Ug Sump Foundation Design Calculations For Capacity 15Klx2 Development of 50 MW Solar PV Project
Ug Sump Foundation Design Calculations For Capacity 15Klx2 Development of 50 MW Solar PV Project
DESIGN CALCULATIONS
FOR CAPACITY OF 15KLx2 Effective Date 4/10/2015
PG. 1 OF 6
PG. 1 OF 6
SWL Doc. No: SWLB-ESRPL-TSMP-50MW-C-CAL-UGS-1307
UG SUMP FOUNDATION- DESIGN CALCULATIONS FOR CAPACITY OF 15KLx2
1.0 PURPOSE :
The Purpose of this Calculation is to determine whether the cross sectional dimensions for the capacity of water required and to
check whether the chosen dimensions withstand the loads acting due to liquid as well as outer soil by satisfying the
requirements provided in the codes.
2.0 REFERENCES :
3.1 Soil Report:- To get the soil properties(Soil Classifications) and SBC
3.2 To calculate the Moments and shear due to water acting on the wall from indside
3.3 Checks also carried out for crack width, shear, flexure and uplit
4.0 GENERAL :
PG. 2 OF 6
SWL Doc. No: SWLB-ESRPL-TSMP-50MW-C-CAL-UGS-1307
UNDERGROUND TANK DESIGN CALCULATION (FOR LAND PARCEL-2)
Raw Water
0.2
GL
2.80
5.30
Ko x δwxa Ko x δs x a
25.51 42.90
A B
2 Bending Momemt for Tank Vertical Short walls
Moment Calculations : ( empty tank with Soil pressure from outside )
Considering walls free at top and fixed at bottom edges (From Table-3, IS:3370 Part-4-1967)
4 Determination of Pull & Cantilever Moment due to water pressure on short and long walls
Bending at a/4 = 0.650 m
or 1.000 m
Bending location at wall h = 1.000 m from the tank base
Water pressure (δw*(a-h)) Pw = 15.696 kNm
Direct tension on long wall (Pw*b/2) PL = 33.979 kN
Direct tension on short wall (Pw*a/2) Ps = 20.405 kN
Cantilever moment at the base per unit height at water face
(δw*a*h2/6) Mc = 6.377 kNm
pt design shear
stress
From IS: 456-2000, Table 19,
0.50 0.5
0.64 0.55
0.75 0.59
Flexural design
11 Sliding check
Seismic Load Caculation
Zone Factor, Z (Zone-II) Z = 0.1
Importance Factor, I I = 1.5
Response Reduction, R R = 3
Time period, T T = 0.154 seconds
Average Response Acceleration Coefficient, Sa/g = 3.303
0.2
GL
2.80
3.75
Ko x δwxa Ko x δs x a
25.51 42.90
A B
2 Bending Momemt for Tank Vertical Short walls
Moment Calculations : ( empty tank with Soil pressure from outside )
Considering walls free at top and fixed at bottom edges (From Table-3, IS:3370 Part-4-1967)
4 Determination of Pull & Cantilever Moment due to water pressure on short and long walls
Bending at a/4 = 0.650 m
or 1.000 m
Bending location at wall h = 1.000 m from the tank base
Water pressure (δw*(a-h)) Pw = 15.696 kNm
Direct tension on long wall (Pw*b/2) PL = 28.429 kN
Direct tension on short wall (Pw*a/2) Ps = 20.405 kN
Cantilever moment at the base per unit height at water face
(δw*a*h2/6) Mc = 6.377 kNm
pt design shear
stress
From IS: 456-2000, Table 19,
0.50 0.5
0.64 0.55
0.75 0.59
Flexural design
11 Sliding check
Seismic Load Caculation
Zone Factor, Z (Zone-II) Z = 0.1
Importance Factor, I I = 1.5
Response Reduction, R R = 3
Time period, T T = 0.154 seconds
Average Response Acceleration Coefficient, Sa/g = 3.303
Check for Deflection as per IS456-2000, Clause : 23.2.1- C & D & Figures: 4 & 5
Permissible Lx/d (rp) = 20 Tension Modification Factor (Mft) = 2 (pt = 0.29%)
Service Stress (fs) = 119.6943 N/mm2 Comp Modification Factor (Mfc) = 1 (pc = 0%)
Actual Lx/d (ra) = 22.22222 Modified Permissible Lx/d (rpm) = 40 (rp X Mft X Mfc)
Since Actual Lx/d is Less Than Permissible Modified Lx/d
Slab is Safe in Deflection
Summary For Sb1 (200 Thk) Two Way Slab With All Four Edges Discontinuous
Short Reinforcememt Long Reinforcement
@ Span = 10 Tor @150 c/c [Bottom] @ Span = 10 Tor @ 150 c/c [Bottom]
Check for Crack Width
BEAM SECTION :-
WIDTH (b) = 1000 e 1
FROM DIAGRAM,
Now, FROM THE METHOD OF THE TRANSFORMED SECTION,
So,
x= 33.47495
fs = Ms/(As*(d-x/3)) 59.9658626254334
900
1500
1600
Shear Design
Factored Shear force Vu = 40.28
Acting shear stress τv = Vu/bxdprov = 0.42 N/mm2
τc > τv
Hence safe
Compression Design
Compressive load on wall = 10 KN
0.2 x Fck x Ac = 112.5 KN
(Considering square section equal to D) (112.5 KN > 10 KN , Hence Safe)
Hence ok
Flexural design
Depth of base slab required d req = sqrt(Mx1.5/0.138*Fck*1000) 43.41 mm
Depth of base slab provided D= = 200 mm
Effective cover = 70 mm
Depth provided d provided = = 130 mm
(130mm > 43.41mm , Hence Safe)
Hence ok
Shear Design
Factored Shear force Vu = 16.26
Acting shear stress τv = Vu/bxdprov = 0.13 N/mm2
τc > τv
Hence safe
Hence provide only minimum reinforcement in transverse direction
Hence provide 8 @ 200 C/c 251.33 mm2
Summary of Design
Wall Thickness = 150
Base slab Thickness = 200
Base slab outer projection = 250
Reinforcement
Wall main reinforcement-vertical = 10 mm @ 150 C/C
Wall Distribution reinforcement-Horizantal = 8 mm @ 200 C/C
Base slab main reinforcement in short direction = 10 mm @ 200 C/C
Base slab Dist. reinforcement in Longer direction = 8 mm @ 200 C/C
Design of Cable Trench for 850mm width
Design of Trench wall
Height of soil retention H = 1m
Width of base slab B = 0.85 m
Density of Soil δs = 16.39 kN/m3
Height of water table Hw = 0.8 m
Density of water δw = 9.81 kN/m3
Surcharge intensity δq = 10 kN/m2
Cable tray load = 0.5 KN/m
Maximum width of cable tray m = 0.55 m
Total no. of cable tray N = 3
Vertical load from electrical equipment a = 10 KN
Angle of repose of soil φ = 12 deg
Co-efficient of earth pressure at rest Ko = (1-sinƟ)
Ko = 0.79
Grade of Concrete Fck = 25 N/mm2
Grade of steel Fy = 415 N/mm2
Wall thickness n = 0.15 m
800
1000
850
Shear Design
Factored Shear force Vu = 21.68
Acting shear stress τv = Vu/bxdprov = 0.23 N/mm2
τc > τv
Hence safe
Compression Design
Compressive load on wall = 10 KN
0.2 x Fck x Ac = 112.5 KN
(Considering square section equal to D) (112.5 KN > 10 KN , Hence Safe)
Hence ok
Flexural design
Depth of base slab required d req = sqrt(Mx1.5/0.138*Fck*1000) 30.44 mm
Depth of base slab provided D= = 150 mm
Effective cover = 70 mm
Depth provided d provided = = 80 mm
(80mm > 31.07mm , Hence Safe)
Hence ok
Shear Design
Factored Shear force Vu = 15.04
Acting shear stress τv = Vu/bxdprov = 0.19 N/mm2
τc > τv
Hence safe
Hence provide only minimum reinforcement in transverse direction
Hence provide 8 @ 200 C/c 251.33 mm2
Summary of Design
Wall Thickness = 150
Base slab Thickness = 150
Base slab outer projection = 0
Reinforcement
Wall main reinforcement-vertical = 10 mm @ 200 C/C
Wall Distribution reinforcement-Horizantal = 8 mm @ 200 C/C
Base slab main reinforcement in short direction = 10 mm @ 200 C/C
Base slab Dist. reinforcement in Longer direction = 8 mm @ 200 C/C
Design of Cable Trench for 600mm width
Design of Trench wall
Height of soil retention H = 1m
Width of base slab B = 0.6 m
Density of Soil δs = 16.39 kN/m3
Height of water table Hw = 0.8 m
Density of water δw = 9.81 kN/m3
Surcharge intensity δq = 10 kN/m2
Cable tray load = 0.5 KN/m
Maximum width of cable tray m = 0.55 m
Total no. of cable tray N = 3
Vertical load from electrical equipment a = 10 KN
Angle of repose of soil φ = 12 deg
Co-efficient of earth pressure at rest Ko = (1-sinƟ)
Ko = 0.79
Grade of Concrete Fck = 25 N/mm2
Grade of steel Fy = 415 N/mm2
Wall thickness n = 0.15 m
800
1000
600
Shear Design
Factored Shear force Vu = 21.68
Acting shear stress τv = Vu/bxdprov = 0.23 N/mm2
τc > τv
Hence safe
Compression Design
Compressive load on wall = 10 KN
0.2 x Fck x Ac = 112.5 KN
(Considering square section equal to D) (112.5 KN > 10 KN , Hence Safe)
Hence ok
Flexural design
Depth of base slab required d req = sqrt(Mx1.5/0.138*Fck*1000) 24.32 mm
Depth of base slab provided D= = 150 mm
Effective cover = 70 mm
Depth provided d provided = = 80 mm
(80mm > 24.32mm , Hence Safe)
Hence ok
Shear Design
Factored Shear force Vu = 13.61
Acting shear stress τv = Vu/bxdprov = 0.17 N/mm2
τc > τv
Hence safe
Hence provide only minimum reinforcement in transverse direction
Hence provide 8 @ 200 C/c 251.33 mm2
Summary of Design
Wall Thickness = 150
Base slab Thickness = 150
Base slab outer projection = 0
Reinforcement
Wall main reinforcement-vertical = 10 mm @ 200 C/C
Wall Distribution reinforcement-Horizantal = 8 mm @ 200 C/C
Base slab main reinforcement in short direction = 10 mm @ 200 C/C
Base slab Dist. reinforcement in Longer direction = 8 mm @ 200 C/C
Design of Cable Trench for 450mm width
Design of Trench wall
Height of soil retention H = 1m
Width of base slab B = 0.45 m
Density of Soil δs = 16.39 kN/m3
Height of water table Hw = 0.8 m
Density of water δw = 9.81 kN/m3
Surcharge intensity δq = 10 kN/m2
Cable tray load = 0.5 KN/m
Maximum width of cable tray m = 0.55 m
Total no. of cable tray N = 3
Vertical load from electrical equipment a = 10 KN
Angle of repose of soil φ = 12 deg
Co-efficient of earth pressure at rest Ko = (1-sinƟ)
Ko = 0.79
Grade of Concrete Fck = 25 N/mm2
Grade of steel Fy = 415 N/mm2
Wall thickness n = 0.15 m
800
1000
450
Shear Design
Factored Shear force Vu = 21.68
Acting shear stress τv = Vu/bxdprov = 0.23 N/mm2
τc > τv
Hence safe
Compression Design
Compressive load on wall = 10 KN
0.2 x Fck x Ac = 112.5 KN
(Considering square section equal to D) (112.5 KN > 10 KN , Hence Safe)
Hence ok
Flexural design
Depth of base slab required d req = sqrt(Mx1.5/0.138*Fck*1000) 20.00 mm
Depth of base slab provided D= = 150 mm
Effective cover = 70 mm
Depth provided d provided = = 80 mm
(80mm > 20mm , Hence Safe)
Hence ok
Shear Design
Factored Shear force Vu = 12.27
Acting shear stress τv = Vu/bxdprov = 0.15 N/mm2
τc > τv
Hence safe
Hence provide only minimum reinforcement in transverse direction
Hence provide 8 @ 200 C/c 251.33 mm2
Summary of Design
Wall Thickness = 150
Base slab Thickness = 150
Base slab outer projection = 0
Reinforcement
Wall main reinforcement-vertical = 10 mm @ 200 C/C
Wall Distribution reinforcement-Horizantal = 8 mm @ 200 C/C
Base slab main reinforcement in short direction = 10 mm @ 200 C/C
Base slab Dist. reinforcement in Longer direction = 8 mm @ 200 C/C
Err:509 UG SUMP FOUNDATION DESIGN CALCULATION R0
200 GL
2100
3000
Ko x δq Ko x δs x H δw x H
11.27 16.59 18.64
A B C
Tank Vertical walls
Moment Calculations :
Moment due to Surcharge = (A x ((H2)) /12 = 3.39 KN-M
Moment due to Soil = (B* H2)/20 = 2.99 KN-M
Moment due to Water (Refer Sheet- Moment Calc-IS 3370, Part-4, 1967) = 0.00 KN-M
Shear Force due to Water (Refer Sheet- Shear Force-IS 3370, Part-4, 1967) = 0.48 KN
Shear Design
Factored Shear force Vu = 42.20
Acting shear stress τv = Vu/bxdprov = 0.25 N/mm2
τc > τv
Hence safe
Provide minimum reinforcement
0.12%BD 204.00 mm2
Hence provide 10 @ 200 C/c 392.70 mm2
Flexural design
Depth of base slab required d req = sqrt(Mx1.5/0.138*Fck*1000) 58.19 mm
Depth of base slab provided D= = 200 mm
Effective cover = 55 mm
Depth provided d provided = = 145 mm
145mm>58.2mm
Hence ok
Shear Design
Factored Shear force Vu = 7.11
Acting shear stress τv = Vu/bxdprov = 0.05 N/mm2
Summary of Design
Wall Thickness = 200
Base slab Thickness = 200
Base slab outer projection = 150
Reinforcement
Wall main reinforcement-vertical = 10 mm @ 150 C/C
Wall Distribution reinforcement-Horizantal = 10 mm @ 200 C/C
Base slab main reinforcement in short direction = 10 mm @ 200 C/C
Base slab Dist. reinforcement in Longer direction = 10 mm @ 200 C/C
Moment Calculations:
Considering Top end free and Bottom end Fixed (From Table-3, IS:3370 Part-4-1967)
Horizontal Moment MH = My * w * a3
Vertical Moment MV = Mx * w * a3
Coefficients of bending moment and varry
Where, Mx & My = depending uotpn x/a , y=b/2 & y=b/4 ratios
Moment Calculation:
Case-1: Considering x/a=0 & y=0
Coefficients, Mx = 0
My = 0.015
MH = -0.001 kN-m
Mv = 0.000 kN-m
MH = 0.000 kN-m
Mv = 0.000 kN-m
MH = 0.002 kN-m
Mv = 0.000 kN-m
MH = -0.001 kN-m
Mv = 0.000 kN-m
Case-5: Considering x/a=1/4 & y=b/4
Coefficients, Mx = 0.002
My = 0.005
MH = 0.000 kN-m
Mv = 0.000 kN-m
MH = 0.003 kN-m
Mv = 0.001 kN-m
MH = -0.001 kN-m
Mv = -0.001 kN-m
MH = -0.001 kN-m
Mv = -0.001 kN-m
MH = 0.003 kN-m
Mv = 0.001 kN-m
MH = -0.001 kN-m
Mv = 0.000 kN-m
MH = 0.000 kN-m
Mv = 0.000 kN-m
Case-12: Considering x/a=3/4 & y=b/2
Coefficients, Mx = -0.005
My = -0.024
MH = 0.002 kN-m
Mv = 0.000 kN-m
MH = 0.001 kN-m
Mv = 0.004 kN-m
MH = 0.000 kN-m
Mv = 0.002 kN-m
MH = 0.000 kN-m
Mv = 0.000 kN-m