T.  Worksheet June 13, 2022
Configure  Working tables Practical Work
8:00 am
network Naigar,  Desktop Area Ongoing
services Vernen Cea to
Computer 5:00 PM
L.

Ontolan,  CBLM
Perform testing, June 13, 2022
Vhen B.  Worksheet Contextual
documentation
 Working tables Learning 8:00 am
and pre- Ongoing
Potato,  Desktop Laboratory to
deployment
Johnrel T. Computer 5:00 PM
practices
Plan and prepare Potato,  CBLM Contextual June 13, 2022 Ongoing
for maintenance Juhnriel T.  Worksheet Learning 8:00 am
and repair Tagab,  Working tables Laboratory to
Mark  Desktop 5:00 PM
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 17 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Anthony C. Computer

Tagab,  CBLM
Alexander  Worksheet June 13, 2022
Maintain
C.  Working tables Training
computer 8:00 am
 Desktop Resource Ongoing
systems and
Tome, Center to
networks Computer 5:00 PM
Geryl D.

Dalangon,  CBLM
Crissel G.  Worksheet June 13, 2022
Diagnose faults  Working tables Training
8:00 am
of computer Duga,  Desktop Resource Ongoing
systems Annie Rose Center to
Computer 5:00 PM
S.

 CBLM
Rectify/correct Edinan,  Worksheet June 13, 2022
Monamae Practical Work
defects in  Working tables 8:00 am
A. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test June 13, 2022
Ladiero,  Worksheet Practical Work
the computer Quenie A. 8:00 am
 Working tables Area Ongoing
systems and to
networks  Desktop
Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 18 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 14, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
June 14, 2022
Assemble Ladiero,  Worksheet Training
Quenie A. 8:00 am
computer  Screwdriver Resource Ongoing
hardware to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
June 14, 2022
system and Lumigan,  Worksheet Training
Arnelyn S. 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ to
 Desktop Center
devices. 5:00 PM
Computer
 CBLM
Install the Training June 14, 2022
Magno,  Worksheet
computer Kimberly Resource 8:00 am
 Working tables Ongoing
application V. Center to
software  Desktop
Computer
5:00 PM
 CBLM
Contextual June 14, 2022
Conduct testing Manaban,  Worksheet
Rosemarie Learning 8:00 am
and  Working tables Ongoing
documentation A. Laboratory to
 Desktop
Computer
5:00 PM
 CBLM
Manait,  Worksheet
Angelica  Working tables
Mae V.  Desktop June 14, 2022
Computer Practical
Install network 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network Suson,  CBLM Practical Work June 14, 2022 Ongoing

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 19 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Glyza Mae  Worksheet
M.
8:00 am
 Working tables Area
configuration to
 Desktop
5:00 PM
Computer
 CBLM
 Worksheet
Set router/Wi- Caing, June 14, 2022
 Working tables
Fi/ wireless Jaymark D. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater Coronel,  ADSL Router to
configuration Ryan L. with Wi-Fi 5:00 PM
 Wireless Access
Point
Dalangon,  CBLM
Inspect and test Cloed B.  Worksheet June 14, 2022
Practical Work
the configured  Working tables 8:00 am
Area Ongoing
computer Deniega,  Desktop to
networks Dave L. Computer 5:00 PM

Dinoy,  CBLM
Lucricio C.  Worksheet June 14, 2022
 Working tables Practical Work
Set-up user 8:00 am
Tagab,  Desktop Area Ongoing
access
Mark to
Computer
Anthony C. 5:00 PM
 Wireless Access
Point
Jocson,  CBLM
Roland A.  Worksheet June 14, 2022
Configure Practical Work
 Working tables 8:00 am
network Area Ongoing
Kilat,  Desktop to
services
Joshua T. Computer 5:00 PM

Lemera,  CBLM
Perform testing, Arman T.  Worksheet June 14, 2022
Contextual
documentation  Working tables Learning 8:00 am
and pre- Naigar,  Desktop Ongoing
Laboratory to
deployment Vernen Cea Computer
practices L. 5:00 PM

Plan and prepare Ontolan,  CBLM Contextual June 14, 2022 Ongoing
for maintenance Vhen B.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Potato,  Desktop 5:00 PM
Johnrel T. Computer
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 20 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)

Potato,  CBLM
Juhnriel T.  Worksheet June 14, 2022
Maintain
 Working tables Training
computer 8:00 am
Tagab,  Desktop Resource Ongoing
systems and to
Mark Computer Center
networks 5:00 PM
Anthony C.

Tagab,  CBLM
Alexander  Worksheet June 14, 2022
Diagnose faults C.  Working tables Training
8:00 am
of computer  Desktop Resource Ongoing
systems Tome, Center to
Computer 5:00 PM
Geryl D.

Dalangon,  CBLM
Crissel G.  Worksheet June 14, 2022
Rectify/correct
 Working tables Practical Work
defects in 8:00 am
Duga,  Desktop Area Ongoing
computer to
Annie Rose Computer
systems 5:00 PM
S.

 CBLM
Inspect and test Edinan, June 14, 2022
 Worksheet Practical Work
the computer Monamae 8:00 am
 Working tables Area Ongoing
systems and A. to
networks  Desktop
Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 21 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 15, 2022


Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
June 15, 2022
Assemble Edinan,  Worksheet Training
Monamae 8:00 am
computer  Screwdriver Resource Ongoing
hardware A. to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
June 15, 2022
system and Ladiero,  Worksheet Training
Quenie A. 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ to
 Desktop Center
devices. 5:00 PM
Computer
 CBLM
Install the Training June 15, 2022
Lumigan,  Worksheet
computer Arnelyn S. Resource 8:00 am
 Working tables Ongoing
application Center to
software  Desktop
Computer
5:00 PM
 CBLM
Contextual June 15, 2022
Conduct testing Magno,  Worksheet
Kimberly Learning 8:00 am
and  Working tables Ongoing
documentation V. Laboratory to
 Desktop
Computer
5:00 PM
 CBLM
Manaban,  Worksheet
Rosemarie  Working tables
A.  Desktop June 15, 2022
Computer Practical
Install network 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network Manait,  CBLM Practical June 15, 2022 Ongoing

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 22 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)
Angelica  Worksheet
Mae V.
8:00 am
 Working tables Work Area
configuration to
 Desktop
5:00 PM
Computer
 CBLM
Suson,  Worksheet
Set router/Wi- Glyza Mae June 15, 2022
 Working tables
Fi/ wireless M. Practical
 Hub / Switch 8:00 am
access Work Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Caing, June 15, 2022
Inspect and test  Worksheet
Jaymark D. Practical
the configured  Working tables 8:00 am
computer Work Area Ongoing
Coronel,  Desktop to
networks Computer 5:00 PM
Ryan L.

 CBLM
Dalangon,
 Worksheet June 15, 2022
Cloed B.
 Working tables Practical
Set-up user 8:00 am
 Desktop Work Area Ongoing
access Deniega, to
Dave L. Computer
5:00 PM
 Wireless Access
Point
Dinoy,  CBLM
Lucricio C.  Worksheet June 15, 2022
Configure  Working tables Practical
8:00 am
network Tagab,  Desktop Work Area Ongoing
services Mark to
Computer 5:00 PM
Anthony C.

Jocson,  CBLM
Perform testing, June 15, 2022
Roland A.  Worksheet Contextual
documentation
 Working tables Learning 8:00 am
and pre- Ongoing
deployment
Kilat,  Desktop Laboratory to
Joshua T. Computer 5:00 PM
practices
Plan and prepare Lemera,  CBLM Contextual June 15, 2022 Ongoing
for maintenance Arman T.  Worksheet Learning 8:00 am
and repair Naigar,  Working tables Laboratory to
Vernen Cea  Desktop 5:00 PM
L. Computer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 23 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)

Ontolan,  CBLM
Maintain Vhen B.  Worksheet June 15, 2022
Training
computer  Working tables 8:00 am
systems and Potato,
Resource Ongoing
 Desktop to
networks Johnrel T. Center
Computer 5:00 PM
Potato,  CBLM
Juhnriel T.  Worksheet June 15, 2022
Diagnose faults  Working tables Training
8:00 am
of computer Tagab,  Desktop Resource Ongoing
systems Mark to
Computer Center
Anthony C. 5:00 PM

Tagab,  CBLM
Alexander  Worksheet
Rectify/correct C.  Working tables June 15, 2022
Practical
defects in  Desktop 8:00 am
computer Tome, Work Area Ongoing
Computer to
systems Geryl D. 5:00 PM

Dalangon,  CBLM
Crissel G.  Worksheet June 15, 2022
Inspect and test
 Working tables Practical
the computer 8:00 am
Duga,  Desktop Work Area Ongoing
systems and
Annie Rose to
networks Computer 5:00 PM
S.

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 24 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 16, 2022


Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Dalangon,  CBLM
June 16, 2022
Assemble Crissel G.  Worksheet Training
8:00 am
computer  Screwdriver Resource Ongoing
hardware Duga, Annie to
(standard) Center
Rose S.  Working tables
5:00 PM
Install  CBLM
operating Edinan,  Worksheet June 16, 2022
Training
system and Monamae A.  Working tables 8:00 am
drivers for
Resource Ongoing
 Desktop to
peripherals/ Center
Computer 5:00 PM
devices.
 CBLM
Install the Training June 16, 2022
Ladiero,  Worksheet
computer Quenie A. Resource 8:00 am
 Working tables Ongoing
application Center to
software  Desktop
5:00 PM
Computer
 CBLM
Contextual June 16, 2022
Conduct Lumigan,  Worksheet
Arnelyn S. Learning 8:00 am
testing and  Working tables Ongoing
documentation Laboratory to
 Desktop
Computer
5:00 PM
 CBLM
 Worksheet
 Working tables
Magno,  Desktop
Kimberly V. June 16, 2022
Computer Practical
Install network 8:00 am
 Crimping tools Work Area Ongoing
cables to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network Manaban,  CBLM Practical WorkJune 16, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 25 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)
Rosemarie  Worksheet
A.
8:00 am
 Working tables Area
configuration to
 Desktop
5:00 PM
Computer
 CBLM
Manait,  Worksheet
Set router/Wi- Angelica June 16, 2022
 Working tables
Fi/ wireless Mae V. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and Suson, Glyza June 16, 2022
 Worksheet
test the Mae M. Practical Work
 Working tables 8:00 am
configured Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
Caing,
 Worksheet June 16, 2022
Jaymark D.
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access Coronel, to
Ryan L. Computer
5:00 PM
 Wireless Access
Point
Dalangon,  CBLM
Cloed B.  Worksheet June 16, 2022
Configure Practical Work
 Working tables 8:00 am
network Area Ongoing
Deniega,  Desktop to
services
Dave L. Computer 5:00 PM

Perform Dinoy,  CBLM


testing, Lucricio C.  Worksheet Contextual June 16, 2022
documentation  Working tables Learning 8:00 am
Ongoing
and pre- Tagab, Mark  Desktop Laboratory to
deployment Anthony C. Computer 5:00 PM
practices
Jocson,  CBLM
Plan and Roland A.  Worksheet Contextual June 16, 2022
prepare for  Working tables Learning 8:00 am
Ongoing
maintenance Kilat, Joshua  Desktop Laboratory to
and repair T. Computer 5:00 PM

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 26 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)
Lemera,  CBLM
Arman T.  Worksheet June 16, 2022
Maintain
 Working tables Training
computer 8:00 am
Naigar,  Desktop Resource Ongoing
systems and
Vernen Cea Center to
networks Computer 5:00 PM
L.

Ontolan,  CBLM
Diagnose Vhen B.  Worksheet June 16, 2022
Training
faults of  Working tables 8:00 am
Resource Ongoing
computer Potato,  Desktop to
Center
systems Johnrel T. Computer 5:00 PM

Potato,  CBLM
Rectify/correct Juhnriel T.  Worksheet June 16, 2022
Practical Work
defects in  Working tables 8:00 am
Area Ongoing
computer Tagab, Mark  Desktop to
systems Anthony C. Computer 5:00 PM

Tagab,  CBLM
Inspect and June 16, 2022
Alexander C.  Worksheet
test the Practical Work
 Working tables 8:00 am
computer Area Ongoing
Tome, Geryl  Desktop to
systems and
D. Computer 5:00 PM
networks

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 27 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 17, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Tagab,  CBLM
Alexander  Worksheet June 17, 2022
Assemble Training
C.  Screwdriver 8:00 am
computer Resource Ongoing
hardware (standard) to
Tome, Center
 Working tables 5:00 PM
Geryl D.
Dalangon,  CBLM
Install operating June 17, 2022
Crissel G.  Worksheet
system and Training
 Working tables 8:00 am
drivers for Resource Ongoing
peripherals/
Duga,  Desktop to
Annie Rose Center
devices. Computer 5:00 PM
S.
 CBLM
Install the Training June 17, 2022
Edinan,  Worksheet
computer Monamae Resource 8:00 am
 Working tables Ongoing
application A. Center to
software  Desktop
Computer
5:00 PM
 CBLM
Contextual June 17, 2022
Conduct testing Ladiero,  Worksheet
Quenie A. Learning 8:00 am
and  Working tables Ongoing
documentation Laboratory to
 Desktop
5:00 PM
Computer
 CBLM
 Worksheet
 Working tables
Lumigan,  Desktop
Arnelyn S. June 17, 2022
Computer Practical
Install network 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 28 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Magno,  CBLM
June 17, 2022
Kimberly  Worksheet Practical Work
Set network V. 8:00 am
 Working tables Area Ongoing
configuration to
 Desktop
Computer
5:00 PM
 CBLM
Manaban,  Worksheet
Set router/Wi- Rosemarie June 17, 2022
 Working tables
Fi/ wireless A. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and test Manait,  Worksheet June 17, 2022
Angelica Practical Work
the configured  Working tables 8:00 am
Mae V. Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
Suson,  Worksheet
Glyza Mae
June 17, 2022
 Working tables Practical Work
Set-up user M. 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
Caing,  CBLM
Jaymark D.  Worksheet June 17, 2022
Configure Practical Work
 Working tables 8:00 am
network Area Ongoing
Coronel,  Desktop to
services
Ryan L. Computer 5:00 PM

Dalangon,  CBLM
Perform testing, June 17, 2022
Cloed B.  Worksheet Contextual
documentation
 Working tables Learning 8:00 am
and pre- Ongoing
Deniega,  Desktop Laboratory to
deployment
Dave L. Computer 5:00 PM
practices
Plan and prepare Dinoy,  CBLM Contextual June 17, 2022 Ongoing
for maintenance Lucricio C.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Tagab,  Desktop 5:00 PM
Mark Computer
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 29 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Anthony C.

Jocson,  CBLM
Maintain Roland A.  Worksheet June 17, 2022
Training
computer  Working tables 8:00 am
Resource Ongoing
systems and Kilat,  Desktop Center to
networks Joshua T. Computer 5:00 PM
Lemera,  CBLM
Arman T.  Worksheet June 17, 2022
Diagnose faults  Working tables Training
8:00 am
of computer Naigar,  Desktop Resource Ongoing
systems Vernen Cea Center to
Computer 5:00 PM
L.

Ontolan,  CBLM
Rectify/correct Vhen B.  Worksheet June 17, 2022
Practical Work
defects in  Working tables 8:00 am
Area Ongoing
computer Potato,  Desktop to
systems Johnrel T. Computer 5:00 PM

Potato,  CBLM
Juhnriel T.  Worksheet June 17, 2022
Inspect and test
 Working tables Practical Work
the computer 8:00 am
Tagab,  Desktop Area Ongoing
systems and to
Mark Computer
networks 5:00 PM
Anthony C.

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 30 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 20, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Potato,  CBLM
Juhnriel T.  Worksheet June 20, 2022
Assemble  Screwdriver Training
8:00 am
computer Tagab, (standard) Resource Ongoing
hardware Mark to
 Working tables Center
Anthony C. 5:00 PM

Tagab,  CBLM
Install operating June 20, 2022
Alexander  Worksheet
system and Training
C.  Working tables 8:00 am
drivers for Resource Ongoing
peripherals/  Desktop to
Tome, Center
devices. Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Install the Crissel G.  Worksheet Training June 20, 2022
computer  Working tables Resource 8:00 am
Ongoing
application Duga,  Desktop Center to
software Annie Rose Computer 5:00 PM
S.
 CBLM
Edinan, Contextual June 20, 2022
Conduct testing  Worksheet
Monamae Learning 8:00 am
and  Working tables Ongoing
documentation A. Laboratory to
 Desktop
5:00 PM
Computer
Install network  CBLM Practical June 20, 2022 Ongoing
cables Ladiero,  Worksheet Work Area 8:00 am
Quenie A.  Working tables to
 Desktop 5:00 PM
Computer
 Crimping tools
 Hub / Switch
 LAN Cable
tester

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 31 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 RJ 45
 UTP cable
 CBLM
June 20, 2022
 Worksheet Practical Work
Set network Lumigan, 8:00 am
 Working tables Area Ongoing
configuration Arnelyn S. to
 Desktop
Computer
5:00 PM
Magno,  CBLM
Kimberly  Worksheet
Set router/Wi- V. June 20, 2022
 Working tables
Fi/ wireless Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and test Manaban,  Worksheet June 20, 2022
Rosemarie Practical Work
the configured  Working tables 8:00 am
A. Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
Manait,  Worksheet
Angelica
June 20, 2022
 Working tables Practical Work
Set-up user Mae V. 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
Suson,  Worksheet June 20, 2022
Configure Glyza Mae Practical Work
 Working tables 8:00 am
network M. Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing, Caing,  CBLM


Contextual June 20, 2022
documentation Jaymark D.  Worksheet
Learning 8:00 am
and pre-  Working tables Ongoing
deployment Coronel,
Laboratory to
 Desktop
practices Ryan L. 5:00 PM
Computer
Plan and prepare Dalangon,  CBLM Contextual June 20, 2022 Ongoing
for maintenance Cloed B.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Deniega,
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 32 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Dave L.  Desktop
5:00 PM
Computer
Dinoy,  CBLM
Lucricio C.  Worksheet June 20, 2022
Maintain
 Working tables Training
computer 8:00 am
Tagab,  Desktop Resource Ongoing
systems and to
Mark Computer Center
networks 5:00 PM
Anthony C.

Jocson,  CBLM
Roland A.  Worksheet June 20, 2022
Diagnose faults Training
 Working tables 8:00 am
of computer Resource Ongoing
systems
Kilat,  Desktop Center to
Joshua T. Computer 5:00 PM
Lemera,  CBLM
Arman T.  Worksheet
Rectify/correct  Working tables June 20, 2022
Practical Work
defects in Naigar,  Desktop 8:00 am
Area Ongoing
computer Vernen Cea Computer to
systems L. 5:00 PM

Ontolan,  CBLM
Inspect and test Vhen B.  Worksheet June 20, 2022
Practical Work
the computer  Working tables 8:00 am
Area Ongoing
systems and Potato,  Desktop to
networks Johnrel T. Computer 5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 33 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 21, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Ontolan,  CBLM
June 21, 2022
Assemble Vhen B.  Worksheet Training
8:00 am
computer  Screwdriver Resource Ongoing
hardware Potato, to
(standard) Center
Johnrel T.  Working tables
5:00 PM
Potato,  CBLM
Install operating Juhnriel T.  Worksheet June 21, 2022
system and  Working tables Training
8:00 am
drivers for Tagab,  Desktop Resource Ongoing
peripherals/ Mark to
Computer Center
devices. Anthony C. 5:00 PM

Tagab,  CBLM
Install the Alexander  Worksheet Training June 21, 2022
computer C.  Working tables Resource 8:00 am
Ongoing
application  Desktop Center to
software Tome, Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Crissel G.  Worksheet Contextual June 21, 2022
Conduct testing
 Working tables Learning 8:00 am
and Ongoing
documentation
Duga,  Desktop Laboratory to
Annie Rose Computer 5:00 PM
S.
Install network  CBLM Practical June 21, 2022 Ongoing
cables Edinan,  Worksheet Work Area 8:00 am
Monamae  Working tables to
A.  Desktop 5:00 PM
Computer
 Crimping tools
 Hub / Switch
 LAN Cable
tester

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 34 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 RJ 45
 UTP cable
 CBLM
June 21, 2022
Ladiero,  Worksheet Practical Work
Set network Quenie A. 8:00 am
 Working tables Area Ongoing
configuration to
 Desktop
Computer
5:00 PM
 CBLM
 Worksheet
Set router/Wi- Lumigan, June 21, 2022
 Working tables
Fi/ wireless Arnelyn S. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
Magno,  CBLM
Inspect and test Kimberly  Worksheet June 21, 2022
V. Practical Work
the configured  Working tables 8:00 am
Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
Manaban,  Worksheet
Rosemarie
June 21, 2022
 Working tables Practical Work
Set-up user A. 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
Manait,  Worksheet June 21, 2022
Configure Angelica Practical Work
 Working tables 8:00 am
network Mae V. Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual June 21, 2022
documentation Suson,  Worksheet
Glyza Mae Learning 8:00 am
and pre-  Working tables Ongoing
deployment M. Laboratory to
 Desktop
practices 5:00 PM
Computer
Plan and prepare Caing,  CBLM Contextual June 21, 2022 Ongoing
for maintenance Jaymark D.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Coronel,
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 35 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Desktop
Ryan L. 5:00 PM
Computer
Dalangon,  CBLM
Maintain Cloed B.  Worksheet June 21, 2022
Training
computer  Working tables 8:00 am
Resource Ongoing
systems and Deniega,  Desktop to
Center
networks Dave L. Computer 5:00 PM
Dinoy,  CBLM
Lucricio C.  Worksheet June 21, 2022
Diagnose faults  Working tables Training
8:00 am
of computer Tagab,  Desktop Resource Ongoing
systems Mark Center to
Computer 5:00 PM
Anthony C.

Jocson,  CBLM
Rectify/correct Roland A.  Worksheet June 21, 2022
Practical Work
defects in  Working tables 8:00 am
Area Ongoing
computer Kilat,  Desktop to
systems Joshua T. Computer 5:00 PM

Lemera,  CBLM
Arman T.  Worksheet
Inspect and test  Working tables June 21, 2022
Practical Work
the computer Naigar,  Desktop 8:00 am
Area Ongoing
systems and Vernen Cea Computer to
networks L. 5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 36 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 22, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Lemera,  CBLM
Arman T.  Worksheet June 22, 2022
Assemble Training
 Screwdriver 8:00 am
computer Resource Ongoing
hardware
Naigar, (standard) to
Vernen Cea Center
 Working tables 5:00 PM
L.
Install operating Ontolan,  CBLM
June 22, 2022
system and Vhen B.  Worksheet Training
8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ Potato, to
 Desktop Center
devices. Johnrel T. Computer
5:00 PM
Potato,  CBLM
Juhnriel T.  Worksheet June 22, 2022
Install the Training
computer  Working tables Resource 8:00 am
Tagab,  Desktop Ongoing
application Center to
Mark Computer
software 5:00 PM
Anthony C.

Tagab,  CBLM
Alexander  Worksheet Contextual June 22, 2022
Conduct testing
C.  Working tables Learning 8:00 am
and Ongoing
documentation  Desktop Laboratory to
Tome, Computer 5:00 PM
Geryl D.
Install network Dalangon,  CBLM Practical June 22, 2022 Ongoing
cables Crissel G.  Worksheet Work Area 8:00 am
 Working tables to
Duga,  Desktop 5:00 PM
Annie Rose Computer
S.  Crimping tools
 Hub / Switch
 LAN Cable
tester

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 37 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 RJ 45
 UTP cable
 CBLM
June 22, 2022
Edinan,  Worksheet Practical Work
Set network Monamae 8:00 am
 Working tables Area Ongoing
configuration A. to
 Desktop
Computer
5:00 PM
 CBLM
Ladiero,  Worksheet
Set router/Wi- Quenie A. June 22, 2022
 Working tables
Fi/ wireless Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and test  Worksheet June 22, 2022
Lumigan, Practical Work
the configured  Working tables 8:00 am
Arnelyn S. Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

Magno,  CBLM
Kimberly  Worksheet
V.
June 22, 2022
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
Manaban,  Worksheet June 22, 2022
Configure Rosemarie Practical Work
 Working tables 8:00 am
network A. Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual June 22, 2022
documentation Manait,  Worksheet
Angelica Learning 8:00 am
and pre-  Working tables Ongoing
deployment Mae V. Laboratory to
 Desktop
practices 5:00 PM
Computer
Plan and prepare  CBLM Contextual June 22, 2022 Ongoing
for maintenance Suson,  Worksheet Learning 8:00 am
and repair Glyza Mae  Working tables Laboratory to
M.
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 38 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Desktop
5:00 PM
Computer
Caing,  CBLM
Maintain June 22, 2022
Jaymark D.  Worksheet Training
computer 8:00 am
 Working tables Resource Ongoing
systems and
Coronel, Center to
networks  Desktop
Ryan L. 5:00 PM
Computer
Dalangon,  CBLM
Cloed B.  Worksheet June 22, 2022
Diagnose faults Training
 Working tables 8:00 am
of computer Resource Ongoing
systems
Deniega,  Desktop Center to
Dave L. Computer 5:00 PM
Dinoy,  CBLM
Lucricio C.  Worksheet June 22, 2022
Rectify/correct
 Working tables Practical Work
defects in 8:00 am
Tagab,  Desktop Area Ongoing
computer
Mark to
systems Computer 5:00 PM
Anthony C.

Jocson,  CBLM
Inspect and test Roland A.  Worksheet June 22, 2022
Practical Work
the computer  Working tables 8:00 am
Area Ongoing
systems and Kilat,  Desktop to
networks Joshua T. Computer 5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 39 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 23, 2022

Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Jocson,  CBLM
June 23, 2022
Assemble Roland A.  Worksheet Training
8:00 am
computer  Screwdriver Resource Ongoing
hardware Kilat, to
(standard) Center
Joshua T.  Working tables
5:00 PM
Lemera,  CBLM
Install operating June 23, 2022
Arman T.  Worksheet
system and Training
 Working tables 8:00 am
drivers for Resource Ongoing
peripherals/
Naigar,  Desktop to
Vernen Cea Center
devices. Computer 5:00 PM
L.
Ontolan,  CBLM
Install the Training June 23, 2022
Vhen B.  Worksheet
computer Resource 8:00 am
 Working tables Ongoing
application Potato, Center to
software  Desktop
Johnrel T. Computer
5:00 PM
Potato,  CBLM
Juhnriel T.  Worksheet June 23, 2022
Contextual
Conduct testing  Working tables Learning 8:00 am
and Tagab,  Desktop Ongoing
documentation Mark Laboratory to
Computer 5:00 PM
Anthony C.

Install network Tagab,  CBLM Practical June 23, 2022 Ongoing


cables Alexander  Worksheet Work Area 8:00 am
C.  Working tables to
 Desktop 5:00 PM
Tome, Computer
Geryl D.  Crimping tools
 Hub / Switch
 LAN Cable
tester

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 40 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)
 RJ 45
 UTP cable
Dalangon,  CBLM
Crissel G.  Worksheet June 23, 2022
Practical Work
Set network  Working tables 8:00 am
Area Ongoing
configuration Duga,  Desktop to
Annie Rose Computer 5:00 PM
S.
 CBLM
Edinan,  Worksheet
Set router/Wi- Monamae June 23, 2022
 Working tables
Fi/ wireless A. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and test Ladiero,  Worksheet June 23, 2022
Quenie A. Practical Work
the configured  Working tables 8:00 am
Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
 Worksheet
Lumigan, June 23, 2022
 Working tables Practical Work
Set-up user Arnelyn S. 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
Magno,  CBLM
Kimberly  Worksheet June 23, 2022
Configure V. Practical Work
 Working tables 8:00 am
network Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual June 23, 2022
documentation Manaban,  Worksheet
Rosemarie Learning 8:00 am
and pre-  Working tables Ongoing
A. Laboratory to
deployment  Desktop
practices Computer
5:00 PM
Plan and prepare  CBLM Contextual June 23, 2022 Ongoing
for maintenance Manait,  Worksheet Learning 8:00 am
and repair Angelica  Working tables Laboratory to
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 41 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstation/ Date & Time Remarks
Activity and Equipment
Area)
Mae V.  Desktop
5:00 PM
Computer
 CBLM
Maintain June 23, 2022
Suson,  Worksheet Training
computer Glyza Mae 8:00 am
 Working tables Resource Ongoing
systems and M. Center to
networks  Desktop
5:00 PM
Computer
Caing,  CBLM
June 23, 2022
Diagnose faults Jaymark D.  Worksheet Training
8:00 am
of computer  Working tables Resource Ongoing
systems Coronel, Center to
 Desktop
Ryan L. Computer
5:00 PM
Dalangon,  CBLM
Rectify/correct Cloed B.  Worksheet June 23, 2022
Practical Work
defects in  Working tables 8:00 am
Area Ongoing
computer Deniega,  Desktop to
systems Dave L. Computer 5:00 PM

Dinoy,  CBLM
Lucricio C.  Worksheet June 23, 2022
Inspect and test
 Working tables Practical Work
the computer 8:00 am
Tagab,  Desktop Area Ongoing
systems and to
Mark Computer
networks 5:00 PM
Anthony C.

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 42 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 24, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Dinoy,  CBLM
Lucricio C.  Worksheet June 24, 2022
Assemble Training
 Screwdriver 8:00 am
computer Resource Ongoing
hardware
Tagab, (standard) to
Mark Center
 Working tables 5:00 PM
Anthony C.
Install operating Jocson,  CBLM
June 24, 2022
system and Roland A.  Worksheet Training
8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ Kilat, to
 Desktop Center
devices. Joshua T. Computer
5:00 PM
Lemera,  CBLM
Install the Arman T.  Worksheet Training June 24, 2022
computer  Working tables Resource 8:00 am
Ongoing
application Naigar,  Desktop Center to
software Vernen Cea Computer 5:00 PM
L.
Ontolan,  CBLM
Contextual June 24, 2022
Conduct testing Vhen B.  Worksheet
Learning 8:00 am
and  Working tables Ongoing
documentation Potato, Laboratory to
 Desktop
Johnrel T. 5:00 PM
Computer
Potato,  CBLM
Juhnriel T.  Worksheet
 Working tables
Tagab,  Desktop
Mark June 24, 2022
Computer Practical
Install network Anthony C. 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 43 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Tagab,  CBLM
Alexander  Worksheet June 24, 2022
Practical Work
Set network C.  Working tables 8:00 am
Area Ongoing
configuration  Desktop to
Tome, Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Crissel G.  Worksheet
Set router/Wi- June 24, 2022
 Working tables
Fi/ wireless Duga, Practical Work
 Hub / Switch 8:00 am
access Annie Rose Area Ongoing
point/repeater  ADSL Router to
S. with Wi-Fi 5:00 PM
configuration
 Wireless Access
Point
 CBLM
Inspect and test Edinan,  Worksheet June 24, 2022
Monamae Practical Work
the configured  Working tables 8:00 am
A. Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
Ladiero,  Worksheet
Quenie A. June 24, 2022
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
 Worksheet June 24, 2022
Configure Lumigan, Practical Work
 Working tables 8:00 am
network Arnelyn S. Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing, Magno,  CBLM


Contextual June 24, 2022
documentation Kimberly  Worksheet
V. Learning 8:00 am
and pre-  Working tables Ongoing
Laboratory to
deployment  Desktop
practices Computer
5:00 PM
 CBLM
Contextual June 24, 2022
Plan and prepare Manaban,  Worksheet
Rosemarie Learning 8:00 am
for maintenance  Working tables Ongoing
and repair A. Laboratory to
 Desktop
5:00 PM
Computer
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 44 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 CBLM
Maintain June 24, 2022
Manait,  Worksheet Training
computer Angelica 8:00 am
 Working tables Resource Ongoing
systems and Mae V. to
 Desktop Center
networks 5:00 PM
Computer
 CBLM
June 24, 2022
Diagnose faults Suson,  Worksheet Training
Glyza Mae 8:00 am
of computer  Working tables Resource Ongoing
systems M. Center to
 Desktop
5:00 PM
Computer
 CBLM
Caing, June 24, 2022
Rectify/correct  Worksheet
Jaymark D. Practical Work
defects in  Working tables 8:00 am
Area Ongoing
computer
Coronel,  Desktop to
systems Computer 5:00 PM
Ryan L.
Dalangon,  CBLM
Inspect and test Cloed B.  Worksheet June 24, 2022
Practical Work
the computer  Working tables 8:00 am
Area Ongoing
systems and Deniega,  Desktop to
networks Dave L. Computer 5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 45 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 27, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
Dalangon,  Worksheet June 27, 2022
Assemble Training
Cloed B.  Screwdriver 8:00 am
computer Resource Ongoing
hardware (standard) to
Deniega, Center
 Working tables 5:00 PM
Dave L.
Dinoy,  CBLM
Install operating Lucricio C. June 27, 2022
 Worksheet Training
system and
 Working tables 8:00 am
drivers for Tagab, Resource Ongoing
peripherals/  Desktop to
Mark Center
devices. Computer 5:00 PM
Anthony C.
Jocson,  CBLM
Install the Training June 27, 2022
Roland A.  Worksheet
computer Resource 8:00 am
 Working tables Ongoing
application Center to
Kilat,  Desktop
software 5:00 PM
Joshua T. Computer
Lemera,  CBLM
Arman T.  Worksheet Contextual June 27, 2022
Conduct testing
 Working tables Learning 8:00 am
and Ongoing
Naigar,  Desktop Laboratory to
documentation
Vernen Cea Computer 5:00 PM
L.
Install network Ontolan,  CBLM Practical June 27, 2022 Ongoing
cables Vhen B.  Worksheet Work Area 8:00 am
 Working tables to
Potato,  Desktop 5:00 PM
Johnrel T. Computer
 Crimping tools
 Hub / Switch
 LAN Cable
tester
 RJ 45

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 46 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 UTP cable
Potato,  CBLM
Juhnriel T.  Worksheet June 27, 2022
 Working tables Practical Work
Set network 8:00 am
Tagab,  Desktop Area Ongoing
configuration
Mark to
Computer 5:00 PM
Anthony C.

Tagab,  CBLM
Alexander  Worksheet
Set router/Wi- C. June 27, 2022
 Working tables
Fi/ wireless Practical Work
 Hub / Switch 8:00 am
access Tome, Area Ongoing
point/repeater  ADSL Router to
Geryl D. with Wi-Fi 5:00 PM
configuration
 Wireless Access
Point
Dalangon,  CBLM
Inspect and test Crissel G.  Worksheet June 27, 2022
Practical Work
the configured  Working tables 8:00 am
Duga, Area Ongoing
computer  Desktop to
networks Annie Rose Computer 5:00 PM
S.
 CBLM
Edinan,  Worksheet
Monamae
June 27, 2022
 Working tables Practical Work
Set-up user A. 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
Ladiero,  Worksheet June 27, 2022
Configure Quenie A. Practical Work
 Working tables 8:00 am
network Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual June 27, 2022
documentation  Worksheet
Lumigan, Learning 8:00 am
and pre-  Working tables Ongoing
deployment Arnelyn S. Laboratory to
 Desktop
practices 5:00 PM
Computer
Plan and prepare Magno,  CBLM Contextual June 27, 2022 Ongoing
for maintenance Kimberly  Worksheet Learning 8:00 am
and repair V.  Working tables Laboratory to
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 47 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Desktop
5:00 PM
Computer
 CBLM
Maintain June 27, 2022
Manaban,  Worksheet Training
computer Rosemarie 8:00 am
 Working tables Resource Ongoing
systems and A. Center to
networks  Desktop
5:00 PM
Computer
 CBLM
June 27, 2022
Diagnose faults Manait,  Worksheet Training
Angelica 8:00 am
of computer  Working tables Resource Ongoing
systems Mae V. Center to
 Desktop
Computer
5:00 PM
 CBLM
Rectify/correct Suson,  Worksheet June 27, 2022
Glyza Mae Practical Work
defects in  Working tables 8:00 am
M. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

Caing,  CBLM
Inspect and test June 27, 2022
Jaymark D.  Worksheet Practical Work
the computer 8:00 am
 Working tables Area Ongoing
systems and
Coronel, to
networks  Desktop
Ryan L. 5:00 PM
Computer

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 48 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 28, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Caing,  CBLM
Jaymark D.  Worksheet June 28, 2022
Assemble Training
 Screwdriver 8:00 am
computer Resource Ongoing
hardware
Coronel, (standard) to
Ryan L. Center
 Working tables 5:00 PM
Dalangon,  CBLM
Install operating June 28, 2022
Cloed B.  Worksheet
system and Training
 Working tables 8:00 am
drivers for Resource Ongoing
peripherals/
Deniega,  Desktop to
Dave L. Center
devices. Computer 5:00 PM
Dinoy,  CBLM
Lucricio C.  Worksheet June 28, 2022
Install the Training
computer  Working tables Resource 8:00 am
Tagab,  Desktop Ongoing
application
Mark Center to
software Computer 5:00 PM
Anthony C.

Jocson,  CBLM
Roland A.  Worksheet Contextual June 28, 2022
Conduct testing
 Working tables Learning 8:00 am
and Ongoing
Kilat,  Desktop Laboratory to
documentation
Joshua T. Computer 5:00 PM
Install network Lemera,  CBLM Practical June 28, 2022 Ongoing
cables Arman T.  Worksheet Work Area 8:00 am
 Working tables to
Naigar,  Desktop 5:00 PM
Vernen Cea Computer
L.  Crimping tools
 Hub / Switch
 LAN Cable
tester
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 49 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 RJ 45
 UTP cable
Ontolan,  CBLM
June 28, 2022
Vhen B.  Worksheet Practical Work
Set network 8:00 am
 Working tables Area Ongoing
configuration to
Potato,  Desktop
Johnrel T. Computer
5:00 PM
 CBLM
Potato,  Worksheet
Set router/Wi- Juhnriel T. June 28, 2022
 Working tables
Fi/ wireless Practical Work
 Hub / Switch 8:00 am
access Tagab, Area Ongoing
point/repeater Mark  ADSL Router to
configuration Anthony C. with Wi-Fi 5:00 PM
 Wireless Access
Point
Tagab,  CBLM
Alexander  Worksheet June 28, 2022
Inspect and test
C.  Working tables Practical Work
the configured 8:00 am
 Desktop Area Ongoing
computer to
Tome, Computer
networks 5:00 PM
Geryl D.

 CBLM
Dalangon,
 Worksheet
Crissel G. June 28, 2022
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access Duga, to
Annie Rose Computer
5:00 PM
S.  Wireless Access
Point
 CBLM
Edinan, June 28, 2022
 Worksheet
Configure Monamae Practical Work
 Working tables 8:00 am
network A. Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual June 28, 2022
documentation Ladiero,  Worksheet
Learning 8:00 am
and pre- Quenie A.  Working tables Ongoing
Laboratory to
deployment  Desktop
practices Computer
5:00 PM
Plan and prepare Lumigan,  CBLM Contextual June 28, 2022 Ongoing
for maintenance Arnelyn S.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 50 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Desktop
5:00 PM
Computer
 CBLM
Maintain Magno, June 28, 2022
 Worksheet Training
computer Kimberly 8:00 am
 Working tables Resource Ongoing
systems and V.
Center to
networks  Desktop
5:00 PM
Computer
 CBLM
Manaban, June 28, 2022
Diagnose faults  Worksheet Training
Rosemarie 8:00 am
of computer  Working tables Resource Ongoing
A. to
systems  Desktop Center
Computer
5:00 PM
 CBLM
Rectify/correct Manait,  Worksheet June 28, 2022
Practical Work
defects in Angelica  Working tables 8:00 am
Area Ongoing
computer Mae V.  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test Suson, June 28, 2022
 Worksheet Practical Work
the computer Glyza Mae 8:00 am
 Working tables Area Ongoing
systems and M. to
networks  Desktop
5:00 PM
Computer

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 51 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 29, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
June 29, 2022
Assemble Suson,  Worksheet Training
Glyza Mae 8:00 am
computer  Screwdriver Resource Ongoing
hardware M. to
(standard) Center
 Working tables
5:00 PM
Caing,  CBLM
Install operating Jaymark D. June 29, 2022
 Worksheet Training
system and
 Working tables 8:00 am
drivers for Coronel, Resource Ongoing
peripherals/  Desktop to
Ryan L. Center
devices. Computer 5:00 PM

Dalangon,  CBLM
Install the Cloed B.  Worksheet Training June 29, 2022
computer  Working tables Resource 8:00 am
Ongoing
application Deniega,  Desktop Center to
software Dave L. Computer 5:00 PM
Dinoy,  CBLM
Lucricio C.  Worksheet June 29, 2022
Contextual
Conduct testing  Working tables Learning 8:00 am
and Tagab,  Desktop Ongoing
documentation Mark Laboratory to
Computer 5:00 PM
Anthony C.

Install network Jocson,  CBLM Practical June 29, 2022 Ongoing


cables Roland A.  Worksheet Work Area 8:00 am
 Working tables to
Kilat,  Desktop 5:00 PM
Joshua T. Computer
 Crimping tools
 Hub / Switch
 LAN Cable
tester

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 52 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 RJ 45
 UTP cable
Lemera,  CBLM
Arman T.  Worksheet June 29, 2022
 Working tables Practical Work
Set network 8:00 am
Naigar,  Desktop Area Ongoing
configuration
Vernen Cea to
Computer 5:00 PM
L.

 CBLM
 Worksheet
Set router/Wi- Ontolan, June 29, 2022
 Working tables
Fi/ wireless Vhen B. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater Potato,  ADSL Router to
configuration Johnrel T. with Wi-Fi 5:00 PM
 Wireless Access
Point
Potato,  CBLM
Juhnriel T.  Worksheet June 29, 2022
Inspect and test
 Working tables Practical Work
the configured 8:00 am
Tagab,  Desktop Area Ongoing
computer to
Mark Computer
networks 5:00 PM
Anthony C.

Tagab,  CBLM
Alexander  Worksheet June 29, 2022
C.  Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access to
Tome, Computer
Geryl D. 5:00 PM
 Wireless Access
Point
Dalangon,  CBLM
Crissel G.  Worksheet June 29, 2022
Configure Practical Work
 Working tables 8:00 am
network Area Ongoing
services
Duga,  Desktop to
Annie Rose Computer 5:00 PM
S.
Perform testing, Edinan,  CBLM
Contextual June 29, 2022
documentation Monamae  Worksheet
Learning 8:00 am
and pre- A.  Working tables Ongoing
Laboratory to
deployment  Desktop
practices Computer
5:00 PM
Plan and prepare Ladiero,  CBLM Contextual June 29, 2022 Ongoing

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 53 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Worksheet
Learning 8:00 am
for maintenance Quenie A.  Working tables
Laboratory to
and repair  Desktop
5:00 PM
Computer
 CBLM
Maintain June 29, 2022
Lumigan,  Worksheet Training
computer 8:00 am
Arnelyn S.  Working tables Resource Ongoing
systems and
Center to
networks  Desktop
5:00 PM
Computer
 CBLM
Magno, June 29, 2022
Diagnose faults  Worksheet Training
Kimberly 8:00 am
of computer  Working tables Resource Ongoing
V. to
systems  Desktop Center
Computer
5:00 PM
 CBLM
Rectify/correct Manaban,  Worksheet June 29, 2022
Practical Work
defects in Rosemarie  Working tables 8:00 am
Area Ongoing
computer A.  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test Manait, June 29, 2022
 Worksheet Practical Work
the computer Angelica 8:00 am
 Working tables Area Ongoing
systems and Mae V. to
networks  Desktop
5:00 PM
Computer

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 54 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

June 30, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
June 30, 2022
Assemble Manait,  Worksheet Training
Angelica 8:00 am
computer  Screwdriver Resource Ongoing
hardware Mae V. to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
June 30, 2022
system and Suson,  Worksheet Training
Glyza Mae 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ M. to
 Desktop Center
devices. 5:00 PM
Computer
Caing,  CBLM
Install the Jaymark D.  Worksheet Training June 30, 2022
computer  Working tables Resource 8:00 am
Ongoing
application Coronel,  Desktop Center to
software Ryan L. Computer 5:00 PM
Dalangon,  CBLM
Cloed B.  Worksheet Contextual June 30, 2022
Conduct testing
 Working tables Learning 8:00 am
and Ongoing
documentation
Deniega,  Desktop Laboratory to
Dave L. Computer 5:00 PM
Dinoy,  CBLM
Lucricio C.  Worksheet
 Working tables
Tagab,  Desktop
Mark June 30, 2022
Computer Practical
Install network Anthony C. 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 55 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Jocson,  CBLM
Roland A.  Worksheet June 30, 2022
Practical Work
Set network  Working tables 8:00 am
Area Ongoing
configuration Kilat,  Desktop to
Joshua T. Computer 5:00 PM

 CBLM
Lemera,  Worksheet
Set router/Wi- Arman T. June 30, 2022
 Working tables
Fi/ wireless Practical Work
 Hub / Switch 8:00 am
access Naigar, Area Ongoing
point/repeater Vernen Cea  ADSL Router to
configuration L. with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Ontolan, June 30, 2022
Inspect and test  Worksheet
Vhen B. Practical Work
the configured  Working tables 8:00 am
Area Ongoing
computer
Potato,  Desktop to
networks Computer 5:00 PM
Johnrel T.

Potato,  CBLM
Juhnriel T.  Worksheet June 30, 2022
 Working tables Practical Work
Set-up user 8:00 am
Tagab,  Desktop Area Ongoing
access to
Mark Computer
Anthony C. 5:00 PM
 Wireless Access
Point
Tagab,  CBLM Ongoing
Alexander  Worksheet June 30, 2022
Configure C.  Working tables Practical Work
8:00 am
network  Desktop Area
services Tome, to
Computer 5:00 PM
Geryl D.

Dalangon,  CBLM
Perform testing, June 30, 2022
Crissel G.  Worksheet Contextual
documentation
 Working tables Learning 8:00 am
and pre- Ongoing
Duga,  Desktop Laboratory to
deployment
Annie Rose Computer 5:00 PM
practices
S.
Plan and prepare Edinan,  CBLM Contextual June 30, 2022 Ongoing
for maintenance Monamae  Worksheet Learning 8:00 am
and repair A.  Working tables Laboratory to

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 56 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Desktop
5:00 PM
Computer
 CBLM
Maintain June 30, 2022
Ladiero,  Worksheet Training
computer 8:00 am
Quenie A.  Working tables Resource Ongoing
systems and
Center to
networks  Desktop
5:00 PM
Computer
 CBLM
June 30, 2022
Diagnose faults Lumigan,  Worksheet Training
8:00 am
of computer Arnelyn S.  Working tables Resource Ongoing
systems Center to
 Desktop
Computer
5:00 PM
 CBLM
Rectify/correct Magno,  Worksheet June 30, 2022
Practical Work
defects in Kimberly  Working tables 8:00 am
Area Ongoing
computer V.  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test Manaban, June 30, 2022
 Worksheet Practical Work
the computer Rosemarie 8:00 am
 Working tables Area Ongoing
systems and A. to
networks  Desktop
5:00 PM
Computer

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 57 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 1, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
July 1, 2022
Assemble Manaban,  Worksheet Training
Rosemarie 8:00 am
computer  Screwdriver Resource Ongoing
hardware A. to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
July 1, 2022
system and Manait,  Worksheet Training
Angelica 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ Mae V. to
 Desktop Center
devices. 5:00 PM
Computer
 CBLM
Install the Training July 1, 2022
Suson,  Worksheet
computer Glyza Mae Resource 8:00 am
 Working tables Ongoing
application M. Center to
software  Desktop
Computer
5:00 PM
Caing,  CBLM
Jaymark D.  Worksheet Contextual July 1, 2022
Conduct testing
 Working tables Learning 8:00 am
and Ongoing
Coronel,  Desktop Laboratory to
documentation
Ryan L. Computer 5:00 PM
Dalangon,  CBLM
Cloed B.  Worksheet
 Working tables
Deniega,  Desktop
Dave L. July 1, 2022
Computer Practical
Install network 8:00 am
 Crimping tools Work Area Ongoing
cables to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network Dinoy,  CBLM Practical Work July 1, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 58 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Lucricio C.  Worksheet
 Working tables 8:00 am
Tagab,  Desktop Area
configuration to
Mark Computer
Anthony C. 5:00 PM

 CBLM
Jocson,  Worksheet
Set router/Wi- July 1, 2022
Roland A.  Working tables
Fi/ wireless Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater
Kilat,  ADSL Router to
Joshua T. with Wi-Fi 5:00 PM
configuration
 Wireless Access
Point
Lemera,  CBLM
Arman T.  Worksheet July 1, 2022
Inspect and test
 Working tables Practical Work
the configured 8:00 am
Naigar,  Desktop Area Ongoing
computer
Vernen Cea to
networks Computer 5:00 PM
L.

 CBLM
Ontolan,  Worksheet July 1, 2022
Vhen B.  Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access
Potato, to
Computer
Johnrel T. 5:00 PM
 Wireless Access
Point
Potato,  CBLM
Juhnriel T.  Worksheet July 1, 2022
Configure  Working tables Practical Work
8:00 am
network Tagab,  Desktop Area Ongoing
services Mark to
Computer 5:00 PM
Anthony C.

Tagab,  CBLM
Perform testing, Alexander  Worksheet July 1, 2022
Contextual
documentation C.  Working tables Learning 8:00 am
and pre-  Desktop Ongoing
deployment Tome,
Laboratory to
Computer 5:00 PM
practices Geryl D.

Plan and prepare Dalangon,  CBLM Contextual July 1, 2022 Ongoing


for maintenance Crissel G.  Worksheet Learning 8:00 am
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 59 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Working tables
Duga,  Desktop Laboratory to
and repair
Annie Rose Computer 5:00 PM
S.
Edinan,  CBLM
Maintain July 1, 2022
Monamae  Worksheet Training
computer 8:00 am
A.  Working tables Resource Ongoing
systems and to
 Desktop Center
networks 5:00 PM
Computer
 CBLM
July 1, 2022
Diagnose faults Ladiero,  Worksheet Training
8:00 am
of computer Quenie A.  Working tables Resource Ongoing
systems Center to
 Desktop
5:00 PM
Computer
 CBLM
Rectify/correct  Worksheet July 1, 2022
Lumigan, Practical Work
defects in  Working tables 8:00 am
Arnelyn S. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test Magno, July 1, 2022
 Worksheet Practical Work
the computer Kimberly 8:00 am
 Working tables Area Ongoing
systems and V. to
networks  Desktop
Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 60 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 4, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
July 4, 2022
Assemble Magno,  Worksheet Training
Kimberly 8:00 am
computer  Screwdriver Resource Ongoing
hardware V. to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
July 4, 2022
system and Manaban,  Worksheet Training
Rosemarie 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ A. to
 Desktop Center
devices. 5:00 PM
Computer
 CBLM
Install the Training July 4, 2022
Manait,  Worksheet
computer Angelica Resource 8:00 am
 Working tables Ongoing
application Mae V. Center to
software  Desktop
Computer
5:00 PM
 CBLM
Contextual July 4, 2022
Conduct testing Suson,  Worksheet
Glyza Mae Learning 8:00 am
and  Working tables Ongoing
documentation M. Laboratory to
 Desktop
Computer
5:00 PM
Caing,  CBLM
Jaymark D.  Worksheet
 Working tables
Coronel,  Desktop
Ryan L. July 4, 2022
Computer Practical
Install network 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network Dalangon,  CBLM Practical Work July 4, 2022 Ongoing

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 61 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Cloed B.  Worksheet
 Working tables 8:00 am
Area
configuration Deniega,  Desktop to
Dave L. Computer 5:00 PM

Dinoy,  CBLM
Lucricio C.  Worksheet
Set router/Wi- July 4, 2022
 Working tables
Fi/ wireless Tagab, Practical Work
 Hub / Switch 8:00 am
access Mark Area Ongoing
point/repeater  ADSL Router to
Anthony C. with Wi-Fi 5:00 PM
configuration
 Wireless Access
Point
Jocson,  CBLM
Inspect and test Roland A.  Worksheet July 4, 2022
Practical Work
the configured  Working tables 8:00 am
Area Ongoing
computer Kilat,  Desktop to
networks Joshua T. Computer 5:00 PM

Lemera,  CBLM
Arman T.  Worksheet July 4, 2022
 Working tables Practical Work
Set-up user 8:00 am
Naigar,  Desktop Area Ongoing
access
Vernen Cea to
Computer
L. 5:00 PM
 Wireless Access
Point
 CBLM
Ontolan, July 4, 2022
 Worksheet
Configure Vhen B. Practical Work
 Working tables 8:00 am
network Area Ongoing
services Potato,  Desktop to
Johnrel T. Computer 5:00 PM

Potato,  CBLM
Perform testing, Juhnriel T.  Worksheet July 4, 2022
Contextual
documentation  Working tables Learning 8:00 am
and pre- Tagab,  Desktop Ongoing
Laboratory to
deployment Mark Computer
practices Anthony C. 5:00 PM

Plan and prepare Tagab,  CBLM Contextual July 4, 2022 Ongoing


for maintenance Alexander  Worksheet Learning 8:00 am
and repair C.  Working tables Laboratory to
 Desktop 5:00 PM
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 62 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Tome, Computer
Geryl D.

Dalangon,  CBLM
Maintain Crissel G.  Worksheet July 4, 2022
Training
computer  Working tables 8:00 am
Resource Ongoing
systems and Duga,  Desktop to
Center
networks Annie Rose Computer 5:00 PM
S.
Edinan,  CBLM
July 4, 2022
Diagnose faults Monamae  Worksheet Training
8:00 am
of computer A.  Working tables Resource Ongoing
systems Center to
 Desktop
5:00 PM
Computer
 CBLM
Rectify/correct  Worksheet July 4, 2022
Ladiero, Practical Work
defects in  Working tables 8:00 am
Quenie A. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test July 4, 2022
Lumigan,  Worksheet Practical Work
the computer 8:00 am
Arnelyn S.  Working tables Area Ongoing
systems and to
networks  Desktop
Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 63 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 5, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
July 5, 2022
Assemble Lumigan,  Worksheet Training
8:00 am
computer Arnelyn S.  Screwdriver Resource Ongoing
hardware to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
July 5, 2022
system and Magno,  Worksheet Training
Kimberly 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ V. to
 Desktop Center
devices. 5:00 PM
Computer
 CBLM
Install the Training July 5, 2022
Manaban,  Worksheet
computer Rosemarie Resource 8:00 am
 Working tables Ongoing
application A. Center to
software  Desktop
Computer
5:00 PM
 CBLM
Contextual July 5, 2022
Conduct testing Manait,  Worksheet
Angelica Learning 8:00 am
and  Working tables Ongoing
documentation Mae V. Laboratory to
 Desktop
Computer
5:00 PM
 CBLM
Suson,  Worksheet
Glyza Mae  Working tables
M.  Desktop July 5, 2022
Computer Practical
Install network 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network Caing,  CBLM Practical Work July 5, 2022 Ongoing

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 64 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Jaymark D.  Worksheet
 Working tables 8:00 am
Area
configuration Coronel,  Desktop to
Ryan L. Computer 5:00 PM

Dalangon,  CBLM
Cloed B.  Worksheet
Set router/Wi- July 5, 2022
 Working tables
Fi/ wireless Deniega, Practical Work
 Hub / Switch 8:00 am
access Dave L. Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
Dinoy,  CBLM
Lucricio C.  Worksheet July 5, 2022
Inspect and test
 Working tables Practical Work
the configured 8:00 am
Tagab,  Desktop Area Ongoing
computer to
Mark Computer
networks 5:00 PM
Anthony C.

 CBLM
Jocson,
 Worksheet
Roland A. July 5, 2022
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access Kilat, to
Joshua T. Computer
5:00 PM
 Wireless Access
Point
Lemera,  CBLM
Arman T.  Worksheet July 5, 2022
Configure  Working tables Practical Work
8:00 am
network Naigar,  Desktop Area Ongoing
services Vernen Cea to
Computer 5:00 PM
L.

Perform testing, Ontolan,  CBLM


Contextual July 5, 2022
documentation Vhen B.  Worksheet
Learning 8:00 am
and pre-  Working tables Ongoing
deployment Potato,
Laboratory to
 Desktop
practices Johnrel T. 5:00 PM
Computer
Plan and prepare Potato,  CBLM Contextual July 5, 2022 Ongoing
for maintenance Juhnriel T.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Tagab,  Desktop 5:00 PM
Mark
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 65 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Anthony C. Computer
Tagab,  CBLM
Maintain Alexander  Worksheet July 5, 2022
Training
computer C.  Working tables 8:00 am
Resource Ongoing
systems and  Desktop to
Center
networks Tome, Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Crissel G.  Worksheet July 5, 2022
Diagnose faults Training
 Working tables 8:00 am
of computer Resource Ongoing
Duga,  Desktop to
systems Center
Annie Rose Computer 5:00 PM
S.
 CBLM
Rectify/correct Edinan, July 5, 2022
 Worksheet Practical Work
defects in Monamae 8:00 am
 Working tables Area Ongoing
computer A. to
systems  Desktop
5:00 PM
Computer
 CBLM
Inspect and test July 5, 2022
Ladiero,  Worksheet Practical Work
the computer 8:00 am
Quenie A.  Working tables Area Ongoing
systems and to
networks  Desktop
Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 66 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 6, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
July 6, 2022
Assemble Ladiero,  Worksheet Training
Quenie A. 8:00 am
computer  Screwdriver Resource Ongoing
hardware to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
July 6, 2022
system and Lumigan,  Worksheet Training
8:00 am
drivers for Arnelyn S.  Working tables Resource Ongoing
peripherals/ to
 Desktop Center
devices. 5:00 PM
Computer
 CBLM
Install the Training July 6, 2022
Magno,  Worksheet
computer Kimberly Resource 8:00 am
 Working tables Ongoing
application V. Center to
software  Desktop
Computer
5:00 PM
 CBLM
Contextual July 6, 2022
Conduct testing Manaban,  Worksheet
Rosemarie Learning 8:00 am
and  Working tables Ongoing
documentation A. Laboratory to
 Desktop
Computer
5:00 PM
 CBLM
Manait,  Worksheet
Angelica  Working tables
Mae V.  Desktop July 6, 2022
Computer Practical
Install network 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network  CBLM Practical Work July 6, 2022 Ongoing

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 67 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Suson,  Worksheet
Glyza Mae
8:00 am
 Working tables Area
configuration M. to
 Desktop
5:00 PM
Computer
Caing,  CBLM
Jaymark D.  Worksheet
Set router/Wi- July 6, 2022
 Working tables
Fi/ wireless Coronel, Practical Work
 Hub / Switch 8:00 am
access Ryan L. Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
Dalangon,  CBLM
Inspect and test Cloed B.  Worksheet July 6, 2022
Practical Work
the configured  Working tables 8:00 am
Deniega, Area Ongoing
computer  Desktop to
networks Dave L. Computer 5:00 PM

Dinoy,  CBLM
Lucricio C.  Worksheet July 6, 2022
 Working tables Practical Work
Set-up user Tagab, 8:00 am
 Desktop Area Ongoing
access Mark to
Computer
Anthony C. 5:00 PM
 Wireless Access
Point
Jocson,  CBLM
Roland A.  Worksheet July 6, 2022
Configure Practical Work
 Working tables 8:00 am
network Area Ongoing
Kilat,  Desktop to
services
Joshua T. Computer 5:00 PM

Lemera,  CBLM
Perform testing, Arman T.  Worksheet July 6, 2022
Contextual
documentation  Working tables Learning 8:00 am
and pre- Naigar,  Desktop Ongoing
Laboratory to
deployment Vernen Cea Computer
practices L. 5:00 PM

Ontolan,  CBLM
Contextual July 6, 2022
Plan and prepare Vhen B.  Worksheet
Learning 8:00 am
for maintenance  Working tables Ongoing
Laboratory to
and repair Potato,  Desktop
Johnrel T. Computer
5:00 PM

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 68 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Potato,  CBLM
Maintain Juhnriel T.  Worksheet July 6, 2022
Training
computer  Working tables 8:00 am
Resource Ongoing
systems and Tagab,  Desktop Center to
networks Mark Computer 5:00 PM
Anthony C.
Tagab,  CBLM
Alexander  Worksheet July 6, 2022
Diagnose faults Training
C.  Working tables 8:00 am
of computer Resource Ongoing
systems  Desktop Center to
Tome, Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Rectify/correct Crissel G.  Worksheet July 6, 2022
Practical Work
defects in  Working tables 8:00 am
Area Ongoing
computer Duga,  Desktop to
systems Annie Rose Computer 5:00 PM
S.
 CBLM
Inspect and test Edinan, July 6, 2022
 Worksheet Practical Work
the computer Monamae 8:00 am
 Working tables Area Ongoing
systems and A. to
networks  Desktop
Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 69 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 7, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
July 7, 2022
Assemble Edinan,  Worksheet Training
Monamae 8:00 am
computer  Screwdriver Resource Ongoing
hardware A. to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
July 7, 2022
system and Ladiero,  Worksheet Training
Quenie A. 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ to
 Desktop Center
devices. 5:00 PM
Computer
 CBLM
Install the Training July 7, 2022
Lumigan,  Worksheet
computer Resource 8:00 am
Arnelyn S.  Working tables Ongoing
application Center to
software  Desktop
Computer
5:00 PM
 CBLM
Contextual July 7, 2022
Conduct testing Magno,  Worksheet
Kimberly Learning 8:00 am
and  Working tables Ongoing
documentation V. Laboratory to
 Desktop
Computer
5:00 PM
 CBLM
Manaban,  Worksheet
Rosemarie  Working tables
A.  Desktop July 7, 2022
Computer Practical
Install network 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network  CBLM Practical Work July 7, 2022 Ongoing

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 70 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Manait,  Worksheet
Angelica
8:00 am
 Working tables Area
configuration Mae V. to
 Desktop
5:00 PM
Computer
 CBLM
Suson,  Worksheet
Set router/Wi- Glyza Mae July 7, 2022
 Working tables
Fi/ wireless M. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
Caing,  CBLM
Inspect and test Jaymark D.  Worksheet July 7, 2022
Practical Work
the configured  Working tables 8:00 am
Coronel, Area Ongoing
computer  Desktop to
networks Ryan L. Computer 5:00 PM

Dalangon,  CBLM
Cloed B.  Worksheet July 7, 2022
 Working tables Practical Work
Set-up user Deniega, 8:00 am
 Desktop Area Ongoing
access Dave L. to
Computer
5:00 PM
 Wireless Access
Point
Dinoy,  CBLM
Lucricio C.  Worksheet July 7, 2022
Configure  Working tables Practical Work
8:00 am
network Tagab,  Desktop Area Ongoing
services Mark to
Computer 5:00 PM
Anthony C.

Jocson,  CBLM
Perform testing, July 7, 2022
Roland A.  Worksheet Contextual
documentation
 Working tables Learning 8:00 am
and pre- Ongoing
deployment
Kilat,  Desktop Laboratory to
Joshua T. Computer 5:00 PM
practices
Plan and prepare Lemera,  CBLM Contextual July 7, 2022 Ongoing
for maintenance Arman T.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Naigar,  Desktop 5:00 PM
Vernen Cea Computer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 71 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
L.

Ontolan,  CBLM
Maintain July 7, 2022
Vhen B.  Worksheet Training
computer 8:00 am
 Working tables Resource Ongoing
systems and to
Potato,  Desktop Center
networks 5:00 PM
Johnrel T. Computer
Potato,  CBLM
Juhnriel T.  Worksheet July 7, 2022
Diagnose faults Training
 Working tables 8:00 am
of computer Resource Ongoing
Tagab,  Desktop to
systems Center
Mark Computer 5:00 PM
Anthony C.
Tagab,  CBLM
Rectify/correct Alexander  Worksheet July 7, 2022
Practical Work
defects in C.  Working tables 8:00 am
Area Ongoing
computer  Desktop to
systems Tome, Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Inspect and test Crissel G.  Worksheet July 7, 2022
Practical Work
the computer  Working tables 8:00 am
Area Ongoing
systems and Duga,  Desktop to
networks Annie Rose Computer 5:00 PM
S.

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 72 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 8, 2022
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Dalangon,  CBLM
Crissel G.  Worksheet July 8, 2022
Assemble Training
 Screwdriver 8:00 am
computer Resource Ongoing
hardware
Duga, (standard) to
Annie Rose Center
 Working tables 5:00 PM
S.
Install operating  CBLM
July 8, 2022
system and Edinan,  Worksheet Training
Monamae 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ A. to
 Desktop Center
devices. Computer
5:00 PM
 CBLM
Install the Training July 8, 2022
Ladiero,  Worksheet
computer Quenie A. Resource 8:00 am
 Working tables Ongoing
application Center to
software  Desktop
5:00 PM
Computer
 CBLM
Contextual July 8, 2022
Conduct testing Lumigan,  Worksheet
Learning 8:00 am
and Arnelyn S.  Working tables Ongoing
documentation Laboratory to
 Desktop
Computer
5:00 PM
 CBLM
Magno,  Worksheet
Kimberly  Working tables
V.  Desktop July 8, 2022
Computer Practical
Install network 8:00 am
 Crimping tools Work Area Ongoing
cables to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network  CBLM Practical Work July 8, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 73 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Manaban,  Worksheet
Rosemarie
8:00 am
 Working tables Area
configuration A. to
 Desktop
5:00 PM
Computer
 CBLM
Manait,  Worksheet
Set router/Wi- Angelica July 8, 2022
 Working tables
Fi/ wireless Mae V. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and test Suson,  Worksheet July 8, 2022
Glyza Mae Practical Work
the configured  Working tables 8:00 am
M. Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

Caing,  CBLM
Jaymark D.  Worksheet July 8, 2022
 Working tables Practical Work
Set-up user Coronel, 8:00 am
 Desktop Area Ongoing
access Ryan L. to
Computer
5:00 PM
 Wireless Access
Point
Dalangon,  CBLM
Cloed B.  Worksheet July 8, 2022
Configure Practical Work
 Working tables 8:00 am
network Deniega, Area Ongoing
services  Desktop to
Dave L. Computer 5:00 PM

Dinoy,  CBLM
Perform testing, Lucricio C.  Worksheet July 8, 2022
Contextual
documentation  Working tables Learning 8:00 am
and pre- Tagab,  Desktop Ongoing
Laboratory to
deployment Mark Computer
practices Anthony C. 5:00 PM

Plan and prepare Jocson,  CBLM Contextual July 8, 2022 Ongoing


for maintenance Roland A.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Kilat,  Desktop 5:00 PM
Joshua T. Computer
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 74 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)

Lemera,  CBLM
Arman T.  Worksheet July 8, 2022
Maintain
 Working tables Training
computer 8:00 am
Naigar,  Desktop Resource Ongoing
systems and to
Vernen Cea Computer Center
networks 5:00 PM
L.

Ontolan,  CBLM
July 8, 2022
Diagnose faults Vhen B.  Worksheet Training
8:00 am
of computer  Working tables Resource Ongoing
systems Potato, Center to
 Desktop
Johnrel T. Computer
5:00 PM
Potato,  CBLM
Rectify/correct Juhnriel T.  Worksheet July 8, 2022
Practical Work
defects in  Working tables 8:00 am
Area Ongoing
computer Tagab,  Desktop to
systems Mark Computer 5:00 PM
Anthony C.
Tagab,  CBLM
Inspect and test Alexander  Worksheet July 8, 2022
Practical Work
the computer C.  Working tables 8:00 am
Area Ongoing
systems and  Desktop to
networks Tome, Computer 5:00 PM
Geryl D.

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 75 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 11, 2022

Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Tagab,  CBLM
Alexander  Worksheet July 11, 2022
Assemble Training
C.  Screwdriver 8:00 am
computer Resource Ongoing
hardware (standard) to
Tome, Center
 Working tables 5:00 PM
Geryl D.
Dalangon,  CBLM
Install operating July 11, 2022
Crissel G.  Worksheet
system and Training
 Working tables 8:00 am
drivers for
Duga,
Resource Ongoing
peripherals/  Desktop to
Annie Rose Center
devices. Computer 5:00 PM
S.
 CBLM
Install the Training July 11, 2022
Edinan,  Worksheet
computer Monamae Resource 8:00 am
 Working tables Ongoing
application A. Center to
software  Desktop
5:00 PM
Computer
 CBLM
Contextual July 11, 2022
Conduct testing Ladiero,  Worksheet
Quenie A. Learning 8:00 am
and  Working tables Ongoing
documentation Laboratory to
 Desktop
Computer
5:00 PM
Install network Lumigan,  CBLM Practical July 11, 2022 Ongoing
cables Arnelyn S.  Worksheet Work Area 8:00 am
 Working tables to
 Desktop 5:00 PM
Computer
 Crimping tools
 Hub / Switch
 LAN Cable
tester
 RJ 45

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 76 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 UTP cable
 CBLM
July 11, 2022
Magno,  Worksheet Practical Work
Set network Kimberly 8:00 am
 Working tables Area Ongoing
configuration V. to
 Desktop
Computer
5:00 PM
 CBLM
Manaban,  Worksheet
Set router/Wi- Rosemarie July 11, 2022
 Working tables
Fi/ wireless A. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and test Manait,  Worksheet July 11, 2022
Angelica Practical Work
the configured  Working tables 8:00 am
Mae V. Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
Suson,  Worksheet
Glyza Mae
July 11, 2022
 Working tables Practical Work
Set-up user M. 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
Caing,  CBLM
Jaymark D.  Worksheet July 11, 2022
Configure Practical Work
 Working tables 8:00 am
network Coronel, Area Ongoing
services  Desktop to
Ryan L. Computer 5:00 PM

Dalangon,  CBLM
Perform testing, July 11, 2022
Cloed B.  Worksheet Contextual
documentation
 Working tables Learning 8:00 am
and pre- Ongoing
Deniega,  Desktop Laboratory to
deployment
Dave L. Computer 5:00 PM
practices
Plan and prepare Dinoy,  CBLM Contextual July 11, 2022 Ongoing
for maintenance Lucricio C.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Tagab,  Desktop 5:00 PM
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 77 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Mark Computer
Anthony C.

Jocson,  CBLM
Maintain Roland A.  Worksheet July 11, 2022
Training
computer  Working tables 8:00 am
Resource Ongoing
systems and Kilat,  Desktop to
Center
networks Joshua T. Computer 5:00 PM
Lemera,  CBLM
Arman T.  Worksheet July 11, 2022
Diagnose faults  Working tables Training
8:00 am
of computer Naigar,  Desktop Resource Ongoing
systems Vernen Cea Center to
Computer 5:00 PM
L.

 CBLM
Ontolan, July 11, 2022
Rectify/correct  Worksheet
Vhen B. Practical Work
defects in  Working tables 8:00 am
Area Ongoing
computer
Potato,  Desktop to
systems Computer 5:00 PM
Johnrel T.
Potato,  CBLM
Inspect and test Juhnriel T.  Worksheet July 11, 2022
Practical Work
the computer  Working tables 8:00 am
Area Ongoing
systems and Tagab,  Desktop to
networks Mark Computer 5:00 PM
Anthony C.

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 78 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 12, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Potato,  CBLM
Juhnriel T.  Worksheet July 12, 2022
Assemble Training
 Screwdriver 8:00 am
computer Resource Ongoing
hardware
Tagab, (standard) to
Mark Center
 Working tables 5:00 PM
Anthony C.
Tagab,  CBLM
Install operating July 12, 2022
Alexander  Worksheet
system and Training
C.  Working tables 8:00 am
drivers for Resource Ongoing
peripherals/  Desktop to
Tome, Center
devices. Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Install the Crissel G.  Worksheet Training July 12, 2022
computer  Working tables Resource 8:00 am
Ongoing
application Duga,  Desktop Center to
software Annie Rose Computer 5:00 PM
S.
 CBLM
Contextual July 12, 2022
Conduct testing Edinan,  Worksheet
Monamae Learning 8:00 am
and  Working tables Ongoing
documentation A. Laboratory to
 Desktop
Computer
5:00 PM
Install network  CBLM Practical July 12, 2022 Ongoing
cables Ladiero,  Worksheet Work Area 8:00 am
Quenie A.  Working tables to
 Desktop 5:00 PM
Computer
 Crimping tools
 Hub / Switch
 LAN Cable
tester
 RJ 45

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 79 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 UTP cable
 CBLM
July 12, 2022
Lumigan,  Worksheet Practical Work
Set network 8:00 am
Arnelyn S.  Working tables Area Ongoing
configuration to
 Desktop
Computer
5:00 PM
 CBLM
Magno,  Worksheet
Set router/Wi- Kimberly July 12, 2022
 Working tables
Fi/ wireless V. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and test Manaban,  Worksheet July 12, 2022
Rosemarie Practical Work
the configured  Working tables 8:00 am
A. Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
Manait,  Worksheet
Angelica
July 12, 2022
 Working tables Practical Work
Set-up user Mae V. 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
Suson,  Worksheet July 12, 2022
Configure Glyza Mae Practical Work
 Working tables 8:00 am
network M. Area Ongoing
services  Desktop to
Computer 5:00 PM

Caing,  CBLM
Perform testing, July 12, 2022
Jaymark D.  Worksheet Contextual
documentation
 Working tables Learning 8:00 am
and pre- Ongoing
Coronel,  Desktop Laboratory to
deployment
Ryan L. Computer 5:00 PM
practices
Plan and prepare Dalangon,  CBLM Contextual July 12, 2022 Ongoing
for maintenance Cloed B.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Deniega,  Desktop 5:00 PM
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 80 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Dave L. Computer

Dinoy,  CBLM
Lucricio C.  Worksheet July 12, 2022
Maintain
 Working tables Training
computer 8:00 am
Tagab,  Desktop Resource Ongoing
systems and
Mark Center to
networks Computer 5:00 PM
Anthony C.

Jocson,  CBLM
Roland A.  Worksheet July 12, 2022
Diagnose faults Training
 Working tables 8:00 am
of computer Resource Ongoing
Kilat,  Desktop to
systems Center
Joshua T. Computer 5:00 PM
Lemera,  CBLM
Arman T.  Worksheet July 12, 2022
Rectify/correct
 Working tables Practical Work
defects in 8:00 am
Naigar,  Desktop Area Ongoing
computer to
Vernen Cea Computer
systems 5:00 PM
L.

Ontolan,  CBLM
Inspect and test July 12, 2022
Vhen B.  Worksheet Practical Work
the computer 8:00 am
 Working tables Area Ongoing
systems and to
Potato,  Desktop
networks 5:00 PM
Johnrel T. Computer

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 81 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 13, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Ontolan,  CBLM
July 13, 2022
Assemble Vhen B.  Worksheet Training
8:00 am
computer  Screwdriver Resource Ongoing
hardware Potato, to
(standard) Center
Johnrel T.  Working tables
5:00 PM
Potato,  CBLM
Install operating July 13, 2022
Juhnriel T.  Worksheet
system and Training
 Working tables 8:00 am
drivers for
Tagab,
Resource Ongoing
peripherals/  Desktop to
Mark Center
devices. Computer 5:00 PM
Anthony C.
Tagab,  CBLM
Install the Alexander  Worksheet Training July 13, 2022
computer C.  Working tables Resource 8:00 am
Ongoing
application  Desktop Center to
software Tome, Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Crissel G.  Worksheet Contextual July 13, 2022
Conduct testing
 Working tables Learning 8:00 am
and Ongoing
Duga,  Desktop Laboratory to
documentation
Annie Rose Computer 5:00 PM
S.
Install network  CBLM Practical July 13, 2022 Ongoing
cables Edinan,  Worksheet Work Area 8:00 am
Monamae  Working tables to
A.  Desktop 5:00 PM
Computer
 Crimping tools
 Hub / Switch
 LAN Cable
tester
 RJ 45

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 82 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 UTP cable
 CBLM
July 13, 2022
Ladiero,  Worksheet Practical Work
Set network Quenie A. 8:00 am
 Working tables Area Ongoing
configuration to
 Desktop
Computer
5:00 PM
 CBLM
 Worksheet
Set router/Wi- July 13, 2022
 Working tables
Fi/ wireless Lumigan, Practical Work
 Hub / Switch 8:00 am
access Arnelyn S. Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and test Magno,  Worksheet July 13, 2022
Kimberly Practical Work
the configured  Working tables 8:00 am
V. Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
Manaban,  Worksheet
Rosemarie
July 13, 2022
 Working tables Practical Work
Set-up user A. 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
Manait,  Worksheet July 13, 2022
Configure Angelica Practical Work
 Working tables 8:00 am
network Mae V. Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual July 13, 2022
documentation Suson,  Worksheet
Glyza Mae Learning 8:00 am
and pre-  Working tables Ongoing
deployment M. Laboratory to
 Desktop
practices 5:00 PM
Computer
Plan and prepare Caing,  CBLM Contextual July 13, 2022 Ongoing
for maintenance Jaymark D.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Coronel,  Desktop 5:00 PM
Ryan L.
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 83 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Computer
Dalangon,  CBLM
Maintain Cloed B.  Worksheet July 13, 2022
Training
computer  Working tables 8:00 am
Resource Ongoing
systems and Deniega,  Desktop to
Center
networks Dave L. Computer 5:00 PM
Dinoy,  CBLM
Lucricio C.  Worksheet July 13, 2022
Diagnose faults  Working tables Training
8:00 am
of computer Tagab,  Desktop Resource Ongoing
systems Mark Center to
Computer 5:00 PM
Anthony C.

Jocson,  CBLM
Rectify/correct Roland A.  Worksheet July 13, 2022
Practical Work
defects in  Working tables 8:00 am
Area Ongoing
computer Kilat,  Desktop to
systems Joshua T. Computer 5:00 PM

Lemera,  CBLM
Arman T.  Worksheet July 13, 2022
Inspect and test
 Working tables Practical Work
the computer 8:00 am
Naigar,  Desktop Area Ongoing
systems and
Vernen Cea to
networks Computer 5:00 PM
L.

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 84 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 14, 2022

Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Lemera,  CBLM
Arman T.  Worksheet July 14, 2022
Assemble Training
 Screwdriver 8:00 am
computer
Naigar,
Resource Ongoing
hardware (standard) to
Vernen Cea Center
 Working tables 5:00 PM
L.
Install operating Ontolan,  CBLM
July 14, 2022
system and Vhen B.  Worksheet Training
8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ Potato, to
 Desktop Center
devices. Johnrel T. 5:00 PM
Computer
Potato,  CBLM
Install the Juhnriel T.  Worksheet Training July 14, 2022
computer  Working tables Resource 8:00 am
Ongoing
application Tagab,  Desktop Center to
software Mark Computer 5:00 PM
Anthony C.
Tagab,  CBLM
Alexander  Worksheet Contextual July 14, 2022
Conduct testing
C.  Working tables Learning 8:00 am
and Ongoing
documentation  Desktop Laboratory to
Tome, Computer 5:00 PM
Geryl D.
Install network Dalangon,  CBLM Practical July 14, 2022 Ongoing
cables Crissel G.  Worksheet Work Area 8:00 am
 Working tables to
Duga,  Desktop 5:00 PM
Annie Rose Computer
S.  Crimping tools
 Hub / Switch
 LAN Cable
tester

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 85 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 RJ 45
 UTP cable
 CBLM
July 14, 2022
Edinan,  Worksheet Practical Work
Set network Monamae 8:00 am
 Working tables Area Ongoing
configuration A. to
 Desktop
Computer
5:00 PM
 CBLM
Ladiero,  Worksheet
Set router/Wi- Quenie A. July 14, 2022
 Working tables
Fi/ wireless Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and test  Worksheet July 14, 2022
Lumigan, Practical Work
the configured  Working tables 8:00 am
Arnelyn S. Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
Magno,  Worksheet
Kimberly
July 14, 2022
 Working tables Practical Work
Set-up user V. 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
Manaban,  Worksheet July 14, 2022
Configure Rosemarie Practical Work
 Working tables 8:00 am
network A. Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual July 14, 2022
documentation Manait,  Worksheet
Angelica Learning 8:00 am
and pre-  Working tables Ongoing
deployment Mae V. Laboratory to
 Desktop
practices 5:00 PM
Computer
Plan and prepare  CBLM Contextual July 14, 2022 Ongoing
for maintenance Suson,  Worksheet Learning 8:00 am
and repair Glyza Mae  Working tables Laboratory to
M.
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 86 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Desktop
5:00 PM
Computer
Caing,  CBLM
Maintain Jaymark D.  Worksheet July 14, 2022
Training
computer  Working tables 8:00 am
Resource Ongoing
systems and Coronel,  Desktop to
Center
networks Ryan L. Computer 5:00 PM
Dalangon,  CBLM
Cloed B.  Worksheet July 14, 2022
Diagnose faults Training
 Working tables 8:00 am
of computer Resource Ongoing
Deniega,  Desktop to
systems Center
Dave L. Computer 5:00 PM
Dinoy,  CBLM
Lucricio C.  Worksheet July 14, 2022
Rectify/correct
 Working tables Practical Work
defects in 8:00 am
Tagab,  Desktop Area Ongoing
computer to
Mark Computer
systems 5:00 PM
Anthony C.

Jocson,  CBLM
Inspect and test Roland A.  Worksheet July 14, 2022
Practical Work
the computer  Working tables 8:00 am
Area Ongoing
systems and Kilat,  Desktop to
networks Joshua T. Computer 5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 87 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 15, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Jocson,  CBLM
July 15, 2022
Assemble Roland A.  Worksheet Training
8:00 am
computer  Screwdriver Resource Ongoing
hardware Kilat, to
(standard) Center
Joshua T.  Working tables
5:00 PM
Lemera,  CBLM
Install operating Arman T. July 15, 2022
 Worksheet Training
system and
 Working tables 8:00 am
drivers for Naigar, Resource Ongoing
peripherals/  Desktop to
Vernen Cea Center
devices. Computer 5:00 PM
L.
Ontolan,  CBLM
Install the Training July 15, 2022
Vhen B.  Worksheet
computer Resource 8:00 am
 Working tables Ongoing
application Potato, Center to
software  Desktop
Johnrel T. 5:00 PM
Computer
Potato,  CBLM
Juhnriel T.  Worksheet Contextual July 15, 2022
Conduct testing
 Working tables Learning 8:00 am
and Ongoing
documentation
Tagab,  Desktop Laboratory to
Mark Computer 5:00 PM
Anthony C.
Tagab,  CBLM
Alexander  Worksheet
C.  Working tables
 Desktop
Tome, July 15, 2022
Computer Practical
Install network Geryl D. 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 88 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Dalangon,  CBLM
Crissel G.  Worksheet July 15, 2022
Practical Work
Set network  Working tables 8:00 am
Area Ongoing
configuration Duga,  Desktop to
Annie Rose Computer 5:00 PM
S.
 CBLM
Edinan,  Worksheet
Set router/Wi- Monamae July 15, 2022
 Working tables
Fi/ wireless A. Practical Work
 Hub / Switch 8:00 am
access Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
 CBLM
Inspect and test Ladiero,  Worksheet July 15, 2022
Quenie A. Practical Work
the configured  Working tables 8:00 am
Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
 Worksheet July 15, 2022
Lumigan,  Working tables Practical Work
Set-up user 8:00 am
Arnelyn S.  Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
Magno,  Worksheet July 15, 2022
Configure Kimberly Practical Work
 Working tables 8:00 am
network V. Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual July 15, 2022
documentation Manaban,  Worksheet
Rosemarie Learning 8:00 am
and pre-  Working tables Ongoing
A. Laboratory to
deployment  Desktop
practices Computer
5:00 PM
 CBLM
Contextual July 15, 2022
Plan and prepare Manait,  Worksheet
Angelica Learning 8:00 am
for maintenance  Working tables Ongoing
and repair Mae V. Laboratory to
 Desktop
5:00 PM
Computer
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 89 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 CBLM
Maintain July 15, 2022
Suson,  Worksheet Training
computer Glyza Mae 8:00 am
 Working tables Resource Ongoing
systems and M. to
 Desktop Center
networks 5:00 PM
Computer
Caing,  CBLM
Jaymark D.  Worksheet July 15, 2022
Diagnose faults Training
 Working tables 8:00 am
of computer Resource Ongoing
Coronel,  Desktop to
systems Center
Ryan L. Computer 5:00 PM
Dalangon,  CBLM
Rectify/correct Cloed B.  Worksheet July 15, 2022
Practical Work
defects in  Working tables 8:00 am
Deniega, Area Ongoing
computer  Desktop to
systems Dave L. Computer 5:00 PM

Dinoy,  CBLM
Lucricio C.  Worksheet July 15, 2022
Inspect and test
 Working tables Practical Work
the computer 8:00 am
Tagab,  Desktop Area Ongoing
systems and to
Mark Computer
networks 5:00 PM
Anthony C.

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 90 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 18, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Dinoy,  CBLM
Lucricio C.  Worksheet July 18, 2022
Assemble Training
 Screwdriver 8:00 am
computer Resource Ongoing
hardware
Tagab, (standard) to
Mark Center
 Working tables 5:00 PM
Anthony C.
Install operating Jocson,  CBLM
July 18, 2022
system and Roland A.  Worksheet Training
8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ Kilat, to
 Desktop Center
devices. Joshua T. Computer
5:00 PM
Lemera,  CBLM
Install the Arman T.  Worksheet Training July 18, 2022
computer  Working tables Resource 8:00 am
Ongoing
application Naigar,  Desktop Center to
software Vernen Cea Computer 5:00 PM
L.
Ontolan,  CBLM
Contextual July 18, 2022
Conduct testing Vhen B.  Worksheet
Learning 8:00 am
and  Working tables Ongoing
documentation Potato, Laboratory to
 Desktop
Johnrel T. 5:00 PM
Computer
Potato,  CBLM
Juhnriel T.  Worksheet
 Working tables
Tagab,  Desktop
Mark July 18, 2022
Computer Practical
Install network Anthony C. 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 91 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Tagab,  CBLM
Alexander  Worksheet July 18, 2022
Practical Work
Set network C.  Working tables 8:00 am
Area Ongoing
configuration  Desktop to
Tome, Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Crissel G.  Worksheet
Set router/Wi- July 18, 2022
 Working tables
Fi/ wireless Duga, Practical Work
 Hub / Switch 8:00 am
access Annie Rose Area Ongoing
point/repeater  ADSL Router to
S. with Wi-Fi 5:00 PM
configuration
 Wireless Access
Point
 CBLM
Inspect and test Edinan,  Worksheet July 18, 2022
Monamae Practical Work
the configured  Working tables 8:00 am
A. Area Ongoing
computer  Desktop to
networks Computer 5:00 PM

 CBLM
Ladiero,  Worksheet
Quenie A. July 18, 2022
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
 Worksheet July 18, 2022
Configure Lumigan, Practical Work
 Working tables 8:00 am
network Arnelyn S. Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual July 18, 2022
documentation Magno,  Worksheet
Kimberly Learning 8:00 am
and pre-  Working tables Ongoing
V. Laboratory to
deployment  Desktop
practices Computer
5:00 PM
 CBLM
Contextual July 18, 2022
Plan and prepare Manaban,  Worksheet
Rosemarie Learning 8:00 am
for maintenance  Working tables Ongoing
and repair A. Laboratory to
 Desktop
5:00 PM
Computer
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 92 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 CBLM
Maintain July 18, 2022
Manait,  Worksheet Training
computer Angelica 8:00 am
 Working tables Resource Ongoing
systems and Mae V. to
 Desktop Center
networks 5:00 PM
Computer
 CBLM
July 18, 2022
Diagnose faults Suson,  Worksheet Training
Glyza Mae 8:00 am
of computer  Working tables Resource Ongoing
systems M. Center to
 Desktop
5:00 PM
Computer
Caing,  CBLM
Rectify/correct Jaymark D.  Worksheet July 18, 2022
Practical Work
defects in  Working tables 8:00 am
Coronel, Area Ongoing
computer  Desktop to
systems Ryan L. Computer 5:00 PM

Dalangon,  CBLM
Inspect and test Cloed B.  Worksheet July 18, 2022
Practical Work
the computer  Working tables 8:00 am
Area Ongoing
systems and Deniega,  Desktop to
networks Dave L. Computer 5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 93 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 19, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Dalangon,  CBLM
July 19, 2022
Assemble Cloed B.  Worksheet Training
8:00 am
computer  Screwdriver Resource Ongoing
hardware Deniega, to
(standard) Center
Dave L.  Working tables
5:00 PM
Dinoy,  CBLM
Install operating July 19, 2022
Lucricio C.  Worksheet
system and Training
 Working tables 8:00 am
drivers for
Tagab,
Resource Ongoing
peripherals/  Desktop to
Mark Center
devices. Computer 5:00 PM
Anthony C.
Jocson,  CBLM
Install the Training July 19, 2022
Roland A.  Worksheet
computer Resource 8:00 am
 Working tables Ongoing
application Kilat, Center to
software  Desktop
Joshua T. 5:00 PM
Computer
Lemera,  CBLM
Arman T.  Worksheet Contextual July 19, 2022
Conduct testing
 Working tables Learning 8:00 am
and Ongoing
documentation
Naigar,  Desktop Laboratory to
Vernen Cea Computer 5:00 PM
L.
Ontolan,  CBLM
Vhen B.  Worksheet
 Working tables
Potato,  Desktop
Johnrel T. July 19, 2022
Computer Practical
Install network 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 94 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Potato,  CBLM
Juhnriel T.  Worksheet July 19, 2022
Practical Work
Set network  Working tables 8:00 am
Area Ongoing
configuration Tagab,  Desktop to
Mark Computer 5:00 PM
Anthony C.
Tagab,  CBLM
Alexander  Worksheet
Set router/Wi- C. July 19, 2022
 Working tables
Fi/ wireless Practical Work
 Hub / Switch 8:00 am
access Tome, Area Ongoing
point/repeater  ADSL Router to
Geryl D. with Wi-Fi 5:00 PM
configuration
 Wireless Access
Point
Dalangon,  CBLM
Inspect and test Crissel G.  Worksheet July 19, 2022
Practical Work
the configured  Working tables 8:00 am
Duga, Area Ongoing
computer  Desktop to
networks Annie Rose Computer 5:00 PM
S.
 CBLM
Edinan,  Worksheet
Monamae July 19, 2022
 Working tables Practical Work
Set-up user A. 8:00 am
 Desktop Area Ongoing
access to
Computer
5:00 PM
 Wireless Access
Point
 CBLM
Ladiero,  Worksheet July 19, 2022
Configure Quenie A. Practical Work
 Working tables 8:00 am
network Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual July 19, 2022
documentation Lumigan,  Worksheet
Learning 8:00 am
and pre- Arnelyn S.  Working tables Ongoing
Laboratory to
deployment  Desktop
practices Computer
5:00 PM
 CBLM
Contextual July 19, 2022
Plan and prepare Magno,  Worksheet
Kimberly Learning 8:00 am
for maintenance  Working tables Ongoing
and repair V. Laboratory to
 Desktop
5:00 PM
Computer
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 95 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 CBLM
Maintain July 19, 2022
Manaban,  Worksheet Training
computer Rosemarie 8:00 am
 Working tables Resource Ongoing
systems and A. to
 Desktop Center
networks 5:00 PM
Computer
 CBLM
July 19, 2022
Diagnose faults Manait,  Worksheet Training
Angelica 8:00 am
of computer  Working tables Resource Ongoing
systems Mae V. Center to
 Desktop
5:00 PM
Computer
 CBLM
Rectify/correct Suson,  Worksheet July 19, 2022
Glyza Mae Practical Work
defects in  Working tables 8:00 am
M. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

Caing,  CBLM
Inspect and test Jaymark D.  Worksheet July 19, 2022
Practical Work
the computer  Working tables 8:00 am
Area Ongoing
systems and Coronel,  Desktop to
networks Ryan L. Computer 5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 96 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 20, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
Caing,  CBLM
July 20, 2022
Assemble Jaymark D.  Worksheet Training
8:00 am
computer  Screwdriver Resource Ongoing
hardware Coronel, to
(standard) Center
Ryan L.  Working tables
5:00 PM
Install operating Dalangon,  CBLM
July 20, 2022
system and Cloed B.  Worksheet Training
8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ Deniega, to
 Desktop Center
devices. Dave L. 5:00 PM
Computer
Dinoy,  CBLM
Install the Lucricio C.  Worksheet Training July 20, 2022
computer  Working tables Resource 8:00 am
Ongoing
application Tagab,  Desktop Center to
software Mark Computer 5:00 PM
Anthony C.
Jocson,  CBLM
Contextual July 20, 2022
Conduct testing Roland A.  Worksheet
Learning 8:00 am
and  Working tables Ongoing
documentation Kilat, Laboratory to
 Desktop
Joshua T. Computer
5:00 PM
Lemera,  CBLM
Arman T.  Worksheet
 Working tables
Naigar,  Desktop
Vernen Cea July 20, 2022
Computer Practical
Install network L. 8:00 am
 Crimping tools Work Area Ongoing
cables to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network Ontolan,  CBLM Practical Work July 20, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 97 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Vhen B.  Worksheet
8:00 am
 Working tables Area
configuration Potato, to
 Desktop
Johnrel T. 5:00 PM
Computer
Potato,  CBLM
Juhnriel T.  Worksheet
Set router/Wi- July 20, 2022
 Working tables
Fi/ wireless Tagab, Practical Work
 Hub / Switch 8:00 am
access Mark Area Ongoing
point/repeater  ADSL Router to
Anthony C. with Wi-Fi 5:00 PM
configuration
 Wireless Access
Point
Tagab,  CBLM
Inspect and test Alexander  Worksheet July 20, 2022
C. Practical Work
the configured  Working tables 8:00 am
Area Ongoing
computer  Desktop to
networks Tome, Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Crissel G.  Worksheet July 20, 2022
 Working tables Practical Work
Set-up user Duga, 8:00 am
 Desktop Area Ongoing
access Annie Rose to
Computer
S. 5:00 PM
 Wireless Access
Point
 CBLM
Edinan,  Worksheet July 20, 2022
Configure Monamae Practical Work
 Working tables 8:00 am
network A. Area Ongoing
services  Desktop to
Computer 5:00 PM

Perform testing,  CBLM


Contextual July 20, 2022
documentation Ladiero,  Worksheet
Quenie A. Learning 8:00 am
and pre-  Working tables Ongoing
deployment
Laboratory to
 Desktop
practices 5:00 PM
Computer
 CBLM
Contextual July 20, 2022
Plan and prepare Lumigan,  Worksheet
Learning 8:00 am
for maintenance Arnelyn S.  Working tables Ongoing
Laboratory to
and repair  Desktop
Computer
5:00 PM
Maintain  CBLM Training July 20, 2022 Ongoing
computer Magno, Resource
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 98 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Kimberly  Worksheet
V.
8:00 am
systems and  Working tables
Center to
networks  Desktop
5:00 PM
Computer
 CBLM
July 20, 2022
Diagnose faults Manaban,  Worksheet Training
Rosemarie 8:00 am
of computer  Working tables Resource Ongoing
systems A. Center to
 Desktop
5:00 PM
Computer
 CBLM
Rectify/correct Manait,  Worksheet July 20, 2022
Angelica Practical Work
defects in  Working tables 8:00 am
Mae V. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test July 20, 2022
Suson,  Worksheet Practical Work
the computer Glyza Mae 8:00 am
 Working tables Area Ongoing
systems and M. to
networks  Desktop
Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 99 of 120
GAITF
Servicing
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 21, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
July 21, 2022
Assemble Suson,  Worksheet Training
Glyza Mae 8:00 am
computer  Screwdriver Resource Ongoing
hardware M. to
(standard) Center
 Working tables
5:00 PM
Install operating Caing,  CBLM
July 21, 2022
system and Jaymark D.  Worksheet Training
8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ Coronel, to
 Desktop Center
devices. Ryan L. 5:00 PM
Computer
Dalangon,  CBLM
Install the Training July 21, 2022
Cloed B.  Worksheet
computer Resource 8:00 am
 Working tables Ongoing
application Deniega, Center to
software  Desktop
Dave L. Computer
5:00 PM
Dinoy,  CBLM
Lucricio C.  Worksheet Contextual July 21, 2022
Conduct testing
 Working tables Learning 8:00 am
and Ongoing
Tagab,  Desktop Laboratory to
documentation
Mark Computer 5:00 PM
Anthony C.
Jocson,  CBLM
Roland A.  Worksheet
 Working tables
Kilat,  Desktop
Joshua T. July 21, 2022
Computer Practical
Install network 8:00 am
 Crimping tools Work Area Ongoing
cables to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network Lemera,  CBLM Practical Work July 21, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 100 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Arman T.  Worksheet
 Working tables 8:00 am
Area
configuration Naigar,  Desktop to
Vernen Cea Computer 5:00 PM
L.
Ontolan,  CBLM
Vhen B.  Worksheet
Set router/Wi- July 21, 2022
 Working tables
Fi/ wireless Potato, Practical Work
 Hub / Switch 8:00 am
access Johnrel T. Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
Potato,  CBLM
Inspect and test Juhnriel T.  Worksheet July 21, 2022
Practical Work
the configured  Working tables 8:00 am
Tagab, Area Ongoing
computer  Desktop to
networks Mark Computer 5:00 PM
Anthony C.
Tagab,  CBLM
Alexander  Worksheet
C.
July 21, 2022
 Working tables Practical Work
Set-up user 8:00 am
 Desktop Area Ongoing
access Tome, to
Computer
Geryl D. 5:00 PM
 Wireless Access
Point
Dalangon,  CBLM
Crissel G.  Worksheet July 21, 2022
Configure Practical Work
 Working tables 8:00 am
network Duga, Area Ongoing
services  Desktop to
Annie Rose Computer 5:00 PM
S.
Perform testing,  CBLM
Contextual July 21, 2022
documentation Edinan,  Worksheet
Monamae Learning 8:00 am
and pre-  Working tables Ongoing
deployment A. Laboratory to
 Desktop
practices 5:00 PM
Computer
 CBLM
Contextual July 21, 2022
Plan and prepare Ladiero,  Worksheet
Quenie A. Learning 8:00 am
for maintenance  Working tables Ongoing
Laboratory to
and repair  Desktop
Computer
5:00 PM
Maintain Lumigan,  CBLM Training July 21, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 101 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
 Worksheet
computer 8:00 am
Arnelyn S.  Working tables Resource
systems and to
 Desktop Center
networks 5:00 PM
Computer
 CBLM
July 21, 2022
Diagnose faults Magno,  Worksheet Training
Kimberly 8:00 am
of computer  Working tables Resource Ongoing
systems V. Center to
 Desktop
5:00 PM
Computer
 CBLM
Rectify/correct Manaban,  Worksheet July 21, 2022
Rosemarie Practical Work
defects in  Working tables 8:00 am
A. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test July 21, 2022
Manait,  Worksheet Practical Work
the computer Angelica 8:00 am
 Working tables Area Ongoing
systems and Mae V. to
networks  Desktop
Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 102 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 21, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
July 21, 2022
Assemble Manait,  Worksheet Training
Angelica 8:00 am
computer  Screwdriver Resource Ongoing
hardware Mae V. to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
July 21, 2022
system and Suson,  Worksheet Training
Glyza Mae 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ M. to
 Desktop Center
devices. 5:00 PM
Computer
Caing,  CBLM
Install the Training July 21, 2022
Jaymark D.  Worksheet
computer Resource 8:00 am
 Working tables Ongoing
application Coronel, Center to
software  Desktop
Ryan L. Computer
5:00 PM
Dalangon,  CBLM
Contextual July 21, 2022
Conduct testing Cloed B.  Worksheet
Learning 8:00 am
and  Working tables Ongoing
documentation Deniega, Laboratory to
 Desktop
Dave L. Computer
5:00 PM
Dinoy,  CBLM
Lucricio C.  Worksheet
 Working tables
Tagab,  Desktop
Mark July 21, 2022
Computer Practical
Install network Anthony C. 8:00 am
cables
 Crimping tools Work Area Ongoing
to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable
Set network Jocson,  CBLM Practical Work July 21, 2022 Ongoing

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 103 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Roland A.  Worksheet
8:00 am
 Working tables Area
configuration Kilat, to
 Desktop
Joshua T. 5:00 PM
Computer
Lemera,  CBLM
Arman T.  Worksheet
Set router/Wi- July 21, 2022
 Working tables
Fi/ wireless Naigar, Practical Work
 Hub / Switch 8:00 am
access Vernen Cea Area Ongoing
point/repeater  ADSL Router to
L. with Wi-Fi 5:00 PM
configuration
 Wireless Access
Point
Ontolan,  CBLM
Inspect and test Vhen B.  Worksheet July 21, 2022
Practical Work
the configured  Working tables 8:00 am
Potato, Area Ongoing
computer  Desktop to
networks Johnrel T. Computer 5:00 PM

Potato,  CBLM
Juhnriel T.  Worksheet July 21, 2022
 Working tables Practical Work
Set-up user Tagab, 8:00 am
 Desktop Area Ongoing
access Mark to
Computer
Anthony C. 5:00 PM
 Wireless Access
Point
Tagab,  CBLM
Alexander  Worksheet July 21, 2022
Configure C. Practical Work
 Working tables 8:00 am
network Area Ongoing
services  Desktop to
Tome, Computer 5:00 PM
Geryl D.
Dalangon,  CBLM
Perform testing, July 21, 2022
Crissel G.  Worksheet Contextual
documentation
 Working tables Learning 8:00 am
and pre- Ongoing
Duga,  Desktop Laboratory to
deployment
Annie Rose Computer 5:00 PM
practices
S.
 CBLM
Contextual July 21, 2022
Plan and prepare Edinan,  Worksheet
Monamae Learning 8:00 am
for maintenance  Working tables Ongoing
and repair A. Laboratory to
 Desktop
5:00 PM
Computer
Maintain  CBLM Training July 21, 2022 Ongoing
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 104 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Ladiero,  Worksheet
computer Quenie A.
8:00 am
 Working tables Resource
systems and to
 Desktop Center
networks 5:00 PM
Computer
 CBLM
July 21, 2022
Diagnose faults Lumigan,  Worksheet Training
8:00 am
of computer Arnelyn S.  Working tables Resource Ongoing
systems Center to
 Desktop
5:00 PM
Computer
 CBLM
Rectify/correct Magno,  Worksheet July 21, 2022
Kimberly Practical Work
defects in  Working tables 8:00 am
V. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test July 21, 2022
Manaban,  Worksheet Practical Work
the computer Rosemarie 8:00 am
 Working tables Area Ongoing
systems and A. to
networks  Desktop
Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 105 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
DAILY TRAINING ACTIVITY MATRIX

July 22, 2022


Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Prayer

Unfreezing
All trainees
Activities
Feedback of
Training
 CBLM
July 21, 2022
Assemble Manaban,  Worksheet Training
Rosemarie 8:00 am
computer  Screwdriver Resource Ongoing
hardware A. to
(standard) Center
 Working tables
5:00 PM
Install operating  CBLM
July 21, 2022
system and Manait,  Worksheet Training
Angelica 8:00 am
drivers for  Working tables Resource Ongoing
peripherals/ Mae V. to
 Desktop Center
devices. Computer
5:00 PM
 CBLM
Install the Training July 21, 2022
Suson,  Worksheet
computer Glyza Mae Resource 8:00 am
 Working tables Ongoing
application M. Center to
software  Desktop
5:00 PM
Computer
Caing,  CBLM
Contextual July 21, 2022
Conduct testing Jaymark D.  Worksheet
Learning 8:00 am
and  Working tables Ongoing
documentation Coronel, Laboratory to
 Desktop
Ryan L. Computer
5:00 PM
Dalangon,  CBLM
Cloed B.  Worksheet
 Working tables
Deniega,  Desktop
Dave L. July 21, 2022
Computer Practical
Install network 8:00 am
 Crimping tools Work Area Ongoing
cables to
 Hub / Switch
5:00 PM
 LAN Cable
tester
 RJ 45
 UTP cable

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 106 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Dinoy,  CBLM
Lucricio C.  Worksheet July 21, 2022
Practical Work
Set network  Working tables 8:00 am
Area Ongoing
configuration Tagab,  Desktop to
Mark Computer 5:00 PM
Anthony C.
Jocson,  CBLM
Roland A.  Worksheet
Set router/Wi- July 21, 2022
 Working tables
Fi/ wireless Kilat, Practical Work
 Hub / Switch 8:00 am
access Joshua T. Area Ongoing
point/repeater  ADSL Router to
configuration with Wi-Fi 5:00 PM
 Wireless Access
Point
Lemera,  CBLM
Inspect and test Arman T.  Worksheet July 21, 2022
Practical Work
the configured  Working tables 8:00 am
Naigar, Area Ongoing
computer  Desktop to
networks Vernen Cea Computer 5:00 PM
L.
Ontolan,  CBLM
Vhen B.  Worksheet July 21, 2022
 Working tables Practical Work
Set-up user Potato, 8:00 am
 Desktop Area Ongoing
access Johnrel T. to
Computer
5:00 PM
 Wireless Access
Point
Potato,  CBLM
Juhnriel T.  Worksheet July 21, 2022
Configure Practical Work
 Working tables 8:00 am
network Tagab, Area Ongoing
services  Desktop to
Mark Computer 5:00 PM
Anthony C.
Tagab,  CBLM
Perform testing, July 21, 2022
Alexander  Worksheet Contextual
documentation
C.  Working tables Learning 8:00 am
and pre- Ongoing
deployment  Desktop Laboratory to
Tome, Computer 5:00 PM
practices
Geryl D.
Plan and prepare Dalangon,  CBLM Contextual July 21, 2022 Ongoing
for maintenance Crissel G.  Worksheet Learning 8:00 am
and repair  Working tables Laboratory to
Duga,  Desktop 5:00 PM
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 107 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
Venue
Training Facilities/Tools
Trainee (Workstatio Date & Time Remarks
Activity and Equipment
n/ Area)
Annie Rose Computer
S.
 CBLM
Maintain July 21, 2022
Edinan,  Worksheet Training
computer Monamae 8:00 am
 Working tables Resource Ongoing
systems and A. to
 Desktop Center
networks 5:00 PM
Computer
 CBLM
July 21, 2022
Diagnose faults Ladiero,  Worksheet Training
Quenie A. 8:00 am
of computer  Working tables Resource Ongoing
systems Center to
 Desktop
5:00 PM
Computer
 CBLM
Rectify/correct  Worksheet July 21, 2022
Lumigan, Practical Work
defects in  Working tables 8:00 am
Arnelyn S. Area Ongoing
computer  Desktop to
systems Computer 5:00 PM

 CBLM
Inspect and test July 21, 2022
Magno,  Worksheet Practical Work
the computer Kimberly 8:00 am
 Working tables Area Ongoing
systems and V. to
networks  Desktop
Computer
5:00 PM

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 108 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
ACHIEVEMENT CHART
Computer System Servicing NC II

Evelyn L. Alegre
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 109 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
PROGRESS CHART
Computer System Servicing NC II

Evelyn L. Alegre
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 110 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
MINUTES OF THE MEETING
Focused Group Discussion
Date: June 10, 2022
Agenda: Facilitating Learning Session
Competency-based Training Delivery
Present:
1. Arichea, Danna Bell L.
2. Dalangon, Crissel G.
3. Duga, Annie Rose S.
4. Edinan, Monamae A.
5. Ladiero, Quenie A.
6. Caing, Jaymark D.
7. Coronel, Ryan L.
8. Dalangon, Cloed B.
9. Deniega, Dave L.
10. Tome, Geryl D.

CBT Concerns Discussions Resolutions/Agreement


1. CBT Layout  CBT Layout were properly  CBT was properly
presented and explain delivered
2. Monitoring of  Proper monitoring of  Attendance must be keep
Attendance attendance. properly for future
reference does must include
contact details of the
participants.
3. Utilization of work  9 Learning Area Layout and  Its Utilization Work Area
area utilization/uses/purpose were should always be properly
properly explain defined for the participants
to understand it’s
important for the whole
training sessions.
4. Orientation  Orientation was properly  In the process of the
presented in accordance to Orientation: CBT, Roles
a. CBT the data and information that of the Trainer and Trainee,
b. Roles need as they are important for TR, CBLM, Facilities and
c. TR the Orientation like as Evaluation System must
d. CBLM follows: be will presented for the
e. Facilities  CBT Presentation participants to fully
f. Evaluation system  Roles of the Trainers and understand and learn what
Trainee expectation and expected
 Training Regulation out of the training to what
competency will be
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 111 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
importance acquired and the standard
 CBLM were properly it prescribe in accordance
discussed to its competency to its Quality and Validity
required to complete the of Information.
training.
 Facilities that are made
available for the trainer
and trainee in the course
of the training.
 Evaluation was illustrated as
to how trainees competent
will be measured and tested
in the course of the training.
5. RPL  Recognition of Prior  RPL must be properly
Learning process what illustrated as to its method
process introduce in order to used and its process of
help speed up the program for validating its authenticity.
the trainee to help understand
that prior learning is will
acknowledge to boost moral
and interest of the
participants.
6. Teaching methods  Active Lecture  Use the appropriate teaching
and technique  Demonstration methods and techniques
 Individual and group called for by the situation
activity
7. Monitoring of  Achievement Chart and  Achievement Chart and
learning activities Progressive Chart are will Progress Chart must be
a. Achievement articulated to the participant illustrated to participant its
chart if how they are monitored importance and its
b. Progress chart and properly supervise rationality as part of the
throughout the training evaluation process if how
process. learning process is measure
as to its outcomes and level
of competency based on the
CBT standards.
8. Feedback  Feedback is will define and  Feedback must always be
articulated for the participant properly articulated in the
to be evolved in the sense that it shall help to
presentation and for them to motivate the participant
get interested on the program. and be involved.
9. Slow learners  Mentoring process were  Slow Learners must be
properly define to help slow motivated in the process

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 112 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
learners understand how for them to get involve and
they are will take and lead build interested on the
into the training for them to program.
meet the competency
standards required on the
program.
10. Other concerns  Other concern like school Other matters to be presented
details and information, must be information that is
policy and guidelines, relevant to the training and
assessment methods, and necessary in the process of
requirements were properly learning for a standard
presented and discuss during outcome of the training.
the session.

Prepared by:

EVELYN L. ALEGRE
CSS Trainer

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 113 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
GLOBAL ACADEMY INSTITUTE OF TECHNOLOGY FOUNDATION, INC.
Training Program Evaluation

OBJECTIVE:
This evaluation instrument aims to gather remarks and comments of the participants related
to the conduct of the Computer Systems Servicing NCII. This will serve as a tool in the
improvement and strengthening of the program.
Part I. Program Evaluation
INSTRUCTIONS:
Please rate the following program components in terms of the indicators provided below by
ticking (/) the column that best describes your evaluation of each program component. Your
rating will be treated confidentially.
Adjective Rating Numerical Rating
Outstanding 5
Very Good/Very Adequate 4
Good/Adequate 3
Fair/Satisfactory/Average 2
Inadequate/Unsatisfactory/Poor 1

NAME:
___________________________________________________
POSITION/DESIGNATION:
__________________________________________________
ORGANIZATION/INSTITUTION:
________________________________________________
DATE:
________________________________________________

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 114 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
PROGRAM COMPONENT INDICATORS RATING
5 4 3 2 1
A. Program Design and Organization
1. Clarity of program objectives
2. Organization of course activities
3. Scheduling of activities and time allotment
4. Attainment of program objectives
B. Course Content
1. Course content vis-à-vis the program objectives
2. Sequencing of the course contents
3. Sufficiency of information
4. Relevance of course content vis-à-vis need
C. Training Methodology
1. Effectiveness of selected method
2. Appropriateness to the course activities
D. Program Administration and Management
1. Adequacy of provided supplies and materials
2. Timeliness of provision of supplies and
materials
3. Availability of training equipment and materials
4. Conduciveness of the training venue to learning
5. Appropriateness of the physical layout of the
venue
6. Overall accommodation
7. Secretariat service
E. Facilitator/Trainer
Instructions: Write the corresponding number to rate each
Facilitator/Trainer:
5 Outstanding 4 Very Good 3 Good
2 Average 1 Poor N/A Not Applicable

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 115 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
1. Knowledge of the subject matter
2. Ability to communicate ideas
3. Ability to arouse interest
4. Ability to encourage participation
5. Ability to organize lecture
6. Ability to answer questions
7. Openness to suggestions and comments
8. Ability to encourage critical and/or creative thinking
9. Spontaneity in expression of ideas
10. Use of training equipment
11. Comprehensive of lecture
12. Ability to provide adequate feedback
13. Ability to provide practical exercises

Part II. Skills


Instruction:
Please rate your acquired skills on the following learning outcomes as a result of this training
program:
Use the following rating scales:
5 – Excellent
4 – Very Good
3 – Good
2 – Fair
1 – Poor
RATING
LEARNING OUTCOMES 1 2 3 4 5
Basic Competencies
1. Participate in workplace communication
2. Work in a team environment
3. Practice career professionalism
4. Practice occupational health and safety

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 116 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
Common Competencies
Apply quality standards

1. Perform computer operations


2. Perform mensuration and calculation
3. Prepare and interpret technical drawing
4. Use hand tools
5. Terminate and connect electrical wiring and electronic
circuits
6. Test electronic components
Core Competencies
1. Install and configure computer systems
2. Set-up Computer Networks
3. Set-up Computer Servers
4. Maintain and Repair Computer Systems and Networks
Part III. Attitude
Instruction:
Please rate your acquired attitude towards work as a trainer resulting from the activities of
this training. Use the following rating scales:
5 – Excellent
4 – Very Good
3 – Good
2 – Fair
1 – Poor

WORK ATTITUDES RATING


1 2 3 4 5
1. Punctuality/Attendance
2. Resource/Creativity
3. Obedience, respect to authority, rules and
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 117 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
regulations
4. Commitment to work
5. Adaptability to change
6. Cooperation with co-workers
7. Concern to environment preservation

Feedback
Please indicate your recommended training program to be offered by this Training
Institution

THANK YOU FOR YOUR COOPERATION!

PRE-TEST AND POST TEST ANALYSIS


TRAINEE'S Pre-test Post-test
25 39
Caing, Jaymark D.
25 28
Coronel, Ryan L.
25 38
Dalangon, Cloed B.
25 28
Deniega, Dave L.
Date Developed: Document No.
July 27, 2022 Issued by:
Computer
System Developed by:
Page 118 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
28 37
Dinoy, Lucricio C.
30 35
Tagab, Mark Anthony C.
22 23
Jocson, Roland A.
26 36
Kilat, Joshua T.
31 38
Lemera, Arman T.
38 39
Naigar, Vernen Cea L.
28 29
Ontolan, Vhen B.
35 36
Potato, Johnrel T.
25 29
Potato, Juhnriel T.
30 40
Tagab, Mark Anthony C.
12 30
Tagab, Alexander C.
44 45
Tome, Geryl D.
14 35
Dalangon, Crissel G.
29 38
Duga, Annie Rose S.
14 23
Edinan, Monamae A.
31 34
Ladiero, Quenie A.
12 23
Lumigan, Arnelyn S.
23 26
Magno, Kimberly V.
26 37
Manaban, Rosemarie A.
34 36
Manait, Angelica Mae V.
20 25
Suson, Glyza Mae M.

45
40
35
30
25
PRE TEST
20 POST TEST
15
10
5
Date Developed: Document No.
0
July 27, 2022 Issued
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 by:
Computer
System Developed by:
Page 119 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF
T-TEST: Paired Two Sample for Means
  Post-test Pre-test
Mean 32.68 25.68
Variance 32.06 49.81
Observations 25 25
Pearson Correlation 0.633362163
Hypothesized Mean Difference 0
df 24
t Stat 6.260990337
P(T<=t) one-tail 8.99918E-07
t Critical one-tail 1.71088208
P(T<=t) two-tail 1.79984E-06
t Critical two-tail 2.063898562  

Date Developed: Document No.


July 27, 2022 Issued by:
Computer
System Developed by:
Page 120 of
GAITF
Servicing
120
NCII Evelyn L. Alegre GAITF

You might also like