0% found this document useful (0 votes)
69 views1 page

SAP PS - Dates 22 PDF

The Dates component in SAP Project System is used to plan and check dates in a project. Dates are entered in work breakdown structures and networks to determine project phases and durations, critical paths, and event schedules. When defining a project, start and finish dates are entered and dates can be changed throughout the lifecycle. Scheduling is used to calculate activity dates for all or parts of the project in the work breakdown structure.

Uploaded by

tarini acharya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views1 page

SAP PS - Dates 22 PDF

The Dates component in SAP Project System is used to plan and check dates in a project. Dates are entered in work breakdown structures and networks to determine project phases and durations, critical paths, and event schedules. When defining a project, start and finish dates are entered and dates can be changed throughout the lifecycle. Scheduling is used to calculate activity dates for all or parts of the project in the work breakdown structure.

Uploaded by

tarini acharya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

4/13/23, 2:57 PM SAP PS - Dates

SAP PS - Dates

The Dates component in Project System is used to plan and check the dates in project. The
use of date scheduling is to determine phases in a project and duration of the phases, critical
paths, and events in project schedule.

In Work breakdown structures WBS and Network, you enter the dates and these dates can be
changed during full project lifecycle.

Maintaining Dates in Projects


When you define a project in system, you enter the start and the finish dates of the projects.
When you create Work Breakdown structure, you start planning dates for WBS. The dates are
calculated for full part of part of project for activities using the scheduling function.