DETAIL OF CONNECTED LOAD, MAX. DEMAND & kWh METERING AREA: MUHAISNAH SECOND - DUBAI
STANDARDIZATION AND METROLOGY OFFICE BUILDING
PLANNED COMPLETION DATE: OWNER : EMIRATES REAL ESTATE CORP. PLOT NO.: 2641059
MDB-01 & MBD-02 FEED FROM DEWA (TX-01 &TX-02) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION OF MDB: BASEMENT-1 FLOOR LV.ROOM
OUTGOING:
2500
MDB-01 4P 65 BY DEWA 2x1Cx150 294.31 293.76 293.55 881.61 793.45 1 2400/5A CT METER
Set @0.85
2500
MDB-02 4P 65 BY DEWA 2x1Cx150 409.11 402.63 411.11 1222.84 1100.56 1 2400/5A CT METER
Set @0.85
DEMAND FACTOR : 0.9 Max. DEMAND: 1894.01 kW * OVERALL /INSTALLED LOAD (TCL): 2085.95 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
MDB-01 FEED FROM DEWA (TX-01) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: BASEMENT-1 FLOOR LV.ROOM
2500
INCOMER 4P 65 BY DEWA 2x1Cx150 294.31 293.76 293.55 793.45 1 2400/5A CT METER
Set @0.85
881.61
MOBILE GENERATOR 2500 MOBILE GENERATOR
4P 65
INCOMER Set @0.85 PROVISION
OUTGOING:
SMDB-RF TP 300 50 1x4C CU/XLPE/SWA/LSZH 185 1x1Cx95 47.33 46.58 46.57 140.48 126.43
MDB-01 CONNECTED TO DEWA (1500 KVA TX-01) TOTAL CONNECTED LOAD PER
294.31 293.76 293.55 881.61 793.45 1 TOTAL
PHASE:
TOTAL CONNECTED LOAD (3 PHASE) : 881.61 kW
STAND BY LOAD : 18.50 kW
DEMAND FACTOR : 0.9 Max. DEMAND: 793.45 kW * OVERALL /INSTALLED LOAD (TCL): 863.11 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
MDB-02 FEED FROM DEWA (TX-02) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: BASEMENT-1 FLOOR LV.ROOM
2500
INCOMER 4P 65 BY DEWA 2x1Cx150 409.11 402.63 411.11 1100.56 1 2400/5A CT METER
Set @0.85
1222.84
MOBILE GENERATOR 2500 MOBILE GENERATOR
4P 65
INCOMER Set @0.85 PROVISION
OUTGOING:
FIRE PUMP TP 300 50 1x4C CU/XLPE/SWA/LSZH 185 1x1Cx95 50.00 50.00 50.00 150.00 135.00 100mA ELS+ALARM+STARTER
SMDB-1ST TP 250 50 1x4C CU/XLPE/SWA/LSZH 150 1x1Cx70 36.57 35.25 36.71 108.52 97.67
SMDB-2ND TP 250 50 1x4C CU/XLPE/SWA/LSZH 150 1x1Cx70 33.88 32.15 32.73 98.76 88.89
SMDB-3RD TP 200 50 1x4C CU/XLPE/SWA/LSZH 95 1x1Cx50 28.12 28.36 28.26 84.73 76.26
SMDB-4TH TP 250 50 1x4C CU/XLPE/SWA/LSZH 150 1x1Cx70 33.40 33.45 32.52 99.36 89.43
MICA GLASS-
EMDB 4P 1250 50 3x4C 300 3x1Cx150 166.76 163.37 166.70 496.83 447.15
XLPE/LSZH/SWA
SMDB-GF TP 250 50 1x4C CU/XLPE/SWA/LSZH 150 1x1Cx70 38.64 38.12 39.37 116.13 104.51
AC COLLECTION
TP 250 50 1x4C CU/XLPE/SWA/LSZH 150 1x1Cx70 PV SOLAR SYSTEM
BOARD (PROVISION)
SMDB-B1 TP 160 50 1x4C CU/XLPE/SWA/LSZH 70 1x1Cx35 21.74 21.94 24.82 68.50 61.65
DEMAND FACTOR : 0.9 Max. DEMAND: 1100.56 kW * OVERALL /INSTALLED LOAD (TCL): 1222.84 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
EMDB FEED FROM MDB-02 / GEN-P-G LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: BASEMENT-1 FLOOR (ELE.ROOM B01-17)
DEMAND FACTOR : 0.9 Max. DEMAND: 447.15 kW * OVERALL /INSTALLED LOAD (TCL): 496.83 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
App. No. E/F ………………………
PROJECT: Emirates Authority For Plot No. 2641059
LOAD DISTRIBUTION SCHEDULE
Standardization And Metrology Sheet No. 1 OF 1
D.B. IDENTIFICATION: DB-L-B3
CLIENT: Emirates Real Estate Corp. LOCATION OF DB: BASEMENT - 03 ELE.ROOM
FED FROM: SMDB-B1
CONNECTED LOAD / POINTS
INCOMER
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps Fan S/O TS/O S/O A/C Each
mm2 mm2 R/O R Y B
1 R 1 10 2.5 2.5 MAIN ELEVATOR LOBBY 4 50 200
2 Y 1 10 2.5 2.5 DRIVEWAY & PARKING 9 50 450
40A-4P 3 B 1 10 2.5 2.5 DRIVEWAY 2 50 100
ELCB-1
100mA 4 R 2 10 2.5 2.5 ELE. ROOM 4 50 200
5 Y 2 10 2.5 2.5 RAMP 12 50 600
6 B 2 10 2.5 2.5 DOMESTIC PUMP ROOM 4 50 200
7 R 3 10 2.5 2.5 FIRE FIGHTING PUMP ROOM 6 50 300
8 Y 3 10 2.5 2.5 STAIR-02 19 50 950
40A TPN ISOLATOR (4 - POLE)
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Size Size Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Ltg. WH SPU Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R/O R Y B
1 R 1 20 4.0 4.0 PARKING 3 200 600
2 Y 1 20 4.0 4.0 PARKING 2 200 400
40A TPN ISOLATOR (4 - POLE)
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps Fan S/O TS/O S/O A/C Each
mm2 mm2 R/O R Y B
1 R 1 10 2.5 2.5 DRIVEWAY 2 50 100
2 Y 1 10 2.5 2.5 DRIVEWAY & PARKING 9 50 450
40A-4P 3 B 1 10 2.5 2.5 ELE. ROOM 4 50 200
ELCB-1
100mA 4 R 2 10 2.5 2.5 MAIN ELEVATOR 4 50 200
5 Y 2 10 2.5 2.5 RAMP 12 50 600
6 B 2 10 2.5 2.5 IDF ROOM , BMS ROOM 5 50 250
7 R 3 SPACE
8 Y 3 20 4.0 4.0 MOTORIZED DAMPER (MNRD-07 TO MNRD-14) 8 50 400
40A TPN ISOLATOR (4 - POLE)
40A-4P 1 R 1 10 SPARE 50
ISOLATOR (4 -
100mA 3 B 1 10 SPARE 50
40A-4P 4 R 2 20 4.0 4.0 TRANS. ROOM 1 200 200
ELCB-2 5 Y 2 20 SPARE 100
30mA 6 B 2 20 4.0 4.0 TRANS. ROOM 1 200 200
Cable size : 4C 10mm2 CU/XLPE/SWA/LSZH
1C 10mm2 PVC Y/G AS ECC 250 400 250
Ltg : Lights,EX.Fan : Exhaust fan,S/o : Socket,WH : Water Heater,FCU : Fan Coil Unit TOTAL CONNECTED LOAD 0.90 KW
PROJECT: Emirates Authority For Plot No. 2641059
LOAD DISTRIBUTION SCHEDULE
Standardization And Metrology Sheet No. 1 OF 1
D.B. IDENTIFICATION: EDB-MTEL
CLIENT: Emirates Real Estate Corp. LOCATION OF DB: BASEMENT - 01 MAIN TEL.ROOM
FED FROM: ESMDB-B1
CCT ECC CONNECTED LOAD / POINTS
INCOMER
CCT ECC
Circuit MCB Wire Wire Load per circuit in Watts
Rating of Sl 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R/O R Y B
1 R 1 10 2.5 2.5 MAIN ELEVATOR 4 50 200
2 Y 1 10 SPARE 50
40A-4P 3 B 1 10 2.5 2.5 DRIVEWAY 3 50 150
ELCB-1
100mA 4 R 2 10 2.5 2.5 DRIVEWAY & PARKING 7 50 350
5 Y 2 10 SPARE 50
6 B 2 10 2.5 2.5 RAMP 6 50 300
7 R 3 10 2.5 2.5 SERVER ROOM 8 50 400
8 Y 3 10 2.5 2.5 CCTV CONT. ROOM 3 50 150
40A-4P 9 B 3 10 2.5 2.5 CCTV EQUIP. ROOM 2 50 100
ELCB-2
100mA 10 R 4 10 2.5 2.5 ELE. ROOM NEAR RAMP 3 50 150
11 Y 4 10 2.5 2.5 LV ROOM 5 50 250
40A TPN ISOLATOR (4 - POLE)
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A 32A
Ref. Rating Size Size Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Ltg. WH SPU INDS.SO Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R/O CKET R Y B
1 R 1 32 4.0 4.0 CCTV EQUIPMENT ROOM 1 3000 3000
2 Y 1 32 4.0 4.0 CCTV EQUIPMENT ROOM 1 3000 3000
40A-4P 3 B 1 32 4.0 4.0 CCTV EQUIPMENT ROOM 1 3000 3000
ELCB-1
30mA 4 R 2 20 4.0 4.0 CCTV CONTROL ROOM 1 400 400
5 Y 2 20 SPARE 100
6 B 2 20 4.0 4.0 ACP SECURITY CON. ROOM (GF) 1 200 200
7 R 3 20 4.0 4.0 CCTV CONTROL ROOM 1 400 400
8 Y 3 20 4.0 4.0 CCTV CONTROL ROOM 1 400 400
40A-4P 9 B 3 20 4.0 4.0 CCTV CONTROL ROOM 1 400 400
ELCB-2
30mA 10 R 4 20 4.0 4.0 CCTV CONTROL ROOM 1 400 400
11 Y 4 20 4.0 4.0 CCTV CONTROL ROOM 1 400 400
12 B 4 20 4.0 4.0 CCTV EQUIPMENT ROOM 2 400 800
80A TPN ISOLATOR (4 - POLE)
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 32A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH INDS.SO
No. Amps Fan S/O TS/O S/O A/C Each
mm2 mm2 CKET R Y B
SMDB-B1 (FEED FROM MDB-02) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: BASEMENT-1 FLOOR (ELE.ROOM B01-09)
INCOMER TP 160 35 1x4C CU/XLPE/SWA/LSZH 70 1x1Cx35 21.74 21.94 24.82 68.50 54.80
OUTGOING:
DB-P-B1 TP 100 35 1x4C CU/XLPE/SWA/LSZH 35 1x1Cx16 13.50 13.10 13.10 39.70 31.76
CIRCULATION
SP 20 35 1x2C CU/XLPE/SWA/LSZH 6 1x1Cx6 0.50 0.50 0.40
PUMP
DEMAND FACTOR : 0.8 Max. DEMAND: 54.80 kW * OVERALL /INSTALLED LOAD (TCL): 68.50 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
ESMDB-B3 (FEED FROM EMDB) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: BASEMENT-3 FLOOR (ELE.ROOM)
MICA CLASS-
INCOMER TP 200 50 1x4C 150 1x1Cx70 25.62 25.47 25.42 76.50 68.85
XLPE/LSZH/SWA
OUTGOING:
MICA GLASS-
EAF-B3-01 TP 40 35 1x4C 10 1x1Cx10 5.00 5.00 5.00 15.00 13.50 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
EAF-B3-02 TP 40 35 1x4C 10 1x1Cx10 5.00 5.00 5.00 15.00 13.50 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
FAF-B3-01 TP 40 35 1x4C 10 1x1Cx10 2.50 2.50 2.50 7.50 6.75 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
FAF-B3-02 TP 40 35 1x4C 10 1x1Cx10 2.50 2.50 2.50 7.50 6.75 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
SP-B3-01
MICA GLASS-
(FOR PETROL TP 25 35 1x4C 6 1x1Cx6 1.47 1.47 1.47 4.40 3.96 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
INTERCEPTOR)
SP-B3-02
(FOR DOMESTIC MICA GLASS-
TP 25 35 1x4C 6 1x1Cx6 1.47 1.47 1.47 4.40 3.96 100mA ELS+TIMER+ALARM
WATER PUMP XLPE/LSZH/SWA
ROOM)
SP-B3-03
MICA GLASS-
(FOR FIRE PUMP TP 25 35 1x4C 6 1x1Cx6 1.47 1.47 1.47 4.40 3.96 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
ROOM)
SP-B3-04
MICA GLASS-
(FOR SEWAGE TP 25 35 1x4C 6 1x1Cx6 1.47 1.47 1.47 4.40 3.96 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
SUMP PIT)
MICA GLASS-
TP-B3-01 TP 40 35 1x4C 10 1x1Cx10 1.83 1.83 1.83 5.50 4.95 100mA ELS+TIMER+ALARM(1D + 1S)
XLPE/LSZH/SWA
MICA GLASS-
BP-B3-01 TP 25 35 1x4C 4 1x1Cx4 0.18 0.18 0.18 0.55 0.50 100mA ELS+TIMER+ALARM(1D + 1S)
XLPE/LSZH/SWA
MAF-B3-01
(DIESEL PUMP MICA GLASS-
TP 25 35 1x4C 4 1x1Cx4 0.18 0.18 0.18 0.55 0.50 100mA ELS+TIMER+ALARM
COMBUSTION XLPE/LSZH/SWA
SUPPLY AIR
MICA GLASS-
EDB-B3 TP 40 35 1x4C 10 1x1Cx10 2.55 2.40 2.35 7.30 6.57
XLPE/LSZH/SWA
DEMAND FACTOR : 0.9 Max. DEMAND: 68.85 kW * OVERALL /INSTALLED LOAD (TCL): 76.50 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
App. No. E/F ………………………
PROJECT: (3B+G+4+ROOF) EMIRATES AUTHORITY FOR
DETAIL OF CONNECTED LOAD, MAX. DEMAND & kWh METERING AREA: MUHAISNAH SECOND - DUBAI
STANDARDIZATION AND METROLOGY OFFICE BUILDING
PLANNED COMPLETION DATE: OWNER : EMIRATES REAL ESTATE CORP. PLOT NO.: 2641059
ESMDB-B2 (FEED FROM EMDB) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: BASEMENT-2 FLOOR (ELE.ROOM)
MICA GLASS-
INCOMER TP 160 50 1x4C 70 1x1Cx35 18.10 17.35 17.35 52.80 47.52
XLPE/LSZH/SWA
OUTGOING:
MICA GLASS-
EAF-B2-01 TP 40 35 1x4C 10 1x1Cx10 5.00 5.00 5.00 15.00 13.50 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
EAF-B2-02 TP 40 35 1x4C 10 1x1Cx10 5.00 5.00 5.00 15.00 13.50 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
FAF-B2-01 TP 32 35 1x4C 10 1x1Cx10 2.50 2.50 2.50 7.50 6.75 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
FAF-B2-02 TP 32 35 1x4C 10 1x1Cx10 2.50 2.50 2.50 7.50 6.75 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
EDB-B2 TP 32 35 1x4C 10 1x1Cx10 3.10 2.35 2.35 7.80 7.02
XLPE/LSZH/SWA
DEMAND FACTOR : 0.9 Max. DEMAND: 47.52 kW * OVERALL /INSTALLED LOAD (TCL): 52.80 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
ESMDB-B1 (FEED FROM EMDB) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: BASEMENT-1 FLOOR (ELE.ROOM B01-17)
MICA GLASS-
INCOMER TP 160 50 1x4C 95 1x1Cx50 24.15 24.05 24.45 72.65 65.38
XLPE/LSZH/SWA
OUTGOING:
MICA GLASS-
EAF-B1-01 TP 63 35 1x4C 16 1x1Cx16 6.17 6.17 6.17 18.50 16.65 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
EAF-B1-02 TP 63 35 1x4C 16 1x1Cx16 6.17 6.17 6.17 18.50 16.65 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
FAF-B1-01 TP 32 35 1x4C 10 1x1Cx10 1.83 1.83 1.83 5.50 4.95 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
FAF-B1-02 TP 32 35 1x4C 10 1x1Cx10 1.83 1.83 1.83 5.50 4.95 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
DEMAND FACTOR : 0.9 Max. DEMAND: 65.38 kW * OVERALL /INSTALLED LOAD (TCL): 72.65 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
ESMDB-DATA CENTER (FEED FROM EMDB) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION : BASEMENT-1 FLOOR (SERVER ROOM)
MICA GLASS-
INCOMER TP 350 50 1x4C 240 1x1Cx120 44.73 42.73 44.73 132.20 118.98
XLPE/LSZH/SWA
.
MICA GLASS-
ESMDB-UPS-DC TP 160 35 1x4C 70 1x1Cx35 21.40 19.40 21.40 62.20 55.98
XLPE/LSZH/SWA
MICA GLASS-
CRAC-B01-01 TP 80 35 1x4C 25 1x1Cx16 11.67 11.67 11.67 35.00 31.50
XLPE/LSZH/SWA
MICA GLASS-
CRAC-B01-01 TP 80 35 1x4C 25 1x1Cx16 11.67 11.67 11.67 35.00 31.50
XLPE/LSZH/SWA
DEMAND FACTOR : 0.9 Max. DEMAND: 118.98 kW * OVERALL /INSTALLED LOAD (TCL): 132.20 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
ESMDB-UPS-CCTV (FEED FROM EMDB) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION : BASEMENT-1 FLOOR (ELE.ROOM B01-09)
MICA GLASS-
INCOMER TP 80 35 1x4C 25 1x1Cx16 10.96 11.16 11.06 33.17 29.85
XLPE/LSZH/SWA
OUTGOING:
MIGA GLASS-
DB-CCTV TP 80 35 1x4C 25 1x1Cx16 9.80 10.00 9.90 29.70 26.73
XLPE/LSZH/SWA
MIGA GLASS- 100mA
CRAC-B01-02 TP 32 35 1x4C 10 1x1Cx10 1.16 1.16 1.16 3.47 3.12
XLPE/LSZH/SWA ELCB+STARTER(UVR+TIMER)
DEMAND FACTOR : 0.9 Max. DEMAND: 29.85 kW * OVERALL /INSTALLED LOAD (TCL): 33.17 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
App. No. E/F ………………………
PROJECT: (3B+G+4+ROOF) EMIRATES AUTHORITY FOR
DETAIL OF CONNECTED LOAD, MAX. DEMAND & kWh METERING AREA: MUHAISNAH SECOND - DUBAI
STANDARDIZATION AND METROLOGY OFFICE BUILDING
PLANNED COMPLETION DATE: OWNER : EMIRATES REAL ESTATE CORP. PLOT NO.: 2641059
ESMDB-LIFT (FEED FROM EMDB) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION : BASEMENT-1 FLOOR (ELE.ROOM B01-09)
MICA GLASS-
INCOMER TP 125 50 1x4C 70 1x1Cx35 18.70 18.70 18.70 56.11 50.50
XLPE/LSZH/SWA
OUTGOING:
MICA GLASS-
LIFT-01 TP 40 35 1x4C 16 1x1Cx16 4.84 4.84 4.84 14.53 13.08 300mA, 4P,RCCB TYPE B
XLPE/LSZH/SWA
MICA GLASS-
LIFT-02 TP 40 35 1x4C 16 1x1Cx16 4.84 4.84 4.84 14.53 13.08 300mA, 4P,RCCB TYPE B
XLPE/LSZH/SWA
MICA GLASS-
LIFT-03 TP 40 35 1x4C 16 1x1Cx16 4.84 4.84 4.84 14.53 13.08 300mA, 4P,RCCB TYPE B
XLPE/LSZH/SWA
MICA GLASS-
LIFT-04 TP 40 35 1x4C 16 1x1Cx16 4.17 4.17 4.17 12.52 11.27 300mA, 4P,RCCB TYPE B
XLPE/LSZH/SWA
MDB-02 CONNECTED TO TR-02 TOTAL CONNECTED LOAD PER
18.70 18.70 18.70 56.11 50.50 TOTAL
ESMDB LIFT CONNECTED TO EMDB PHASE:
TOTAL CONNECTED LOAD (3 PHASE) : 56.11 kW
STAND BY LOAD : 0.00 kW
DEMAND FACTOR : 0.9 Max. DEMAND: 50.50 kW * OVERALL /INSTALLED LOAD (TCL): 56.11 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
App. No. E/F ………………………
PROJECT: (3B+G+4+ROOF) EMIRATES AUTHORITY FOR
DETAIL OF CONNECTED LOAD, MAX. DEMAND & kWh METERING AREA: MUHAISNAH SECOND - DUBAI
STANDARDIZATION AND METROLOGY OFFICE BUILDING
PLANNED COMPLETION DATE: OWNER : EMIRATES REAL ESTATE CORP. PLOT NO.: 2641059
ESMDB-UPS-DC (FEED FROM ESMDB-DATA CENTER) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION : BASEMENT-1 FLOOR (SERVER ROOM)
MICA GLASS-
INCOMER TP 160 35 1x4C 70 1x1Cx35 21.40 19.40 21.40 62.20 55.98
XLPE/LSZH/SWA
OUTGOING:
MIGA CLASS-
EDB1-UPS-DC TP 80 35 1x4C 25 1x1Cx16 12.20 12.20 12.20 36.60 32.94
XLPE/LSZH/SWA
MIGA CLASS-
EDB2-UPS-DC TP 80 35 1x4C 25 1x1Cx16 9.20 7.20 9.20 25.60 23.04
XLPE/LSZH/SWA
DEMAND FACTOR : 0.9 Max. DEMAND: 55.98 kW * OVERALL /INSTALLED LOAD (TCL): 62.20 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
App. No. E/F ………………………
PROJECT: Emirates Authority For Plot No. 2641059
LOAD DISTRIBUTION SCHEDULE
Standardization And Metrology Sheet No. 1 OF 1
D.B. IDENTIFICATION: DB-L-GF
CLIENT: Emirates Real Estate Corp. LOCATION OF DB: GROUND FLOOR ELE.ROOM
FED FROM: SMDB-GF
CCT ECC CONNECTED LOAD / POINTS
INCOMER
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps Fan S/O TS/O S/O A/C Each
mm2 mm2 R/O R Y B
1 R 1 10 2.5 2.5 NURSERY 10 50 500
2 Y 1 10 2.5 2.5 TRAINING ROOM 18 20 / M 360
40A-4P
3 B 1 10 2.5 2.5 HAPINESS & CUSTOMER 3 50 150
ELCB-1
100mA 4 R 2 10 2.5 2.5 NURSERY 1 100 100
5 Y 2 10 2.5 2.5 TRAINING ROOM 22 28 / M 616
6 B 2 10 2.5 2.5 HAPINESS & CUSTOMER 3 50 150
7 R 3 10 2.5 2.5 NURSERY 1 50 50
8 Y 3 10 2.5 2.5 TRAINING ROOM 6 50 300
40A-4P
9 B 3 10 2.5 2.5 CORRIDOR 5 50 250
ELCB-2
100mA 10 R 4 10 2.5 2.5 NURSERY 11 28 / M 308
11 Y 4 10 2.5 2.5 TRAINING ROOM 18 20 / M 360
12 B 4 10 2.5 2.5 RAMP 8 50 400
13 R 5 10 2.5 2.5 NURSERY 10 20 / M 200
14 Y 5 10 2.5 2.5 TRAINING ROOM 6/1 50 / 20 / M 320
40A-4P
15 B 5 10 2.5 2.5 CHAIRMAN ENT 1 300 300
ELCB-3
100mA 16 R 6 10 2.5 2.5 PANTRY & TOILET 10 / 3 50 / 20 / M 560
17 Y 6 10 2.5 2.5 TRAINING ROOM 8/1 50 / 20 / M 420
40A TPN ISOLATOR (4 - POLE)
INCOMER
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps Fan S/O TS/O S/O A/C Each
mm 2 mm 2 R/O R Y B
1 R 1 32 4.0 4.0 STAFF DINNING, STORE 1 2 200 / 400 1000
2 Y 1 32 4.0 4.0 TRAINING,PRE FUNCTION 4 400 1600 RING
40A-4P 3 B 1 20 AUTRIUM 2 800
4.0 4.0 400
ELCB-1
30mA 4 R 2 32 4.0 4.0 FEMALE PRAYER ROOM 3 400 1200 RING
5 Y 2 20 4.0 4.0 RECEPTION 2 400 800
6 B 2 32 4.0 4.0 DUBAI SERVICE CENTER 4 400 1600 RING
7 R 3 32 4.0 4.0 NURSERY 5 400 2000 RING
8 Y 3 20 4.0 4.0 CORRIDOR & CHAIRMAN ENT. 4 200 800
40A-4P 9 B 3 20 DUBAI SERVICE CENTER 2 800
4.0 4.0 400
ELCB-2
30mA 10 R 4 20 4.0 4.0 GARBAGE ROOM 2 200 400
11 Y 4 32 4.0 4.0 MALE PRAYER ROOM 3 400 1200 RING
12 B 4 32 4.0 4.0 SLEEPING KIDS AREA 1 3 200 / 400 1400 RING
13 R 5 20 4.0 4.0 STAFF DINING - FRIDGE 1 300 300
14 Y 5 32 4.0 4.0 CORRIDOR 3 1 200 / 400 1000 RING
40A-4P 15 B 5 20 MALE & FEMALE TOILET (WC) 8 400
4.0 4.0 50
ELCB-3
30mA 16 R 6 32 4.0 4.0 STAFF DINING, CORRIDOR 1 3 200 / 400 1400 RING
17 Y 6 32 4.0 4.0 TRAINING ROOM 5 400 2000 RING
18 B 6 20 4.0 4.0 AUTRIUM 1 400 400
19 R 7 20 SPARE 100
20 Y 7 20 4.0 4.0 TRAINING ROOM 2 400 800
40A-4P 21 B 7 20 FEMALE TOILET - HAND DRYER 1 1000
4.0 4.0 1000
ELCB-4
30mA 22 R 8 32 6.0 4.0 STAFF DINING - COOKER CONTROL UNIT 1 7200 7200
23 Y 8 32 4.0 4.0 TRAINING ROOM 3 400 1200 RING
24 B 8 20 4.0 4.0 MANAGEMENT & CUS. SER. CENTER 1 400 400
25 R 9 20 4.0 4.0 TOILET NURSERY - HAND DRYER 1 1000 1000
26 Y 9 20 4.0 4.0 NURSERY PANTRY - FRIDGE 1 300 300
125A TPN ISOLATOR (4 - POLE)
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R/O R Y B
1 R 1 10 2.5 2.5 ELE. ROOM 2 50 100
2 Y 1 10 2.5 2.5 CORRIDOR 5 50 250
40A-4P 3 B 1 10 2.5 2.5 TEL.ROOM 1 50 50
ELCB-1
100mA 4 R 2 10 2.5 2.5 SECURITY CONTROL 4 50 200
5 Y 2 SPACE
6 B 2 10 2.5 2.5 LIFT ELEVATION 23 20 / M 460
7 R 3 10 2.5 2.5 GUARD ROOM 2 50 100
8 Y 3 SPACE
40A-4P 9 B 3 10 2.5 2.5 CHAIRMAN ENT. CORRIDOR 4 50 200
ELCB-2
100mA 10 R 4 10 2.5 2.5 GENERATOR 4 50 200
11 Y 4 10 2.5 2.5 LIFT ELEVATION 23 20 / M 460
12 B 4 10 2.5 2.5 MANAGEMENT OF CUST. SER. CENTER 3 50 150
13 R 5 SPACE
14 Y 5 20 4.0 4.0 FACP (SEC.CONTROL ROOM) 1 200 200
40A TPN ISOLATOR (4 - POLE)
CCT ECC
Circuit MCB Wire Wire Load per circuit in Watts
Rating of Sl
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH Others
No. Amps Fan S/O TS/O S/O A/C Each
mm2 mm2 R Y B
40A-4P 1 R 1 10 SPARE 50
ISOLATOR (4 -
100mA
POLE)
3 B 1 10 SPARE 50
40A-4P 4 R 2 20 4.0 4.0 RMU ROOM 1 200 200
ELCB-2 5 Y 2 20 SPARE 100
30mA 6 B 2 20 4.0 4.0 RMU ROOM 1 200 200
Cable size : 4C 10mm2 CU/XLPE/SWA/LSZH
1C 10mm2 PVC Y/G AS ECC 250 300 250
Ltg : Lights,EX.Fan : Exhaust fan,S/o : Socket,WH : Water Heater,FCU : Fan Coil Unit TOTAL CONNECTED LOAD 0.80 KW
Plot No. 2641059
PROJECT: Emirates Authority For Standardization And Metrology LOAD DISTRIBUTION SCHEDULE
Sheet No. 1 OF 1
D.B. IDENTIFICATION: DB-FACADE
CLIENT: Emirates Real Estate Corp. LOCATION OF DB: GROUND FLOOR SECURITY CONTROL
FED FROM: SMDB-GF
ECC CONNECTED LOAD / POINTS
INCOMER
40A-4P
15 B 5 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 8 24 192 CONT. BY PHOTOCELL & TIMER
ELCB-3
100mA 16 R 6 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 5/2 10 / 42 134 CONT. BY PHOTOCELL & TIMER
17 Y 6 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 8 24 192 CONT. BY PHOTOCELL & TIMER
18 B 6 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 9 / 13 24 / 24 528 CONT. BY PHOTOCELL & TIMER
19 R 7 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 1 / 13 15 / 10 145 CONT. BY PHOTOCELL & TIMER
20 Y 7 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 9 10 90 CONT. BY PHOTOCELL & TIMER
40A-4P
21 B 7 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 11 / 1 15 / 10 175 CONT. BY PHOTOCELL & TIMER
ELCB-4
100mA 22 R 8 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 5 24 120 CONT. BY PHOTOCELL & TIMER
23 Y 8 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 11 24 264 CONT. BY PHOTOCELL & TIMER
24 B 8 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 1 / 11 15 / 10 125 CONT. BY PHOTOCELL & TIMER
25 R 9 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 13 24 312 CONT. BY PHOTOCELL & TIMER
26 Y 9 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 14 20 280 CONT. BY PHOTOCELL & TIMER
40A-4P
27 B 9 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 5/5 10 / 24 170 CONT. BY PHOTOCELL & TIMER
ELCB-5
100mA 28 R 10 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 2 50 100 CONT. BY PHOTOCELL & TIMER
29 Y 10 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 5 50 250 CONT. BY PHOTOCELL & TIMER
30 B 10 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 5 50 250 CONT. BY PHOTOCELL & TIMER
31 R 11 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 18 10 180 CONT. BY PHOTOCELL & TIMER
32 Y 11 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 13 10 130 CONT. BY PHOTOCELL & TIMER
40A-4P
33 B 11 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 9 10 90 CONT. BY PHOTOCELL & TIMER
ELCB-6
100mA 34 R 12 16 2X6 CU / XLPE / SWA / LSZH 6.0 FACADE LIGHTING 6 50 300 CONT. BY PHOTOCELL & TIMER
35 Y 12 16 SPARE 100
36 B 12 16 SPARE 100
Cable size : 4C 10mm2 CU/XLPE/SWA/LSZH
1C 10mm2 PVC Y/G AS ECC 2134 2110 2180
Ltg : Lights,EX.Fan : Exhaust fan,S/o : Socket,WH : Water Heater,FCU : Fan Coil Unit TOTAL CONNECTED LOAD 6.42 KW
PROJECT: Emirates Authority For Plot No. 2641059
LOAD DISTRIBUTION SCHEDULE
Standardization And Metrology Sheet No. 1 OF 1
D.B. IDENTIFICATION: DB-HVAC-GF
CLIENT: Emirates Real Estate Corp. LOCATION OF DB: GROUND FLOOR ELE.ROOM
FED FROM: SMDB-GF
CONNECTED LOAD / POINTS
INCOMER
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire
Ref. Rating Room / Area Ex 13A 13A 15A VAV / Load in Watts REMARKS
ELCB No Size Size Ltg. WH Others
No. Amps 2 2 Fan S/O TS/O S/O FCU Each
mm mm R Y B
1 R 1 20 4.0 2.5 SECURITY CONTROL 1 300 300
2 Y 1 20 4.0 2.5 CORRIDOR 1 300 300
40A-4P 3 B 1 20 4.0 2.5 CORRIDOR 1 300 300
ELCB-1
100mA 4 R 2 20 4.0 2.5 ABLUTION - FEMALE PRAYER 1 300 300
5 Y 2 20 4.0 2.5 RECEPTION 1 300 300
6 B 2 20 4.0 2.5 CORRIDOR 1 300 300
7 R 3 20 4.0 2.5 FCU - STAFF DINNING 1 548 548 FCU-GF-02
8 Y 3 20 4.0 2.5 AIR CURTAIN - TRAINING ROOM 1 660 660 DAC-01
40A-4P 9 B 3 20 4.0 2.5 AIR CURTAIN - STAFF DINNING 1 660 660 DAC-01
ELCB-2
100mA 10 R 4 20 4.0 2.5 FCU - STAFF DINNING 1 548 548 FCU-GF-02
11 Y 4 20 4.0 2.5 TRAINING ROOM 1 300 300
12 B 4 20 4.0 2.5 DUBAI SERVICE CENTER 1 300 300
13 R 5 20 4.0 2.5 AIR CURTAIN - NURSERY 1 350 350 DAC-02
14 Y 5 20 4.0 2.5 TRAINING ROOM 1 300 300
40A TPN ISOLATOR (4 - POLE)
SMDB-GF (FEED FROM MDB-02) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION : GROUND FLOOR ELE.ROOM
INCOMER TP 250 35 1x4C CU/XLPE/SWA/LSZH 150 1x1Cx70 38.64 38.12 39.37 116.13 92.90
DB-P-GF TP 125 35 1x4C CU/XLPE/SWA/LSZH 50 1x1Cx25 19.55 18.90 18.10 56.55 45.24
COMPACTOR
TP 25 35 1x4C CU/XLPE/SWA/LSZH 6 1x1Cx6 1.83 1.83 1.83 5.50 4.40 100mA ELS + ALARM
GARBAGEROOM
MASTER CONT.
SP 20 35 1x2C CU/XLPE/SWA/LSZH 6 1x1Cx6 2.50 2.50 2.00
PANEL GAR. RM
DEMAND FACTOR : 0.8 Max. DEMAND: 92.90 kW * OVERALL /INSTALLED LOAD (TCL): 116.13 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
App. No. E/F ………………………
PROJECT: (3B+G+4+ROOF) EMIRATES AUTHORITY FOR
DETAIL OF CONNECTED LOAD, MAX. DEMAND & kWh METERING AREA: MUHAISNAH SECOND - DUBAI
STANDARDIZATION AND METROLOGY OFFICE BUILDING
PLANNED COMPLETION DATE: OWNER : EMIRATES REAL ESTATE CORP. PLOT NO.: 2641059
ESMDB-GF (FEED FROM EMDB) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION : GROUND FLOOR ELE.ROOM
MICA GLASS-
INCOMER TP 125 35 1x4C 50 1x1Cx25 18.62 18.18 19.26 56.06 50.45
XLPE/LSZH/SWA
.
MICA GLASS-
EDB-GF TP 40 35 1x4C 10 1x1Cx10 4.20 3.91 4.26 12.37 11.13
XLPE/LSZH/SWA
MICA GLASS-
EDB-1ST TP 40 35 1x4C 10 1x1Cx10 3.02 2.85 2.79 8.66 7.79
XLPE/LSZH/SWA
MICA GLASS-
EDB-2ND TP 40 35 1x4C 10 1x1Cx10 4.21 4.00 4.34 12.55 11.29
XLPE/LSZH/SWA
MICA GLASS-
EDB-3RD TP 40 35 1x4C 10 1x1Cx10 2.52 2.43 2.73 7.68 6.91
XLPE/LSZH/SWA
MICA GLASS-
EDB-4TH TP 40 35 1x4C 10 1x1Cx10 4.67 5.00 5.13 14.80 13.32
XLPE/LSZH/SWA
DEMAND FACTOR : 0.9 Max. DEMAND: 50.45 kW * OVERALL /INSTALLED LOAD (TCL): 56.06 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
App. No. E/F ………………………
PROJECT: Emirates Authority For Plot No. 2641059
LOAD DISTRIBUTION SCHEDULE
Standardization And Metrology Sheet No. 1 OF 1
D.B. IDENTIFICATION: DB-L-1ST
CLIENT: Emirates Real Estate Corp. LOCATION OF DB: FIRST FLOOR ELE.ROOM
FED FROM: SMDB-1ST
CONNECTED LOAD / POINTS
INCOMER
CCT ECC
Circuit MCB Wire Wire Load per circuit in Watts
Rating of Sl 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu REMARKS
ELCB No Size Size Ltg. WH SPU Others Load in Watts Each
No. Amps 2 2 Fan S/O TS/O S/O A/C
mm mm R/O R Y B
1 R 1 10 2.5 2.5 METEROLOGICAL 3 / 25 50 / 28 / M 850
2 Y 1 10 2.5 2.5 CONFIRMITY AFFAIRS,MANAGER 5 / 14 50 / 20 / M 530
40A-4P 3 B 1 10 2.5 2.5 CONFIRMITY AFFAIRS 21 28 / M 588
ELCB-1
100mA 4 R 2 10 2.5 2.5 METEROLOGICAL 20 20 / M 400
5 Y 2 10 2.5 2.5 TECHANICAL AFFAIRS SEC.MGR 9/1 50 / 150 600
6 B 2 10 2.5 2.5 SMART SOLUTION DEP. 18 28 / M 504
7 R 3 10 2.5 2.5 LIBRARY 9/8 50 / 28 / M 674
8 Y 3 10 2.5 2.5 OPEN AREA 23 28 / M 644
40A-4P 9 B 3 10 2.5 2.5 PRODUCT CONTROL 3 / 10 50 / 28 / M 480
ELCB-2
100mA 10 R 4 10 2.5 2.5 MEETING ROOM 1 13 50 650
11 Y 4 10 2.5 2.5 MEETING ROOM 2 13 50 650
40A TPN ISOLATOR (4 - POLE)
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R/O R Y B
1 R 1 10 2.5 2.5 METEROLOGICAL, MANAGER 2 / 12 50 / 28 / M 436
2 Y 1 10 2.5 2.5 CONFIRMITY AFFAIR 2 / 1 / 11 50 / 60 / 28 / M 468
40A-4P 3 B 1 10 2.5 2.5 MAIN ARCHIVING 8 20 / M 160
ELCB-1
100mA 4 R 2 10 2.5 2.5 MALE & FEMALE TOILET 2 / 14 50 / 28 / M 492
5 Y 2 10 2.5 2.5 CORRIDOR 5 50 250
6 B 2 10 SPARE 50
7 R 3 10 2.5 2.5 MEETING ROOM-1 2 50 100
8 Y 3 10 2.5 2.5 MEETING ROOM-2 2 50 100
40A-4P 9 B 3 10 2.5 2.5 SMART SOLUTION DEP. 18 20 / M 360
ELCB-2
100mA 10 R 4 10 2.5 2.5 MEETING ROOM-1 5 20 / M 100
11 Y 4 10 2.5 2.5 MEETING ROOM-2 5 20 / M 100
12 B 4 10 2.5 2.5 CORRIDOR 4 50 200
13 R 5 20 4.0 4.0 METEROLOGICAL 3 160 480 CURTAIN
14 Y 5 10 2.5 2.5 EXCECUTIVE ,TECH.AFFAIRS 5 50 250
40A TPN ISOLATOR (4 - POLE)
CCT ECC
Circuit MCB Wire Wire Load per circuit in Watts
Rating of Sl
Ref. Rating Room / Area Ex 13A 13A 15A VAV Load in Watts REMARKS
ELCB No Size Size Ltg. WH Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R Y B
1 R 1 20 4.0 2.5 METROLOGICAL 1 300 300
2 Y 1 20 4.0 2.5 CORRIDOR 1 300 300
40A-4P 3 B 1 20 4.0 2.5 CORRIDOR (OPEN SPACE OFFICE) 1 300 300
ELCB-1
100mA 4 R 2 20 4.0 2.5 METROLOGICAL 1 300 300
5 Y 2 20 4.0 2.5 EXCECUTIVE 1 300 300
6 B 2 20 4.0 2.5 PROCUCT CONTROL 1 300 300
7 R 3 20 4.0 2.5 OPEN AREA 1 300 300
8 Y 3 20 4.0 2.5 CORRIDOR 1 300 300
40A-4P 9 B 3 20 4.0 2.5 CALL CENTER 1 300 300
ELCB-2
100mA 10 R 4 20 4.0 2.5 LIBRARY 1 300 300
11 Y 4 20 SPARE 100
40A TPN ISOLATOR (4 - POLE)
SMDB-1ST (FEED FROM MDB-02) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: FIRST FLOOR ELE.ROOM
INCOMER TP 250 50 1x4C CU/XLPE/SWA/LSZH 150 1x1Cx70 36.57 35.25 36.71 108.52 86.82
OUTGOING:
DB-P-1ST TP 100 35 1x4C CU/XLPE/SWA/LSZH 35 1x1Cx16 14.40 13.95 14.60 42.95 34.36
FURURE LOAD TP 80 35 1x4C CU/XLPE/SWA/LSZH 25 1x1Cx16 13.33 13.33 13.33 40.00 32.00
DEMAND FACTOR : 0.8 Max. DEMAND: 86.82 kW * OVERALL /INSTALLED LOAD (TCL): 108.52 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
CCT ECC
Circuit MCB Wire Wire Load per circuit in Watts
Rating of Sl
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R Y B
1 R 1 32 4.0 4.0 CORRIDOR 5 200 1000 RING
2 Y 1 32 4.0 4.0 CORRIDOR HUMAN & FINANCE 5 400 2000 RING
40A-4P 3 B 1 32 4.0 4.0 HUMAN & FINANCIAL 3 400 1200 RING
ELCB-1
30mA 4 R 2 32 4.0 4.0 HUMAN & FINANCE MANAGER 4 400 1600 RING
5 Y 2 20 4.0 4.0 PANTRY - FRIDGE 1 300 300
6 B 2 32 4.0 4.0 HUMAN & FINANCE 4 400 1600 RING
7 R 3 32 4.0 4.0 HUMAN & FINANCE 4 400 1600 RING
8 Y 3 32 4.0 4.0 BUSINESS DEVELOPMENT 3 400 1200 RING
40A-4P 9 B 3 32 4.0 4.0 EXCECUTIVE 3 400 1200 RING
ELCB-2
30mA 10 R 4 32 4.0 4.0 MEETING ROOM 3 400 1200 RING
11 Y 4 20 4.0 4.0 PANTRY 2 400 800
80A TPN ISOLATOR (4 - POLE)
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Size Size Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Ltg. WH SPU Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R/O R Y B
1 R 1 32 4.0 4.0 HUMAN & FINANCIAL MANAGER 3 400 1200 RING
2 Y 1 32 4.0 4.0 SPECIFICATIONS 3 400 1200 RING
40A-4P 3 B 1 32 4.0 4.0 MEETING ROOM-2 1 2 200 / 400 1000
ELCB-1
30mA 4 R 2 32 4.0 4.0 MEETING ROOM-1 4 400 1600 RING
5 Y 2 32 4.0 4.0 SPECIFICATIONS 4 400 1600 RING
6 B 2 32 4.0 4.0 MEETING ROOM-2 4 400 1600 RING
7 R 3 32 4.0 4.0 MEETING ROOM-1 5 400 2000 RING
8 Y 3 32 4.0 4.0 SPECIFICATIONS 4 400 1600 RING
40A-4P 9 B 3 32 4.0 4.0 MANAGER NEAR STAIR-02 3 400 1200 RING
ELCB-2
30mA 10 R 4 32 4.0 4.0 HUMAN & FINANCE MANAGER 3 400 1200 RING
11 Y 4 32 4.0 4.0 SPECIFICATIONS 5 400 2000 RING
12 B 4 20 4.0 4.0 MEETING ROOM-2 1 1000 1000
80A TPN ISOLATOR (4 - POLE)
SMDB-2ND (FEED FROM MDB-02) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: 2ND FLOOR ELE.ROOM
INCOMER TP 250 50 1x4C CU/XLPE/SWA/LSZH 150 1x1Cx70 33.88 32.15 32.73 98.76 79.01
OUTGOING:
DEMAND FACTOR : 0.8 Max. DEMAND: 79.01 kW * OVERALL /INSTALLED LOAD (TCL): 98.76 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
40A-4P
15 B 5 10 2.5 2.5 MEETING ROOM 1 & 2 21 50 1050
ELCB-3
100mA 16 R 6 10 2.5 2.5 MALE & FEMALE TOILET 9 / 14 50 / 20 / M 880
17 Y 6 10 2.5 2.5 CORRIDOR,LIFT LOBBY 12 50 600
18 B 6 10 2.5 2.5 MEETING ROOM 1 & 2 17 20 / M 340
19 R 7 10 2.5 2.5 NATIONAL ACCREDIATION 27 20 / M 540
20 Y 7 10 2.5 2.5 CORRIDOR 10 50 500
40A-4P
21 B 7 20 4.0 4.0 GEN.DIRECTOR SECRETARIES 8/4 15 / 160 760 CURTAIN
ELCB-4
100mA 22 R 8 10 2.5 2.5 STORE,NATIONAL ACCREDIATION 8/9/1 50 / 28 / M / 57 709
23 Y 8 10 2.5 2.5 GENERAL DIRECTOR 1 / 12 200 / 28 / M 536
24 B 8 10 2.5 2.5 MAJLIS 8/1 50 / 60 460
25 R 9 10 2.5 2.5 GOVT. COMMUNICATION & MANAGER 24 20 / M 480
26 Y 9 10 2.5 2.5 INSTITUTAIONAL 17 20 / M 340
40A-4P
27 B 9 20 4.0 4.0 INSTITUTAIONAL ,GOV. COMUNICATION 12 160 1920 CURTAIN
ELCB-5
100mA 28 R 10 10 2.5 2.5 GRAND STAIR - LED LIGHT 28 20 / M 560
29 Y 10 10 2.5 2.5 PRIVATE LOBBY, LOBBY, COR, , PANTRY 15 / 4 50 / 20 / M 830
30 B 10 10 2.5 2.5 GEN. DIRECTOR TOILET 4/7 50 / 20 / M 380
31 R 11 10 2.5 2.5 NATIONAL ACCREDIATION & MANAGER 20 20 / M 400
32 Y 11 20 4.0 4.0 GEN.DIR.& MEETING ROOM,OFF. MGR. 16 15 240 CURTAIN
40A-4P
33 B 11 20 4.0 4.0 MEETING RM 1 & 2 NATIONAL ACC. MGR. 6 160 960 CURTAIN
ELCB-6
100mA 34 R 12 20 4.0 4.0 GOVT. COMMUNICATION & MANAGER 4 160 640 CURTAIN
35 Y 12 10 SPARE 200
36 B 12 20 4.0 4.0 MAJLIS 10 15 150 CURTAIN
Cable size : 4C 16mm2 CU/XLPE/SWA/LSZH
1C 16mm2 PVC Y/G AS ECC 7071 8156 7556
Ltg : Lights,EX.Fan : Exhaust fan,S/o : Socket,WH : Water Heater,FCU : Fan Coil Unit TOTAL CONNECTED LOAD 22.78 KW
PROJECT: Emirates Authority For Plot No. 2641059
LOAD DISTRIBUTION SCHEDULE
Standardization And Metrology Sheet No. 1 OF 1
D.B. IDENTIFICATION: EDB-3RD
CLIENT: Emirates Real Estate Corp. LOCATION OF DB: THIRD FLOOR ELE.ROOM
FED FROM: ESMDB-GF
CONNECTED LOAD / POINTS
INCOMER
CCT ECC
Circuit MCB Wire Wire Load per circuit in Watts
Rating of Sl 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R/O R Y B
1 R 1 10 2.5 2.5 NATIONAL ACCREDITATION 4 / 22 50 / 28 / M 816
2 Y 1 10 2.5 2.5 INSTITUTIONAL 2 / 14 50 / 28 / M 492
40A-4P 3 B 1 10 2.5 2.5 GOVT. COMMUNICATION, MANAGER 3/8 50 / 28 / M 374
ELCB-1
100mA 4 R 2 10 2.5 2.5 OFFICE OF INT. AFFAIRS 1 / 18 50 / 28 / M 554
5 Y 2 10 2.5 2.5 GEN.DIRECTOR MEETING ROOM 2 50 100
6 B 2 10 2.5 2.5 MAJLIS 50 20 / M 1000
7 R 3 10 2.5 2.5 GEN.DIRECTOR OFFICE MANAGER 3 20 / M 60
8 Y 3 10 2.5 2.5 GENERAL DIRECTOR 8 28 / M 224
40A-4P 9 B 3 10 2.5 2.5 GEN.DIRECTOR SECRETARIES 3 50 150
ELCB-2
40A TPN ISOLATOR (4 - POLE)
INCOMER
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps Fan S/O TS/O S/O A/C Each
mm2 mm2 R/O R Y B
1 R 1 32 4.0 4.0 MAJLIS 1 5 200 / 400 2200 RING
2 Y 1 32 4.0 4.0 PRIVATE LOBBY,CORRIDOR 6 2 200 / 400 2000 RING
40A-4P 3 B 1 32 4.0 4.0 GENERAL DIRECTOR SECRETARIES 4 400 1600 RING
ELCB-1
30mA 4 R 2 32 4.0 4.0 GENERAL DIRECTOR OFF.MANAGER 3 400 1200 RING
5 Y 2 32 4.0 4.0 GENERAL DIRECTOR 5 400 2000 RING
6 B 2 20 4.0 4.0 MEETING ROOM-1 1 1000 1000
7 R 3 32 4.0 4.0 OFFICE OF INT. AFFAIRS 3 400 1200 RING
8 Y 3 32 4.0 4.0 GENERAL DIRECTOR MEETING ROOM 1 3 200 / 400 1400 RING
40A-4P 9 B 3 32 4.0 4.0 MEETING ROOM - 1 4 400 1600 RING
ELCB-2
30mA 10 R 4 32 4.0 4.0 NATIONAL ACCREDITATION,MANAGER 4 400 1600 RING
11 Y 4 32 4.0 4.0 GENERAL DIRECTOR MEETING ROOM 4 400 1600 RING
12 B 4 32 4.0 4.0 MEETING ROOM - 2 4 400 1600 RING
13 R 5 32 4.0 4.0 PANTRY 3 400 1200 RING
14 Y 5 32 4.0 4.0 GENERAL DIRECTOR MEETING ROOM 3 400 1200 RING
40A-4P 15 B 5 32 4.0 4.0 MEETING ROOM - 2 4 400 1600 RING
ELCB-3
30mA 16 R 6 20 4.0 4.0 TOILET MALE - HAND DRAYER 1 1000 1000
17 Y 6 20 4.0 4.0 GEN.DIRECTOR MEETING ROOM 1 1000 1000
18 B 6 32 4.0 4.0 MEETING ROOM - 2 1 2 200 / 400 1000 RING
19 R 7 20 4.0 4.0 TOILET GEN.DIRECTOR - HAND DRAYER 1 1000 1000
125A TPN ISOLATOR (4 - POLE)
CCT ECC
Circuit MCB Wire Wire Load per circuit in Watts
Rating of Sl
Ref. Rating Room / Area Ex 13A 13A 15A VAV Load in Watts REMARKS
ELCB No Size Size Ltg. WH Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R Y B
1 R 1 20 4.0 2.5 MAJLIS 1 300 300
2 Y 1 20 4.0 2.5 PRIVATE LOBBY 1 300 300
40A-4P 3 B 1 20 4.0 2.5 GENERAL DIRECTOR SECRETARIES 1 300 300
ELCB-1
100mA 4 R 2 20 4.0 2.5 GENERAL DIRECTOR OFF.MANAGER 1 300 300
5 Y 2 20 4.0 2.5 GENERAL DIRECTOR 1 300 300
6 B 2 20 4.0 2.5 GOVT. COMMUNICATION 1 300 300
7 R 3 20 4.0 2.5 OFFICE OF INT. AFFAIRS 1 300 300
8 Y 3 20 4.0 2.5 GENERAL DIRECTOR MEETING ROOM 1 300 300
40A-4P 9 B 3 20 4.0 2.5 CORRIDOR 1 300 300
ELCB-2
40A TPN ISOLATOR (4 - POLE)
SMDB-3RD (FEED FROM MDB-02) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: 3RD FLOOR ELE.ROOM
INCOMER TP 200 50 1x4C CU/XLPE/SWA/LSZH 95 1x1Cx50 28.12 28.36 28.26 84.73 67.79
OUTGOING:
DB-P-3RD TP 125 35 1x4C CU/XLPE/SWA/LSZH 50 1x1Cx25 18.55 17.90 18.20 54.65 43.72
DEMAND FACTOR : 0.8 Max. DEMAND: 67.79 kW * OVERALL /INSTALLED LOAD (TCL): 84.73 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R/O R Y B
1 R 1 10 2.5 2.5 MANAGER ROOMS - IHAF STAFF 4 50 200
2 Y 1 10 2.5 2.5 IHAF STAFF 22 28 / M 616
40A-4P 3 B 1 10 2.5 2.5 MEETING ROOM 1 & 2 18.5 20 / M 370
ELCB-1
100mA 4 R 2 10 2.5 2.5 INTERNAL AUDIT OFFICE 10 50 500
5 Y 2 10 2.5 2.5 CHAIRMAN MEETING ROOM 16 20 / M 320
6 B 2 10 2.5 2.5 BOARD ROOM 98 20 / M 1960
7 R 3 10 2.5 2.5 PRIVATE LOBBY & LOBBY 34 20 / M 680
8 Y 3 10 2.5 2.5 CHAIRMAN MEETING ROOM 1 125 125
40A-4P 9 B 3 10 2.5 2.5 BOARD ROOM 18 20 / M 360
ELCB-2
100mA 10 R 4 10 2.5 2.5 MAJLIS 48 20 / M 960
11 Y 4 10 2.5 2.5 CHAIRMAN OFFICE 49 20 / M 980
12 B 4 10 2.5 2.5 BOARD ROOM 7 50 350
13 R 5 10 2.5 2.5 CORRIDOR 10 50 500
14 Y 5 10 2.5 2.5 CHAIRMAN OFF. MANAGER & SECRETARY 3/3 50 / 28 / M 234
40A TPN ISOLATOR (4 - POLE)
INCOMER
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire 13A
Ref. Rating Room / Area Ex 13A 13A 15A Fcu Load in Watts REMARKS
ELCB No Size Size Ltg. WH SPU Others
No. Amps Fan S/O TS/O S/O A/C Each
mm2 mm2 R/O R Y B
1 R 1 32 4.0 4.0 MANAGER - IHAF STAFF 3 400 1200 RING
2 Y 1 32 4.0 4.0 IHAF ASSISTANT 4 400 1600 RING
40A-4P
3 B 1 32 4.0 4.0 BOARD ROOM 4 400 1600 RING
ELCB-1
30mA 4 R 2 32 4.0 4.0 MANAGER - IHAF STAFF 4 400 1600 RING
5 Y 2 32 4.0 4.0 IHAF STAFF 2 2 400 1200 RING
6 B 2 32 4.0 4.0 BOARD ROOM 5 400 2000 RING
7 R 3 32 4.0 4.0 IHAF GENERAL 4 400 1600 RING
8 Y 3 32 4.0 4.0 IHAF STAFF 5 400 2000 RING
40A-4P
9 B 3 20 4.0 4.0 BOARD ROOM 1 1000 1000
ELCB-2
30mA 10 R 4 32 4.0 4.0 IHAF 3 400 1200 RING
11 Y 4 32 4.0 4.0 IHAF STAFF 4 400 1600 RING
12 B 4 32 4.0 4.0 BOARD ROOM 2 4 200 / 400 2000 RING
13 R 5 32 4.0 4.0 COUNSELOR-1 & 2 5 400 2000 RING
14 Y 5 32 4.0 4.0 IHAF STAFF 4 400 1600 RING
40A-4P
15 B 5 32 4.0 4.0 COR. GOVERANCE & MANAGER 6 400 2400 RING
ELCB-3
30mA 16 R 6 32 4.0 4.0 INTERNAL AUDIT 4 400 1600 RING
17 Y 6 32 4.0 4.0 CHAIRMAN MEETING ROOM 5 400 2000 RING
18 B 6 32 4.0 4.0 MEETING ROOM-2 1 2 200 / 400 1000 RING
19 R 7 20 4.0 4.0 MEETING ROOM-2 1 1000 1000
20 Y 7 32 4.0 4.0 IHAF STAFF 5 400 2000 RING
40A-4P
21 B 7 20 4.0 4.0 TOILET FEMALE - HAND DRAYER 1 1000 1000
125A TPN ISOLATOR (4 - POLE)
ELCB-4
30mA 22 R 8 20 4.0 4.0 CORRIDOR 4 200 800
23 Y 8 32 4.0 4.0 CHAIRMAN OFF. MANAGER 3 400 1200 RING
24 B 8 20 4.0 4.0 BOARD ROOM 1 1000 1000
25 R 9 20 4.0 4.0 TOILET MALE - HAND DRAYER 1 1000 1000
26 Y 9 32 4.0 4.0 CHAIRMAN OFFICE 2 4 400 2000 RING
40A-4P
27 B 9 20 4.0 4.0 IHAF GENERAL -TOILET (WC) 1 50 50
ELCB-5
30mA 28 R 10 20 4.0 4.0 CHAIRMAN MEETING ROOM 1 1000 1000
29 Y 10 32 4.0 4.0 CHAIRMAN MEETING ROOM 1 3 400 1400 RING
30 B 10 20 4.0 4.0 MEETING ROOM-1 1 1000 1000
31 R 11 32 4.0 4.0 MAJLIS 1 5 200 / 400 2200 RING
32 Y 11 20 4.0 4.0 MALE & FEMALE TOILET (WC) 8 50 400
40A-4P
33 B 11 32 4.0 4.0 MEETING ROOM-1 4 400 1600 RING
ELCB-6
30mA 34 R 12 32 4.0 4.0 LOBBY,CORRIDOR 2 2 200 / 400 1200 RING
35 Y 12 20 4.0 4.0 CHAIRMAN OFFICE -TOILET (WC) 1 50 50
36 B 12 32 4.0 4.0 MEETING ROOM-1 4 400 1600 RING
37 R 13 20 4.0 4.0 PANTRY 2 400 800
38 Y 13 32 4.0 4.0 IHAF STAFF 4 400 1600 RING
40A-4P
39 B 13 20 4.0 4.0 MEETING ROOM-1 1 1000 1000
ELCB-7
30mA 40 R 14 20 4.0 4.0 PANTRY FRIDGE 1 300 300
41 Y 14 32 4.0 4.0 CHAIRMAN SECRETARY 3 400 1200 RING
42 B 14 32 4.0 4.0 MEETING ROOM-2 4 400 1600 RING
43 R 15 20 4.0 4.0 MEETING ROOM-2 1 1000 1000
44 Y 15 20 SPARE 100
40A-4P
45 B 15 20 4.0 4.0 TOILET FEMALE - HAND DRAYER 1 1000 1000
ELCB-8
30mA 46 R 16 20 4.0 4.0 CHAIRMAN MEETING ROOM 1 1000 1000
47 Y 16 32 SPARE 100
48 B 16 32 SPARE 100
40A-4P 49 R 17 20 4.0 4.0 TOILET MALE - HAND DRAYER 1 1000 1000
ELCB-9 50 Y 17 SPACE
30mA 51 B 17 SPACE
Cable size : 4C 50mm2 CU/XLPE/SWA/LSZH
1C 25mm2 PVC Y/G AS ECC 20500 20050 19950
Ltg : Lights,EX.Fan : Exhaust fan,S/o : Socket,WH : Water Heater,FCU : Fan Coil Unit TOTAL CONNECTED LOAD 60.50 KW
PROJECT: Emirates Authority For Plot No. 2641059
LOAD DISTRIBUTION SCHEDULE
Standardization And Metrology Sheet No. 1 OF 1
D.B. IDENTIFICATION: DB-HVAC-4TH
CLIENT: Emirates Real Estate Corp. LOCATION OF DB: 4TH FLOOR ELE.ROOM
FED FROM: SMDB-4TH
CONNECTED LOAD / POINTS
INCOMER
CCT ECC
Circuit MCB Load per circuit in Watts
Rating of Sl Wire Wire
Ref. Rating Room / Area Ex 13A 13A 15A VAV Load in Watts REMARKS
ELCB No Size Size Ltg. WH Others
No. Amps 2 2 Fan S/O TS/O S/O A/C Each
mm mm R Y B
1 R 1 20 4.0 2.5 MAJLIS 1 300 300
2 Y 1 20 4.0 2.5 CHAIRMAN SECRETARY 1 300 300
40A-4P 3 B 1 20 4.0 2.5 BOARD ROOM 1 300 300
ELCB-1
100mA 4 R 2 20 4.0 2.5 INTERNAL AUDIT 1 300 300
5 Y 2 20 4.0 2.5 CHAIRMAN OFFICE MANAGER 1 300 300
6 B 2 20 4.0 2.5 BOARD ROOM 1 300 300
7 R 3 20 4.0 2.5 INTERNAL AUDIT 1 300 300
8 Y 3 20 4.0 2.5 IHAF STAFF 1 300 300
40A-4P 9 B 3 20 4.0 2.5 BOARD ROOM 1 300 300
ELCB-2
100mA 10 R 4 20 4.0 2.5 INTERNAL AUDIT 1 300 300
11 Y 4 20 4.0 2.5 IHAF STAFF 1 300 300
12 B 4 20 4.0 2.5 BOARD ROOM 1 300 300
13 R 5 20 4.0 2.5 INTERNAL AUDIT 1 300 300
14 Y 5 20 4.0 2.5 IHAF STAFF 1 300 300
40A TPN ISOLATOR (4 - POLE)
SMDB-4TH (FEED FROM MDB-02) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: 4TH FLOOR ELE.ROOM
INCOMER TP 250 50 1x4C CU/XLPE/SWA/LSZH 150 1x1Cx70 33.40 33.45 32.52 99.36 79.49
OUTGOING:
DB-P-4TH TP 125 35 1x4C CU/XLPE/SWA/LSZH 50 1x1Cx25 20.50 20.05 19.95 60.50 48.40
ISO-GSM ROOM TP 20 35 1x4C CU/XLPE/SWA/LSZH 6 1x1Cx6 1.67 1.67 1.67 5.00 4.00 100mA ELS + ALARM
DEMAND FACTOR : 0.8 Max. DEMAND: 79.49 kW * OVERALL /INSTALLED LOAD (TCL): 99.36 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
12 B 4 20 SPARE 100
13 R 5 20 4.0 4.0 MCC ROOM 2 400 800
14 Y 5 20 4.0 4.0 ROOF PARAPET WALL 3 200 600
40A-4P
15 B 5 20 4.0 4.0 ELE CTRICAL ROOM 2 400 800
ELCB-3
30mA 16 R 6 20 4.0 4.0 CHILLER PUMP ROOM 3 200 600
17 Y 6 20 4.0 4.0 CHEMICAL DOSING UNIT 1 800 800
18 B 6 20 4.0 4.0 GSM ROOM 2 400 800
19 R 7 20 4.0 4.0 BMS-DDC-RF-08 (MCC ROOM) 1 200 200
20 Y 7 32 4.0 4.0 ROOF PARAPET WALL 5 200 1000 RING
40A-4P
21 B 7 20 4.0 4.0 BMS-DDC-RF-06 (ELE. ROOM) 1 200 200
ELCB-4
30mA 22 R 8 20 4.0 4.0 MCC ROOM (CHILLER PLANT MANAGER) 1 400 400
23 Y 8 20 4.0 4.0 EX.FAN - CHILLER ROOM (EAF-UF-01) 1 100 100
24 B 8 20 4.0 4.0 BMS-DDC-RF-07 (ELE. ROOM) 1 200 200
25 R 9 20 4.0 4.0 ROOF PARAPET WALL 2 200 400
26 Y 9 20 SPARE 100
40A-4P
27 B 9 20 4.0 4.0 UV STERLIZER 1 800 800
ELCB-5
30mA 28 R 10 SPACE
29 Y 10 20 SPARE 100
30 B 10 20 SPARE 100
Cable size : 4C 10mm2 XLPE/SWA/LSZH
1C 10mm2 PVC Y/G AS ECC 3967 3957 3945
Ltg : Lights,EX.Fan : Exhaust fan,S/o : Socket,WH : Water Heater,FCU : Fan Coil Unit TOTAL CONNECTED LOAD 11.87 KW
PROJECT: (3B+G+4+ROOF) EMIRATES AUTHORITY FOR
DETAIL OF CONNECTED LOAD, MAX. DEMAND & kWh METERING AREA: MUHAISNAH SECOND - DUBAI
STANDARDIZATION AND METROLOGY OFFICE BUILDING
PLANNED COMPLETION DATE: OWNER : EMIRATES REAL ESTATE CORP. PLOT NO.: 2641059
SMDB-RF (FEED FROM MDB-01) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: UTILITY FLOOR ELE.ROOM
INCOMER TP 300 50 1x4C CU/XLPE/SWA/LSZH 185 1x1Cx95 47.33 46.58 46.57 140.48 112.38
OUTGOING:
AHU-01 TP 80 35 1x4C CU/XLPE/SWA/LSZH 25 1x1Cx16 10.00 10.00 10.00 30.00 24.00 100mA ELS+TIMER+ALARM
AHU-02 TP 80 35 1x4C CU/XLPE/SWA/LSZH 25 1x1Cx16 12.33 12.33 12.33 37.00 29.60 100mA ELS+TIMER+ALARM
AHU-03 TP 80 35 1x4C CU/XLPE/SWA/LSZH 25 1x1Cx16 10.00 10.00 10.00 30.00 24.00 100mA ELS+TIMER+ALARM
FAHU-01 TP 63 35 1x4C CU/XLPE/SWA/LSZH 16 1x1Cx16 6.96 6.96 6.96 20.87 16.70 100mA ELS+TIMER+ALARM
HWCP - FOR
SP 20 35 1x2C CU/XLPE/SWA/LSZH 6 1x1Cx6 0.37 0.37 0.30 100mA ELS+TIMER+ALARM
SOLAR PANEL
HWCP - FOR
SP 20 35 1x2C CU/XLPE/SWA/LSZH 6 1x1Cx6 0.37 0.37 0.30 100mA ELS+TIMER+ALARM
BUILDING
SOLAR SYSTEM
TP 40 35 1x4C CU/XLPE/SWA/LSZH 10 1x1Cx10 3.33 3.33 3.33 10.00 8.00 100mA ELS+TIMER+ALARM
BACKUP
DEMAND FACTOR : 0.8 Max. DEMAND: 112.38 kW * OVERALL /INSTALLED LOAD (TCL): 140.48 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
MCC-CH (FEED FROM MDB-01) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: UTILITY FLOOR MCC ROOM
INCOMER TP 1600 50 1600A BUS BAR TPN+E 246.48 246.48 246.48 739.43 591.54
OUTGOING:
CH-UF-01 TP 630 50 2x4C CU/XLPE/SWA/LSZH 185 2x1Cx95 73.77 73.77 73.77 221.31 177.05 1000mA ELS+TIMER+ALARM
CH-UF-02 TP 630 50 2x4C CU/XLPE/SWA/LSZH 185 2x1Cx95 73.77 73.77 73.77 221.31 177.05 1000mA ELS+TIMER+ALARM
CH-UF-03 TP 630 50 2x4C CU/XLPE/SWA/LSZH 185 2x1Cx95 73.77 73.77 73.77 221.31 177.05 1000mA ELS+TIMER+ALARM
MCC-RF TP 160 50 1x4C CU/XLPE/SWA/LSZH 70 1x1Cx35 25.17 25.17 25.17 75.50 60.40 1000mA ELS+TIMER+ALARM
DEMAND FACTOR : 0.8 Max. DEMAND: 591.54 kW * OVERALL /INSTALLED LOAD (TCL): 720.93 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
MCC-RF FEED FROM MCC-CH LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: UTILITY FLOOR MCC ROOM
INCOMER TP 160 35 1x4C CU/XLPE/SWA/LSZH 70 1x1Cx35 25.17 25.17 25.17 75.50 60.40
OUTGOING:
CHWP-UF-01 TP 63 35 1x4C CU/XLPE/SWA/LSZH 16 1x1Cx16 6.17 6.17 6.17 18.50 14.80 100mA ELR
CHWP-UF-02 TP 63 35 1x4C CU/XLPE/SWA/LSZH 16 1x1Cx16 6.17 6.17 6.17 18.50 14.80 100mA ELR
CHWP-UF-03 TP 63 35 1x4C CU/XLPE/SWA/LSZH 16 1x1Cx16 6.17 6.17 6.17 18.50 14.80 100mA ELR
CHWP-UF-04
TP 63 35 1x4C CU/XLPE/SWA/LSZH 16 1x1Cx16 6.17 6.17 6.17 18.50 14.80 100mA ELR (STANDBY)
(STANDBY)
100mA ELS+TIMER+ALARM
PRESS.UNIT TP 25 35 1x4C CU/XLPE/SWA/LSZH 10 1x1Cx10 0.50 0.50 0.50 1.50 1.20
(1D + 1S)
DEMAND FACTOR : 0.8 Max. DEMAND: 60.40 kW * OVERALL /INSTALLED LOAD (TCL): 57.00 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)
ESMDB-RF (FEED FROM EMDB) LEAD CONSULTANT: EHAF Consulting Engineers LOCATION: UTILITY FLOOR (ELE.ROOM )
MICA GLASS-
INCOMER TP 40 35 1x4C 10 1x1Cx10 5.88 5.73 5.73 17.35 15.62
XLPE/LSZH/SWA
OUTGOING:
MICA GLASS-
BP-UF-01 TP 25 35 1x4C 10 1x1Cx10 0.73 0.73 0.73 2.20 1.98 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
SEF-UF-01 TP 25 35 1x4C 10 1x1Cx10 2.50 2.50 2.50 7.50 6.75 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
SEF-UF-02 TP 25 35 1x4C 10 1x1Cx10 2.50 2.50 2.50 7.50 6.75 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
MICA GLASS-
EAF-UF-02 SP 25 35 1x2C 6 1x1Cx6 0.15 0.15 0.14 100mA ELS+TIMER+ALARM
XLPE/LSZH/SWA
DEMAND FACTOR : 0.9 Max. DEMAND: 15.62 kW * OVERALL /INSTALLED LOAD (TCL): 17.35 kW TOTAL BUILD-UP AREA
* TCL - Shall include all loads proposed to be installed including standby, spare and future load provisions.
Type of Meter (Rating of Incomer) : (1) Upto 60A (2) Upto 125A (3) LV CT / A / HV CT / A (* 200/5Amps CT Metering)
(1Phase) (3 Phase)