DB Checklist

This document summarizes an inspection of electrical and functional checks of a distribution board. It lists items that were checked, including the operation of isolators, switches, indicators, and protective devices. Voltage availability and insulation resistance tests were also performed. The inspection was accepted by signatures from Petroserv and Stantec representatives.

Uploaded by

Jabin
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
506 views

DB Checklist

This document summarizes an inspection of electrical and functional checks of a distribution board. It lists items that were checked, including the operation of isolators, switches, indicators, and protective devices. Voltage availability and insulation resistance tests were also performed. The inspection was accepted by signatures from Petroserv and Stantec representatives.

Uploaded by

Jabin
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Check and verify the labeling of each core to the feeder pillar

L6
as built drawings.

17 Check the availa,bility of schematic drawing inside the DB

Comments if any n

Works Accepted / Rejected / Rework

INSPECTED VERIFIED / APPROVED


Signature
Name & Designation
Date

PETROSERV LIMITED STANTEC

{ I

C851/6-CLT-QMT:0046 Rev-00
22 Augusl2O2Z
O.*rvaa Thc acn e stantec APETng,qFRv
TNSPECTTON/TEST|NG & COMMtSStONTNG FOR DTSTRTBUTTON BOARD
ELECTRTCAL/ FU NCTTONAL CH ECKS
Design and Build (DB) for FIFA Readine:;s Project 6 (FRP 5) forSurface and Ground water Network at
Project Title:
Al Madinat Khalifa and lmmigration Underpass Scheme C857/6
Contract No. :

Report No. : Date:


Location : Drawing No. :

OBSERVATION/RESUtT
SlNo.. Item / Activity to checked Remarks
Petroserv Stantec

L Electrical / Functional checks

2 Operation of incomer and outgoing isolators / MCBs / RCBOs

3 Operation of indicating devices

4 Operation of protective devices

Verify cables/circuits and terminations are as per approved


5
drawings
Carry out Voltage availability checks at incoming terminals
and outgoing
6
terminals

7 Check the operation of photocell and timer


n

8 lnsulation resistance (lR) test lR Values

Megger Voltage : 500V / 1 Min.

L1 - (12+13+N+E)

L2 - (Ll +13+N+E)

L3 - (12+11+N+E)

E - (12+13+Lr.)

Comments if any U

Works Accepted / Rejected / Rework

C851/6-CLT-QMT-0047 Rev-00
22 Augusl2022
INSPiCTED VEIIIFIED / APPFOVED
Sigpature :

Name & Designation :

Date :

PETROSERV LIMITED STANTEC

C85 1/6-CLT-QMT-0047 Rev-00


22 August2O2?