Proposal for Slope Formation & Greenary Works on Rock Fill Slopes
Minimum 1m Soil Fill
3
1 Rock Fill
Maximum
1V:1.5H slope
1. Rock slope shall be finished with a mix of smaller particles of rock and soil to a slope flatter
than 1V:1.5H.
2. Slope shall be covered with a minimum 75mm layer of top soil.
3. Slope shall be turfed.
Payments shall be made as follows:
Slope formation by BOQ Item 2.5.7
Embankment turfing by BOQ Item 7.1.1
Proposal for Rock Slope Protection in Flood Areas
Minimum 1m Soil Fill
3
1 Rock Fill
Maximum
1V:1.5H slope
1. Rock slope shall be finished with a mix of smaller particles of rock and soil to a slope flatter than
1V:1.5H.
2. Slope shall be covered with a Geotextile.
3. Slope shall be protected with 300mm thick Reno-mat.
4. Fill toe shall be protected with 2m x 1m Gabion.
5. Berm shall be covered with 100mm top soil & be turfed.
Payments shall be made as follows:
Slope formation by BOQ Item 2.5.7
Embankment turfing by BOQ Item 7.1.1
Geotextile by BOQ Item 6.7.1
Gabion by BOQ Item 7.22.2
Reno-mats by BOQ Item 7.22.1