0% found this document useful (0 votes)
55 views1 page

Concrete Pour Card

1. The document provides details on a concrete pour for cast-in-situ concrete including formwork details, reinforcement details, concrete mix proportions, and start and completion times. 2. Reinforcement included main bars, distribution bars, rings, laps, inserts, chairs, cover blocks, and bent up bars. 3. Concrete mix included cement brand and quantity, target and exact concrete quantities, aggregate quantities, and water-cement ratio.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

Concrete Pour Card

1. The document provides details on a concrete pour for cast-in-situ concrete including formwork details, reinforcement details, concrete mix proportions, and start and completion times. 2. Reinforcement included main bars, distribution bars, rings, laps, inserts, chairs, cover blocks, and bent up bars. 3. Concrete mix included cement brand and quantity, target and exact concrete quantities, aggregate quantities, and water-cement ratio.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Medical Collage Infrastructure Construction Development Committee

(MCICDC), Geta, Kalika


Consultant:- SILT-Moonlight-Eversafe Jv
Contrctor:-Uchchakoti Nirman Sewa Pvt.Ltd.
CONCRETE POUR CRD FOR CAST -IN-SITU PCC

Construction of Water Supply System with Overhead Tank, Mutipurpose Hall, Temple,Septic Tank and Allied Works

Ref. No. CONTRACT NO: NCB/MCICDC/WSOHT/078/079-001


DATE: Temperature:
STRUCTURAL IDENTIFICATION/JOB:

FORMWORK:
1. LINE/PLUMB: …………………………………………………… 2. LEVEL: …………………………………
3. CONCRETE BOTTOM LEVEL: ……………………………………… 4. CONCRETE TOPLVL: …………
5. DIMENSIONS & SIZE: ……………………………………………… 6. DEVIATION: None (mm) ……
7.SLOPE: ……………………………………………………………..

REINFORCEMENT:
1. MAIN BAR DIA: ………………………………………………………… 2. DISTRIBUTION BAR: ………
3. RINGS: …………………………………………………………….. 4. SPACING: ………………………………
5. L-HOOKS: …………………………………………………………….. 6. LAPS: None (mm)
7. DETAILS OF INSERTS: ………………………………………………
8. BAR PALCING: ………………………………………………………… 9. CHAIRS: ………………………………
10. SPACE BAR: …………………………………………………………… 11. JUNCTION DETAILS: ………
12. COVER & COVER BLOCKS: ……………………………………
12. BENT UP AND CURTAILMENT: ……………………………
14. ELECTRICAL CONDITION: …………………………………… 15. SANITARY DUCTS: ……………

CONCRETE:
CEMENT BRAND:…………………………………………………. CEMENT QUANTITY:…………(BAGS)
QUANTITY OF CONCRETE (Target) : ………………………… GRADE OF CONCRETE: ……………
QUANTITY OF CONCRETE (Exact) : ……………………………
W/C RATIO:
ADMIXTURE:

PROPORTIONS OF COCRETE:
CEMENT QUANTITY: F.A:
WATER: C.A:

MATERIALS QUANTITY DETAILS:


QUANTITY AVAILABLE: THEORETICAL CONSUMPTION:
CA: m3 CA: m3
FA: m3 FA: m3
CEMENT: …………………………………………………………….. CEMENT: ……………………………………

STARTING TIME: ……………………………………………………………COMPLETION TIME: …………………

ANY OTHER DETAILS: …………………………………………………


REMARKS:
…………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………….
………………………….. ………………………….. …………………………..
Prepared by Checked by Verified by

You might also like