Micom P40 Agile P543/P545 (With Distance) : Technical Manual
Micom P40 Agile P543/P545 (With Distance) : Technical Manual
Technical Manual
Single Breaker Current Differential
(with Distance)
Hardware Version: M
Software Version: 82
Publication Reference: P54x1Z-TM-EN-1
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is
given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical
and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or
disclosure to third parties, without express written authority, is strictly prohibited.
Contents
Chapter 1 Introduction 1
1 Chapter Overview 3
2 Foreword 4
2.1 Target Audience 4
2.2 Typographical Conventions 4
2.3 Nomenclature 5
2.4 Compliance 5
3 Product Scope 6
3.1 Product Versions 6
3.2 Ordering Options 7
4 Features and Functions 9
4.1 Current Differential Protection Functions 9
4.2 Distance Protection Functions 9
4.3 Protection Functions 9
4.4 Control Functions 10
4.5 Measurement Functions 11
4.6 Communication Functions 11
5 Logic Diagrams 12
6 Functional Overview 14
Chapter 4 Configuration 61
1 Chapter Overview 63
2 Settings Application Software 64
3 Using the HMI Panel 65
3.1 Navigating the HMI Panel 66
3.2 Getting Started 66
3.3 Default Display 67
3.4 Default Display Navigation 68
3.5 Password Entry 69
3.6 Processing Alarms and Records 70
3.7 Menu Structure 70
3.8 Changing the Settings 71
3.9 Direct Access (The Hotkey menu) 72
3.9.1 Setting Group Selection 72
3.9.2 Control Inputs 73
3.9.3 Circuit Breaker Control 73
3.10 Function Keys 74
4 Line Parameters 75
4.1 Tripping Mode 75
4.2 Residual Compensation 75
4.3 Mutual Compensation 76
5 Date and Time Configuration 78
5.1 Using an SNTP Signal 78
5.2 Using an IRIG-B Signal 78
5.3 Using an IEEE 1588 PTP Signal 78
5.4 Without a Timing Source Signal 79
5.5 Time Zone Compensation 79
ii P54x1Z-TM-EN-1
P54x1Z Contents
P54x1Z-TM-EN-1 iii
Contents P54x1Z
iv P54x1Z-TM-EN-1
P54x1Z Contents
P54x1Z-TM-EN-1 v
Contents P54x1Z
vi P54x1Z-TM-EN-1
P54x1Z Contents
P54x1Z-TM-EN-1 vii
Contents P54x1Z
viii P54x1Z-TM-EN-1
P54x1Z Contents
P54x1Z-TM-EN-1 ix
Contents P54x1Z
x P54x1Z-TM-EN-1
P54x1Z Contents
P54x1Z-TM-EN-1 xi
Contents P54x1Z
xii P54x1Z-TM-EN-1
P54x1Z Contents
P54x1Z-TM-EN-1 xiii
Contents P54x1Z
xiv P54x1Z-TM-EN-1
P54x1Z Contents
P54x1Z-TM-EN-1 xv
Contents P54x1Z
xvi P54x1Z-TM-EN-1
P54x1Z Contents
P54x1Z-TM-EN-1 xvii
Contents P54x1Z
xviii P54x1Z-TM-EN-1
P54x1Z Contents
P54x1Z-TM-EN-1 xix
Contents P54x1Z
xx P54x1Z-TM-EN-1
P54x1Z Contents
P54x1Z-TM-EN-1 xxi
Contents P54x1Z
xxii P54x1Z-TM-EN-1
Table of Figures
Figure 1: P40L family - version evolution 7
Figure 2: Key to logic diagrams 13
Figure 3: Functional Overview 14
Figure 4: Hardware architecture 32
Figure 5: Coprocessor hardware architecture 33
Figure 6: Exploded view of IED 34
Figure 7: Front panel (60TE) 36
Figure 8: Rear view of populated case 40
Figure 9: Terminal block types 41
Figure 10: Rear connection to terminal block 42
Figure 11: Main processor board 43
Figure 12: Power supply board 44
Figure 13: Power supply assembly 45
Figure 14: Power supply terminals 46
Figure 15: Watchdog contact terminals 47
Figure 16: Rear serial port terminals 48
Figure 17: Input module - 1 transformer board 48
Figure 18: Input module schematic 49
Figure 19: Transformer board 50
Figure 20: Input board 51
Figure 21: Standard output relay board - 8 contacts 52
Figure 22: IRIG-B board 53
Figure 23: Fibre optic board 54
Figure 24: Rear communication board 55
Figure 25: Ethernet board 56
Figure 26: Redundant Ethernet board 57
Figure 27: Fully populated Coprocessor board 59
Figure 28: Navigating the HMI 66
Figure 29: Default display navigation 68
Figure 30: Permissive Intertripping example 87
Figure 31: Ping-pong measurement for alignment of current signals 89
Figure 32: Asymmetric propogation delay times 91
Figure 33: Dual slope current differential bias characteristic 95
Figure 34: Capacitive charging current 97
Figure 35: CT Compensation 98
Figure 36: Phase Current Differential Protection logic 99
Figure 37: Typical two-terminal plain feeder circuit 103
Figure 38: Typical three-terminal plain feeder circuit 105
Table of Figures P54x1Z
xxiv P54x1Z-TM-EN-1
P54x1Z Table of Figures
P54x1Z-TM-EN-1 xxv
Table of Figures P54x1Z
xxvi P54x1Z-TM-EN-1
P54x1Z Table of Figures
P54x1Z-TM-EN-1 xxvii
Table of Figures P54x1Z
xxviii P54x1Z-TM-EN-1
P54x1Z Table of Figures
P54x1Z-TM-EN-1 xxix
Table of Figures P54x1Z
xxx P54x1Z-TM-EN-1
INTRODUCTION
CHAPTER 1
Chapter 1 - Introduction P54x1Z
2 P54x1Z-TM-EN-1
P54x1Z Chapter 1 - Introduction
1 CHAPTER OVERVIEW
This chapter provides some general information about the technical manual and an introduction to the
device(s) described in this technical manual.
P54x1Z-TM-EN-1 3
Chapter 1 - Introduction P54x1Z
2 FOREWORD
This technical manual provides a functional and technical description of Alstom Grid's P54x1Z, as well as a
comprehensive set of instructions for using the device. The level at which this manual is written assumes
that you are already familiar with protection engineering and have experience in this discipline. The
description of principles and theory is limited to that which is necessary to understand the product. For
further details on general protection engineering theory, we refer you to Alstom's publication NPAG, which is
available online or from our contact centre.
We have attempted to make this manual as accurate, comprehensive and user-friendly as possible. However
we cannot guarantee that it is free from errors. Nor can we state that it cannot be improved. We would
therefore be very pleased to hear from you if you discover any errors, or have any suggestions for
improvement. Our policy is to provide the information necessary to help you safely specify, engineer, install,
commission, maintain, and eventually dispose of this product. We consider that this manual provides the
necessary information, but if you consider that more details are needed, please contact us.
All feedback should be sent to our contact centre via the following URL:
http://www.alstom.com/grid/contactcentre/
4 P54x1Z-TM-EN-1
P54x1Z Chapter 1 - Introduction
2.3 NOMENCLATURE
Due to the technical nature of this manual, many special terms, abbreviations and acronyms are used
throughout the manual. Some of these terms are well-known industry-specific terms while others may be
special product-specific terms used by Alstom Grid. The first instance of any acronym or term used in a
particular chapter is explained. In addition, a separate glossary is available on the Alstom Grid website, or
from the Alstom Grid contact centre.
We would like to highlight the following changes of nomenclature however:
● The word 'relay' is no longer used to describe the device itself. Instead, the device is referred to as the
'IED' (Intelligent Electronic Device), the 'device', or the 'product'. The word 'relay' is used purely to
describe the electromechanical components within the device, i.e. the output relays.
● British English is used throughout this manual.
● The British term 'Earth' is used in favour of the American term 'Ground'.
2.4 COMPLIANCE
The device has undergone a range of extensive testing and certification processes to ensure and prove
compatibility with all target markets. A detailed description of these criteria can be found in the Technical
Specifications chapter.
P54x1Z-TM-EN-1 5
Chapter 1 - Introduction P54x1Z
3 PRODUCT SCOPE
The P543 and P545 devices have been designed for current differential protection of overhead line and
cable applications. The products within this range interface readily with the longitudinal (end-end)
communications channel between line terminals. The P543 and P545 devices are for single circuit breaker
applications.
The devices include high-speed current differential unit protection with optional high performance sub-cycle
distance protection, including phase segregated aided directional earth fault protection as well as in-zone
transformer differential protection and 4-shot phase-segregated Autoreclose protection. The P545 provides
more I/O and is housed in a larger case than the P543. The differences between the model variants are
summarised in the table below:
Feature/Variant P543 model A P543 model S P545 model A P545 model N P545 model S
Number of CT Inputs 5 5 5 5 5
Number of VT inputs 4 4 4 4 4
Opto-coupled digital inputs 16 16 24 32 24
Standard relay output contacts 14 7 32 32 16
High speed high break output contacts 4 8
6 P54x1Z-TM-EN-1
P54x1Z Chapter 1 - Introduction
P445: J37
P54x No Distance: K47
P841A: K47
All other products: K57
Conventional Stream NCIT Stream
P445: P41
P54x No Distance: M61
P446, P546, P841B: M72
P841A: M61
All other products: M71
· XCPU3
· Cyber-security · NCIT (now obsolete)
· New Protection functions
Sub-cycle Diff Stream
P445: P45
P54x No Distance: M65
P543, P545: M63 P446, P546, P841B: M74
P841A: M65
All other products: M75
· XCPU3
· Sub-cycle differential for
· New Protection functions · Cyber-security
non-distance versions
· NCIT (9-2LE interface)
P445: P46
P54x No Distance: M66
P841A: M66
All other products: M76
V00062
P54x1Z-TM-EN-1 7
Chapter 1 - Introduction P54x1Z
http://www.alstom.com/grid/contactcentre/
A copy of the CORTEC is also supplied as a static table in the Appendices of this document. However, it
should only be used for guidance as it provides a snapshot of the interactive data taken at the time of
publication.
8 P54x1Z-TM-EN-1
P54x1Z Chapter 1 - Introduction
P54x1Z-TM-EN-1 9
Chapter 1 - Introduction P54x1Z
10 P54x1Z-TM-EN-1
P54x1Z Chapter 1 - Introduction
Feature ANSI
NERC compliant cyber-security
Front RS232 serial communication port for configuration 16S
Rear serial RS485 communication port for SCADA control 16S
2 Additional rear serial communication ports for SCADA control and
16S
teleprotection (fibre and copper) (optional)
Ethernet communication (optional) 16E
Redundant Ethernet communication (optional) 16E
Courier Protocol 16S
IEC 61850 edition 1 or edition 2 (optional) 16E
IEC 60870-5-103 (optional) 16S
DNP3.0 over serial link (optional) 16S
DNP3.0 over Ethernet (optional) 16E
SNMP 16E
IRIG-B time synchronisation (optional) CLK
IEEE 1588 PTP (Edition 2 devices only)
P54x1Z-TM-EN-1 11
Chapter 1 - Introduction P54x1Z
5 LOGIC DIAGRAMS
This technical manual contains many logic diagrams, which should help to explain the functionality of the
device. Although this manual has been designed to be as specific as possible to the chosen product, it may
contain diagrams, which have elements applicable to other products. If this is the case, a qualifying note will
accompany the relevant part.
The logic diagrams follow a convention for the elements used, using defined colours and shapes. A key to
this convention is provided below. We recommend viewing the logic diagrams in colour rather than in black
and white. The electronic version of the technical manual is in colour, but the printed version may not be. If
you need coloured diagrams, they can be provided on request by calling the contact centre and quoting the
diagram number.
12 P54x1Z-TM-EN-1
P54x1Z Chapter 1 - Introduction
Key:
Energising Quantity AND gate &
Hardcoded setting
Pulse / Latch
Measurement Cell S
SR Latch Q
R
Internal Calculation
S
SR Latch Q
Derived setting Reset Dominant RD
Switch Multiplier X
Bandpass filter
Comparator for detecting
undervalues
P54x1Z-TM-EN-1 13
Chapter 1 - Introduction P54x1Z
6 FUNCTIONAL OVERVIEW
This diagram is applicable to several Current Differential protection products in the P40L family; P543, P545,
P544 and P546. Use the key on the diagram to determine the features relevant to the product described in
this technical manual. For products that do not feature Distance Protection, the functions 21, 21N, 68, 78, 85
are not applicable.
BUS 1
I
Remote
LINE V
X
V ref
IM
LINE 50BF 50BF-2 46BC FL CTS VTS 27/59 59N 85 79 25 PSL LEDs
Neutral current
from parallel line
(if present)
BUS 2
V00013
14 P54x1Z-TM-EN-1
SAFETY INFORMATION
CHAPTER 2
Chapter 2 - Safety Information P54x1Z
16 P54x1Z-TM-EN-1
P54x1Z Chapter 2 - Safety Information
1 CHAPTER OVERVIEW
This chapter provides information about the safe handling of the equipment. The equipment must be properly
installed and handled in order to maintain it in a safe condition and to keep personnel safe at all times. You
must be familiar with information contained in this chapter before unpacking, installing, commissioning, or
servicing the equipment.
P54x1Z-TM-EN-1 17
Chapter 2 - Safety Information P54x1Z
The documentation provides instructions for installing, commissioning and operating the equipment. It
cannot, however cover all conceivable circumstances. In the event of questions or problems, do not take any
action without proper authorisation. Please contact your local sales office and request the necessary
information.
18 P54x1Z-TM-EN-1
P54x1Z Chapter 2 - Safety Information
3 SYMBOLS
Throughout this manual you will come across the following symbols. You will also see these symbols on
parts of the equipment.
Caution:
Refer to equipment documentation. Failure to do so could result in damage to
the equipment
Warning:
Risk of electric shock
Earth terminal. Note: This symbol may also be used for a protective conductor (earth) terminal if that
terminal is part of a terminal block or sub-assembly.
Note:
The term 'Earth' used in this manual is the direct equivalent of the North American term 'Ground'.
P54x1Z-TM-EN-1 19
Chapter 2 - Safety Information P54x1Z
Plan carefully, identify any possible hazards and determine how best to move the product. Look at other
ways of moving the load to avoid manual handling. Use the correct lifting techniques and Personal Protective
Equipment (PPE) to reduce the risk of injury.
Caution:
All personnel involved in installing, commissioning, or servicing this equipment
must be familiar with the correct working procedures.
Caution:
Consult the equipment documentation before installing, commissioning, or
servicing the equipment.
Caution:
Always use the equipment as specified. Failure to do so will jeopardise the
protection provided by the equipment.
Warning:
Removal of equipment panels or covers may expose hazardous live parts. Do
not touch until the electrical power is removed. Take care when there is
unlocked access to the rear of the equipment.
Warning:
Isolate the equipment before working on the terminal strips.
Warning:
Use a suitable protective barrier for areas with restricted space, where there is a
risk of electric shock due to exposed terminals.
Caution:
Disconnect power before disassembling. Disassembly of the equipment may
expose sensitive electronic circuitry. Take suitable precautions against
electrostatic voltage discharge (ESD) to avoid damage to the equipment.
20 P54x1Z-TM-EN-1
P54x1Z Chapter 2 - Safety Information
Caution:
NEVER look into optical fibres or optical output connections. Always use optical
power meters to determine operation or signal level.
Caution:
Testing may leave capacitors charged to dangerous voltage levels. Discharge
capacitors by rediucing test voltages to zero before disconnecting test leads.
Caution:
Operate the equipment within the specified electrical and environmental limits.
Caution:
Before cleaning the equipment, ensure that no connections are energised. Use a
lint free cloth dampened with clean water.
Note:
Contact fingers of test plugs are normally protected by petroleum jelly, which should not be removed.
Caution:
Equipment intended for rack or panel mounting is for use on a flat surface of a
Type 1 enclosure, as defined by Underwriters Laboratories (UL).
Caution:
To maintain compliance with UL and CSA/CUL, install the equipment using UL/
CSA-recognised parts for: cables, protective fuses, fuse holders and circuit
breakers, insulation crimp terminals, and replacement internal batteries.
Caution:
Where UL/CSA listing of the equipment is required for external fuse protection, a
UL or CSA Listed fuse must be used for the auxiliary supply. The listed
protective fuse type is: Class J time delay fuse, with a maximum current rating
of 15 A and a minimum DC rating of 250 V dc (for example type AJT15).
P54x1Z-TM-EN-1 21
Chapter 2 - Safety Information P54x1Z
Caution:
Where UL/CSA listing of the equipment is not required, a high rupture capacity
(HRC) fuse type with a maximum current rating of 16 Amps and a minimum dc
rating of 250 V dc may be used for the auxiliary supply (for example Red Spot
type NIT or TIA).
For P50 models, use a 1A maximum T-type fuse.
For P60 models, use a 4A maximum T-type fuse.
Caution:
Digital input circuits should be protected by a high rupture capacity NIT or TIA
fuse with maximum rating of 16 A. for safety reasons, current transformer
circuits must never be fused. Other circuits should be appropriately fused to
protect the wire used.
Caution:
CTs must NOT be fused since open circuiting them may produce lethal
hazardous voltages
Warning:
Terminals exposed during installation, commissioning and maintenance may
present a hazardous voltage unless the equipment is electrically isolated.
Caution:
Tighten M4 clamping screws of heavy duty terminal block connectors to a
nominal torque of 1.3 Nm.
Tighten captive screws of terminal blocks to 0.5 Nm minimum and 0.6 Nm
maximum.
Caution:
Always use insulated crimp terminations for voltage and current connections.
Caution:
Always use the correct crimp terminal and tool according to the wire size.
Caution:
Watchdog (self-monitoring) contacts are provided to indicate the health of the
device on some products. We strongly recommend that you hard wire these
contacts into the substation's automation system, for alarm purposes.
22 P54x1Z-TM-EN-1
P54x1Z Chapter 2 - Safety Information
Caution:
Earth the equipment with the supplied PCT (Protective Conductor Terminal).
Caution:
Do not remove the PCT.
Caution:
The PCT is sometimes used to terminate cable screens. Always check the PCT’s
integrity after adding or removing such earth connections.
Caution:
Use a locknut or similar mechanism to ensure the integrity of stud-connected
PCTs.
Caution:
The recommended minimum PCT wire size is 2.5 mm² for countries whose
mains supply is 230 V (e.g. Europe) and 3.3 mm² for countries whose mains
supply is 110 V (e.g. North America). This may be superseded by local or
country wiring regulations.
For P60 products, the recommended minimum PCT wire size is 6 mm². See
product documentation for details.
Caution:
The PCT connection must have low-inductance and be as short as possible.
Caution:
All connections to the equipment must have a defined potential. Connections
that are pre-wired, but not used, should be earthed, or connected to a common
grouped potential.
Caution:
Check voltage rating/polarity (rating label/equipment documentation).
Caution:
Check CT circuit rating (rating label) and integrity of connections.
Caution:
Check protective fuse or miniature circuit breaker (MCB) rating.
P54x1Z-TM-EN-1 23
Chapter 2 - Safety Information P54x1Z
Caution:
Check integrity of the PCT connection.
Caution:
Check voltage and current rating of external wiring, ensuring it is appropriate for
the application.
Warning:
Do not open the secondary circuit of a live CT since the high voltage produced
may be lethal to personnel and could damage insulation. Short the secondary of
the line CT before opening any connections to it.
Note:
For most Alstom equipment with ring-terminal connections, the threaded terminal block for current transformer
termination is automatically shorted if the module is removed. Therefore external shorting of the CTs may not be
required. Check the equipment documentation and wiring diagrams first to see if this applies.
Caution:
Where external components such as resistors or voltage dependent resistors
(VDRs) are used, these may present a risk of electric shock or burns if touched.
Warning:
Take extreme care when using external test blocks and test plugs such as the
MMLG, MMLB and P990, as hazardous voltages may be exposed. Ensure that CT
shorting links are in place before removing test plugs, to avoid potentially lethal
voltages.
4.9 UPGRADING/SERVICING
Warning:
Do not insert or withdraw modules, PCBs or expansion boards from the
equipment while energised, as this may result in damage to the equipment.
Hazardous live voltages would also be exposed, endangering personnel.
Caution:
Internal modules and assemblies can be heavy and may have sharp edges. Take
care when inserting or removing modules into or out of the IED.
24 P54x1Z-TM-EN-1
P54x1Z Chapter 2 - Safety Information
Caution:
Before decommissioning, completely isolate the equipment power supplies
(both poles of any dc supply). The auxiliary supply input may have capacitors in
parallel, which may still be charged. To avoid electric shock, discharge the
capacitors using the external terminals before decommissioning.
Caution:
Avoid incineration or disposal to water courses. Dispose of the equipment in a
safe, responsible and environmentally friendly manner, and if applicable, in
accordance with country-specific regulations.
P54x1Z-TM-EN-1 25
Chapter 2 - Safety Information P54x1Z
6 STANDARDS COMPLIANCE
Compliance with the European Commission Directive on EMC and LVD is demonstrated by self certification
against international standards.
Protective Class
IEC 60255-27: 2005 Class 1 (unless otherwise specified in equipment documentation). This equipment
requires a protective conductor (earth) to ensure user safety.
Installation category
IEC 60255-27: 2005 Overvoltage Category 3. Equipment in this category is qualification tested at 5kV peak,
1.2/50 mS, 500 Ohms, 0.5 J, between all supply circuits and earth and also between independent circuits.
Environment
IEC 60255-27: 2005, IEC 60255-26:2009. The equipment is intended for indoor use only. If it is required for
use in an outdoor environment, it must be mounted in a cabinet with the appropriate degree of ingress
protection.
26 P54x1Z-TM-EN-1
P54x1Z Chapter 2 - Safety Information
Equipment with this marking is not itself suitable for operation within a potentially explosive
atmosphere.
P54x1Z-TM-EN-1 27
Chapter 2 - Safety Information P54x1Z
28 P54x1Z-TM-EN-1
HARDWARE DESIGN
CHAPTER 3
Chapter 3 - Hardware Design P54x1Z
30 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
1 CHAPTER OVERVIEW
This chapter provides information about the product's hardware design.
This chapter contains the following sections:
Chapter Overview 31
Hardware Architecture 32
Mechanical Implementation 34
Front Panel 36
Rear Panel 40
Boards and Modules 42
P54x1Z-TM-EN-1 31
Chapter 3 - Hardware Design P54x1Z
2 HARDWARE ARCHITECTURE
The main components comprising devices based on the Px4x platform are as follows:
● The housing, consisting of a front panel and connections at the rear
● The Main processor module consisting of the main CPU (Central Processing Unit), memory and an
interface to the front panel HMI (Human Machine Interface)
● A selection of plug-in boards and modules with presentation at the rear for the power supply,
communication functions, digital I/O, analogue inputs, and time synchronisation connectivity
All boards and modules are connected by a parallel data and address bus, which allows the processor
module to send and receive information to and from the other modules as required. There is also a separate
serial data bus for conveying sampled data from the input module to the CPU. These parallel and serial
databuses are shown as a single interconnection module in the following figure, which shows typical
modules and the flow of data between them.
Keypad
Output relay boards Output relay contacts
Processor module
Front panel HMI
LCD
Opto-input boards Digital inputs
LEDs
I/O
Front port
CTs Power system currents
Memory
Interconnection
V00233
32 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
FPGA
Comms between main and
coprocessor board
Interconnection
CPU SRAM
V00249
P54x1Z-TM-EN-1 33
Chapter 3 - Hardware Design P54x1Z
3 MECHANICAL IMPLEMENTATION
All products based on the Px4x platform have common hardware architecture. The hardware is modular and
consists of the following main parts:
● Case and terminal blocks
● Boards and modules
● Front panel
The case comprises the housing metalwork and terminal blocks at the rear. The boards fasten into the
terminal blocks and are connected together by a ribbon cable. This ribbon cable connects to the processor in
the front panel.
The following diagram shows an exploded view of a typical product. The diagram shown does not
necessarily represent exactly the product model described in this manual.
The products are available in panel-mount or standalone versions. All products are nominally 4U high. This
equates to 177.8 mm or 7 inches.
The cases are pre-finished steel with a conductive covering of aluminium and zinc. This provides good
grounding at all joints, providing a low resistance path to earth that is essential for performance in the
presence of external noise.
The case width depends on the product type and its hardware options. There are three different case widths
for the described range of products: 40TE, 60TE and 80TE. The case dimensions and compatibility criteria
are as follows:
34 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
Note:
Not all case sizes are available for all models.
P54x1Z-TM-EN-1 35
Chapter 3 - Hardware Design P54x1Z
4 FRONT PANEL
36 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
4.1.2 KEYPAD
The keypad consists of the following keys:
A read key for viewing larger blocks of text (arrow keys now used
for scrolling)
2 hot keys for scrolling through the default display and for control
of setting groups. These are situated directly below the LCD
display.
P54x1Z-TM-EN-1 37
Chapter 3 - Hardware Design P54x1Z
Note:
The front serial port does not support automatic extraction of event and disturbance records, although this data can
be accessed manually.
You must use the correct serial cable, or the communication will not work. A straight-through serial cable is
required, connecting pin 2 to pin 2, pin 3 to pin 3, and pin 5 to pin 5.
Once the physical connection from the unit to the PC is made, the PC’s communication settings must be set
to match those of the IED. The following table shows the unit’s communication settings for the front port.
Protocol Courier
Baud rate 19,200 bps
Courier address 1
Message format 11 bit - 1 start bit, 8 data bits, 1 parity bit (even parity), 1 stop bit
38 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
P54x1Z-TM-EN-1 39
Chapter 3 - Hardware Design P54x1Z
5 REAR PANEL
The MiCOM Px40 series uses a modular construction. Most of the internal workings are on boards and
modules which fit into slots. Some of the boards plug into terminal blocks, which are bolted onto the rear of
the unit. However, some boards such as the communications boards have their own connectors. The rear
panel consists of these terminal blocks plus the rears of the communications boards.
The back panel cut-outs and slot allocations vary. This depends on the product, the type of boards and the
terminal blocks needed to populate the case. The following diagram shows a typical rear view of a case
populated with various boards.
Note:
This diagram is just an example and may not show the exact product described in this manual. It also does not show
the full range of available boards, just a typical arrangement.
Not all slots are the same size. The slot width depends on the type of board or terminal block. For example,
HD (heavy duty) terminal blocks, as required for the analogue inputs, require a wider slot size than MD
(medium duty) terminal blocks. The board positions are not generally interchangeable. Each slot is designed
to house a particular type of board. Again this is model-dependent.
The device may use one or more of the terminal block types shown in the following diagram. The terminal
blocks are fastened to the rear panel with screws.
● Heavy duty (HD) terminal blocks for CT and VT circuits
● Medium duty (MD) terminal blocks for the power supply, opto-inputs, relay outputs and rear
communications port
● MiDOS terminal blocks for CT and VT circuits
● RTD/CLIO terminal block for connection to analogue transducers
40 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
Note:
Not all products use all types of terminal blocks. The product described in this manual may use one or more of the
above types.
P54x1Z-TM-EN-1 41
Chapter 3 - Hardware Design P54x1Z
6.1 PCBS
A PCB typically consists of the components, a front connector for connecting into the main system parallel
bus via a ribbon cable, and an interface to the rear. This rear interface may be:
● Directly presented to the outside world (as is the case for communication boards such as Ethernet
Boards)
● Presented to a connector, which in turn connects into a terminal block bolted onto the rear of the case
(as is the case for most of the other board types)
6.2 SUBASSEMBLIES
A sub-assembly consists of two or more boards bolted together with spacers and connected with electrical
connectors. It may also have other special requirements such as being encased in a metal housing for
shielding against electromagnetic radiation.
Boards are designated by a part number beginning with ZN, whereas pre-assembled sub-assemblies are
designated with a part number beginning with GN. Sub-assemblies, which are put together at the production
stage, do not have a separate part number.
42 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
There are two board types available depending on the size of the case:
● For models in 40TE cases
● For models in 60TE cases and larger
P54x1Z-TM-EN-1 43
Chapter 3 - Hardware Design P54x1Z
44 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
P54x1Z-TM-EN-1 45
Chapter 3 - Hardware Design P54x1Z
6.4.1 WATCHDOG
The Watchdog contacts are also hosted on the power supply board. The Watchdog facility provides two
output relay contacts, one normally open and one normally closed. These are used to indicate the health of
the device and are driven by the main processor board, which continually monitors the hardware and
software when the device is in service.
46 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
P54x1Z-TM-EN-1 47
Chapter 3 - Hardware Design P54x1Z
48 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
Noise Noise
filter filter
Parallel Bus
Buffer
Transformer
board
VT
or
CT
VT
or
CT
V00239
A/D Conversion
The differential analogue inputs from the CT and VT transformers are presented to the main input board as
shown. Each differential input is first converted to a single input quantity referenced to the input board’s earth
potential. The analogue inputs are sampled and converted to digital, then filtered to remove unwanted
properties. The samples are then passed through a serial interface module which outputs data on the serial
sample data bus.
The calibration coefficients are stored in non-volatile memory. These are used by the processor board to
correct for any amplitude or phase errors introduced by the transformers and analogue circuitry.
Opto-isolated inputs
The other function of the input board is to read in the state of the digital inputs. As with the analogue inputs,
the digital inputs must be electrically isolated from the power system. This is achieved by means of the 8 on-
board optical isolators for connection of up to 8 digital signals. The digital signals are passed through an
optional noise filter before being buffered and presented to the unit’s processing boards in the form of a
parallel data bus.
This selectable filtering allows the use of a pre-set filter of ½ cycle which renders the input immune to
induced power-system noise on the wiring. Although this method is secure it can be slow, particularly for
P54x1Z-TM-EN-1 49
Chapter 3 - Hardware Design P54x1Z
inter-tripping. This can be improved by switching off the ½ cycle filter, in which case one of the following
methods to reduce ac noise should be considered.
● Use double pole switching on the input
● Use screened twisted cable on the input circuit
The opto-isolated logic inputs can be configured for the nominal battery voltage of the circuit for which they
are a part, allowing different voltages for different circuits such as signalling and tripping.
Note:
The opto-input circuitry can be provided without the A/D circuitry as a separate board, which can provide
supplementary opto-inputs.
50 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
P54x1Z-TM-EN-1 51
Chapter 3 - Hardware Design P54x1Z
52 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
P54x1Z-TM-EN-1 53
Chapter 3 - Hardware Design P54x1Z
There are two types of each of these boards; one type which accepts a modulated IRIG-B input and one type
which accepts a demodulated IRIG-B input.
54 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
P54x1Z-TM-EN-1 55
Chapter 3 - Hardware Design P54x1Z
IRIG-B Connector
● Centre connection: Signal
● Outer connection: Earth
LEDs
LED Function On Off Flashing
Green Link Link ok Link broken
Yellow Activity Traffic
56 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
RJ45connector
Pin Signal name Signal definition
1 TXP Transmit (positive)
2 TXN Transmit (negative)
3 RXP Receive (positive)
4 - Not used
5 - Not used
6 RXN Receive (negative)
7 - Not used
8 - Not used
IRIG-B
Link Fail
Pin3 connector
Pin 2
Pin 1
Link channel Link channel B
A (green LED) (green LED)
Activity channel Activity channel B
A (yellow LED) (yellow LED)
A
C
V01009
P54x1Z-TM-EN-1 57
Chapter 3 - Hardware Design P54x1Z
● 100 Mbps redundant Ethernet running DHP, with on-board modulated IRIG-B
● 100 Mbps redundant Ethernet running DHP, with on-board unmodulated IRIG-B
● 100 Mbps redundant Ethernet running PRP, with on-board modulated IRIG-B
● 100 Mbps redundant Ethernet running PRP, with on-board demodulated IRIG-B
The Ethernet and other connection details are described below:
IRIG-B Connector
● Centre connection: Signal
● Outer connection: Earth
LEDs
LED Function On Off Flashing
Green Link Link ok Link broken
Yellow Activity SHP running PRP, RSTP or DHP traffic
RJ45connector
Pin Signal name Signal definition
1 TXP Transmit (positive)
2 TXN Transmit (negative)
3 RXP Receive (positive)
4 - Not used
5 - Not used
6 RXN Receive (negative)
7 - Not used
8 - Not used
58 P54x1Z-TM-EN-1
P54x1Z Chapter 3 - Hardware Design
Note:
The above figure shows a coprocessor complete with GPS input and 2 fibre-optic serial data interfaces, and is not
necessarily representative of the product and model described in this manual. These interfaces will not be present on
boards that do not require them.
Where applicable, a second processor board is used to process the special algorithms associated with the
device. This second processor board provides fast access (zero wait state) SRAM for use with both program
and data memory storage. This memory can be accessed by the main processor board via the parallel bus.
This is how the software is transferred from the flash memory on the main processor board to the
coprocessor board on power up. Further communication between the two processor boards is achieved via
interrupts and the shared SRAM. The serial bus carrying the sample data is also connected to the co-
processor board, using the processor’s built-in serial port, as on the main processor board.
There are several different variants of this board, which can be chosen depending on the exact device and
model. The variants are:
● Coprocessor board with current differential inputs and GPS input
● Coprocessor board with current differential inputs only
● Coprocessor board with GPS input only
P54x1Z-TM-EN-1 59
Chapter 3 - Hardware Design P54x1Z
Note:
The 1 pps signal is always supplied by a GPS receiver (such as a P594).
Note:
This signal is used to control the sampling process, and timing calculations and is not used for time stamping or real
time synchronisation.
60 P54x1Z-TM-EN-1
CONFIGURATION
CHAPTER 4
Chapter 4 - Configuration P54x1Z
62 P54x1Z-TM-EN-1
P54x1Z Chapter 4 - Configuration
1 CHAPTER OVERVIEW
Each product has different configuration parameters according to the functions it has been designed to
perform. There is, however, a common methodology used across the entire product series to set these
parameters.
Some of the communications setup can only be carried out using the HMI, and cannot be carried out using
settings applications software. This chapter includes concise instructions of how to configure the device,
particularly with respect to the communications setup, as well as a description of the common methodology
used to configure the device in general.
P54x1Z-TM-EN-1 63
Chapter 4 - Configuration P54x1Z
64 P54x1Z-TM-EN-1
P54x1Z Chapter 4 - Configuration
The keypad provides full access to the device functionality using a range of menu options. The information is
displayed on the LCD.
Keys Description Function
Function keys (not all models) For executing user programmable functions
P54x1Z-TM-EN-1 65
Chapter 4 - Configuration P54x1Z
Note:
As the LCD display has a resolution of 16 characters by 3 lines, some of the information is in a condensed mnemonic
form.
Alarm message
V00400
66 P54x1Z-TM-EN-1
P54x1Z Chapter 4 - Configuration
If there are alarms present, the yellow Alarms LED will be flashing and the menu display will read as follows:
Alarms / Faults
Present
HOTKEY
Even though the device itself should be in full working order when you first start it, an alarm could still be
present, for example, if there is no network connection for a device fitted with a network card. If this is the
case, you can read the alarm by pressing the 'Read' key.
ALARMS
NIC Link Fail
If the device is fitted with an Ethernet card, you will first need to connect the device to an active Ethernet
network to clear the alarm and get the default display.
If there are other alarms present, these must also be cleared before you can get into the default display
menu options.
11:09:15
23 Nov 2011
HOTKEY
Description (user-defined)
For example:
Description
MiCOM P14NB
HOTKEY
P54x1Z-TM-EN-1 67
Chapter 4 - Configuration P54x1Z
Plant Reference
MiCOM
HOTKEY
Access Level
For example:
Access Level
3
HOTKEY
In addition to the above, there are also displays for the system voltages, currents, power and frequency etc.,
depending on the device model.
NERC compliant
banner
System Current
Access Level
Measurements
System Voltage
System Frequency
Measurements
System Power
Plant Reference
Measurements
V00403
68 P54x1Z-TM-EN-1
P54x1Z Chapter 4 - Configuration
If the device is cyber-secure but is not yet configured for NERC compliance (see Cyber-security chapter), a
warning will appear when moving from the "NERC compliant" banner. The warning message is as follows:
You will have to confirm with the Enter button before you can go any further.
Note:
Whenever the IED has an uncleared alarm the default display is replaced by the text Alarms/ Faults present. You
cannot override this default display. However, you can enter the menu structure from the default display, even if the
display shows the Alarms/Faults present message.
Enter Password
1. A flashing cursor shows which character field of the password can be changed. Press the up or down
cursor keys to change each character (tip: pressing the up arrow once will return an upper case "A" as
required by the default level 3 password).
2. Use the left and right cursor keys to move between the character fields of the password.
3. Press the Enter keyto confirm the password. If you enter an incorrect password, an invalid password
message is displayed then the display reverts to Enter password. On entering a valid password a
message appears indicating that the password is correct and which level of access has been
unlocked. If this level is sufficient to edit the selected setting, the display returns to the setting page to
allow the edit to continue. If the correct level of password has not been entered, the password prompt
page appears again.
4. To escape from this prompt press the Clear key. Alternatively, enter the password using the Password
setting in the SYSTEM DATA column. If the keypad is inactive for 15 minutes, the password protection
of the front panel user interface reverts to the default access level.
To manually reset the password protection to the default level, select Password, then press the CLEAR key
instead of entering a password.
Note:
In the SECURITY CONFIG column, you can set the maximum number of attemps, the time window in which the
failed attempts are counted and the time duration for which the user is blocked.
P54x1Z-TM-EN-1 69
Chapter 4 - Configuration P54x1Z
Press Clear To
Reset Alarms
3. To clear all alarm messages, press the Clear key. To return to the display showing alarms or faults
present, and leave the alarms uncleared, press the Read key.
4. Depending on the password configuration settings, you may need to enter a password before the
alarm messages can be cleared.
5. When all alarms are cleared, the yellow alarm LED switches off. If the red LED was on, this will also
be switched off.
Note:
To speed up the procedure, you can enter the alarm viewer using the Read key and subsequently pressing the Clear
key. This goes straight to the fault record display. Press the Clear key again to move straight to the alarm reset
prompt, then press the Clear key again to clear all alarms.
Note:
Sometimes the term "Setting" is used generically to describe all of the three types.
70 P54x1Z-TM-EN-1
P54x1Z Chapter 4 - Configuration
SYSTEM DATA (Col 00) VIEW RECORDS (Col 01) MEASUREMENTS 1 (Col 02) …
Password (Row 02) Menu Cell Ref (Row 02) IA Phase Angle (Row 02) …
Sys Fn Links (Row 03) Time & Date (Row 03) IB Magnitude (Row 03) …
… … … …
It is convenient to specify all the settings in a single column, detailing the complete Courier address for each
setting. The above table may therefore be represented as follows:
Setting Column Row Description
SYSTEM DATA 00 00 First Column definition
Language (Row 01) 00 01 First setting within first column
Password (Row 02) 00 02 Second setting within first column
Sys Fn Links (Row 03) 00 03 Third setting within first column
… … …
VIEW RECORDS 01 00 Second Column definition
Select Event [0...n] 01 01 First setting within second column
Menu Cell Ref 01 02 Second setting within second column
Time & Date 01 03 Third setting within second column
… … …
MEASUREMENTS 1 02 00 Third Column definition
IA Magnitude 02 01 First setting within third column
IA Phase Angle 02 02 Second setting within third column
IB Magnitude 02 03 Third setting within third column
… … …
The first three column headers are common throughout much of the product ranges. However the rows
within each of these column headers may differ according to the product type. Many of the column headers
are the same for all products within the series. However, there is no guarantee that the addresses will be the
same for a particular column header. Therefore you should always refer to the product settings
documentation and not make any assumptions.
P54x1Z-TM-EN-1 71
Chapter 4 - Configuration P54x1Z
9. For protection group settings and disturbance recorder settings, the changes must be confirmed
before they are used. When all required changes have been entered, return to the column heading
level and press the Down cursor key. Before returning to the default display, the following prompt
appears.
Update settings?
ENTER or CLEAR
10. Press the Enter key to accept the new settings or press the Clear key to discard the new settings.
Note:
For the protection group and disturbance recorder settings, if the menu time-out occurs before the changes have
been confirmed, the setting values are discarded. Control and support settings, howeverr, are updated immediately
after they are entered, without the Update settings? prompt.
The availability of these functions is controlled by the Direct Access cell in the CONFIGURATION column.
There are four options: Disabled, Enabled, CB Ctrl only and Hotkey only.
For the Setting Group selection and Control inputs, this cell must be set to either Enabled or Hotkey
only. For CB Control functions, the cell must be set to Enabled or CB Ctrl only.
Use the right cursor keys to enter the SETTING GROUP menu.
¬Menu User01®
SETTING GROUP 1
Nxt Grp Select
72 P54x1Z-TM-EN-1
P54x1Z Chapter 4 - Configuration
Select the setting group with Nxt Grp and confirm by pressing Select. If neither of the cursor keys is pressed
within 20 seconds of entering a hotkey sub menu, the device reverts to the default display.
Press the right cursor key twice to get to the first control input, or the left cursor key to get to the last control
input.
¬STP GP User02®
Control Input 1
EXIT SET
Now you can execute the chosen function (Set/Reset in this case).
If neither of the cursor keys is pressed within 20 seconds of entering a hotkey sub menu, the device reverts
to the default display.
Plant Reference
MiCOM
HOTKEY CLOSE
To close the circuit breaker (in this case), press the key directly below CLOSE. You will be given an option to
cancel or confirm.
Execute
CB CLOSE
Cancel Confirm
More detailed information on this can be found in the Monitoring and Control chapter.
P54x1Z-TM-EN-1 73
Chapter 4 - Configuration P54x1Z
FUNCTION KEYS
Fn Key Status
0000000000
The next cell down (Fn Key 1) allows you to activate or disable the first function key (1). The Lock setting
allows a function key to be locked. This allows function keys that are set to Toggled mode and their DDB
signal active ‘high’, to be locked in their active state, preventing any further key presses from deactivating the
associated function. Locking a function key that is set to the Normal mode causes the associated DDB
signals to be permanently off. This safety feature prevents any inadvertent function key presses from
activating or deactivating critical functions.
FUNCTION KEYS
Fn Key 1
Unlocked
The next cell down (Fn Key 1 Mode) allows you to set the function key to Normal or Toggled. In the
Toggle mode the function key DDB signal output stays in the set state until a reset command is given, by
activating the function key on the next key press. In the Normal mode, the function key DDB signal stays
energised for as long as the function key is pressed then resets automatically. If required, a minimum pulse
width can be programmed by adding a minimum pulse timer to the function key DDB output signal.
FUNCTION KEYS
Fn Key 1 Mode
Toggled
The next cell down (Fn Key 1 Label) allows you to change the label assigned to the function. The default
label is Function key 1 in this case. To change the label you need to press the enter key and then
change the text on the bottom line, character by character. This text is displayed when a function key is
accessed in the function key menu, or it can be displayed in the PSL.
FUNCTION KEYS
Fn Key 1 Label
Function Key 1
Subsequent cells allow you to carry out the same procedure as above for the other function keys.
The status of the function keys is stored in non-volatile memory. If the auxiliary supply is interrupted, the
status of all the function keys is restored. The IED only recognises a single function key press at a time and
a minimum key press duration of approximately 200 ms is required before the key press is recognised. This
feature avoids accidental double presses.
74 P54x1Z-TM-EN-1
P54x1Z Chapter 4 - Configuration
4 LINE PARAMETERS
This product requires information about the circuit to which it is applied. This includes line impedance,
residual compensation, and phase rotation sequence. For this reason circuit parameter information must be
input using the LINE PARAMETERS settings. These LINE PARAMETERS settings are used by protection
elements as well as by the fault locator.
VA
ZF1 =
I A + k ZN ⋅ I N
where:
● VA is the phase A voltage
● IA is the phase A current
● IN is the residual current, derived from the phase currents by the equation:
I N = I A + I B + IC
Z L 0 − Z L1
k ZN =
3Z L1
where:
● ZL0 is the total zero sequence impedance of the line (a complex value)
● ZL1 is the total positive sequence impedance of the protected line (a complex value)
The complex residual compensation coefficient is defined by two settings: kZN Res Comp (the absolute
value) and kZN Res Angle (the angle in degrees).
P54x1Z-TM-EN-1 75
Chapter 4 - Configuration P54x1Z
Caution:
The kZN Res Angle is different to that in LFZP, SHNB, and LFZR products: If
importing settings from these products, you must subtract angle ÐZL1
VA
Z F1 =
I A + kZN ⋅ I N + k Zm ⋅ I M
where:
● VA is the phase A voltage
● IA is the phase A current
● IN is the residual current of the protected line (derived from phase currents)
● IM is the residual current of the parallel line (measured)
● kZN is the residual compensation coefficient
● kZm is the mutual compensation coefficient
I N = I A + I B + IC
Z L 0 − Z L1
k ZN =
3Z L1
Zm0
k Zm =
3Z L1
where:
● ZL0 is the total zero sequence impedance of the line (a complex value)
● ZL1 is the total positive sequence impedance of the protected line (complex value)
● Zm0 is the zero sequence mutual impedance between the two circuits (complex value).
If used, you must set the mutual compensation feature kZm using the settings:
● kZm Mutual Set (the absolute value) and
● kZm Mutual Angle (the angle in degrees).
In applications where the Mutual Compensation is used to reduce errors in the distance elements, a third
setting, Mutual Cut Off, is used for a fast dynamic control. The ratio IM/IN is compared with the Mutual Cut
Off setting. If the ratio is higher, mutual compensation is suppressed to prevent false-tripping for faults on the
parallel line.
76 P54x1Z-TM-EN-1
P54x1Z Chapter 4 - Configuration
Typically a Mutual Cut Off factor of 1.5 is chosen to give a good margin of safety between the requirements
of correct mutual compensation for faults on the protected circuit whilst avoiding maloperations for faults on
the parallel circuit.
P54x1Z-TM-EN-1 77
Chapter 4 - Configuration P54x1Z
78 P54x1Z-TM-EN-1
P54x1Z Chapter 4 - Configuration
3. Ensure that the IED is receiving valid time synchronisation messages by checking that the PTP Status
cell reads Valid Master.
4. Check that Act. Time Source cell reads PTP. This indicates that the IED is using PTP as the source
for its time. Note that If IRIG-B or SNTP have been selected as the Primary Source, these must first be
disconnected before the device can switch to PTP as the active source.
5. Once the IED is using PTP as the active time source, adjust the time offset of the universal
coordinated time on the Master Clock equipment, so that local time is displayed.
6. Check that the time, date and month are correct in the Date/Time cell.
The LocalTime Offset setting allows you to enter the local time zone compensation from -12 to + 12 hours
at 15 minute intervals.
P54x1Z-TM-EN-1 79
Chapter 4 - Configuration P54x1Z
These settings are described in the DATE AND TIME settings table in the configuration chapter.
80 P54x1Z-TM-EN-1
P54x1Z Chapter 4 - Configuration
P54x1Z-TM-EN-1 81
Chapter 4 - Configuration P54x1Z
82 P54x1Z-TM-EN-1
CURRENT DIFFERENTIAL
PROTECTION
CHAPTER 5
Chapter 5 - Current Differential Protection P54x1Z
84 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
1 CHAPTER OVERVIEW
This chapter introduces the principles and theory behind Current Differential protection and describes how
they are implemented in this product. Guidance for applying this protection is also provided.
This chapter contains the following sections:
Chapter Overview 85
Current Differential Protection Principle 86
Implementation 87
Phase Current Differential Protection 92
Neutral Current Differential Protection 107
Feeders with In-Zone Transformers 108
Stub Bus Differential Protection 117
P54x1Z-TM-EN-1 85
Chapter 5 - Current Differential Protection P54x1Z
86 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
3 IMPLEMENTATION
This product provides biased, phase-segregated, numerical Current Differential protection. The current
differential protection is enabled by default, but it can be disabled if you don’t want to use it. The current
differential protection needs digital communications links to exchange the values of current between the
terminals in the scheme.
Note:
The term “permissive intertripping” associated with this current differential protection is not the same as that
commonly used in teleprotection schemes. It is specific to this type of Current Differential protection implementation.
A device can be configured to send a permissive intertrip command over the protection communication
channel. To use this function you need to map the Perm Intertrip DDB signal to one of the opto-inputs using
the PSL.
Busbar
IED1 IED2 protection
PIT = 1
Data message
Opto
E02612
P54x1Z-TM-EN-1 87
Chapter 5 - Current Differential Protection P54x1Z
Tripping occurs if the current remains above the Phase Is1 setting of the phase current differential elements
while the PIT command is received. The condition must remain satisfied for a minimum time setting. The
time is set in the PIT Time setting in the CURRENT DIFF column. The permissive intertrip (PIT) timer can be
set between 0 and 200 ms. This time should be set to provide discrimination with other protection devices.
For example, if there is a genuine busbar fault, the time delay should be set to allow busbar protection to
clear the fault. A typical setting may be 100 to 150 ms.
You can choose whether to use the local current value sent with the PIT command to make the decision at
the remote end, or whether to use the remote current value at the receiving end for the decision. This choice
is made using the PIT I selection setting in the CURRENT DIFF column.
Note:
The permissive intertripping function always trips three-phase.
88 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
A B
Digital communications link
End A End B
Curren
tA1 t vectors tB1
tp1 tA1
tA2
tB2
tB*
tA3
td
tB3* tB3
tA4 s
t vector
tp2 Curren tB4
tA5 1 td
tA* tB3 tA tB5
E02606
P54x1Z-TM-EN-1 89
Chapter 5 - Current Differential Protection P54x1Z
The device assumes that the time to communicate data between two terminals is the same in each direction,
and on this basis tp1 and tp2 can be calculated as:
tp1 = tp2 = ½(tA* - tA1 - td)
The propagation delay time is measured for each received message. This is used to monitor changes on the
communication link and to manage the response of the protection. When the propagation delay time has
been calculated, the sampling instant of the received data from End B (tB3*) can also be calculated. As
shown in the figure, the sampling time tB3* is measured by End A as:
tB3* = (tA* - tp2)
In the figure, tB3* is between tA3 and tA4. To calculate the differential and bias currents, the values at each
terminal must correspond to the same point in time. So the values received at tB3* must be aligned with
values taken at sampling instants tA3 and tA4. This is achieved by rotating the received current vector by an
angle corresponding to the time difference between tB3* and tA3 (and tA4).
After this time-alignment process, the respective differential and bias currents can be calculated.
90 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
ta
tA1 tB1
tA2 tp 1
tB2
tB*
tc
tA3 tB3
tB3* td
tA4 tB4
tp 2
tA5
tB5
tA*
tA6 tB6
Relay A Relay B
E02607
P54x1Z-TM-EN-1 91
Chapter 5 - Current Differential Protection P54x1Z
Note:
The line end to be ‘configured out’ must be open before issuing a reconfiguration command. If this is not done, any
current flowing in or out of the ‘configured out’ end will be seen as fault current and when the Inhibit C Diff’input is
removed, it might cause the other devices to operate.
92 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
Reconfiguration is only permitted if all three devices are energised and communicating correctly with each
other.
Four values are available for the Re-Configuration setting:
● Three Ended (stay as three-ended)
● Two Ended(L&R1) (Local + Remote 1)
● Two Ended(L&R2) (Local + Remote 2)
● Two Ended(R1&R2) (Remote 1 + Remote 2)
If the reconfigured scheme incorporates the local device, the trip outputs of the differential protection will
continue to be inhibited until the Inhibit C Diff signal at the local device is cleared. If the new reconfiguration
scheme only incorporates the remote devices, the differential protection at the remote devices are not
inhibited because they will ignore all commands from the local device unless it is a command for
reconfiguration.
Setting the Re-Configuration setting to Three Ended at any terminal will restore three-terminal operation
without regard to the status of the Inhibit C Diff DDB signal or the Recon Interlock DDB signal.
The operation of the change configuration logic is as follows:
● The reconfiguration setting is changed.
● The product detects the change in setting and attempts to implement the new setting.
If the current configuration is Two-Ended and the new setting is also Two-Ended, the device blocks the
change and issues a configuration error alarm.
If the current configuration is Two-Ended and the new setting is Three-Ended, the device checks that all the
communications are healthy and sends out the restore command to the other devices. It then checks that the
scheme has stabilised as ‘Three-Ended’ after one second.
If any of the communications in the scheme were failed or if the scheme has not stabilised as Three-Ended,
the device returns to its original Two-Ended setting and issues a configuration error alarm.
If the scheme stabilises as Three-Ended, the Reconfiguration setting is updated.
If the device configuration is Three-Ended and the new setting is Two-Ended L & R1, the device first checks
that the two interlocks are energised. The differential tripping is blocked, but the backup protection can still
operate the trip outputs. The device then checks that the communication with Remote 1 is healthy and sends
out the command to the remote devices. It then checks that the scheme has stabilised as Two-Ended L & R1
after one second.
If the interlocks are not energised, or the communication with Remote 1 has failed, or the scheme does not
stabilise as Two-Ended L & R1, the device returns to Three-Ended and issues a configuration error alarm.
If the scheme stabilises as Two-Ended L & R1, the Reconfiguration setting is updated.
If the device configuration is Three-Ended and the new setting is Two-Ended L & R2, the device reacts
similarly to a Two-Ended L & R1 reconfiguration.
If the device configuration is Three-Ended and the new setting is Two-Ended R1&R2, the device reacts
similarly to a Two-Ended L & R1 reconfiguration.
P54x1Z-TM-EN-1 93
Chapter 5 - Current Differential Protection P54x1Z
The differential and bias currents are compared against a tripping criterion which is defined by a dual-slope
characteristic as shown below. The figure shows the tripping criteria for protection of a three-terminal feeder,
but the principle is similar for a two-terminal feeder.
94 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
I diff
V02605
P54x1Z-TM-EN-1 95
Chapter 5 - Current Differential Protection P54x1Z
96 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
IL ZL IR
VL IchL IchR VR
Where:
IL Local end line current
IR Remote end line current
VL Local end voltage
VR Remote end voltage
ZL Line Impedance
IchL Local end charging current
E02608 IchR Remote end charging current
P54x1Z-TM-EN-1 97
Chapter 5 - Current Differential Protection P54x1Z
4.5 CT COMPENSATION
The primary and secondary ratios for the phase current transformers are set in the CT AND VT RATIOS
column. These settings are used to display the phase current quantities in the MEASUREMENTS 1 column.
The device can be set to display the input current either in primary values or in secondary values.
To ensure correct operation of the differential elements, it is important that under load and through fault
conditions, the currents into the differential elements of the devices balance. If the CTs have different ratios
this will not be the case. This product has CT ratio correction (magnitude compensation) to overcome this
problem.
When calculating differential and bias currents, the devices use per-unit (p.u.) quantities. CT ratio
compensation is used to scale-up the current signals to match those of the remote terminals by setting an
appropriate value in the Ph CT Corr'tion setting in the CURRENT DIFF column. Because of dynamic
limitations, this scaled-up value is limited to 40 p.u. Values exceeding this are clipped at 40 p.u.
Similarly compensated per-unit values are used in the calculation of the differential and bias currents.
The per-unit compensated values of local and remote currents as well as the per-unit values of differential
and bias currents are scaled-down by the local CT ratio correction factor and displayed in the
MEASUREMENTS 3 column.
The process is outlined in the figure below:
Transmission to
Secondary CT 40 p.u. clipping
correction
rating
Remote end
I ABC [Amps sec.] *
I LOCAL [p.u.]
Vector
I LOCAL [p.u.]
* 1 / I CT rated CT_Correction
* CT_Ratio
I LOCAL [p.u.]
calculations
I DIFF [p.u.]
Diff/Bias
I REMOTE 1 [p.u.]
Decision
[p.u.]
I BIAS Trip, Intertrip
Measurements 1
Trip
I REMOTE 2 [p.u.]
Settings
* 1 / CT_Correction [Amps pri. or sec .] Settings [p.u.]
* 1 / ICT rated
Primary or Primary or
Secondary CT * ICT rated
Secondary CT
rating rating
Measurements 3
V02609
98 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
IDiff>Start B
& t
Phase B Operate threshold
& Diff Trip B
reached
0
Send Diff Intertrip B
IDiff>Start C
& t
Phase C Operate threshold
& Diff Trip C
reached
0
Send Diff Intertrip C
Receive Inhibit C Diff
1
Inhibit C Diff
Send Inhibit C Diff
V02616
P54x1Z-TM-EN-1 99
Chapter 5 - Current Differential Protection P54x1Z
CURRENT DIFF column. If Cap Charging is selected, Phase Is1 may be set below the value of line
charging current. We recommend that you choose Phase Is1 only sufficiently below the charging current to
offer the required fault resistance coverage as now described.
The table below shows some typical steady state charging currents for various lines and cables.
Core formation and
Voltage (kV) Conductor size in mm2 Charging current A/km
spacing
11 kV Cable Three-core 120 1.2
33 kV Cable Three-core 120 1.8
33 kV Cable Close-trefoil 300 2.5
66 kV Cable Flat, 127 mm 630 10
132 kV Overhead Line 175 0.22
132 kV Overhead Line 400 0.44
132 kV Cable Three-core 500 10
132 kV Cable Flat, 520 mm 600 20
275 kV Overhead Line 2 x 175 0.58
275 kV Overhead Line 2 x 400 0.58
275 kV Cable Flat, 205 mm 1150 19
275 kV Cable Flat, 260 mm 2000 24
400 kV Overhead Line 2 x 400 0.85
400 kV Overhead Line 4 x 400 0.98
400 kV Cable Flat, 145 mm 2000 28
400 kV Cable Tref., 585 mm 3000 33
If capacitive charging current compensation is not used, the setting of Phase Is1 must be set above 2.5
times the steady state charging current. Where charging current is low or negligible, the recommended
setting of 0.2 pu (factory default) should be applied.
If there is a mismatch between CTs at line ends, then the lowest primary CT rated current should be used as
a reference current for p.u. calculations (assuming that the load current cannot continuously exceed this
value). This means that the recommended settings Phase Is1 = 0.2 pu is equal to 0.2*(the lowest primary
CT rated value). The same consideration applies for other current settings such as Phase Is2.
ILOCAL = IL + IF
IREMOTE1 = -y*IL where 0<y<1
IREMOTE2 = - (1-y) IL
100 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
|Idiff|= |IF|
|Ibias| = |IL| + 0.5 |IF|
Phase current differential protection sensitivity when |Ibias| < Phase Is2:
The phase current differential protection would operate if |Idiff| > Phase k1 |Ibias| + Phase Is1
therefore:
|IF| > (Phase k1 |IL| + Phase Is1) / (1 - 0.5 Phase k1)
For Phase Is1 = 0.2 pu, Phase k1 = 30% and Phase Is2 =2.0 pu, then
● for |IL| = 1.0 pu, the phase current differential protection would operate if |IF| > 0.59 pu
● for |IL| = 1.59 pu, the phase current differential protection would operate if |IF| > 0.80 pu
If |IF| = 0.80 pu and |I| = 1.59 pu, then |Ibias| = 1.99 pu, which reaches the limit of the low percentage bias
curve.
Phase current differential protection sensitivity when |bias| > Phase Is2:
The phase current differential protection would operate if |Idiff| > Phase k2 |Ibias| - (Phase k2 - Phase k1)
Phase Is2 + Phase Is1
therefore:
|IF| > (Phase k2 |IL| - (Phase k2 - Phase k1) Phase Is2 + Phase Is1) / (1 - 0.5 Phase k2)
For Phase Is1= 0.2 pu, Phase k1 = 30%, Phase Is2 = 2.0 pu and Phase k2 = 100%, then,
● for |IL| = 2.0 pu, the phase current differential protection would operate if |IF| > 1.6 pu
● for |IL| = 2.5 pu, the phase current differential protection would operate if |IF| > 2.6 pu
P54x1Z-TM-EN-1 101
Chapter 5 - Current Differential Protection P54x1Z
Note:
The following consideration includes references to currents used in Neutral Current Differential protection and
protection of feeders with In-zone transformers. If not applicable they may be ignored.
If the CTs at line ends have different primary ratings, then one of them is considered as a reference (the one
with the lowest primary rating). Ph CT Corr’tion should be set to 1 in the device connected to the reference
CT. For all other devices Ph CT Corr’tion is calculated as follows:
Ph CT Corr'tion IEDx = (Phase CT Primary IEDx) / (Phase CT Primary REFERENCE)
Settings Phase Is1, Phase Is2, Id High Set, Diff Is1, Diff Is2 must be calculated as pu of the reference
primary rating, then converted into local primary (secondary) values. For setting Phase Is1 in IEDX, the
equations would be:
Phase Is1 [p.u.] = (Phase Is1 IABSOLUTE PRI [A]) / (Phase CT Primary REFERENCE [A])
Phase Is1 IEDx PRI. [A] = (Phase Is1 [p.u.]) (Phase CT Primary IEDx)
Phase Is1 IEDx SEC. [A] = (Phase Is1 [p.u.]) (Phase CT Sec'y IEDx)
The same considerations apply to settings Phase Is2, Id High Set, In Diff Is1, Diff Is2.
Example:
Assume that we have a three-ended application with line ends X, Y, Z (500/5, 800/5, 200/1) and Current
Differential settings in absolute primary values:
Phase Is1 ABSOLUTE PRI. = 100A
Phase Is2 ABSOLUTE PRI. = 1000A
Id High Set ABSOLUTE PRI. = 3000A
Diff Is1 ABSOLUTE PRI. = 50A
Diff Is2 ABSOLUTE PRI. = 1000A
Setting End X End Y End Z
Phase CT Primary 500A 800A 200A
Phase CT Sec’y 5A 5A 1A
Ph CT Corr’tion 500/200 = 2.5 800/200 = 4 1 (reference)
Phase Is1 [p.u.] 100/200 = 0.5 100/200 = 0.5 100/200 = 0.5
Phase Is1 (Primary) 0.5*500 = 250A 0.5*800 = 400A 0.5*200 = 100A
Phase Is1 (Secondary) 0.5*5 = 2.5A 0.5*5 = 2.5A 0.5*1 = 0.5A
Phase Is2 [p.u.] 1000/200 = 5 1000/200 = 5 1000/200 = 5
Phase Is2 (Primary) 5*500 = 2500A 5*800 = 4000A 5*200 = 100A
Phase Is2 (Secondary) 5*5 = 25A 5*5 = 25A 5*1 = 5A
Id High Set [p.u.] 3000/200 = 15 3000/200 = 15 3000/200 = 15
Id High Set (Primary) 15*500 = 7500A 15*800 = 12000A 15*200 = 300A
Id High Set (Secondary) 15*5 = 75A 15*5 = 75A 15*1 = 15A
In Diff Is1 [p.u.] 50/200 = 0.25 50/200 = 0.25 50/200 = 0.25
In Diff Is1 (Primary) 0.25*500 = 125A 0.25*800 = 200A 0.25*200 = 50A
In Diff Is2 (Secondary) 0.25*5 = 0.75A 0.25*5 = 0.75A 0.25*1 = 0.25A
In Diff Is1 [p.u.] 1000/200 = 5 1000/200 = 5 1000/200 = 5
102 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
P54x1Z-TM-EN-1 103
Chapter 5 - Current Differential Protection P54x1Z
104 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
End A End B
275 kV 275 kV
4000/5 4000/5
45 Km 30 Km
End C
275 kV
1200/5
P54x
Ch 1 Ch 2
Steady State Charging Current = 0.58 A/Km Overhead Line
E02620
P54x1Z-TM-EN-1 105
Chapter 5 - Current Differential Protection P54x1Z
Note:
Settings shown in primary values at ends A and B appear different compared with end C. This is not a problem as the
currents at ends A and B will be multiplied by the Correction Factor, when the differential calculation is done.
106 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
P54x1Z-TM-EN-1 107
Chapter 5 - Current Differential Protection P54x1Z
This product therefore provides facilities to deal with the above issues by providing:
● CT compensation for phase shifts and imbalances across the transformer
● Zero sequence compensation.
● Magnetising Inrush detection and restraint
● Second harmonic blocking.
● Overfluxing detection and restraint
● Fifth harmonic blocking.
To make these available you need to enable the differential protection for an in-zone power transformer. This
is done on a per-setting group basis. The phase differential element (Phase Diff) for the setting group
concerned must be enabled.
To enable the transformer feeder protection you set the Compensation cell in the CURRENT DIFF settings
to Transformer.
108 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
Ia = IC
Yy8 120 lead Ib = IA
Ic = IB
Ia = -IB
Yy10 60 lead Ib = -IC
Ic = -IA
Ia = (IA - IB) / √3
Yd11 30 lead Ib = (IB - IC) / √3
Ic = (IC - IA) / √3
Ia = IA - (IA + IB + IC) / 3
Ydy0 0 Ib = IB - (IA + IB + IC) / 3
Ic = IC - (IA + IB + IC) / 3
Where Ia, Ib, Ic are the uncorrected values and IA, IB, IC are the corrected values.
Note:
You must set Compensation to Transformer before the Vectorial Comp setting becomes visible.
P54x1Z-TM-EN-1 109
Chapter 5 - Current Differential Protection P54x1Z
I0
IR1 I0 IR2
IED1 IED2
Digital communication channel
IED IED2
IR1 = 0 IR2 = I0
IR2 = I0 Received IR1 = I0
Received
Idiff = I0 Idiff = I0
E02611
110 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
+Fm
Steady state
-Fm
2Fm
Switch on at voltage
zero – No residual flux
V03123
We can see that inrush current is a regularly occurring phenomenon and should not be considered a fault, as
we do not wish the protection device to issue a trip command whenever a transformer is switched on at an
inconvenient point during the input voltage cycle. This presents a problem to the protection device, because
it should always trip on an internal fault. The problem is that typical internal transformer faults may produce
overcurrents which are not necessarily greater than the inrush current. Furthermore, faults tend to manifest
themselves on switch on, due to the high inrush currents. For this reason, we need to find a mechanism that
can distinguish between fault current and inrush current. Fortunately, this is possible due to the different
natures of the respective currents. An inrush current waveform is rich in harmonics, especially 2nd
harmonics, whereas an internal fault current consists only of the fundamental. We can therefore develop a
restraining method based on the 2nd harmonic content of the inrush current. The mechanism by which this is
achieved, is called second harmonic blocking.
P54x1Z-TM-EN-1 111
Chapter 5 - Current Differential Protection P54x1Z
Using the Inrush Restraint setting you can choose what will happen to differential characteristic in the
presence of second harmonic current:
● If set to Disabled, the characteristic will not be modified,
● If set to Restraint, the characteristic will be restrained if the second harmonic component is above a
user set threshold.
● If set to Blocking, the protection will be blocked
The Restraint and Blocking modes are qualified by other settings outlined below. In both cases an
unbiased high-set current differential element becomes visible.
Note:
You must set Compensation to Transformer before the Inrush Restraint setting becomes visible.
Note:
When used, the Inrush Restraint function must be enabled at all ends to avoid possible maloperation.
Note:
There is an Inrush Detection setting in the SUPERVISION column of the menu. The Inrush Detection setting is
only visible if the Inrush Blocking’in the CURRENT DIFF column is not being used. The function asserts the same
DDB outputs as Inrush Restraint and can be used to control other protection elements during magnetising inrush
conditions. The output of Inrush Detection does not, however, affect the Current Differential protection.
Note:
Where Inrush Restraint is used to restrain operation, it must be used at all terminals in the scheme to avoid possible
maloperation.
112 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
Note:
The Id High Set cell should be set so that it is in excess of the anticipated inrush current after ratio correction has
been applied.
E03107
P54x1Z-TM-EN-1 113
Chapter 5 - Current Differential Protection P54x1Z
You can choose whether to block just the affected phase, or to block all three phases using the Ih(5)
CrossBlock cell. If you disable Ih(5) CrossBlock, only the affected phase is blocked. If you enable Ih(5)
CrossBlock, all phases are blocked.
Permit Cdiff
SD
Q
1 R
Ih(2) Block A
1
Ih(5) Block A
Ih(2) Block B
1
Ih(5) Block B
Ih(2) Block C
1
Ih(5) Block C
Figure 42: Phase Current Differential Protection logic for feeders with in-zone transformers
114 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
Ih(2) CrossBlock
1 Ih(2) Blk A
Enabled
1 Ih(2) Blk B
P54x1Z-TM-EN-1 115
Chapter 5 - Current Differential Protection P54x1Z
Ih(5) CrossBlock
1 Ih(5) Blk A
Enabled
1 Ih(5) Blk B
116 P54x1Z-TM-EN-1
P54x1Z Chapter 5 - Current Differential Protection
When the stub bus protection is enabled and activated by energisation of the opto-isolated input, the
differential protection is disabled. No differential trip signals will be issued by the affected terminal. No
differential intertrip signals will be issued, or acted upon by the affected terminal. No permissive intertrip
signals will be issued, or acted upon by the affected terminal. Intertripping signals mapped via IM64 will be
acted upon, and the affected terminal remains active to protect the isolated stub bus.
For products having two sets of CT inputs, the stub bus protection takes the two sets of current inputs and
uses them as inputs to the phase differential current protection. The values are compared against the dual
slope characteristics to determine whether tripping should occur or not.
For products having a single set of CT inputs, an additional setting (Ph Is1 StubBus) is provided. In these
applications, if the stub-bus feature is enabled and activated, the protection will trip if the measured current
exceeds the Ph Is1 StubBus setting.
Tripping due to the operation of the stub-bus protection is always three-phase.
The principle is outlined in the figure below:
X
P54x P54x
X
V02614
Note:
Models having distance protection feature a phase segregated stub bus protection associated with the distance
protection elements. Where applicable these are described along with the distance elements.
P54x1Z-TM-EN-1 117
Chapter 5 - Current Differential Protection P54x1Z
118 P54x1Z-TM-EN-1
DISTANCE PROTECTION
CHAPTER 6
Chapter 6 - Distance Protection P54x1Z
120 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
1 CHAPTER OVERVIEW
This chapter introduces the principles and theory behind the protection and describes how it is implemented
in this product. Guidance for applying this protection is also provided.
This chapter contains the following sections:
Chapter Overview 121
Introduction 122
Distance Measuring Zones Operating Principles 124
Phase and Earth Fault Distance Protection Implementation 155
Delta Directional Element 163
Application Notes 167
P54x1Z-TM-EN-1 121
Chapter 6 - Distance Protection P54x1Z
2 INTRODUCTION
Distance protection for transmission and distribution feeders is commonplace. Amongst protection
engineers, the basic principles are widely documented and understood. If you are reading this chapter, we
assume that you are familiar with the principles of distance protection and associated components such as
Aided Schemes. However, to help you choose suitable settings, some of the principles of operation of the
Distance Measuring Zones is included in this chapter.
R
Source Line
VS IR VL=VR
ZL
V VR
V02753
122 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
VR = V/(SIR+1)
where SIR = ZS/ZL
From the equation above, it can be seen that the measured voltage has a significant impact on the decision
making process.
The ability of distance protection to measure accurately for a given reach point fault, depends on the voltage
at the relaying location being above a minimum value at the time of the fault. If the voltage is above this
minimum value, it is generally used to polarize the distance protection and indicate the direction of the fault.
This is called self-polarization.
If the voltage collapses below the minimum threshold necessary to make a sensible decision, alternative
methods of polarization to determine the direction of the fault are needed. Two methods that are applied are
cross-polarization and memory polarization. If a fault doesn’t affect all phases, the voltage signals on the
healthy phases can be used for the directional decision. This is called cross-polarization. If the fault causes
all phase voltages to collapse, a stored record of the pre-fault voltage can be used to make the directional
decision. This is called memory polarization. Memory polarization, cross-polarization, and self-polarization
can sometimes be used in combination.
P54x1Z-TM-EN-1 123
Chapter 6 - Distance Protection P54x1Z
124 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
Note:
The faulted phase current (I) is generally used as the reference (0º) for the vector diagrams.
V IZ
IZ
V 90°
V02710
P54x1Z-TM-EN-1 125
Chapter 6 - Distance Protection P54x1Z
V IZ
IZ
90°
V
V I Z
I
I Z
V02711
126 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
jX Z k ZN I N I ph
jX
V ph I ph Z replica
V IZ
Z Z
Z replica
90°
90°
R R
V I V ph I ph
V02712
Zreplica = Z(1+kZN.IN/Iph)
or if mutual compensation is applied:
P54x1Z-TM-EN-1 127
Chapter 6 - Distance Protection P54x1Z
Z(1+kZN.IN/Iph+kZM.IM/Iph)
Then if healthy phase currents are much less then the current of the faulty phase and the mutual
compensation is disabled:
IN @ Iph
so that
Zreplica @ Z(1 + kZN)
Thus the ZLP plane representation of the characteristic becomes static.
jX Z1 -plane
V IZ
Z
90°
V I
V I Z
R
Z
V02713
128 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
Z LP -plane
jX Z k ZN I N I ph
V ph I ph Z replica
Z Z replica
90°
h
h / Ip
Vp
Z replica R
Z
V ph I ph Z replica
Z k ZN I N I ph
V02714
P54x1Z-TM-EN-1 129
Chapter 6 - Distance Protection P54x1Z
Operation occurs when the angle between the signals is greater than 90°.
The memory voltage Vmem is the pre-fault voltage. Assuming the pre-fault current is close to zero at the
relaying point, he pre-fault voltage is equal to the source voltage. Therefore:
Vmem = VS
IED
Dist
VS Bus I
Line
ZS ZF
V
V02715
p
90° ≤ ∠ V I + ⋅ Z S − ∠ ( V I − Z ) ≤ −90°
1+ p
130 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
The Mho expansion for a forward fault is illustrated in the following diagram:
jX
Self-polarised
V IZ
Z
V I 90°
R
p
ZS
1 p p
V I ZS
1 p
V02716
ZS = (Vmem - V)/I
P54x1Z-TM-EN-1 131
Chapter 6 - Distance Protection P54x1Z
IED
Dist
Bus VS
I
Network
ZF ZL ZS
V
V02717
p
90° ≤ ∠ V I − ⋅ ( Z S + Z L ) − ∠ ( V I − Z ) ≤ −90°
1+ p
The Mho contraction for a reverse fault is illustrated in the following diagram:
132 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
p
V I (ZS ZL )
1 p
jX
90°
V IZ
p
(Z S Z L )
1 p
V I
R
Self-polarised
V02718
P54x1Z-TM-EN-1 133
Chapter 6 - Distance Protection P54x1Z
The cross-polarization voltage is generated using phase(s) not otherwise used for the particular distance or
directional measurement. While one pole is dead, and the memory is not available, the elements associated
with the remaining phases are polarized as shown in the following table:
Cross Polarizing Signal Cross Polarizing Signal Cross Polarizing Signal
Loop
(No poles dead) Lagging Pole Dead Leading Pole Dead
A-N 0.5(aVB + a2VC) αVB α2VC
B-N 0.5(aVC + a2VA) αVC α2VA
C-N 0.5(aVA + a2VB) αVA α2VB
A-B √3VC Ð -90º 0 0
B-C √3VA Ð -90º 0 0
C-A √3VB Ð -90º 0 0
where a is a mathematical operator which rotates a vector through 120° and a2 denotes a rotation of 240°.
The table shows polarizing signal contributions for each loop under the different operating conditions. The
proportion of cross-polarization voltage used is defined by the Dist. Polarizing (p) setting.
Note:
Cross polarization is used only when there is no memory polarization quantity available.
Note:
If no memory voltage is available then the cross-polarized quantity is used instead.
The setting Dist. Polarizing (p) defines the amount of memory polarization (or if need be, cross polarization
voltage), which should be added with respect to the existing self-polarizing voltage so that:
S1 = V + pVmem.
The value "p" can be set from 0.2 (20%) to 5 (500%).
This will have an affect on the characteristic where operation occurs when the fault impedance lies inside a
circle whose diameter is set by the points IZ and p/(1+p)IZsource
This means for example:
● If p = 1, the characteristic will have an expansion of 50% IZsource
● If p = 5, the characteristic will have an expansion of 83.3% IZsource
134 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
4. If the fault is cleared before the voltage memory signal expires, the memory algorithm resets and
restarts the two/four cycle validation process.
5. If there is no voltage memory available (either because the line has just been energised, or because
the memory voltage has expired), cross polarization is used instead. The contribution of cross
polarizing signals is only used when memory polarizing is invalid and is only valid for certain pole dead
conditions.
6. If neither memory polarization voltage nor cross-polarization voltage is available (pole dead condition
for phase-to-phase element), then the phase-to-phase elements are self polarized. If the polarizing
voltage is less than 1V, only zone 1 is allowed to operate. In this case a Mho characteristic with a
reverse offset of 25% is applied. This ensures operation when closing on to a close-up three-phase
fault (SOTF/ TOR condition).
One of the additional benefits of adding memory into the polarizing mix is that Mho characteristics offer
dynamic expansion if there is a forward fault, therefore covering greater fault arc resistance
jX
Zone 3
(offset)
Zone 2
(forward)
Directional line
Zone 1
-R θ +R
Reverse direction
-jX V02700
P54x1Z-TM-EN-1 135
Chapter 6 - Distance Protection P54x1Z
A combination of simple comparators, each using signals derived from measured currents and voltages,
determines whether measured impedance is within a tripping zone. A separate comparator is used for each
line of each Quadrilateral.
Each tripping zone is constructed from a Quadrilateral based on that depicted in the following diagram:
136 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
jX Z
Tripping
Region
Directional Line
R’ θ R +R
Z’ Forward direction
60°
-jX
P54x1Z-TM-EN-1 137
Chapter 6 - Distance Protection P54x1Z
jX
Offset zone
Directional zone
Directional zone
Directional Line
-R +R
Forward direction
-jX
Figure 59: Quadrilateral Characteristic featuring 2 directional forward zones and 1 offset zone
Each of the lines produced by the comparators defines a tripping limit: Impedance on one side of the line
prevents tripping whereas impedance on the other side of the line may, if the other comparators agree, allow
tripping. For example, impedance beyond the Impedance Reach Line will not allow tripping.
The combination of the comparator outputs produces a polygon shaped tripping region. The polygon may be
either 4-sided or 5-sided. The shape depends according to the settings that are applied by the five
comparators and how the Directional Line interacts with the reach lines (usually the Reverse Impedance
Reach Line):
● The Directional Line may completely mask a reach line. If that is the case, the polygon will be 4-sided
(quadrilateral).
● If the Directional Line intersects a reach line, the polygon will be 5-sided.
138 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
jX
Directional Line
-R R
Forward direction
-jX
The Impedance Reach, the Resistive Reach, and the Zone Characteristic Impedance Angle, can be freely
assigned. The Directional Line Angle is 60º by default but can be varied if the Delta Directional element is
enabled. The Tilt Angle of the impedance lines has a default setting of -3º, but some variation is allowed if
the Advanced setting option is chosen.
The Reverse Impedance Reach, and the Reverse Resistive Reach are applied as a fixed ratio of the
Impedance Reach and the Resistive Reach for Directional characteristics. The ratios used vary according to
the zone type. The following tables present the different values for phase-phase characteristics and phase-
earth characteristics. For completion, the reach limit values for Offset zones are also included (although the
overlaid Directional line does not apply and the Offset characteristics will always be quadrilateral).
P54x1Z-TM-EN-1 139
Chapter 6 - Distance Protection P54x1Z
where kZN = (Z0 - Z1) / 3Z1 and is defined by two settings: kZN Res Comp and KZN Res Angle.
Note:
Not all products feature all zones.
Note:
With default settings applied, Directional Zones 1, 2, and 4 should appear Quadrilateral.
140 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
+jX
V IZ
Z V I
+R
V02722
P54x1Z-TM-EN-1 141
Chapter 6 - Distance Protection P54x1Z
+jX
+R
+Z’ V/I
-3°
V / I - Z’
V02723
142 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
IED
Dist V I Half of the loop
Bus
A
ZF
R LP
B
Network Line
V02725
+jX
V/I
V/I-R
R ÐZ +R
V02724
P54x1Z-TM-EN-1 143
Chapter 6 - Distance Protection P54x1Z
S1 = V - I.R
S2 = I.Z
The impedance on the left side of the right hand resistive line is detected when the angle between S1 and S2
is greater than 0°.
+jX
ÐZ
V/I
V / I - R’ +R
R’
V02726
144 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
+jX
V/I
R’ R +R
Z’
3°
V02727
The positive sequence reach settings used for the Phase-Fault Quadrilateral characteristics are summarised
in the following table:
Reverse Impedance Reverse Resistive
Zone Type Impedance Reach Z Resistive Reach R
Reach Z’ Reach R’
1 Ph-Ph Forward Z1 Ph. Reach 0.25 Z ½*R1 Ph. Resistive 0.25 R
2 Ph-Ph Forward Z2 Ph. Reach 0.25 Z ½*R2 Ph. Resistive 0.25 R
3 Ph-Ph Forward Z3 Ph. Reach 0.25 Z ½*R3 Ph. Resistive 0.25 R
3 Ph-Ph Reverse Z3 Ph. Reach 0.25 Z ½*R3 Ph. Resistive 0.25 R
3 Ph-Ph Offset Z3 Ph. Reach Z3’ Ph Rev Reach ½*R3 Ph. Resistive ½*R3’ Ph Res. Rev.
4 Ph-Ph Reverse Z4 Ph. Reach Z ½*R4 Ph. Resistive 0.25 R
P Ph-Ph Forward ZP Ph. Reach Z ½*RP Ph Resistive 0.25 R
P Ph-Ph Reverse ZP Ph. Reach Z ½*RP Ph Resistive 0.25 R
P Ph-Ph Offset ZQ Ph. Reach ZP’ Ph Rev Reach ½*RP Ph Resistive ½*RP’ Ph. Res. Rev.
Q Ph-Ph Forward ZQ Ph. Reach Z ½*RQ Ph Resistive 0.25 R
Q Ph-Ph Reverse ZQ Ph. Reach Z ½*RQ Ph Resistive 0.25 R
Q Ph-Ph Offset ZQ Ph. Reach ZQ’ Ph Rev Reach ½*RQ Ph Resistive ½*RQ’ Ph. Res. Rev.
P54x1Z-TM-EN-1 145
Chapter 6 - Distance Protection P54x1Z
Note:
Not all zones feature in all product variations.
146 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
Ifault should be used to determine S2, but, because the Distance protection cannot measure the fault current
directly (due to the unknown infeed from the remote end), Ifault cannot be used as the polarizing current.
Instead, the angle of Ifault must be estimated. Two proven methods to estimate the angle of Ifault are:
1. The angle of Ifault can be assumed to be close to the angle of Iph
2. The angle of Ifault can be assumed to be close to the angle of the negative sequence current I2.
In case 1, the angle of Iph can be used to polarize the Quadrilateral characteristic and so the tilt of the
reactance line is fixed.
In case 2 the angle of I2 can be used to polarize the Quadrilateral characteristic. In this case, the reactance
line tilt varies dynamically according to the angle of I2.
The reactance line follows the fault resistance impedance and tilts up or down, starting from the set initial tilt
angle (σ) to avoid underreaching or overreaching.
For both fixed and dynamic tilting the validity of current polarization is controlled by the following condition:
|Ð I2 - Ð Iph | < 45º
If this condition is not fulfilled, the assumptions that the angle of Ifault is close to the angle of Iph or close to
the angle of I2 cannot be considered valid. Under such conditions the Quadrilateral characteristic could
significantly overreach or underreach. To avoid this, the distance protection automatically switches from
Quadrilateral to Mho characteristics to provide stable operation.
P54x1Z-TM-EN-1 147
Chapter 6 - Distance Protection P54x1Z
Z 1-plane
Iph j
+jX Ð e
I
V IZ
Z V I
+R
V02731
148 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
Z LP -plane
+jX Z k ZN I N I ph V ph I ph Z replica
Z replica
Z
V ph I ph
+R
V02732
P54x1Z-TM-EN-1 149
Chapter 6 - Distance Protection P54x1Z
ZLP plane
+jX
Zreplica
Vph / Iph
R’ LP R LP
+R
3°
Z’ replica
V02733
150 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
● For Reverse operating zones the dynamically tilting line is in the opposite quadrant of the
characteristic compared with Forward/Offset Zones and the dynamic tilt moves the line away from the
resistive axis.
● For Offset zones, the Impedance Reach lines tilt away from the R-axis, whilst the Reverse Impedance
Reach Lines tilt towards the +R axis. This avoids overreaching in the reverse direction.
● For products that feature single-phase tripping, when one circuit breaker pole is open during a single-
pole autoreclose sequence, dynamic tilting is automatically disabled. The fault current is used as the
polarizing signal and a fixed -7° tilt is applied. The additional tilt reduces the possibility of overreach
caused by using the faulted phase as the reference.
Note:
Zone 1X used in Zone 1 Extension Schemes uses the Zone 2 tilt settings to ensure that it does not underreach.
Dynamic tilting of reactance lines only occurs when the line is polarized with I2. If Iph is used as the
polarizing quantity the tilt of the Impedance Reach line is fixed. If fixed tilting is selected, Iph is always used.
If dynamic tilting is enabled, then the protection will decide whether to use I2 or Iph (and hence whether
dynamic tilting will apply) according to the angular relationship between I2 and Iph.
The following criteria are applied:
● If the angle between I2 and Iph is more than 45°, the Quadrilateral characteristics are disabled and
Mho characteristics are used instead.
● If the angle between I2 and Iph is less than 45°, Leading and lagging polarizing currents are allocated
according to the phase relations between I2 and Iph as presented in the diagram below:
I LEAD I ph I ph I LEAD I 2
I LAG I 2 I LAG I ph
I2
I ph
I2
V02728
Figure 70: Phase relations between I2 and Iph for leading and lagging polarizing currents
The comparators used for the reactance lines are allocated as per the following table:
Zone Line S1 S2 Condition
P54x1Z-TM-EN-1 151
Chapter 6 - Distance Protection P54x1Z
If ILEAD is I2 the lines are dynamically tilted up from the fixed angle.
If ILEAD is Iph, the fixed tilt applies.
If ILAG is I2, the lines are dynamically tilted down from the fixed angle.
If ILAG is Iph, the fixed tilt applies.
+jX
Z1 plane
Ð (Iph / I) +
V/I
R’
+R
Z’ R
Ð (I ph / I) – 3°
V02734
152 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
+jX Z 1 plane
1
Ð
1 k ZN
Z
1
R 'LP
1 k ZN 1
RLP
1 k ZN
R’ reach Rreach
+R
Z’
1
Ð 3°
1 k ZN
V02735
a = (1/(1 + kZN))
In typical cases the sine ratio coefficient term is close to unity so the simplified equations can be used:
Rreach = RLP / ǀ (1 + kZN) ǀ,
R’reach = R’LP / ǀ (1 + kZN) ǀ,
So in terms of replica impedances and loop resistances, the comparators used for the resistance lines are as
per the following table:
Zone Line S1 S2 Condition
Forward or Offset Resistive reach Vph - Iph.RLP Iph.Zreplica ∠S1 -∠S2 > 0º
Forward or Offset Reverse resistive reach Vph - Iph.R’LP Iph.Zreplica ∠S1 -∠S2 < 0º
Reverse Resistive reach Vph + Iph.RLP -Iph.Zreplica ∠S1 -∠S2 > 0º
Reverse Reverse resistive reach Vph + Iph.R’LP -Iph.Zreplica ∠S1 -∠S2 < 0º
The Resistive Impedance Reach side of the earth zone is controlled by the Resistive Reach setting applied
(Rx Gnd Resistive). This defines the fault arc resistance that can be detected for a single phase-earth fault.
For such a fault, the fault resistance appears in the total fault loop (out and return loop), in which the line
impedance is Z1 x (1 + kZN), if IN @ Iph.
Most injection test sets plot impedance characteristics in positive sequence terms, so that the right-hand
intercept appears less than the setting applied (Rn Gnd Resistive /(1+ kZN)). The left hand side is set by the
Rn Gnd Res Rev setting and acts similarly.
P54x1Z-TM-EN-1 153
Chapter 6 - Distance Protection P54x1Z
Note:
The resistive reach lines of earth-fault Quadrilateral characteristics are not affected by the type of tilting used by the
reactive lines (fixed or dynamic), nor by the angle values.
If fixed tilting is selected, then he current input quantity for S2 is Iph in all cases.
The positive sequence reach settings used for the Earth-Fault Quadrilateral characteristics are summarised
in the table below:
Reverse Resistive
Zone Type Impedance Reach Z Reverse Impedance Reach Z’ Resistive Reach R
Reach R’
1 Ph-Earth Forward Z1 Gnd. Reach * (1 + kZN) 0.25 Z R1 Gnd Resistive 0.25 R
2 Ph-Earth Forward Z2 Gnd. Reach * (1 + kZN) 0.25 Z R2 Gnd Resistive 0.25 R
3 Ph-Earth Forward Z3 Gnd. Reach * (1 + kZN) 0.25 Z R3 Gnd Resistive 0.25 R
3 Ph-Earth Reverse Z3 Gnd. Reach * (1 + kZN) 0.25 Z R3 Gnd Resistive 0.25 R
3 Ph-Earth Offset Z3 Gnd. Reach * (1 + kZN) Z3’ Gnd Rev Rch * (1 + kZN) R3 Gnd Resistive R3’ Ph Res. Rev
4 Ph-Earth Reverse Z4 Gnd. Reach * (1 + kZN) Z R4 Gnd Resistive 0.25 R
P Ph-Earth Forward ZP Gnd. Reach * (1 + kZN) 0.25 Z RP Gnd Resistive 0.25 R
P Ph-Earth Reverse ZP Gnd. Reach * (1 + kZN) 0.25 Z RP Gnd Resistive 0.25 R
P Ph-Earth Offset ZQ Gnd. Reach * (1 + kZN) ZP’ Gnd Rev Rch * (1 + kZN) RP Gnd Resistive RP’ Gnd Res. Rev
Q Ph-Earth Forward ZQ Gnd. Reach * (1 + kZN) 0.25 Z RQ Gnd Resistive 0.25 R
Q Ph-Earth Reverse ZQ Gnd. Reach * (1 + kZN) 0.25 Z RQ Gnd Resistive 0.25 R
Q Ph-Earth Offset ZQ Gnd. Reach * (1 + kZN) ZQ’ Gnd Rev Rch * (1 + kZN) RQ Gnd Resistive RQ’ Gnd Res. Rev
where kZN = (Z0 - Z1) / 3Z1 and is defined by two settings: kZN Res Comp and KZN Res Angle.
154 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
P54x1Z-TM-EN-1 155
Chapter 6 - Distance Protection P54x1Z
● For directional zones, the directionality element must agree with the tripping zone. Zones 1, 2, and 4
are always directional whereas other zones are only directional if set as directional. In directional
zones the directionality element must agree with the tripping zone. For example, Zone 1 is a Forward
Directional zone and must not trip for Reverse faults. Therefore a Zone 1 trip is only allowed if the
directionality element issues a Forward decision. Zone 4 is reverse-looking so needs a Reverse
decision by the directionality element.
● The set time delay for the measuring zone must expire, with the measured fault impedance remaining
inside the zone characteristic for the duration of the delay time. Typically, Zone 1 has no time delay
(instantaneous), whereas all other zones have time delays.
● Where channel-aided distance schemes are used, the time delay tZ2 for overreaching Zone 2 may be
bypassed for some of the schemes.
Note:
Any existing trip decision is not reset under this condition. After the first cycle following a selection, the phase selector
is only permitted to change to a selection involving additional phases.
On double phase-to-earth faults, only the phase-to-phase elements are enabled. This is because they are
generally more accurate under these conditions than earth fault elements. A biased neutral current level
detector operates to indicate the involvement of earth in the fault.
156 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
AB
BC
CA
V02702
Figure 73: Phase to phase current changes for C phase-to-ground (CN) fault
As default, phase selection is made when any superimposed current exceeds 5% of nominal current (0.05
In).
Any superimposed current greater than 80% of the largest superimposed current is included in the phase
selection logic.
For applications which might experience high levels of sub-synchronous currents, the phase selector
automatically raises the threshold from the default 5% of In, in order to prevent sporadic operation whilst
maintaining high sensitivity to faults.
Note:
If you test the distance elements using test sets, which do not provide a dynamic model to generate true fault delta
conditions, you need to set Static Test Mode to Enabled in the COMMISSION TESTS column. This disables phase
selector control and forces the distance protection to use a conventional (non-delta) directional line.
The phase selector picks up on fault detection, and enables Distance protection on all elements which have
been selected by the pick-up. These elements are enabled for 2 cycles, and normally this will result in
tripping. On double ground-to-phase faults, only appropriate phase elements are enabled. This is because
they are generally more accurate than ground elements under these conditions. If, however, tripping is not
initiated within the 2 cycles, for the following 5 cycles all Distance elements (including all phase-earth
elements) are enabled. During these five cycles, this could lead to incorrect operation of earth-fault elements
in case of an out-of-zone double-phase-earth fault. This is because one of the phase-earth elements could
demonstrate significant overreach, which may result in maloperation. To help prevent this, a Biased Neutral
Current Detector is incorporated.
P54x1Z-TM-EN-1 157
Chapter 6 - Distance Protection P54x1Z
I N I A I B IC
Neutral current
Bias current I BIAS max I A I B , I B I C , I C I A
V02703
Note:
Distance zones are directionalized by a Delta Directional decision. The characteristic angle for this decision is set
with the Delta Directional configuration, in the DISTANCE SETUP column. The default setting is 60°.
158 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
optimum performance. The Directional characteristic angle, (also known as the relay characteristic angle –
RCA) is set to 60° by default, but you can change this to suit your application using the Dir. Char Angle
setting in the DISTANCE SETUP column.
The Delta Directional technique needs the changes in voltage and current to exceed the preset thresholds, in
order to determine forward and reverse decisions. If these thresholds are not exceeded, but a potential fault
is detected, the Distance protection reverts to a conventional directional technique with memory polarization
of the voltage.
If you don’t want to use the Delta directional technique, set Dir. Status in the DISTANCE SETUP column to
Disabled in which case memory polarization is used.
P54x1Z-TM-EN-1 159
Chapter 6 - Distance Protection P54x1Z
Sensitivity (Z1, Z2) = max (5%In, (0.25/Zone reach), (1.5 x (0.25/Zone 4 reach)))
The dependency on the Zone 4 element always applies, even if Zone 4 is disabled.
The default reach setting for Zones 1, 2, and 4 are 80%, 120%, and 150% respectively. For these settings
the zone-dependent terms can be reduced to:
0.25/Zone 1 reach = 0.25/(0.8 x line impedance)
0.25/Zone 2 reach = 0.25/(1.2 x line impedance)
1.5 x (0.25/Zone 4 reach) = 0.25/line impedance
In such cases, for Zone 1, the dominant Zone reach term is that of Zone 1 and the equation can be reduced
to:
Sensitivity (Z1) = max (5%In, (0.25/(0.8 x line impedance)))
For lines with an impedance of less than 6.25 Ω the Zone 1 reach term dominates and the sensitivity is
greater than 5% In. Above this line impedance the sensitivity is 5% In.
Similarly, for Zone 2, the dominant Zone reach term is that of Zone 4 and the equation can be reduced to:
Sensitivity (Z2) = max (5%In, (0.25/line impedance))
For lines with an impedance of less than 5 Ω the Zone reach term dominates and the sensitivity is greater
than 5% In. Above this line impedance the sensitivity is 5% In.
In Advanced setting mode the same qualifications for distance zone minimum sensitivity as minimum
sensitivity should be applied to ensure distance element accuracy.
Therefore, for slower operation, I needs to be low, as restricted by a relatively weak infeed and Z needs to be
small, as for a short line.
160 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
Sub-cycle tripping is maintained for lower SIRs, up to a ratio of 2. The instantaneous operating time is
increased by about a quarter of a power frequency cycle at higher SIRs.
Transients caused by voltage dips, however severe, do not affect the protection’s directional measurement
because it uses voltage memory.
Operate
Blind
Radius
Load
Blind
Blind
Blind
Operate
V00645
P54x1Z-TM-EN-1 161
Chapter 6 - Distance Protection P54x1Z
The protection can allow the load blinder to be bypassed any time that the measured voltage for the phase in
question falls below an undervoltage setting. Under such circumstances, the low voltage could not be
attributed to normal voltage excursion tolerances on load. A fault must be present on the phase in question,
so it is acceptable to override the blinder action and allow the Distance protection to trip for an in-zone
measurement. The advantage of bypassing the load blinders is that the resistive coverage for faults near to
the protection location can be higher.
To use the load blinders you must set the Load Blinders setting to Enabled. You then set appropriate
values for the blinder impedance using the Z< Blinder Imp setting, the b value using the Load/B Angle
setting, and the undervoltage threshold using the Load Blinder V< setting.
Note:
Load blinding can be applied for phase and earth characteristics. Residual compensation is not applied. Phase
characteristics use phase-to-phase voltage and phase-to-phase current. Earth fault characteristics use phase-to-
neutral voltage and phase-to-neutral current.
162 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
Note:
The characteristic angle set in this section is also used by the Distance protection. This is because distance zones
are directionalized by the delta decision.
Delta directional comparison looks at the relative phase angle of the superimposed current DI (delta I)
compared to the superimposed voltage DV (delta V), at the instant of fault inception. The delta is only
present when a fault occurs and a step change from the pre-fault steady-state load is generated by the fault.
The element issues a forward or reverse decision which can be input into an aided channel unit protection
scheme.
Under healthy network conditions the system voltage is close to Vn nominal and load current flows. Under
such steady-state conditions, if the voltage measured on each phase now is compared with a stored memory
from exactly two power-system cycles previously, the difference between them is zero. Zero voltage change
(DV = 0) and zero current change (DI = 0), except when there are changes in load current.
When a fault occurs on the system, the delta changes measured are:
DV = fault voltage (time “t”) - pre-fault healthy voltage (t-2 cycles)
DI = fault current (time “t”) - pre-fault load current (t-2 cycles)
The delta measurements are a vector difference, resulting in a delta magnitude and angle. Under healthy
system conditions the pre-fault values are those measured 2 cycles earlier. When a fault is detected the pre-
fault values are retained for the duration of the fault.
The changes in magnitude are used to detect the presence of the fault and the angles are used to determine
whether the fault is in the Forward or Reverse direction.
The following figure shows a single phase to earth fault.
P54x1Z-TM-EN-1 163
Chapter 6 - Distance Protection P54x1Z
E02704
164 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
Note:
If Delta directional aided scheme are not used, Distance zone directionalizing uses fixed operating thresholds:
DV=0.5V and DI=5%In. If the fault DV is below the setting of 0.5V, a conventional distance line ensures correct
forward/reverse polarizing. For Delta directional aided schemes, sufficient DV must be present for tripping to occur.
The delta directional element will produce a forward decision when the angle between the delta volts and
delta current shifted by the Dir. Char Angle setting is greater than 90°. The Dir. Char Angle setting is the
characteristic angle of the source impedance, Zs.
Forward
Reverse
DI
Zs
RCA
P54x1Z-TM-EN-1 165
Chapter 6 - Distance Protection P54x1Z
column to Enabled. This disables phase selector control and forces the protection to use a conventional
(non-delta) directional line.
166 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
6 APPLICATION NOTES
E02746
P54x1Z-TM-EN-1 167
Chapter 6 - Distance Protection P54x1Z
The following figure shows the basic settings needed to configure a forward-looking mho zone, assuming
that the load blinder is enabled.
E02747
168 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
plus the longest adjacent line. A higher apparent impedance of the adjacent line may need to be allowed
where fault current can be fed from multiple sources or flow through parallel paths.
Zone 3 may also be programmed with a slight reverse (“rev”) offset, in which case its reach in the reverse
direction is set as a percentage of the protected line impedance too. This would typically provide back-up
protection for the local busbar, where the offset reach is set to 20% for short lines (<30km) or 10% for longer
lines.
Zone 3 may also be set as a reverse directional zone. The setting chosen for Zone 3, if used, depends on its
application. Typical applications include its use as an additional time delayed zone or as a reverse back-up
protection zone for busbars and transformers.
Programmable zone elements can be set with the same options as Zone 3 (Forward, Reverse or Offset). A
programmable zone can be used as an additional forward protection zone if custom and practice requires
using more than three forward zones of Distance protection.
The Zone 4 elements may also provide back-up protection for the local busbar. Where Zone 4 is used to
provide reverse directional decisions for Blocking or Permissive Overreach schemes, Zone 4 must reach
further behind the protection than Zone 2 for the remote end protection. In such cases the reverse reach
should be:
● Mho: Z4 > Remote Zone 2 reach x 120%
● Quadrilateral: Z4 > (Remote Zone 2 reach x 120%) minus the protected line impedance
Note:
In the case of the Mho, the line impedance is not subtracted. This ensures that whatever the amount of dynamic
expansion of the circle, the reverse looking zone always detects all solid and resistive faults capable of detection by
Zone 2 at the remote line end.
Note:
Because the fault current for an earth fault may be limited by tower footing resistance, high soil resistivity, and weak
infeeding; any arcing resistance is often higher than for a corresponding phase fault at the same location. It maybe
necessary to set the Rn Gnd Resistive settings to be higher than the Rn Ph Resistive setting. A setting of Rn Gnd
Resistive three times that of Rn Ph Resistive is not uncommon.
P54x1Z-TM-EN-1 169
Chapter 6 - Distance Protection P54x1Z
Long lines
In the case of medium and long line applications where quadrilateral distance earth-fault characteristics are
used, Zn Dynamic Tilt should be enabled and the starting tilt angle should be -3° (as per the default
settings). This tilt compensates for possible current and voltage transformer and line data errors.
For high resistive faults during power exporting, the underreaching Zone 1 is only allowed to tilt down by the
angle difference between the faulted phase and negative sequence current Ð(Iph-I2) starting from the –3°
set angle. This ensures stability of Zone 1 for high resistance faults beyond the Zone 1 reach even during
heavy load conditions (high load angle between two voltage sources) and sufficient sensitivity for high
resistance internal faults. The tilt angle for all other zones (that are by nature overreaching zones) remain at
-3°.
In the case of power importing, Zone 1 remains at –3° while all other zones are allowed to tilt up by the
Ð(Iph-I2) angle difference, starting from –3°. This increases the Zone 2 and Zone 4 resistive reaches and
secures correct operation in permissive overreach and blocking type schemes.
Short lines
For very short lines, typically below 10Miles (16km), the ratio of resistive to reactance reach setting (R/X)
could easily exceed 10. For such applications the geometrical shape of the quadrilateral characteristic could
be such that the top reactance line is close or even crosses the resistive axis as presented in the following
figure:
jX
High resistive internal fault
Total dynamic tilt starting from zero
Z1
-3 ° Iph -I 2
Line angle R
Iph -I 2
V02748
170 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
As shown in the previous figure, the internal resistive fault then falls in the Zone 1 operating characteristic.
However, for short lines the load angle is relatively low when compared to long transmission lines for the
same transfer capacity and therefore the impedance reach line dynamic tilting may be moderate. Therefore it
may be necessary to reduce the Zone 1 reach to guarantee Zone 1 stability. This is particularly
recommended if the distance protection is operating in an aided scheme. To summarise, for very short lines
with large R/X setting ratios, we recommend settiing the initial tilt angle to zero and the Zone 1 reach to
70-75% of the line impedance.
The above discussion assumes homogenous networks where the angle of the negative sequence current
derived at relaying point is very close to the total fault current angle. If the network is non-homogenous, there
is a difference in angle that causes inaccurate dynamic tilting. Therefore in such networks either quadrilateral
with fixed tilt angle or mho characteristic should be considered to avoid Zone 1 overreach.
Note:
You can also use Delta Directional schemes to detect high resistance faults.
Exporting End
To secure stability, the tilt angle of Zone 1 at the exporting end has to be set negative and above the
maximum angle difference between sources feeding the resistive faults. This data should be known from
load flow study, but if unavailable, the minimum recommended setting would be the angle difference between
voltage and current measured at local end during the heaviest load condition coupled with reduced Zone 1
reach of 70-75% of the line impedance.
Note:
With a sharp fixed tilt angle, the effective resistive coverage would be significantly reduced. Therefore for short lines,
dynamic tilting (with variable tilt angle depending on fault resistance and location) is preferred. For all other
overreaching zones, set the tilting angle to zero.
Importing End
Set zone 1 tilt angle to zero and for all other zones the typical setting should be positive and between +5°
and +10°.
Note:
The setting accuracy for overreaching zones is not crucial because it does not pose a risk for distance maloperation.
The purpose is to boost Zone 2 and Zone 4 reach and improve the performance of Aided Schemes.
P54x1Z-TM-EN-1 171
Chapter 6 - Distance Protection P54x1Z
By factory default, the impedance reach lines of the quadrilateral characteristics are not fixed as horizontal
reactance lines. To account for phase angle tolerances in the line transformers, etc., the lines are tilted
downwards at a droop of -3°. This tilt down helps to prevent Zone 1 overreach.
The fixed tilt setting on the phase elements may also be used to compensate for overreach effects when pre-
fault heavy load export is flowing. In such cases, fault arc resistance is phase shifted on the impedance polar
plot, tilting down towards the resistive axis and not appearing to be fully resistive in nature. For long lines
with heavy power flow, the zone 1 top line might be tilted downwards in the range –5° to –15°, mimicking the
phase shift of the resistance.
Note:
A negative angle is used to set a downwards tilt gradient, and a positive angle to tilt upwards.
Note:
Mho characteristics have an inherent tendency to avoid unwanted overreaching, making them very desirable for long
line protection.
172 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
Note:
When using the Special Applications filter the instantaneous operating time is increased by about a quarter of a
power frequency cycle.
P54x1Z-TM-EN-1 173
Chapter 6 - Distance Protection P54x1Z
Cable applications
Use 20% (0.2) memory. This results in minimum Mho expansion and keeps the protected line section well
within the expanded Mho, thereby ensuring better accuracies and faster operating times for close-up faults.
This matches the guidance previously provided for LFZP123 or LFZR applications for cable feeders
Short lines
For lines shorter than 10miles (16km), or with an SIR higher than 15, use the maximum memory polarization
(setting = 5). This ensures sufficient characteristic expansion to cover fault arc resistance.
The reverse fault detectors must be set more sensitively, as they are used to invoke the blocking and current
reversal guard elements. We suggest that all reverse detectors are set at 66 to 80% of the setting of the
forward detector, typically:
● Dir. V Rev = Dir. V Fwd x 0.66
● Dir. I Rev = Dir. I Fwd x 0.66
Due to the implementation method, Deltas are present only for 2 cycles on fault inception. If any distance
elements are enabled, these will automatically allow the delta forward or reverse decisions to seal-in, until
such time as the fault is cleared from the system. Therefore as a minimum, some distance zone(s) must be
enabled in the DISTANCE SETUP column as fault detectors. It does not matter what time delay is applied for
the zone(s). This can either be the typical distance delay for that zone or set to ‘Disabled’ in the SCHEME
174 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
LOGIC column, if no distance tripping is required. As a minimum, Zone 3 must be enabled, with a reverse
reach such as to allow seal-in of Dir. Rev, and a forward reach to allow seal-in of Dir. Fwd.
The applicable reaches would be:
● Zone 3 Forward: Set at least as long as a conventional Zone 2 (120-150% of the protected line)
● Zone 3 Reverse: Set at least as long as a conventional Zone 4, or supplement by assigning Zone 4 if
a large reverse reach is not preferred for Zone 3.
We generally advise a Mho characteristic in such starter applications, although quadrilaterals are acceptable.
As the Mho starter is likely to have a large radius, we strongly advise applying the Load Blinder.
The settings are applicable whether the Distance protection characteristics are set to Mho, or Quadrilateral.
If you choose Quadrilateral however, you will need to consider the Resistive reaches of Quadrilaterals.
For this study, we wish to protect one line of a double 230kV, 100km line between a substation at Green
Valley and a substation at Blue river. There are generating sources at Tiger Bay, 80 km from Green Valley
and at Rocky Bay, 60 km from Blue River.
The single-line diagram for the system is shown in the following figure:
100 km
80 km 60 km
IED IED
E02705
P54x1Z-TM-EN-1 175
Chapter 6 - Distance Protection P54x1Z
Therefore set:
kZN Res Comp = 0.79
kZN Res Angle = -6.5°
176 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
From this the protection algorithm automatically calculates the required Ohmic reaches.
Alternatively, using the Setting Mode Advanced, the values can be calculated and entered manually as
follows:
Required Zone 1 reach = 0.8 x 100 x 0.484Ð79.4° x 0.12 = 4.64Ð79.4° W secondary
So:
● Set Z1 Ph. Reach and Z1 Gnd. Reach = 4.64 W
● Set Z1 Ph. Angle and Z1 Gnd. Angle = 80°
Alternatively, in Simple setting mode, this reach can be set as a percentage of the protected line. Typically
a figure of at least 120% of the line between Green Valley and Blue River is used.
Alternatively, in Simple setting mode, this reach can be set as a percentage of the protected line.
P54x1Z-TM-EN-1 177
Chapter 6 - Distance Protection P54x1Z
178 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
Phase-Fault Elements
Ideally, the Resistive reach should be set greater than the maximum fault arc resistance for a phase-phase
fault (Ra), calculated in terms of the minimum expected phase-phase fault current, the maximum phase
conductor separation, according to the formula developed by (van) Warrington as:
Ra = (28710 x L)/If x 1.4
where:
● If = Minimum expected phase-phase fault current (A)
● L = Maximum phase conductor separation (m)
Typical figures for Ra are given, for different values of minimum expected phase fault currents, in the
following table:
Note:
For circuits with infeed from more than one terminal, the fault resistance will appear greater. This is because the
protection cannot measure the current contribution from a remote terminal. The apparent fault resistance increase
could be between 2 to 8 times the calculated resistance. For this reason, we recommended setting the zone
Resistive reaches to 4 times the calculated arc resistance.
In this example, the minimum phase fault level is 1000 MVA. This is equivalent to an effective short-circuit
fault feeding impedance of:
P54x1Z-TM-EN-1 179
Chapter 6 - Distance Protection P54x1Z
Earth-Fault Elements
Fault resistance would comprise arc-resistance and tower footing resistance. A typical resistive reach
coverage setting would be 40 W (primary).
For high resistance earth faults, the situation could arise where no distance elements would operate. In such
cases, supplementary earth fault protection (for example Aided DEF protection) should be applied. If
supplementary earth fault protection is used, large resistive reaches for Earth-Fault Distance protection do
not need to be used so that the Earth-Fault Resistive reach can be set according to the utility practice. In the
absence of specific guidance, a recommendation for setting Zone 1 is:
● Cables: Resistive Reach = 3 x Zone 1 reach
● Overhead lines: Choose Resistive Reach in the range [2.3 - 0.0045] x Line length(km) x Zone 1 Reach
● Lines longer than 400 km: Choose Resistive Reach = 0.5 x Zone 1 Reach
A Ia B
Ib
Zat
Zbt
Ic
Zct
180 P54x1Z-TM-EN-1
P54x1Z Chapter 6 - Distance Protection
Like overreaching of Zone 2 elements, underreaching of Zone 1 elements must also be assured. Zone 1
elements at each terminal must be set to underreach the true impedance to their nearest terminal (limiting
case = no infeed to the tee-point - hence no overreach contribution).
Changing the reach requirements to match the infeed expectations is possible using the alternative setting
group feature. Tailoring setting group contents to the different conditions, coupled with appropriate setting
group switching, enables the changing reach requirements to be met.
Carrier aided schemes can also be used in conjunction with distance elements to protect teed feeders.
Although Permissive Overreaching and Permissive Underreaching schemes may be used, they suffer some
limitations. Blocking schemes are generally considered to be the most suitable.
For a full explanation of Teed Feeders applications in carrier aided schemes, please refer to the Carrier
Aided Schemes chapter.
P54x1Z-TM-EN-1 181
Chapter 6 - Distance Protection P54x1Z
182 P54x1Z-TM-EN-1
CARRIER AIDED SCHEMES
CHAPTER 7
Chapter 7 - Carrier Aided Schemes P54x1Z
184 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
1 CHAPTER OVERVIEW
This chapter contains the following sections:
Chapter Overview 185
Introduction 186
Carrier Aided Schemes Implementation 187
Aided Distance Scheme Logic 189
Aided DEF Scheme Logic 203
Aided Delta Scheme Logic 212
Application Notes 217
P54x1Z-TM-EN-1 185
Chapter 7 - Carrier Aided Schemes P54x1Z
2 INTRODUCTION
The provision of communication channels between the terminals of a protected transmission line or
distribution feeder enables unit protection to be applied.
Protection devices located at different terminals can be configured to communicate with one another in order
to implement unit protection schemes. The exchange of simple ON/OFF command signals allows unit
protection to be achieved with Distance Protection schemes (Aided Distance), Directional Earth Fault
schemes (Aided DEF) and if applicable, Delta Directional Comparison Protection schemes (Aided Delta).
Schemes where a communication channel is used to send command signals between line ends are known
as Carrier Aided Schemes.
The terms ‘simplex’ and ‘duplex’ are used to describe the type of communication channel used. Simplex
communication, also sometimes referred to as half-duplex, requires only a single communication channel
between line ends. Signals can be sent in both directions but not at the same time. Duplex communication
requires two communication channels between line ends (one in each direction). Duplex communication
allows signals to be sent and received at the same time.
186 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
The underreaching options can be used to implement Carrier Aided Distance schemes. The other options
can be used with any Carrier Aided scheme application.
The following diagram shows how the schemes can be assigned.
Scheme Mode PUR PUR Unblocking POR POR Unblocking Block 1 Block 2 Prog Unblock Prog
Scheme Function Aided Distance Aided Distance Aided DEF Aided Delta*
*Not P445
V03500
P54x1Z-TM-EN-1 187
Chapter 7 - Carrier Aided Schemes P54x1Z
Note:
The PUR schemes are only suitable for Distance protection. Therefore, if a PUR scheme is selected, the option to
allocate to other protection is not available.
188 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
Note:
This assumes a 20% typical end-zone when Zone 1 is set to 80% of the protected line.
The following are some of the main features and requirements for a permissive under-reaching scheme.
● Only a simplex channel is required.
● Scheme security is high, because the signalling channel is only keyed for faults in the protected line.
● If the circuit breaker at the remote terminal is open, faults in the remote 20% of the line are cleared
using the Zone 2 time delay of the local protection.
● If there is a weak-infeed, or zero-infeed from the remote terminal, (current below the protection
sensitivity), faults in the remote 20% of the line are cleared using the Zone 2 time delay of the local
protection.
● If the signalling channel fails, basic distance scheme tripping remains available.
The PUR logic is:
● Send logic: Assert signal if Zone 1 element operates
● Permissive trip logic: Trip if the Zone 2 element picks up AND the Carrier Aided signal is received
P54x1Z-TM-EN-1 189
Chapter 7 - Carrier Aided Schemes P54x1Z
E03501
Note:
This assumes a 20% typical end-zone when Zone 1 is set to 80% of the protected line.
190 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
The following are some of the main features and requirements for a POR scheme:
● The scheme requires a duplex signalling channel to prevent possible maloperation if a carrier is keyed
for an external fault. Because the signalling channel can be keyed for faults external to the protected
zone, it is vital that they are only received by, and acted upon by, the intended recipient. A simplex
channel cannot assure this.
● A POR scheme may be more advantageous than a PUR scheme for the protection of short
transmission lines. This is because the resistive coverage of the Zone 2 elements may be greater than
that of the Zone 1 elements (in the case of Mho elements)
● Current reversal guard logic prevents healthy-line protection maloperation for high speed current
reversals that can be experienced on double circuit line applications, which can be caused by
sequential opening of circuit breakers.
● If the signalling channel fails, basic distance scheme tripping remains available.
The POR scheme also uses the reverse looking zone 4 as a reverse fault detector. This is used in the
current reversal logic and in the weak infeed echo feature, shown dotted in the figure below:
P54x1Z-TM-EN-1 191
Chapter 7 - Carrier Aided Schemes P54x1Z
Zone 4
Zone 3
Zone 2
Zone 1
Zone 1
Zone 2
Zone 3
Zone 4
CB Open
Zone 4
LD0V
&
Trip A Trip B
Selectable features
E03502
192 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
as quickly as possible. The send signal is generated by the Any Trip command, and it is sent on any
channel that is being used.
This feature is called permissive trip reinforcement. It is designed to ensure that synchronous tripping occurs
at all protected terminals.
P54x1Z-TM-EN-1 193
Chapter 7 - Carrier Aided Schemes P54x1Z
The window of time during which the unblocking logic is enabled starts 10ms after the guard signal is lost,
and continues for 150ms. The 10ms delay gives time for the signalling equipment to change frequency, as in
normal operation. For the duration of any alarm condition, Zone 1 extension logic is invoked if the Zone 1Ext
Status setting is set to operate for channel failure.
E03503
194 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
faulted line. After the faulted line is isolated, the reverse-looking Zone 4 elements at substation C and the
forward looking elements at substation D reset.
Two variants of Blocking scheme are available:
● Blocking 1 (Reversal Guard applied to the Signal Send)
● Blocking 2 (Reversal Guard applied to the Signal Receive)
The two schemes are similar. Both schemes feature current reversal guard signals used in conjunction with
reverse looking Zone 4 elements. In the Blocking 1 scheme, the current reversal guard signal applies to the
send signal, whereas in the Blocking 2 scheme, the current reversal guard signal applies to the receive
signal.
The signalling channel is keyed from operation of the reverse-looking Zone 4 elements. If the remote zone 2
element picks up, it operates after the trip delay if no block is received. Listed below are some of the main
features and requirements for a Blocking scheme:
● Blocking schemes require only a simplex communication channel.
● Reverse-looking Zone 4 is used to send a blocking signal to the remote end to prevent unwanted
tripping.
● When a simplex channel is used, a blocking scheme can easily be applied to a multi-terminal line
provided that outfeed does not occur for any internal faults.
● The blocking signal is transmitted over a healthy line, and so problems associated with power line
carrier signals failing are avoided.
● Blocking schemes provide similar resistive coverage to the permissive overreach schemes.
● Fast tripping occurs at a strong source line end, for faults along the protected line section, even if
there is weak- or zero- infeed at the other end of the protected line.
● If a line terminal is open, fast tripping still occurs for faults along the whole of the protected line length.
● If the signalling channel fails to send a blocking signal during a fault, fast tripping occurs for faults
along the whole of the protected line, but also for some faults in the next line section.
● If the signalling channel is taken out of service, the protection operates in the conventional basic
mode.
● A current reversal guard timer is included in the logic to prevent unwanted tripping on healthy circuits
during current reversal situations on a parallel circuits.
P54x1Z-TM-EN-1 195
Chapter 7 - Carrier Aided Schemes P54x1Z
Selectable features
E03504
196 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
The Aided 1 Scheme RX signal corresponds to a 'channel-receive' signal for scheme 1. The Aided 1
COS/LGS signal corresponds to a 'channel out of service' or 'loss of guard' signal ('Loss of guard' is the
inverse signal to 'guard received').
As well as the default mapping, it is possible to map the signals to other inputs if required.
The window during which the unblocking logic is enabled starts 10ms after the guard signal is lost and
continues for 150ms. The 10ms delay gives time for the signalling equipment to change frequency.
Note:
If the Zone 1Ext Status setting is set to operate for channel failure, the Zone 1 extension logic will be invoked if a
channel failure is detected.
This scheme type also provides Loss of Guard logic as described below.
Permissive Loss of Permissive Alarm
System condition
channel received guard trip allowed generated
Healthy Line No No No No
Internal Line Fault Yes Yes Yes No
Unblock No Yes Yes, during a 150 ms window Yes, delayed on pickup by 150 ms
Signalling Anomaly Yes No No Yes, delayed on pickup by 150 ms
P54x1Z-TM-EN-1 197
Chapter 7 - Carrier Aided Schemes P54x1Z
Aid 1 Distance
Scheme options *
Zone1 AN Element
&
Zone1 BN Element 1 1 &
1
Zone1 CN Element
Zone1 AB Element
&
Zone1 BC Element 1
Zone1 CA Element 1
&
Zone2 AN Element
&
Zone2 BN Element 1 1
Zone2 CN Element
Zone2 AB Element Signal Send
&
Zone2 BC Element 1 Echo Send
Zone2 CA Element 1
&
Zone4 AN Element 1
& Aided 1 Send
& tRG
Zone4 BN Element 1 1
Zone4 CN Element From Aided 1 DEF
Aided 1 scheme only shown. Note: For the purpose of clarity , this diagram shows
the first relevant stage number for each signal and V03505
setting name.
198 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
&
1 Aid 1 Channel Fail
&
t DR t DW
&
1
&
1 Aided 1 receive
1
& t PR
&
&
Aided 1 COS/LGS
&
Aided 1 Scheme Rx
&
Aided 1 Selection
PUR Unblocking
POR Unblocking 1
Prog. Unblocking V03508
Aid1 InhibitDist
Aid. 1 DeltaTrip
1 1 &
3 Pole & 1 Aided 1 Trip N
1 And 3 Pole From Aided 1 Def Trip A
1 And 3 Pole 1 From Aided 1 Delta Trip A (if applicable )
From Aided 1 Def Trip B
From Aided 1 Delta Trip B (if applicable )
From Aided 1 Def Trip C
Zone2 AB Element From Aided 1 Delta Trip C (if applicable)
&
From Aided 1 Def Trip N
From Aided 1 Delta Trip N (if applicable)
Zone2 BC Element
&
Notes:
Aided 1 scheme only shown .
Zone2 CA Element P445 does not provide an Aided Delta function .
&
V03509
P54x1Z-TM-EN-1 199
Chapter 7 - Carrier Aided Schemes P54x1Z
Aided 1 Selection
PUR
& Aid1 Trip Enable
Aided 1 Receive 100 ms
V03512
200 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
Aided 1 Receive
&
Aid. 1 Selection & Aid1 Trip Enable
POR
Signal Send
Signal Send 1
Signal Send tReversal Guard
Signal Send
Any Trip
&
Trip Inputs 3Ph &
1 Echo Send
Send on Trip
None
Any Trip
& &
Any Trip 1 100ms
Send on Trip
Aided / Z1
&
Aid 1 Distance
Disabled
&
Zone 1 Trip
1
Aid 1 Dist Trip
&
Aid 1 DEF Trip 1
250 ms 100 ms
Aided 1 Receive
&
Aid. 1 Selection
POR
CB Open 3 ph 10 ms
CB Open A ph
CB Open C ph Disabled
& Aid1 WI Trip 3Ph
Blk Send 60 ms
Aided 1 WI V < B
P54x1Z-TM-EN-1 201
Chapter 7 - Carrier Aided Schemes P54x1Z
Aided 1 Send
1
Aided 1 Receive 1 Aid1 Trip Enable
Aided 1 COS/LGS
V03516
tReversal Guard
Aided 1 Send
1
Aided 1 Receive tRGD 1 Aid1 Trip Enable
Aided 1 COS/LGS
V03517
202 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
5.2 IMPLEMENTATION
Aided DEF protection can be used with permissive over-reach schemes or blocking schemes.
The Aided DEF protection is enabled using the Directional E/F setting in the CONFIGURATION column.
This makes the settings in the AIDED DEF column visible.
The Aided DEF requires a polarizing quantity (selected in the DEF Polarizing setting) in conjunction with a
characteristic angle setting (DEF Char. Angle) to make the directional decision.
For all models a signal derived from the phase voltage inputs can be used for polarization. For certain
models with more VT inputs, a directly measured input can be used.
You have a choice between Zero Sequence Polarizing or Negative Sequence Polarizing for the Aided DEF
element. If you choose Zero Sequence Polarization, you have a choice to enable an innovative feature
known as Virtual Current Polarization to enhance the Aided DEF function.
Aided DEF protection is blocked if any of the following conditions are met:
● An Any Trip signal is asserted by one of the integrated protection functions
● The phase selector picks up on more than one phase
● Any of the signals Pole Dead A, Pole Dead B, or Pole Dead C are asserted
Zero Sequence polarization normally uses the measurement of residual voltage (VN). This can only be
achieved if a 5-limb VT or three single-phase VTs are used. A special form of zero sequence polarization
called Virtual Current Polarization is also possible with this device. Virtual Current Polarization allows
directionalisation for low levels of polarization voltage.
P54x1Z-TM-EN-1 203
Chapter 7 - Carrier Aided Schemes P54x1Z
the passage of residual flux and hence allow the device to derive the required residual voltage. A 3-limb VT
has no path for residual flux and is therefore unsuitable for zero-sequence Polarization.
Small levels of residual voltage may be present under normal system conditions due to system imbalances,
VT inaccuracies and device tolerances. You can set a threshold (DEF VNPol Set) to provide stability against
Aided DEF operation under these conditions. Residual voltage (Vres) is nominally 180 out of phase with
residual current so Aided DEF elements are polarized from the -Vres quantity. This 180 phase shift is
automatically compensated in this device.
Directional forward
90° < (angle(VNpol) +180°) - (angle(IN )- RCA) < 90°
Directional reverse
90° > (angle(VNpol) +180° - (angle(IN) - RCA) > 90°
This is represented in the following figure:
204 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
IN angle -RCA
IN
The problems in these applications can be alleviated using negative phase sequence (nps) voltage for
polarization. The nps voltage threshold must be set in the cell DEF V2pol Set.
Note:
The current quantity used for operation of the Aided DEF when it is nps Polarized is the residual current not the nps
current.
Directional forward
-90° < [(angle(V2) +180°) - (angle(I2) - RCA) ] < 90°
P54x1Z-TM-EN-1 205
Chapter 7 - Carrier Aided Schemes P54x1Z
Directional reverse
-90° > [ (angle(V2) +180°) - angle(I2) - RCA) ] > 90°
where RCA is the relay characteristic angle set in the DEF Char. Angle setting.
This is represented in the following figure:
I2 angle -RCA
I2
If Virtual I Pol is set to ‘Disabled’ it prevents checking of the faulted phase and subsequent removal of the
faulted phase voltage. The aided DEF protection is then polarized by the residual voltage only.
For negative sequence polarization, the relay characteristic angle settings (DEF Char. Angle) must be
based on the angle of the upstream negative phase sequence source impedance. A typical setting is -60°.
206 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
The Aided DEF Forward setting determines the current sensitivity (trip sensitivity) of the aided DEF aided
scheme. This setting must be set higher than any standing residual current unbalance. A typical setting will
be between 10% and 20% In.
The Aided DEF Reverse setting determines the current sensitivity for the reverse earth fault. The setting
must always be below the aided DEF forward threshold for correct operation of blocking schemes and to
provide stability for current reversal in parallel line applications. The recommended setting is 2/3 of the Aided
DEF forward setting.
Note:
The Aided DEF Reverse setting has to be above the maximum steady state residual current imbalance.
P54x1Z-TM-EN-1 207
Chapter 7 - Carrier Aided Schemes P54x1Z
DEF Forward
ZL
DEF Forward
CB Open CB Open
CRx CRx
DEF-Reverse CTx CTx DEF-Reverse
LD0V LD0V
DEF-Forward DEF-Forward
Trip Trip
DEF Inst DEF Inst
A B
208 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
The figures below show the element reaches, and the simplified scheme logic of the Aided Directional Earth
Fault (Aided DEF) Blocking scheme.
DEF-Forward
DEF-Reverse
DEF-Forward
DEF-Reverse
CRx CRx
DEF-Reverse Start Start DEF-Reverse
CTx CTx
Stop Stop
DEF-Forward DEF-Forward
E03519
P54x1Z-TM-EN-1 209
Chapter 7 - Carrier Aided Schemes P54x1Z
DEF Reverse
Aid1 Inhibit DEF
TOC Active
Blk Send
Aid1 Custom Send
Aid1 Block Send
Notes:
Aided 1 scheme only shown.
P445 does not provide an Aided Delta function.
V03506
&
1 Aid 1 Channel Fail
&
t DR t DW
&
1
&
1 Aided 1 receive
1
& t PR
&
&
Aided 1 COS/LGS
&
Aided 1 Scheme Rx
&
Aided 1 Selection
PUR Unblocking
POR Unblocking 1
Prog. Unblocking V03508
210 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
P54x1Z-TM-EN-1 211
Chapter 7 - Carrier Aided Schemes P54x1Z
Caution:
Aided Delta should not be used on a communications channel if that channel is being used
to implement an Aided Distance Scheme or an Aided DEF scheme. You should ensure that
the Aided Distance and Aided DEF elements are disabled if you want to apply the Aided Delta
(Directional Comparison Protection).
212 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
R R
Z (T)
CRX CRX
CB CB
OPEN & Signalling Signalling & OPEN
Equipment Equipment
Trip G Trip H
1 1
TZ (T) TZ (T)
END G END H t
Z t Z
0 0
E03520
P54x1Z-TM-EN-1 213
Chapter 7 - Carrier Aided Schemes P54x1Z
R R
Z (T)
CRX CRX
Signalling Signalling
Equipment Equipment
Trip G Trip H
1 1
E03521
214 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
Aided 1 Delta
Enabled
&
1 Aid 1 Channel Fail
&
t DR t DW
&
1
&
1 Aided 1 receive
1
& t PR
&
&
Aided 1 COS/LGS
&
Aided 1 Scheme Rx
&
Aided 1 Selection
PUR Unblocking
POR Unblocking 1
Prog. Unblocking V03508
P54x1Z-TM-EN-1 215
Chapter 7 - Carrier Aided Schemes P54x1Z
&
Delta Dir FWD AN & 1 Aided 1 Trip A
1
&
Delta Dir FWD BN & 1 Aided 1 Trip B
1
&
Delta Dir FWD CN & 1 Aided 1 Trip C
1
Delta Dir FWD AB &
& 1 Aided 1 Trip N
Delta Dir FWD BC 1
From Aided 1 Def Trip A
Delta Dir FWD CA From Aided 1 Distance Trip A
From Aided 1 Def Trip B
From Aided 1 Distance Trip B
Notes: From Aided 1 Def Trip C
Aided 1 scheme only shown. From Aided 1 Distance Trip C
From Aided 1 Def Trip N
V03511 From Aided 1 Distance Trip N
216 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
7 APPLICATION NOTES
The time delay setting (Aided 1 Dist dly, Aided 2 Dist dly) should be set to 0 ms for fast fault clearance.
The time delay setting (Aided 1 Dist dly, Aided 2 Dist dly) should be set to 0 ms for fast fault clearance.
The POR scheme also uses the reverse looking zone 4 IED as a reverse fault detector. This is used in the
current reversal logic and in the optional weak infeed echo feature.
Weak Infeed
Where weak infeed tripping is employed, a typical voltage setting is 70% of rated phase-neutral voltage.
Weak infeed tripping is time delayed according to the WI Trip Delay value, usually set at 60ms.
To allow time for a blocking signal to arrive, a short time delay must be allowed before tripping (Aided 1 Dist
dly, Aided 2 Dist dly). The recommended delay is as follows:
● Recommended setting = Maximum signalling channel operating time + one power frequency cycle.
Note:
Two variants of a Blocking scheme are provided, Blocking 1 and Blocking 2. Both schemes operate similarly, except
that the reversal guard timer location in the logic changes. Blocking 2 may sometimes allow faster unblocking when a
fault evolves from external to internal, and hence a faster trip.
P54x1Z-TM-EN-1 217
Chapter 7 - Carrier Aided Schemes P54x1Z
To allow time for a blocking signal to arrive, a short time delay on aided tripping must be used. The
recommended delay time setting (Aided 1 DEF dly, Aided 2 DEF dly) is the maximum signalling channel
operating time +20ms.
The time delay (Aided 1 Delta dly, Aided 2 Delta dly)should be set to 0 ms for fast fault clearance.
218 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
Recommended delay setting (Aided1 Delta dly, Aided2 Delta dly): Maximum signalling channel operating
time + 6ms.
A Ia B
Ib
Zat
Zbt
Ic
Zct
P54x1Z-TM-EN-1 219
Chapter 7 - Carrier Aided Schemes P54x1Z
Changing the reach requirements to match the infeed expectations is possible using the alternative setting
group feature. Tailoring setting group contents to the different conditions, coupled with appropriate setting
group switching, enables the changing reach requirements to be met.
Carrier aided schemes can also be used in conjunction with distance elements to protect teed feeders.
Although Permissive Overreaching and Permissive Underreaching schemes may be used, they suffer some
limitations. Blocking schemes are generally considered to be the most suitable.
220 P54x1Z-TM-EN-1
P54x1Z Chapter 7 - Carrier Aided Schemes
(i) A B
(ii) A C
Z1A Z1B
(iii) A C B
No infeed
Figure 108: Problematic Fault Scenarios for PUR Scheme Application to Teed Feeders
● Scenario (i) shows a short tee connected to one nearby terminal and one distant terminal. In this case,
Zone 1 elements set to 80% of the shortest connected feeder length don’t all overlap, resulting in a
section not covered by any Zone 1 element. Any fault in this section would rely on delayed Zone 2
tripping.
● Scenario (ii) shows an example where terminal C has no infeed. Distance elements at C may not
operate for faults close to the terminal. As the fault is outside the Zone 1 reaches of A and B,
clearance will rely on delayed Zone 2 tripping at A and B.
● Scenario (iii) shows an example where outfeed from terminal C feeds an internal fault via terminal B.
In this case, terminal C will not see the fault until the breaker at B has operated. The result would be
sequential (and hence delayed) tripping.
Note:
Triangulated simplex channels could be used in place of a common simplex one if prefered.
P54x1Z-TM-EN-1 221
Chapter 7 - Carrier Aided Schemes P54x1Z
222 P54x1Z-TM-EN-1
NON-AIDED SCHEMES
CHAPTER 8
Chapter 8 - Non-Aided Schemes P54x1Z
224 P54x1Z-TM-EN-1
P54x1Z Chapter 8 - Non-Aided Schemes
1 CHAPTER OVERVIEW
This chapter describes the distance schemes that do not require communication between the ends (Non-
Aided Schemes).
This chapter contains the following sections:
Chapter Overview 225
Non-Aided Schemes 226
Basic Schemes 227
Trip On Close Schemes 232
Zone1 Extension Scheme 237
Loss of Load Scheme 239
P54x1Z-TM-EN-1 225
Chapter 8 - Non-Aided Schemes P54x1Z
2 NON-AIDED SCHEMES
This product provides Distance protection. The Distance protection has been designed for use as a
standalone non-unit protection, or for use with communications systems to provide unit protection (Carrier
Aided schemes).
Standalone operation provides basic scheme Distance protection (e.g. instantaneous Zone 1 operation,
delayed Zone 2 protection and further delayed Back-up protection, etc.). It also implements some special
standalone schemes that don’t require communications. These are known as Non-Aided Distance Schemes.
The non-aided schemes provided in this product can be divided into the following categories:
● Basic schemes
● Trip On Close schemes
● Zone 1 Extension scheme
● Loss of Load scheme
The settings for these Non-Aided Distance Schemes are located in the SCHEME LOGIC column.
226 P54x1Z-TM-EN-1
P54x1Z Chapter 8 - Non-Aided Schemes
3 BASIC SCHEMES
Basic Scheme operation is always executed if distance elements are enabled. It is the process by which the
measured line impedance is compared against the Distance measuring zone configuration (reach settings
and timers). Instantaneous or time delayed tripping or blocking signals may be issued for a specific zone
according to its settings and the measured impedance values.
There are five basic scheme zones; Zone 1, Zone 2, Zone 3, Zone 4 and Zone P
The Basic Scheme settings include:
● A mode setting, which is common to all zones
● Zone Tripping settings for each zone
● Zone phase delay settings for each zone
● Zone ground delay settings for each zone
On a per-zone basis, phase and earth-fault elements may be set to have different time delays.
To supplement Basic Scheme operation, there are also standalone scheme designs (Non-Aided Distance
Schemes) that provide timely clearance for particular fault scenarios where carrier aided signalling is either
not available, or is unnecessary. These scenarios cover Trip on Closure (including Switch On to Fault, and
Trip on Reclose), Loss of Load, and Zone1 Extension.
The Basic Scheme is continually executed, regardless of any carrier-aided acceleration schemes which may
be enabled.
P54x1Z-TM-EN-1 227
Chapter 8 - Non-Aided Schemes P54x1Z
Note: The logic circuits for Zone 2 to Zone P follow the same principles as Zone 1 V02738-1
228 P54x1Z-TM-EN-1
P54x1Z Chapter 8 - Non-Aided Schemes
Zone1 AN Element
&
1
1 Zone 1 Trip
Zone1 BN Element
& & Zone 1 A Trip
1
Zone1 CN Element
& & Zone 1 B Trip
Block Zone 1 Gnd
Enabled
1 Zone 1 Start B
Zone1 AB Element &
1 Zone 1 Start C
Zone1 BC Element &
1 Zone 1 Start N
Zone1 CA Element &
Block Zone 1 Phs Note: This diagram shows Zone 1 only. The other zones follow the same principles V02737
P54x1Z-TM-EN-1 229
Chapter 8 - Non-Aided Schemes P54x1Z
Zone1 CN Element
&
& 1 Zone 1 C Trip
Block Zone 1 Gnd
1 Zone 1 N Trip
tZ1 Ph. Delay
&
&
&
Zone1 CA Element
& 1 Zone 1 Start N
Block Zone 1 Phs
Note: This diagram shows Zone 1 only. The other zones follow the same principles V02738-2
230 P54x1Z-TM-EN-1
P54x1Z Chapter 8 - Non-Aided Schemes
Programmable Scheme Logic) may be used to block zones that may be at risk of tripping on inrush current.
Settings for the inrush detector are found in the SUPERVISION column.
The figure below shows the typical application of the Basic scheme.
E02749
P54x1Z-TM-EN-1 231
Chapter 8 - Non-Aided Schemes P54x1Z
SOTF provides instantaneous operation of selected elements if a fault is present when manual closure of the
circuit breaker is performed.
TOR provides instantaneous operation of selected elements if a persistent fault is present when the circuit
breaker attempts autoreclosure
The SOTF and TOR functions are known as Trip on Close logic. Both methods operate in parallel if mapped
to the SOTF and TOR Tripping matrix in the setting file.
The settings for Switch on to Fault (SOTF) and Trip on Reclose (TOR) are located in the TRIP ON CLOSE
section of the SCHEME LOGIC column.
SOTF and TOR are complemented by Current No Voltage level detectors (also known as CNV level
detectors). These CNV level detectors are set using the voltage and current settings located in the CB FAIL
& P.DEAD column. The same settings are used for pole dead logic detection. A 20ms time delay in the logic
avoids a possible race between very fast overvoltage and undercurrent level detectors.
The following figures show the Trip On Close function in relation to the Distance zones and the Trip On Close
function when driven by Current No Volt level detectors.
TOR Status
Enabled
SOTF Pulse
SOTF Status
Enabled PoleDead 1
En Pdead + Pulse
Enabled ExtPulse 1
&
Set SOTF
V02742
232 P54x1Z-TM-EN-1
P54x1Z Chapter 8 - Non-Aided Schemes
Fast OV PHA
&
IA < Start
Fast OV PHB 20 ms
& 1 CNV ACTIVE
IB < Start 0
Fast OV PHC
&
IC< Start
TOR Tripping
CNV
TOR Active
SOTF Tripping
CNV
SOTF Active
V02743
P54x1Z-TM-EN-1 233
Chapter 8 - Non-Aided Schemes P54x1Z
SOTF Tripping
Zone 1
& SOTF Trip Zone 1
SOTF Active
Zone1 AN Element
Zone1 BN Element Note: This diagram shows Zone 1 only. The other zones follow the
Zone1 CN Element same principles
1
Zone1 AB Element
Zone1 BC Element
Zone1 CA Element V02756
Fast OV PHA
&
IA < Start
Fast OV PHB 20 ms
& 1 CNV ACTIVE
IB < Start 0
Fast OV PHC
&
IC< Start & SOTF Trip CNV
SOTF Active
SOTF Tripping
CNV V02758
234 P54x1Z-TM-EN-1
P54x1Z Chapter 8 - Non-Aided Schemes
The SOTF and TOR features stay in service for the duration of the TOC Reset Delay time, once the circuit is
energised. The delay timer starts on CB closure and is common for SOTF and TOR protection. Once this
timer expires after successful closure, all protection reverts to normal.
A user settable time delay (TOC Delay) starts when the CB opens, after which TOR is enabled. The time
delay must not exceed the minimum Dead Time setting of the auto-reclose because both times start
simultaneously and TOR protection must be ready by the time the CB closes on potentially persistent faults.
While the Trip on Reclose Mode is active, the protection trips instantaneously for pick up of any selected
Distance zone. You select the zone with the TOR Tripping setting. For example, Zone 2 could operate
without waiting for the usual time delay if a fault is in Zone 2 on CB closure. Also Current No Volts can be
mapped for fast fault clearance on line reclosure on a permanent fault. To operate for faults on the entire
circuit length, at least Zone 1 and Zone 2 should be selected. If no elements are selected, the normal time
delayed elements and aided scheme provide the protection. TOR tripping is three-phase and auto-reclose is
blocked.
TOR Tripping
Zone 1
& TOR Trip Zone 1
TOR Active
Zone1 AN Element
Zone1 BN Element
Zone1 CN Element Note: This diagram shows Zone 1 only. The other zones follow the
1
Zone1 AB Element same principles
Zone1 BC Element
Zone1 CA Element V02755
Fast OV PHA
&
IA < Start
Fast OV PHB 20 ms
& 1 CNV ACTIVE
IB < Start 0
Fast OV PHC
&
IC< Start & TOR Trip CNV
TOR Active
TOR Tripping
CNV V02757
P54x1Z-TM-EN-1 235
Chapter 8 - Non-Aided Schemes P54x1Z
236 P54x1Z-TM-EN-1
P54x1Z Chapter 8 - Non-Aided Schemes
E02739
P54x1Z-TM-EN-1 237
Chapter 8 - Non-Aided Schemes P54x1Z
&
&
Aid 1 Chan Fail
1
Aid 2 Chan Fail V02754
238 P54x1Z-TM-EN-1
P54x1Z Chapter 8 - Non-Aided Schemes
Zone 2 IED1
Zone 1 IED 1
Zone 1 IED 2
Zone 2 IED 2
IED 1 IED 2
V02740
P54x1Z-TM-EN-1 239
Chapter 8 - Non-Aided Schemes P54x1Z
Note:
Loss of load tripping is only available where three pole tripping is used.
Note:
Assertion of the Any Trip DDB signal or the LOL Inhibit DDB signal will prevent LOL tripping.
LOL Scheme
Enabled
En. On Ch 1 Fail 1
&
En. On Ch 2 Fail
En. All Ch Fail
En. Any Ch Fail &
&
&
Aid 1 Chan Fail
1
Aid 2 Chan Fail
Tripping Mode
3 Pole
1 18 ms
Inhibit LoL & SD
Q Loss ofLoad Trip
R
Any trip
LOL Window
I> LoL A
I> LoL B &
tLOL
I> LoL C
&
Zone2 AN Element
&
Zone2 BN Element
&
Zone2 CN Element
1
&
Zone2 AB Element
&
Zone2 BC Element
&
Zone2 CA Element V02741
240 P54x1Z-TM-EN-1
POWER SWING FUNCTIONS
CHAPTER 9
Chapter 9 - Power Swing Functions P54x1Z
242 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
1 CHAPTER OVERVIEW
This chapter describes special blocking and protection functions, which use Power swing Analysis.
This chapter contains the following sections:
Chapter Overview 243
Introduction to Power Swing Blocking 244
Power Swing Blocking 247
Out of Step Protection 258
P54x1Z-TM-EN-1 243
Chapter 9 - Power Swing Functions P54x1Z
Note:
Power swings do not involve earth, so only phase-phase impedances are affected.
For stable power swings, distance protection should not trip. To prevent this, a Power Swing Blocking (PSB)
function is usually provided to compliment Distance protection.
For unstable power swings, there may be a strategy for instigating a controlled system split. In this case,
distance protection should not trip during loss of stability. If unstable power swings or Pole-Slipping
conditions might be expected, certain points on the network may be designated as split points, where the
network should be split if unstable (or potentially unstable) conditions occur. Strategic splitting of the system
can be achieved by means of dedicated Out-of-Step Tripping protection (OOS or OST protection), or it may
be possible to achieve splitting by strategically limiting the duration for which the operation a specific
distance protection is blocked during power swing conditions.
A method often used to help understand power system stability and Pole Slipping is called Equal Area
Criterion. This is based on a number of operational curves as outlined in the figure below:
244 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
Power
Curve 1
Area 2
F Area 1
A E G
Out of step
D
Curve 2 Curve 3
C
B
Figure 123: Power transfer related to angular difference between two generation sources
The figure describes the behaviour of a power system with parallel lines connecting two sources of
generation.
● Curve 1 represents pre-fault system operation through parallel lines where the transmitted power is
Po.
● Curve 2 represents transmitted power during a phase-phase-earth fault.
● Curve 3 represents a new power curve when the faulted line is tripped.
At fault inception, the operating point A moves to B, which is a reduced power transfer level. There is,
therefore, a surplus of power (A to B) at that sending end and a corresponding deficit of power at the
receiving end. The sending end generators start to speed up, and the receiving end generators start to slow
down, so the phase angle θ increases, and the operating point moves along curve 2 until the fault is cleared
(point C). At this point, the phase angle is θ1. The operating point now moves to point D on curve 3 which
represents the power transfer curve when just one line is in service. There is still a power surplus at the
sending end and a deficit at the receiving end, so the generators continue to lose synchronism and the
operating point moves further along curve 3.
If, at some point between E and G (point F) the generators are rotating at the same speed, the phase angle
will stop increasing. According to the Equal Area Criterion, this occurs when Area 2 is equal to Area 1. The
sending end will now start to slow down and receiving end to speed up. Therefore, the phase angle starts to
decrease and the operating point moves back towards E. As the operating point passes E, the net sending
end deficit again becomes a surplus and the receiving end surplus becomes a deficit, so the sending end
generators begin to speed up and the receiving end generators begin to slow down. With no losses, the
system operating point will oscillate around point E on curve 3, but in practise the oscillation is damped, and
the system eventually settles at operating point E.
So, if Area 1 is less than Area 2, the system will oscillate but will stay in synchronism. This swing is usually
called a recoverable, or stable, power swing. If, on the contrary, the system passes point G with a further
increase in angle difference between sending and receiving ends, the system loses synchronism and
becomes unstable. This will happen if the initial power transfer Po is so high that the Area 1 is greater than
Area 2. This power swing is not recoverable and is usually called an Out-of-Step condition or a Pole Slip
P54x1Z-TM-EN-1 245
Chapter 9 - Power Swing Functions P54x1Z
condition. In such a case, only system separation and subsequent re-synchronising of the generators can
restore normal system operation.
The point G is shown at approximately 120°, but this can vary. If, for example, the pre-fault transmitted power
(Po) was high and the fault clearance was slow, Area 1 would be greater. For the system to recover from this
case, the angle θ would be closer to 90º. Similarly, if the pre-fault transmitted power Po was low and fault
clearance fast, Area 1 would be small, and the angle θ could go closer to 180º with the system remaining
stable.
246 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
P54x1Z-TM-EN-1 247
Chapter 9 - Power Swing Functions P54x1Z
zone using the zone specific settings. For example the zone 1 setting is Zone 1 Ph. PSB. The available
options are Blocking, Allow Trip, or Delayed Unblock.
Start of
power swing End of
power swing
i (t)
3 cycles
PH1
PH2
t1 t2 t3
t 2: Threshold 2 invoked. PH2 goes low on account of threshold being increased . PH1 remains high,
because there continues to be a D i
t 3: PH1 goes low as power swing has diminished and D i goes below threshold 1
V02769
248 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
i (t)
PH1
PH2
t1 t2 t3
t2: Fault current value appears in 2 cycle buffer . This equals present fault current value so D i is reduced to
zero. PH1 therefore goes low. PH2 remains high because value in PH 2 memory is a stored value .
t3: Fault is cleared so PH 2 goes low. PH1 stays low even though there is a new D I, because the absolute
current value is also taken into consideration .
V02770
P54x1Z-TM-EN-1 249
Chapter 9 - Power Swing Functions P54x1Z
Start of
power swing
i (t)
3 cycles
PH1
PH2
t1 t2 t3 t4 t5
t2: Threshold 2 invoked (10%In). PH2 goes low on account of threshold being increased (from 5%IN to 10%In).
PH1 remains high, because there continues to be a D i
Figure 126: Phase selector timing for fault during a power swing
Note:
If the Slow Swing feature is not Enabled, very slow power swings (< 0.5 Hz) may not be detected.
The Slow Swing method is based on changing impedance measurements and uses a pair of configurable
concentric quadrilateral zones on the impedance plane (Zone 7 and Zone 8). Since power swings don’t
involve earth, the impedance measurements are based on positive sequence quantities and only phase-
phase measurements are necessary. The characteristic is shown in the following figure:
250 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
+jX
PSB Z8 Zone 8
PSB Z7 Zone 7
Dt
ZL
Z1 = V1/I1
PSB Z7'
PSB Z8'
V02744
P54x1Z-TM-EN-1 251
Chapter 9 - Power Swing Functions P54x1Z
You also need to configure the impedance phase angle a. This is the same for zone 7 and zone 8. To do this
you need to set Alpha between 20° and 90°.
The PSB timer setting defines the minimum time that the impedance trajectory must take to cross through
zone 8 into zone 7 (Dt) before a power swing is deemed to have taken place. A power swing is indicated if
Dt > PSB Timer.
252 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
Blocking: Prevents tripping for that element, even if a power swing locus enters the element’s
characteristic.
Delayed Unblock: This maintains the block for a set duration after a power swing has been detected. To
use it, you must set PSB Unblocking to Enabled, and then set the desired PSB Unblock dly time for
removing the block.
Note:
The PSB Unblock dly timer is common to all elements.
The PSB Unblock dly is used to time the duration for which the swing is present. The intention is to allow
the distinction between a stable and an unstable swing. If after the timeout period the swing has still not
stabilised, the block for selected zones can be released (unblocking), giving the opportunity to split the
system. If no unblocking is required, set to maximum (10 s).
There is a further timer associated with the PSB function. This is the PSB Reset Delay timer. This timer is
provided to maintain the power swing detection for a period after the superimposed current detection (ΔI)
has reset. ΔI naturally tends to zero twice during each power swing cycle (around the current maxima and
minima in the swing element). A short time delay ensures continued PSB pick-up during these ΔI minima.
The PSB Reset Delay is used to maintain the PSB status when DI naturally is low during the swing cycle
(near the current maxima and minima in the swing envelope). A typical setting of 0.2s is used to seal-in the
detection until DI has chance to appear again.
The WI Trip PSB setting determines what will happen if a power swing is detected whilst the Weak Infeed
(WI) tripping feature is being used and the WI condition is present for longer than the WI Trip Delay time. If
Blocking is selected, the WI Trip operation will be disabled for the duration of the swing. If Unblocking is
chosen, the WI Trip element block will be removed after drop off timer PSB Unblock dly has expired, even if
the swing is still present. This allows system separation when swings fail to stabilise. In Allow trip mode,
the WI Trip element is unaffected by power swing detection.
P54x1Z-TM-EN-1 253
Chapter 9 - Power Swing Functions P54x1Z
Power Swing
Blocking
t
1 & Block selected element
0 &
Fault detection
during power swing
PSB Fault
Ph2
Power Swing
PSB Unblock Dly
PSB Unblocking
Enabled
PSB Z7
PSB Z8
Slow PSB
PSB Z7' Detector
PSB Z8' Module
Quad
PSB R7 characteristic
definition
PSB R8
PSB R7'
PSB R8'
Alpha
V02745
Note:
This is a simplified representation to highlight the outputs of the Power Swing Blocking function.
254 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
To configure the slow power swing function you need to set the resistive and reactive limits of the Zone 7 and
Zone 8 quadrilaterals. You also need to set the PSB Timer which defines the critical time period of the
transition between the two zones and which is characteristic of the slow swing.
Whichever power swing detector is responsible for applying PSB, the removal of PSB is defined by two
settings – the PSB Reset Delay and (if an unblocking philosophy is employed) the PSB Unblock dly.
Zone 7
Maximum Load
½ Rx Ph. Resistive
V02750
P54x1Z-TM-EN-1 255
Chapter 9 - Power Swing Functions P54x1Z
The angle Alpha should be set equal to the angle of the total impedance ZT:
a = ÐZT
+jX
Zone 8
Zone 7
ZR
ZL α = ÐZ T
ZT
Resistive reverse (R’) Resistive forward (+R)
ZS
V02751
(θ1 − θ 2 ) ⋅ f nom
∆t =
f PS
where
● angles q1 and q2 are defined in the following figure
● fnom is the nominal frequency
● fPS is the maximum Power Swing frequency to be taken into account
Since any power swing with fPS >= 0.5Hz can be detected by the setting-free delta current algorithm, only
power swings with fPS < 0.5Hz Hz need to be considered for Slow Power Swing detection. We
recommended setting fPS to 1Hz because this value provides sufficient security margin.
256 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
ZR Zone 7 Zone 8
ZL
ZT
2 q1
q2
ZT
ZS
V02752
P54x1Z-TM-EN-1 257
Chapter 9 - Power Swing Functions P54x1Z
258 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
+jX
OST Z6 Zone 6
OST Z5 Zone 5
OST Z5'
OST Z6'
V02760
P54x1Z-TM-EN-1 259
Chapter 9 - Power Swing Functions P54x1Z
timer is started. The timer is stopped after the positive sequence impedance passes through the inner
quadrilateral (zone 5). Let us call this time the zone 6 to zone 5 transition time.
If this time is less than 25 ms, the protection considers this to be a power system fault, not an Out-of-Step
condition. This 25 ms time is fixed and cannot be set. During a power system fault, the speed of change from
a load impedance to a fault impedance is fast, but the protection may operate slower for marginal faults
close to a zone boundary. This is particularly the case for high resistive faults inside the zone operating
characteristic and close to the Zone 5 boundary. The fixed time of 25 ms is implemented to provide sufficient
time for a distance element to operate and therefore to distinguish between a fault and an extremely fast
power swing.
If the zone 6 to zone 5 transition time takes more than 25 ms but less than the set delta T time, this is
treated as a very fast power swing and the protection will trip if either the Pred. OST Trip or the Pred. &
OST Trip options are selected and the Out-of-Step tripping time delay (Tost) has expired. The minimum
delta T setting is 30 ms, allowing 5 ms margin with the fixed 25 ms timer.
If the zone 6 to zone 5 transition time takes longer than the set delta T time, it is considered as a slow power
swing. On entering Zone 5, the protection records the polarity of the resistive part of the positive sequence
impedance. From this state, two outcomes are possible:
● If the resistive part of the positive sequence impedance leaves Zone 5 with the same polarity as
previously recorded on entering Zone 5, it is considered to be a recoverable swing. In this case, the
protection does not trip.
● If, when exiting Zone 5, the resistive part of the positive sequence impedance has the opposite polarity
to that of the recorded polarity on entering Zone 5, an Out-of-Step condition is recognised. This is
followed by tripping if either Pred. OST Trip or Pred. & OST Trip is selected.
As the tripping mode for the detected Out-of-Step condition is always three-phase, the Pred. OST and OST
DDB signals are mapped to the three-phase tripping signal in the default programmable scheme logic.
The Out-of-Step tripping time delay (Tost), delays the OST tripping command until the angle between
internal voltages between the two ends are at 240 degrees closing towards 360 degrees. This limits the
voltage stress across the circuit breaker. If a fault occurs during the swing condition, the Out-of-Step tripping
function is blocked.
The Out-of-Step algorithm is completely independent from the distance elements and the power swing
detection function. The load blinder does not affect the OST characteristics. In common with other similar
functions, a minimum positive sequence current of 5%In is needed for Out-of-Step operation.
260 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
Setting OST Trip is the most commonly used approach when this protection is applied. OST Trip should
be used when Out-of-Step conditions are probable. If Out-of-Step conditions are detected, the OST
command will be issued to split the system at the pre-determined points. A disadvantage of the OST Trip
option compared with the ‘Predictive’ options is that tripping will take a little longer so that the power
oscillations may escalate further after separation and the split parts may become separately unstable. An
advantage, however, is that the decision to split the system will always be valid even if the accurate system
data and setting parameters cannot be obtained.
The predictive setting options Pred. OST Trip and Pred. & OST Trip are recommended for systems
where Out-of-Step conditions could possibly occur, and where an early system split should minimise the
phase shift between generation sources. This should maximise the chances for the separated parts of the
P54x1Z-TM-EN-1 261
Chapter 9 - Power Swing Functions P54x1Z
system to stabilise as quickly as possible. Special care must be taken when these settings are used to
ensure that the circuit breakers at the different terminals do not open when the voltages at different ends are
in anti-phase. This is because most circuit breakers are not designed to break current at double the nominal
voltage. Attempting to break the current at double the nominal voltage could lead to flash-over and circuit
breaker damage.
‘Predictive’ settings are designed to detect and trip for fast power oscillations. When predictive tripping is
used with a circuit breaker capable of operating in typically two-cycles, the two voltages angles may rapidly
move in opposite directions at the time of opening the circuit breaker. So, if you use the predictive settings
you need to apply settings that will ensure that the circuit breaker opening occurs well before the phase
difference between the different terminals approaches 180º. This means that accurate settings can only be
determined by exhaustive system studies.
The setting Pred. & OST Trip provides two stages of OST. If a power system oscillation is very fast, the
combination of ∆R (the difference between the Zone 5 and Zone 6 resistive reaches), and the Delta T
settings, must be set so that Pred. OST Trip operates. If the oscillation is slower, the condition for the
predictive OST is not met and so tripping is dictated by the OST condition being met. For the OST condition
to be met, the resistive component of the impedance must leave Zone 5 with opposite polarity compared with
when it entered. If the polarity is opposite when Zone 5 resets, OST will trip. If the polarity is the same when
Zone 5 resets, OST will not trip. This distinguishes between a slower non-recoverable oscillation and
recoverable swings.
You should disable OST for applications on lines where unrecoverable power oscillations are not expected,
or not expected to be severe. This is likely to apply to strong interconnected systems operating with three-
phase tripping.
+jX
OST Z6 Zone 6
OST Z5 Zone 5
OST Z5'
OST Z6'
V02763
Figure 134: OST setting determination for the positive sequence resistive component OST R5
262 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
ZT is the total system positive sequence impedance equal to ZS + ZL + ZR, where ZS and ZR are the
equivalent positive sequence impedances at the sending and receiving ends and ZL is the positive sequence
line impedance.
θ is the angular difference between the voltages at the sending and receiving ends beyond which no system
recovery is possible.
To determine the settings for OST, the minimum inner resistive reach of OST R5 (R5min) needs to be
calculated.
The figure above shows that:
R5min = (ZT/2) / tan(θ/2
Next the maximum (limit value) for the outer resistive reach OST R6 (R6 max) needs to be calculated.
Referring to the figure below, point A must not overlap with the load area for the worst assumed power factor
of 0.85 and the lowest possible ZT angle α.
+jX
OST Z6 Zone 6
ZT LOAD
OST Z6'
V02764
P54x1Z-TM-EN-1 263
Chapter 9 - Power Swing Functions P54x1Z
Note:
The R6max reach must be greater than the maximum resistive reach of any distance zone to ensure correct initiation
of the 25 ms and Delta T timers. However, the R5min reach could be set below the distance maximum resistive reach
(inside the distance characteristic) if an extensive resistive coverage is required, meaning that Out-of-Step protection
does not pose a restriction to the quadrilateral applications.
For each zone, we receommend setting the positive and negative limits to be the same so, OST R5’ = OST
R5, OST Z5’ = OST Z5, OST R6’ = OST R6, and OST Z6’ = OST Z6.
Note:
You cannot assume that the rate-of-change of positive sequence impedance while crossing the OST R6 – OST R5
region is the same as the average rate-of-change of positive sequence impedance for the whole swing cycle. A false
assumumption could lead to incorrect predictive OST operation.
Note:
For a fault, the OST R6 – OST R5 region will be crossed faster than 25ms, therefore even very fast oscillations up to
7Hz will not be mistaken as a fault condition and predictive OST will not operate.
264 P54x1Z-TM-EN-1
P54x1Z Chapter 9 - Power Swing Functions
OST setting
For the OST Trip setting option, such a precise setting of the blinders and Delta T is not necessary. This is
because for a wide ∆R region and a short Delta T setting, any oscillation will be successfully detected.
However, the fault impedance must pass through the ∆R region faster than the Delta T setting.
Therefore, for the OST Trip setting, assume that θ = 120° and set:
● OST R5 = OST R5’ = R5min = ZT/3.46
● OST R6 = OST R6’ = R6max
● Delta T = 30 ms
Delta T always expires. Therefore, the setting value given above will secure the detection of a wide range of
oscillations, starting from very slow oscillations (caused by recoverable swings) up to a fastest oscillation
limit of 7Hz. Note that any fault impedance will pass the OST R6 – OST R5 region faster than the minimum
settable Delta T time of 30ms.
P54x1Z-TM-EN-1 265
Chapter 9 - Power Swing Functions P54x1Z
+jX
OST Z6 Zone 6
OST Z5 Zone 5
DR
OST trip
MOVs operation
ZL
OST R6' OST R5'
Resistive reverse (R’) OST R5 OST R6
Resistive forward (+R)
OST Z5'
OST Z6'
V02765
Note:
If the OST Trip setting is chosen, the timer when triggered, will eventually expire as the power oscillations progress,
therefore the MOV operation will not have any impact on Out-of-Step operation.
266 P54x1Z-TM-EN-1
AUTORECLOSE
CHAPTER 10
Chapter 10 - Autoreclose P54x1Z
268 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
1 CHAPTER OVERVIEW
Selected models of this product provide sophisticated Autoreclose (AR) functionality. The purpose of this
chapter is to describe the operation of this functionality including the principles, logic diagrams and
applications.
This chapter contains the following sections:
Chapter Overview 269
Introduction to Autoreclose 270
Autoreclose Implementation 271
Autoreclose System Map 276
Logic Modules 291
Setting Guidelines 324
P54x1Z-TM-EN-1 269
Chapter 10 - Autoreclose P54x1Z
2 INTRODUCTION TO AUTORECLOSE
Approximately 80 - 90% of faults on transmission lines and distribution feeders are transient in nature. This
means that most faults do not last long, and are self-clearing if isolated. A common example of a transient
fault is an insulator flashover, which may be caused, for example, by lightning, clashing conductors, or wind-
blown debris. Protection functions detecting the flashover will cause one or more circuit breakers to trip and
may also remove the fault. If the source is removed, the fault does not recur if the line is re-energised.
The remaining 10 – 20% of faults are either semi-permanent or permanent. A small tree branch falling onto
the line for example, could cause a semi-permanent fault. Here the cause of the fault would not be removed
by immediate tripping of the circuit, but could possibly be burnt away during a time-delayed trip. Permanent
faults could be broken conductors, transformer faults, cable faults or machine faults, which must be located
and repaired before the power supply can be restored. In many fault incidents, if the faulty line is immediately
tripped out, and time is allowed for the fault arc to de-ionise, reclosing the circuit breakers will result in the
line being successfully re-energised.
Autoreclose schemes are used to automatically reclose a circuit breaker a set time after it has been opened
due to operation of a protection element. On EHV transmission networks, Autoreclose is usually
characterised by high-speed single-phase operation for the first attempt at reclosure. This is intended to help
maintain system stability during a transient fault condition. On HV/MV distribution networks, Autoreclose is
applied mainly to radial feeders, where system stability problems do not generally arise, and is generally
characterised by delayed three-phase operation with potentially multiple reclosure attempts.
Autoreclosing provides an important benefit on circuits using time-graded protection, in that it allows the use
of instantaneous protection to provide a high speed first trip. With fast tripping, the duration of the power arc
resulting from an overhead line fault is reduced to a minimum. This lessens the chance of damage to the
line, which might otherwise cause a transient fault to develop into a permanent fault. Using instantaneous
protection also prevents blowing of fuses in teed feeders, as well as reducing circuit breaker maintenance by
eliminating pre-arc heating. When instantaneous protection is used with Autoreclose, the scheme is normally
arranged to block the instantaneous protection after the first trip. Therefore, if the fault persists after re-
closure, the time-graded protection will provide discriminative tripping resulting in the isolation of the faulted
section. However, for certain applications, where the majority of the faults are likely to be transient, it is
common practise to allow more than one instantaneous trip before the instantaneous protection is blocked.
Some schemes allow a number of re-closures and time-graded trips after the first instantaneous trip, which
may result in the burning out and clearance of semi-permanent faults. Such a scheme may also be used to
allow fuses to operate in teed feeders where the fault current is low.
When considering feeders that are partly overhead line and partly underground cable, any decision to install
Autoreclose should be subject to analysis of the data (knowledge of the frequency of transient faults). This is
because this type of arrangement probably has a greater proportion of semi-permanent and permanent
faults than for purely overhead feeders. In this case, the advantages of Autoreclose are small. It can even be
disadvantageous because re-closing on to a faulty cable is likely to exacerbate the damage.
270 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
3 AUTORECLOSE IMPLEMENTATION
Before describing this function it is first necessary to understand the following terminology:
● A Shot is an attempt to close a circuit breaker using the Autoreclose function.
● Multi-shot is where more than one Shot is attempted.
● Single-shot is where only one Shot is attempted.
● Dead Time denotes the time between initiation of the Autoreclose operation and the attempt to close
the circuit breaker.
● Reclaim time is the time following the initiation of the circuit breaker closing and the resetting of the
Autoreclose scheme should the Autoreclose attempt be successful and the protection does not detect
a subsequent fault condition.
● High-speed Autoreclose is generally regarded as an Autoreclose application where the Dead Time
is less than 1 second.
● Delayed Autoreclose is generally regarded as an Autoreclose application where the Dead Time is
greater than 1 second.
This product features a multiple-shot Autoreclose function, which is suitable for both High-speed Autoreclose
and Delayed Autoreclose.
The Autoreclose function can be set to perform a single-shot, two-shot, three-shot or four-shot cycle. Dead
Times for all shots can be adjusted independently.
If a circuit breaker closes successfully at the end of the Dead Time, a Reclaim Time starts. If the circuit
breaker does not trip again, the Autoreclose function resets at the end of the Reclaim Time. If the protection
trips again during the Reclaim Time, the sequence advances to the next shot in the programmed cycle. If all
programmed reclose attempts have been made and the circuit breaker does not remain closed, the
Autoreclose function goes into Lockout, whereupon manual intervention is required.
An Autoreclose cycle can be initiated by operation of an internal or external protection element provided it is
mapped correctly, and that the circuit breaker is closed when the protection operates.
You can choose to initiate the Dead Time on:
● Protection operation
● A protection reset
● A Line Dead condition
● Circuit breaker operation
At the end of the relevant Dead Time, provided system conditions are suitable, a circuit breaker close signal
is given. The system conditions to be met for closing are that:
● the system voltages are in synchronism
● or that the dead line/live bus or live line/dead bus conditions exist as indicated by the internal system
check synchronising element
● and that the circuit breaker closing spring, or other energy source, is fully charged as indicated by the
circuit breaker healthy input.
The circuit breaker close signal is removed when the circuit breaker closes.
If the protection trips and the circuit breaker opens during the Reclaim Time, the Autoreclose function either
advances to the next shot in the programmed cycle, or if all programmed reclose attempts have been made,
goes into Lockout. Each time a closure is attempted, a sequence counter is incremented by 1 and the
Reclaim Time starts again.
Autoreclose is configured in the AUTORECLOSE column of the relevant settings group. The function is
disabled by default. If you wish to use it you must enable it first in the CONFIGURATION column.
P54x1Z-TM-EN-1 271
Chapter 10 - Autoreclose P54x1Z
The Autoreclose function is a logic controller implemented in software. It takes inputs and processes them
according to defined logic to generates appropriate outputs. The logic is controlled by user prescribed
settings and commands. The controlling logic is complex and so, in order to facilitate its design and
understanding, it is decomposed into smaller logic functions which, when combined together implement the
complete scheme. This section concludes with a summary of:
● the logic inputs to the Autoreclose function,
● the logic outputs from the Autoreclose function
● the Autoreclose operating sequence
● the high-level design of the system logic functionality
272 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
It can also be used if an Autoreclose cycle is likely to fail for conditions associated with the protected circuit,
such as during the Dead Time, if a circuit breaker indicates that it is not healthy to switch.
P54x1Z-TM-EN-1 273
Chapter 10 - Autoreclose P54x1Z
An Autoreclose lockout condition resets any ‘Autoreclose in progress’ and associated signals. Signals are
available to indicate that Autoreclose is in progress and that a circuit breakers has been successfully closed.
Note:
In a multi-shot AR sequence, a number of Dead Timers are used (one for each shot). All Dead Timers are enabled
when the sequence is initiated, but each timer only starts when the particular shot with which it is associated is
triggered.
Protection Trip
AR in Progress
CB Open
Dead Time
Auto -close
Reclaim Time
Successful Autoreclose
V03395
274 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
Protection Trip
AR in Progress
CB Open
Dead Time
Auto-close
Reclaim Time
Successful Autoreclose
Autoreclose Lockout
V03396
AR in Progress
CB Open
Dead Time
Auto -close
Reclaim Time
Successful Autoreclose
Autoreclose Lockout
V03397
Figure 139: Autoreclose sequence for an evolving or permanent fault - single-phase operation
P54x1Z-TM-EN-1 275
Chapter 10 - Autoreclose P54x1Z
276 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
Key:
Energising Quantity AND gate &
Hardcoded setting
Pulse / Latch
Measurement Cell S
SR Latch Q
R
Internal Calculation
S
SR Latch Q
Derived setting Reset Dominant RD
Switch Multiplier X
Bandpass filter
Comparator for detecting
undervalues
P54x1Z-TM-EN-1 277
Chapter 10 - Autoreclose P54x1Z
Seq Counter = 1
CB1 L SPAROK
AR DISABLED
TARANY
V03392-1
278 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
CB1AROK CB1OP1P
V03392-2
P54x1Z-TM-EN-1 279
Chapter 10 - Autoreclose P54x1Z
Close Pulse Time 3P Reclaim TComp Reset CB Shots CB Total Shots Counter
Auto Close 3P Reclaim Time
Set CB Close CB Successful SPAR Shot 1
1P Reclaim Time CBARCancel CB Succ 1P AR Counter
3P Reclaim Time CB Successful 3PAR
CB Succ 3P AR
Module 35 Shot 1 Counter
CB Closed 3 ph Seq Counter = 1
Reclaim Time CB Successful 3PAR
CB ARIP Module 41 Shot 2 Counter
Seq Counter = 2 AR Shot Counters
CB Successful 3PAR
SETCB1SPCL Seq Counter = 3 Shot 3 Counter
CB1LARIP Seq Counter = 4 CB Successful 3PAR
SETCB13PCL CB Arip Shot 4 Counter
RESCB1ARSUCC
SETCB13PCL
CB1OP2/3P
V03392-3
280 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
CB Open C ph TARB
CB Closed 3 ph TMEM2/3Ph
CB Closed A ph TARC
V03392-4
P54x1Z-TM-EN-1 281
Chapter 10 - Autoreclose P54x1Z
V03392-5
282 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
P54x1Z-TM-EN-1 283
Chapter 10 - Autoreclose P54x1Z
AR In Progress (16)
Signal to remember that Autoreclose was initiated
TMEM1Ph 1-pole / 3-pole Trip (13) 1-phase AR Cycle Selection (19)
by a single-phase fault
Autoreclose Lockout (55)
AR In Progress (16)
Signal to remember that Autoreclose was initiated
TMEM2/3Ph 1-pole / 3-pole trip (13) CB Trip Time Monitor (53)
by a 2-phase fault or a 3-phase fault
Autoreclose Lockout (55)
284 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
P54x1Z-TM-EN-1 285
Chapter 10 - Autoreclose P54x1Z
286 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
P54x1Z-TM-EN-1 287
Chapter 10 - Autoreclose P54x1Z
288 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
P54x1Z-TM-EN-1 289
Chapter 10 - Autoreclose P54x1Z
290 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
5 LOGIC MODULES
This section contains a complete set of logic diagrams, which will help to explain the Autoreclose function.
Most of the logic diagrams shown are logic modules that comprise the overall Autoreclose system. Some of
the diagrams shown are not directly related to Autoreclose functionality, however, they may use some inputs
are produce outputs that are used by the Autoreclose system. These diagrams are shown in this section for
the sake of completeness.
P54x1Z-TM-EN-1 291
Chapter 10 - Autoreclose P54x1Z
CB Aux 3ph(52- A)
&
CB Aux 3ph(52- B)
& 1
1 CB Closed 3 ph
XOR
&
CB Status Input
&
52A 3 pole
52B 3 pole
52A & 52B 3 pole & 1
1 CB Open 3 ph
&
&
CB Aux A(52-A)
&
CB Status Input
&
52A 1 pole
52B 1 pole
1 CB Open A ph
52A & 52B 1 pole & 1
&
&
&
CB Aux B(52-B)
Phase B 1 CB Open B ph
CB Status Input
(Same logic as phase A )
52A 1 pole
52B 1 pole
52A & 52B 1 pole
CB Aux C(52- B)
Phase C 1 CB Open C ph
CB Status Input
(Same logic as phase A )
52A 1 pole
52B 1 pole
1 CB Status Alm
52A & 52B 1 pole
292 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
CB Open Aph
CB Open Bph 1 CB1Op1P
CB Open Cph
1 CB1OpAny
CB Open 3ph
1 CB1Op2/3P
³2
V03389
CBIST
CB Closed 3 ph
CBISMT & S
Q CB In Service
R
Logic 1 1
CB ARIP
V03302
P54x1Z-TM-EN-1 293
Chapter 10 - Autoreclose P54x1Z
AR In Service
& CB NoAR
AR Enable CB
CB In Service
CB1 AR OK
A/R Lockout
BAR CB1
V03308
Auto-Reclose
Enabled
& AR DISABLED
HMI Comand
AR OFF Pulse
AR Enable
AR Enable CB *
* Defaults to High if not mapped in PSL
V03300
294 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
Single-phase Autoreclosing is permitted only for the first shot of an Autoreclose cycle. In a multi-shot
Autoreclose cycle the second and subsequent trips will always be three-phase.
For multi-phase faults, you can use the Multi Phase AR setting in the AUTORECLOSE column to configure
the following options:
● Allow Autoreclose for all fault types (Allow Autoclose)
● Block Autoreclose for 2-phase and 3-phase faults (BAR 2 and 3 ph)
● Block Autoreclose for 3-phase faults (BAR 3 Phase)
P54x1Z-TM-EN-1 295
Chapter 10 - Autoreclose P54x1Z
AR In Service
&
AR Enable CB *
AR Mode
AR 1P
&
AR 1/3P 1 & CB1 LSPAROK
AR 3P
AR Opto
& CB1L3 PAROK
1
&
AR Mode 1P
&
AR Mode 3P
Seq Counter = 0
1
Seq Counter = 1
* Defaults to High if not mapped in PSL
V03309
&
Seq Counter = 1
1 & AR Force 3 pole
Seq Counter = 2 & 1
Seq Counter = 3
Seq Counter = 4
AR Lockout
A/R CB Unhealthy
Inhibit AR
V03313
296 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
(ARIP) is indicated. The indication remains until the end of the cycle. The end of the cycle is signified by
successful Autoreclose, or by lockout.
Autoreclose cycles can be initiated by:
● Protection functions internal to the product
● A Trip Test feature
● External protection equipment
P54x1Z-TM-EN-1 297
Chapter 10 - Autoreclose P54x1Z
AR Trip Test A
1
&
AR Trip Test B
AR Trip Test C
Any Trip
V03315
Init 3P AR Test
1 AR Trip Test 3Ph
Test Autoreclose
No Operation
Trip Pole A
Trip Pole A
Trip Pole A
Trip 3 Pole
V03304
298 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
≥
TAR2/3PH
2
1 TARANY
Init AR
&
Trip Output A 1 TARA
External Trip A S
Q Trip AR MemA
Init AR R
&
Trip Output B 1 TARB
External Trip B S
Q Trip AR MemB
R
Init AR
&
Trip Output C 1 TARC
External Trip C S
Q Trip AR MemC
R
External Trip3ph
0.01
ARIP
0.1
&
1 RESPRMEM
1 0.2
AR Disabled & S
0 Q
R
1
TARANY
Trip AR MemA
Trip AR MemB 1 TMEMANY
Trip AR MemC
=
TMEM1Ph
1
≥
TMEM2/3Ph
2
& TMEM3Ph
V03317
Figure 155: Autoreclose initiation by external trip or evolving conditions (Module 13)
Note:
The signals must be mapped as shown in the default PSL scheme.
P54x1Z-TM-EN-1 299
Chapter 10 - Autoreclose P54x1Z
TMEMANY 0
&
0.02 &
1 Prot ReOp
TARANY
&
Discrim Time
t
&
1P DTime 0
Seq Counter = 1
& Evolve 3Ph
0
LastShot & S
0.02 Q
R & CB Failed AR
A/R Lockout
Set CB1 CL
0 1
CB Closed 3 ph &
0.02
CB ARIP
V03331
Figure 156: Protection Reoperation and Evolving Fault logic diagram (Module 20)
Trip Inputs A
1
Ext Fault APh & S
Q =
R FLTMEM 2P
Trip Inputs B 2
1
Ext Fault BPh & S
Q
R & FLTMEM 3P
Trip Inputs C
1
Ext Fault CPh & S
Q
R
AR Start
RESPRMEM
V03320
300 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
Init AR
External Trip A 1 AR Start
External Trip B
External Trip C
External Trip3ph
TMEM2/3Ph
1
TMEM1Ph &
& & AR Initiation
CB1 Op2/3P
S
CB1L3 PAROK Q CB ARIP
R
ARIP
Inhibit AR 1
CB1 LARIP
Lockout Alarm
CB NoAR
CB1 ARSUCC
CBARCancel
0.02
CB1 OpAny
0 &
CB ARIP 1
AR Start &
Set CB Close
&
CB Closed 3 ph
CB1 AR OK
V03321
P54x1Z-TM-EN-1 301
Chapter 10 - Autoreclose P54x1Z
AR Initiation
&
1
ARIP &
AR Start
&
1P Dtime
&
Seq Counter = 1
Sequence Counter Seq Counter = 0
& S
Prot Re-op Q LastShot
R
V03326
CB1 L ARIP
& S
CB1 L SPAROK Q AR 1pole in prog
R
TMEM1PH CB1 L SPAR
CB1 L ARIP
1
CB1 L 3 PAR
V03329
Figure 160: Single-phase Autoreclose Cycle Selection logic diagram (Module 19)
302 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
CB1 L ARIP
& S
Q CB1L3PAR
CB1 L3 PAROK R
Evolve3Ph:1547
TMEM3P
TMEM ANY
&
CB1 L SPAROK
V03334
Figure 161: Three-phase Autoreclose Cycle Selection logic diagram (Module 21)
The DT Start by Prot determines how the protection action will initiate a dead time. The setting is always
visible and has three options Protection Reset, Protection Op (protection operation), and Disable
which should be selected if you don’t want protection action to start the dead time. These options set the
basic conditions for starting the dead time.
Selecting protection operation to start the dead time can, optionally, be qualified by a check that the line is
dead.
Selecting protection reset to start the dead time can, optionally, be qualified by a check, that the circuit
breaker is open (DTStart by CB Op) before starting the dead time. For three-phase tripping applications,
there is a further option to check that the line is dead (3PDTStart WhenLD) before starting the dead time.
If DT Start by Prot is disabled, the circuit breaker must be open for the dead time to start. For three-phase
tripping applications, there is an option to check that the line is dead (3PDTStart WhenLD) before starting
the dead time. To check that the line is dead, set 3PDTStart WhenLD to enabled. To check that the circuit
breaker is open, set DTStart by CB Op to Enabled.
P54x1Z-TM-EN-1 303
Chapter 10 - Autoreclose P54x1Z
DT Start by Prot
Disable
1
Protection Reset & DTOK All
&
Protection Op
AR Start
Dead Line Time
OKTimeSP &
S
Q
OK Time 3P 1 R
& S t
Q DeadLineLockout
ARIP R 0
0 1
AR Initiation
0.02
Dead Line
1
3PDTStart WhenLD
&
Enabled
Disabled
DT Start by Prot
Protection Reset
1
Disable &
AR 1pole in prog
&
DTStart by CB Op
Disabled
1
Enabled
1 DTOK CB 1P
&
CB1OP1P
1 DTOK CB 3P
&
CB Open 3 ph
V03337
Figure 162: Dead time Start Enable logic diagram (Module 22)
304 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
CB1LSPAR
&
DTOK CB 1P & S
Q
R & OKTimeSP
Seq Counter = 1
DTOK All
AR Start
1
DT Start by Prot
&
Protection Reset
CB1LSPAR
CB1OP2/3P
Logic 1
&
CB1LSPAR 1
t
0
1 Pole Dead Time
& CB1SPDTCOMP
V03342
P54x1Z-TM-EN-1 305
Chapter 10 - Autoreclose P54x1Z
CB1L3PAR
&
DTOK CB1L 3P
DTOK All
& S
Q
3PDTCOMP R & OK Time 3P
DT Start by Prot
Protection Reset
&
1
AR Start
Logic 1
&
CB1L3PAR
3P AR DT Shot 1
t 1 3PDTCOMP
&
Seq Counter = 1 0
& 3P DTime1
3P AR DT Shot 2
t
&
Seq Counter = 2 0
& 3P DTime2
3P AR DT Shot 3
t
&
Seq Counter = 3 0
& 3P DTime3
3P AR DT Shot 4
t
&
Seq Counter = 4 0
& 3P DTime4
1 3P Dead Time IP
3PDTCOMP
& CB13PDTCOMP
V03340
306 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
The Autoclose command is a pulse lasting 100 milliseconds. Another command (Set CB Close) to set the
circuit breaker to close is asserted as well as the Autoclose command. This signal will remain set either until
the end of the Autoreclose cycle, or until the next protection operation. These commands are used to initiate
the Reclaim Time logic and the Autoreclose Shot Counter logic.
Any Trip
A/R Lockout &
&
CB Healthy
Note: If the DDB signal CB1 Healthy is not
CB1SPDTCOMP mapped in PSL, it defaults to High.
CB1OP1P &
CB1L3PAR
CB Open 3 ph
CB13PDTCOMP
&
CB SCOK 1
CB Fast SCOK
& 1
OK Time 3P
Set CB Close
A/R Lockout & S
Logic 1 Q Auto Close
R
PROTREOP
0.1s
1
ARIP
CB ARIP
& CB Control
CB Closed 3 ph
V03349
P54x1Z-TM-EN-1 307
Chapter 10 - Autoreclose P54x1Z
CB1SPDTCOMP
& S
Q SETCB1SPCL
Set CB Close R
CB13PDTCOMP
&
CB SCOK
&
CB Fast SCOK 1 S
&
OK Time 3P Q SETCB13PCL
R
V03352
SPAR ReclaimTime
SETCB1SPCL
& t
CB1 LARIP & 1P Reclaim TComp
Logic 1 0
Auto Close
3PAR ReclaimTime
SETCB13 PCL
& t
CB1 LARIP & 3P Reclaim TComp
Logic 1 0
Auto Close
1P Reclaim Time t
1
3P Reclaim Time 0
&
Prot Re-op & CBARCancel
CB Closed 3 ph
&
CB ARIP
V03355
308 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
3P Reclaim TComp
1
1P Reclaim TComp & S
Q CB Succ 1P AR
RD
SETCB1SPCL 0
&
CB1OP1P 0.02S
& S
CB Closed 3 Ph Q
R
RESCB1ARSUCC 1 CB1ARSUCC
3P Reclaim TComp
1
1P Reclaim TComp & S
Q CB Succ 3P AR
RD
SETCB13PCL 0
&
CB1OP2/3P 0.02S
& S
CB Closed 3 Ph Q
R
V03358
CB1 OPANY
1
AR Start
1 RESCB1 ARSUCC
Res AROK by UI
Enabled
&
Reset AROK Ind
Yes
Figure 169: Autoreclose Reset Successful Indication logic diagram (Module 37)
P54x1Z-TM-EN-1 309
Chapter 10 - Autoreclose P54x1Z
At the completion of a dead time, the logic starts an Autoreclose healthy timer. If a circuit breaker healthy
signal becomes high before the Autoreclose healthy time is complete, the timer stops and, if all other
relevant circuit breaker closing conditions are satisfied, the scheme issues a circuit breaker Autoclose signal.
If the circuit breaker healthy signal stays low, then, at the end of the Autoreclose healthy time, a circuit
breaker unhealthy alarm is raised. This forces the Autoreclose sequence to be cancelled.
Additionally, at the completion of any three-phase dead time, the logic starts an Autoreclose check
synchronism timer. If the circuit breaker synchronism-check OK signal goes high before the time is complete,
the timer stops and, if all other relevant circuit breaker closing conditions are satisfied, the scheme issues a
circuit breaker Autoclose signal. If the circuit breaker synchronism-check OK signal stays low, then when the
Autoreclose check synchronism timer expires, an alarm is set to inform that the check synchronism is not
satisfied and cancels the Autoreclose cycle.
CB Healthy Time
CB1L3PAR
OK Time 3P 1
CB Fast SCOK
CB1SPDTCOMP 1
& S t
CB13PDTCOMP Q AR CB Unhealthy
RD 0
CB Healthy
A/R Lockout 1
CB Closed 3 Ph
Check Sync Time
CB13PDTCOMP
1 S t
CB SCOK Q A/R No Checksync
RD 0
A/R Lockout Note: If the DDB signal CB1 Healthy is not mapped in PSL,
1
CB Closed 3 Ph it defaults to High.
V03363
Figure 170: Circuit Breaker Healthy and System Check Timers Healthy logic diagram (Module 39)
310 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
V03366
P54x1Z-TM-EN-1 311
Chapter 10 - Autoreclose P54x1Z
CB Control by
Opto
Opto+Local Note: If the DDB signal CB Healthy is not mapped in PSL it defaults to High .
1
Opto+Remote
Opto+Rem+Local
Trip Pulse Time
HMI Trip Control Trip
1
& S t
& Q
Init Trip CB RD 0 & CB Trip Fail
&
Init close CB Man Close Delay Close Pulse Time
1 Close in Prog
HMI Close
& S t
CB ARIP Q
RD 0 & Control Close
1 S t
Auto Close Q
RD 0
Reset Close Dly
External Trip3Ph 1
1
External Trip A
External Trip B
External Trip C
1 1
CB Open 3 ph
CB Open A ph
CB Open B ph &
CB Open C ph
CB Closed 3 ph
1
CB Closed A ph
CB Closed C ph
t
& Man CB Unhealthy
CB Healthy 0
t
& No C/S Man Close
CB Man SCOK 0
V03369
312 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
TAR2/3Ph S t
Q
RD 0 1 CB Fail Pr Trip
& S
CB Open 3 Ph Q
RD
CB Closed 3 Ph
TARA
& S
TMEM2 /3Ph Q t
RD 1
0
& S
CB Open 3 Ph Q
RD
CB Closed 3 Ph 1
TARB
& S
TMEM2 /3Ph Q
RD
& S
CB Open 3 Ph Q
RD
CB Closed 3 Ph 1
TARC
& S
TMEM2 /3Ph Q
RD
& S
CB Open 3 Ph Q
RD
CB Closed 3 Ph 1
V03376
Figure 173: Circuit Breaker Trip Time Monitoring logic diagram (Module 53)
P54x1Z-TM-EN-1 313
Chapter 10 - Autoreclose P54x1Z
● Block Autoreclose. If the block Autoreclose DDB is asserted whilst Autoreclose is in progress, the
cycle goes to lockout.
● Protection function selection. Setting ‘Block AR’ against a particular protection function in the
AUTORECLOSE column means that operation of the protection will block Autoreclose and force
lockout.
● Circuit breaker failure to close. If a circuit breaker fails to close Autoreclose is blocked and forced to
lockout.
● Circuit breaker remains open at the end of the reclaim time. An Autoreclose lockout is forced if the
circuit breaker is open at the end of the reclaim time.
● Circuit breaker fails to close when the close command is issued.
● Circuit breaker fails to trip correctly.
● Three-phase dead time started by ‘line dead’ violation. If the line does not go dead within the Dead
Line Time setting, the logic forces the Autoreclose sequence to lockout. Determination of when to
start the timer is made in the 3PDTStart WhenLD setting.
● Multi-phase faults. The logic can be set to block Autoreclose either for two-phase or three-phase
faults, or to block Autoreclose for three-phase faults only. For this, the setting Multi Phase AR in the
AUTORECLOSE column applies.
● Single-phase evolving into multi-phase fault. A discriminating time (Discrim Time in the
AUTORECLOSE settings) is provided for this feature If, after expiry of the discriminating time, a
single-phase fault evolves into a two-phase or three-phase fault, the internal signal ‘Evolve Lock’ is
asserted and the Autoreclose is forced to lockout.
314 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
FLTMEM3P
&
Multi Phase AR
BAR 3Ph
1
BAR 2 and 3Ph
&
FLTMEM2P A/ R Lockout
CB Close Fail
CB Fail Pr Trip
AR In Service
CB1OpAny & S
Q
R
CB ARIP &
Block CB AR
A/R CB Unhealthy
RESCB1LO
A/R No Checksync &
Evolve 3Ph S
Q
PROTRE-OP R
LastShot &
CB ARIP
1 BARCB1
EVOLVELOCK &
ProtARBlock
CB In Service
&
TMEM2/3Ph
0
CB1L3 PAROK
0.02s
CB In Service
&
TMEM1Ph
0
CB1 LSPAROK
0.02s
Seq Counter >Set
DeadLineLockout
V03379
P54x1Z-TM-EN-1 315
Chapter 10 - Autoreclose P54x1Z
If Res LO by NoAR is set to Enabled, the circuit breaker lockout can be reset by temporarily generating an
AR disabled signal.
If Res LO by TDelay is set to Enabled, the circuit breaker lockout is automatically reset after a time delay
set in the LO Reset Time setting.
If Res LO by ExtDDB is Enabled, the circuit breaker lockout can be reset by activation of an external input
mapped in the PSL to the relevant reset lockout DDB signal.
Res LO by CB IS
Enabled
&
CB1CRLO
Res LO by UI
Enabled
&
Reset CB LO
Yes
Res LO by NoAR
Enabled
& 1 RESCB1LO
AR Disabled
1
Num CBs
CB2 Only
Res LO by ExtDDB
Enabled
&
Reset Lockout
Res LO by TDelay
Enabled
&
LO Reset Time
t
A/ R Lockout
0
V03382
Figure 175: Reset Circuit Breaker Lockout Logic Diagram (Module 57)
316 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
A/ R Lockout
1 0.04
Lockout Alarm & Pole Discrepancy
0
Pol Disc Ext
&
AR 1 pole in prog
CB Open A ph
1
CB Open B ph
CB Open C ph
&
V03384
Trip Inputs A
1 S
Q Trip Output A
R
Trip Inputs B
1 S
Q Trip Output B
R
Trip Inputs C
1 S
Q Trip Output C
1 R
Tripping Mode &
3 Pole 1 S
Q Trip 3 ph
AR Force 3 pole 1 R
Trip Inputs 3 Ph
Dwell
1 Any Trip
100 ms
Trip Inputs A
Trip Inputs B
≥
S
Trip Inputs C 2 Q 2/3 Ph Fault
R
Pole Dead A &
1 S
Q 3 Ph Fault
R
& 1
Pole Dead B 1
&
1
Pole Dead C
&
V03386
Figure 177: Circuit Breaker Trip Conversion Logic Diagram (Module 63)
P54x1Z-TM-EN-1 317
Chapter 10 - Autoreclose P54x1Z
318 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
System Checks
Disabled SysChks Inactive
Enabled
CS1 Criteria OK
VAN &
VBN CS2 Criteria OK
&
VCN
Select CS1 SlipF>
VAB & CS1 SlipF>
CS Vline>
& CS Vline>
CS Vbus>
& CS Vbus>
CS Vline<
& CS Vline<
Check Synchronisation Function
CS Vbus<
& CS Vbus<
CS1 Vl>Vb
& CS1 Vl>Vb
CS1 Vl<Vb
& CS1 Vl<Vb
CS1 Fl>Fb
& CS1 Fl>Fb
CS1 Fl<Fb
& CS1 Fl<Fb
CS1 AngHigh+
& CS1 AngHigh+
CS1 AngHigh-
& CS1 AngHigh-
CS2 Fl>Fb
& CS2 Fl>Fb
CS2 Fl<Fb
& CS2 Fl<Fb
CS2 AngHigh+
& CS2 AngHigh+
CS2 AngHigh-
& CS2 AngHigh-
CS AngRotACW
MCB/VTS CB CS & CS AngRotACW
MCB/VTS CS AngRotCW
& CS AngRotCW
VTS Fast Block
1 CS2 Vl>Vb
F out of Range & CS2 Vl>Vb
CS2 Vl<Vb
& CS2 Vl<Vb
CS1 Status
Enabled
& Check Sync 1 OK
CS1 Enabled
CS2 Status
Enabled & Check Sync 2 OK
P54x1Z-TM-EN-1 319
Chapter 10 - Autoreclose P54x1Z
System Checks
Enabled
VAN
Live Line & Live Line
VBN
VCN
Select Dead Line & Dead line
VAB
VBC
Live Bus & Live Bus
VCA
Voltage Monitors
MCB/VTS
MCB/VTS CB CS
1
Inhibit LL
1
Inhibit DL
1
Inhibit LB
1
Inhibit DB
V 01257
When the circuit breaker has closed, the Autoreclose function asserts a DDB signal Set CB1 Close, which
indicates that an attempt has been made to close the circuit breaker. At this point, the Reclaim Time starts. If
320 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
the circuit breaker remains closed after the reclaim timer expires, the Autoreclose cycle is complete, and
signals are generated to indicate that Autoreclose was successful. These are:
● CB1 Succ 1P AR (Single-phase Autoreclose CB1)
● CB2 Succ 1P AR (Single-phase Autoreclose CB2)
● CB1 Succ 3P AR (Three-phase Autoreclose CB1)
● CB2 Succ 3P AR (Three-phase Autoreclose CB2)
These signals increment the relevant circuit breaker successful Autoreclose shot counters, as well as
resetting the Autoreclose in progress signal.
The relevant circuit breaker successful Autoreclose shot counters are:
● CB1 SUCC SPAR (Single-phase Autoreclose CB1)
● CB1 SUCC 3PAR Shot1 (Three-phase Autoreclose CB1, Shot 1)
● CB1 SUCC 3PAR Shot2 (Three-phase Autoreclose CB1, Shot 2)
● CB1 SUCC 3PAR Shot3 (Three-phase Autoreclose CB1, Shot 3)
● CB1 SUCC 3PAR Shot4 (Three-phase Autoreclose CB1, Shot 4)
● CB2 SUCC SPAR (Single-phase Autoreclose CB2)
● CB2 SUCC 3PAR Shot1 (Three-phase Autoreclose CB2, Shot 1)
● CB2 SUCC 3PAR Shot2 (Three-phase Autoreclose CB2, Shot 2)
● CB2 SUCC 3PAR Shot3 (Three-phase Autoreclose CB2, Shot 3)
● CB1 SUCC 3PAR Shot4 (Three-phase Autoreclose CB2, Shot 4)
P54x1Z-TM-EN-1 321
Chapter 10 - Autoreclose P54x1Z
CB SC ClsNoDly
Enabled
& CB Fast SCOK
CB SC CS1
Enabled
& 1
Check Sync 1 OK
CB SC CS2
Enabled
&
Check Sync 2 OK
CB SC DLLB
Enabled
&
Dead Line
Live Bus
CB SC LLDB
Enabled
& 1 CB SCOK
Live Line
Dead Bus
CB SC DLDB
Enabled
&
Dead Line
Dead Bus
Note:
CB SC Shot 1 If the DDB signal Ext CS OK is not mapped in
Disabled PSL, it defaults to High.
&
Seq Counter = 1
CB SC all
Disabled
&
Ext CS OK
V03372
Figure 180: Three-phase Autoreclose System Check Logic Diagram (Module 45)
322 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
CBM SC CS 1
Enabled
&
Check Sync 1 OK
CBM SC CS 2
Enabled
&
Check Sync 2 OK
CBM SC DLLB
Enabled
&
Dead Line
Live Bus
CBM SC LLDB
Enabled
& 1 CB Man SCOK
Live Line
Dead Bus
CBM SC DLDB
Enabled
&
Dead Line
Note: If the DDB signal CB Ext CS OK is not
Dead Bus mapped in PSL, it defaults to High.
CBM SC required
Disabled
&
Ext CS OK
V03374
Figure 181: CB Manual Close System Check Logic Diagram (Module 51)
P54x1Z-TM-EN-1 323
Chapter 10 - Autoreclose P54x1Z
6 SETTING GUIDELINES
324 P54x1Z-TM-EN-1
P54x1Z Chapter 10 - Autoreclose
The minimum Autoreclose dead time setting is therefore the greater of:
(a) + (c) = 50 ms + 80 ms = 130 ms, to allow protection reset
(a) + (e) - (d) = 50 ms + 280 ms - 85 ms = 245 ms, to allow de-ionising
In practice a few additional cycles would be added to allow for tolerances, so Dead Time 1 could be set to
300 ms or greater. The overall system dead time is found by adding (d) to the chosen settings then
subtracting (a). This gives 335 ms.
A typical de-ionising time value for single-phase trip on a 220 kV line is 560 ms, so the 1 Pole Dead Time
could be chosen as 600 ms or greater. The overall system dead time is found by adding (d) to the chosen
settings then subtracting (a). This gives 635 ms.
P54x1Z-TM-EN-1 325
Chapter 10 - Autoreclose P54x1Z
326 P54x1Z-TM-EN-1
CB FAIL PROTECTION
CHAPTER 11
Chapter 11 - CB Fail Protection P54x1Z
328 P54x1Z-TM-EN-1
P54x1Z Chapter 11 - CB Fail Protection
1 CHAPTER OVERVIEW
The device provides a Circuit Breaker Fail Protection function. This chapter describes the operation of this
function including the principles, logic diagrams and applications.
This chapter contains the following sections:
Chapter Overview 329
Circuit Breaker Fail Protection 330
Circuit Breaker Fail Implementation 331
Circuit Breaker Fail Logic 333
Application Notes 337
P54x1Z-TM-EN-1 329
Chapter 11 - CB Fail Protection P54x1Z
330 P54x1Z-TM-EN-1
P54x1Z Chapter 11 - CB Fail Protection
You can configure the CBF elements CB Fail 1 Timer and CBF Fail 2 Timer to operate for trips triggered by
protection elements within the device. Alternatively you can use an external protection trip by allocating one
of the opto-inputs to the External Trip DDB signal in the PSL.
You can reset the CBF from a breaker open indication (from the pole dead logic) or from a protection reset.
In these cases resetting is only allowed if the undercurrent elements have also been reset. The resetting
mechanism is determined by the settings Volt Prot Reset and Ext Prot Reset.
The resetting options are summarised in the following table:
Initiation (Menu Selectable) CB Fail Timer Reset Mechanism
The resetting mechanism is fixed (e.g. 50/51/46/21/87)
Current based protection IA< operates AND IB< operates AND IC< operates AND IN<
operates
The resetting mechanism is fixed.
Sensitive Earth Fault element
ISEF< Operates
Three options are available:
● All I< and IN< elements operate
Non-current based protection (e.g. 27/59/81/32L)
● Protection element reset AND all I< and IN< elements operate
● CB open (all 3 poles) AND all I< and IN< elements operate
Three options are available.
● All I< and IN< elements operate
External protection
● External trip reset AND all I< and IN< elements operate
● CB open (all 3 poles) AND all I< and IN< elements operate
The Remove I> Start and Remove IN> Start settings are used to remove starts issued from the overcurrent
and earth elements respectively following a breaker fail time out. The start is removed when the cell is set to
Enabled.
P54x1Z-TM-EN-1 331
Chapter 11 - CB Fail Protection P54x1Z
The time constant of this subsidence current depends on the CT secondary circuit time constant and it is
generally long. If the protection clears the fault, the CB Fail function should reset fast to avoid maloperation
due to the subsidence current. To compensate for this the device includes a zero-crossing detection
algorithm, which ensures that the CB Fail re-trip and back-trip signals are not asserted while subsidence
current is flowing. If all the samples within half a cycle are greater than or smaller than 0 A (10 mS for a 50
Hz system), then zero crossing detection is asserted, thereby blocking the operation of the CB Fail function.
The zero-crossing detection algorithm is used after the circuit breaker in the primary system has opened
ensuring that the only current flowing in the AC secondary circuit is the subsidence current.
332 P54x1Z-TM-EN-1
P54x1Z Chapter 11 - CB Fail Protection
WI Prot Reset
Enabled
ZCDStateA
ZCDStateB
ZCD function
ZCDStateC
ZCDStateSEF
V00729
P54x1Z-TM-EN-1 333
Chapter 11 - CB Fail Protection P54x1Z
External Trip A S
4 Q TripStateExt A
1
RD
3
1
Ext Prot Reset
2 I< Only
&
CB Open & I<
Pole Dead A 1 Prot Reset & I<
&
Prot Reset OR I<
0 Rst OR CBOp & I<
IA<FastUndercurrent
4
Latch ATripResetIncomp
3
2
&
1
&
0
Logic 0
V00730
Note:
This diagram shows only phase-A for a single-CB device. The diagrams for phases B and C follow the same principle
and are not repeated here.
334 P54x1Z-TM-EN-1
P54x1Z Chapter 11 - CB Fail Protection
WIINFEEDA
TripStateExtA 1 TripStateA
3
1
Ext Prot Reset
2 I< Only
&
CB Open & I<
All Poles Dead
1 1 Prot Reset& I<
&
Pole Dead A Prot Reset OR I<
0 Rst OR CBOp & I<
Pole Dead B &
Pole Dead C
4
Latch3PhTripResetIncomp
2
&
IA<FastUndercurrent
IB<FastUndercurrent & 1
&
IC<FastUndercurrent
0
ExtTrip Only Ini 0
Enabled
& S
CBF Non I Trip
2 Q
&
RD
All Poles Dead
1 1
&
Pole Dead A Ext Prot Reset
0 I< Only
Pole Dead B &
CB Open & I<
Pole Dead C Prot Reset& I<
Prot Reset OR I<
IA<FastUndercurrent Rst OR CBOp & I<
IB<FastUndercurrent &
2
&
IC<FastUndercurrent LatchNonITripResetIncomp
1
&
0
Logic 0
V00731
P54x1Z-TM-EN-1 335
Chapter 11 - CB Fail Protection P54x1Z
WIINFEEDA
1
TripStateA
& &
t 1 CB Fail1 Trip A
CB Fail 1 Status
0
Enabled
CB Fail 1 Timer
1
&
TripStateA t 1 CB Fail2 Trip A
&
0
CB Fail 2 Status
Enabled
CB Fail 2 Timer
ZCDStateSEF
1
TripStateSEF
& &
t
CB Fail 1 Status
0
Enabled
CB Fail 1 Timer
1
&
TripStateSEF t
&
0
CB Fail 2 Status
Enabled
CB Fail 2 Timer
*1: Not used in P445.
V00732
Note:
This diagram shows only phase-A for a single-CB device. The diagrams for phases B and C follow the same principle
and are not repeated here.
336 P54x1Z-TM-EN-1
P54x1Z Chapter 11 - CB Fail Protection
5 APPLICATION NOTES
For any protection function requiring current to operate, the device uses operation of undercurrent elements
to detect that the necessary circuit breaker poles have tripped and reset the CB fail timers. However, the
undercurrent elements may not be reliable methods of resetting CBF in all applications. For example:
● Where non-current operated protection, such as under/overvoltage or under/overfrequency, derives
measurements from a line connected voltage transformer. Here, I< only gives a reliable reset method
if the protected circuit would always have load current flowing. In this case, detecting drop-off of the
initiating protection element might be a more reliable method.
● Where non-current operated protection, such as under/overvoltage or under/overfrequency, derives
measurements from a busbar connected voltage transformer. Again using I< would rely on the feeder
normally being loaded. Also, tripping the circuit breaker may not remove the initiating condition from
the busbar, and so drop-off of the protection element may not occur. In such cases, the position of the
circuit breaker auxiliary contacts may give the best reset method.
P54x1Z-TM-EN-1 337
Chapter 11 - CB Fail Protection P54x1Z
CBF resets:
1. Undercurrent element asserts
2. Undercurrent element asserts and the
breaker status indicates an open position
3. Protection resets and the undercurrent
Fault occurs element asserts
CBF Safety
Protection Maximum breaker reset margin
Normal operating time clearing time time time
operation
t
Local 86 Remote CB
operating clearing time
time
Note:
All CB Fail resetting involves the operation of the undercurrent elements. Where element resetting or CB open
resetting is used, the undercurrent time setting should still be used if this proves to be the worst case.
Where auxiliary tripping relays are used, an additional 10-15 ms must be added to allow for trip relay operation.
338 P54x1Z-TM-EN-1
CURRENT PROTECTION FUNCTIONS
CHAPTER 12
Chapter 12 - Current Protection Functions P54x1Z
340 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
1 CHAPTER OVERVIEW
The primary purpose of this product is not overcurrent protection. It does however provide a range of current
protection functions to be used as backup protection. This chapter assumes you are familiar with overcurrent
protection principles and does not provide detailed information here. If you require further information about
general overcurrent protection principles, please refer either to Alstom Grid's NPAG publication, earlier
incarnations of this technical manual, or one of our technical manuals from our P40 Agile Modular
distribution range of products such as the P14x.
This chapter contains the following sections:
Chapter Overview 341
Phase Fault Overcurrent Protection 342
Negative Sequence Overcurrent Protection 345
Earth Fault Protection 348
Sensitive Earth Fault Protection 353
High Impedance REF 359
Thermal Overload Protection 361
Broken Conductor Protection 366
P54x1Z-TM-EN-1 341
Chapter 12 - Current Protection Functions P54x1Z
342 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
Under system fault conditions, the fault current vector lags its nominal phase voltage by an angle depending
on the system X/R ratio. The IED must therefore operate with maximum sensitivity for currents lying in this
region. This is achieved by using the IED characteristic angle (RCA). This is the is the angle by which the
current applied to the IED must be displaced from the voltage applied to the IED to obtain maximum
sensitivity.
The device provides a setting I> Char Angle, which is set globally for all overcurrent stages. It is possible to
set characteristic angles anywhere in the range –95° to +95°.
A directional check is performed based on the following criteria:
Directional forward
-90° < (angle(I) - angle(V) - RCA) < 90°
Directional reverse
-90° > (angle(I) - angle(V) - RCA) > 90°
For close up three-phase faults, all three voltages will collapse to zero and no healthy phase voltages will be
present. For this reason, the device includes a synchronous polarisation feature that stores the pre-fault
voltage information and continues to apply this to the directional overcurrent elements for a time period of a
few seconds. This ensures that either instantaneous or time-delayed directional overcurrent elements will be
allowed to operate, even with a three-phase voltage collapse.
P54x1Z-TM-EN-1 343
Chapter 12 - Current Protection Functions P54x1Z
VBC
I>1 Direction
Directional
check
VTS Fast Block Timer Settings
I> Blocking &
VTS Blocks I>1
I>1 Start B
IB
VCA
I>1 Direction
Directional
check
VTS Fast Block Timer Settings
I> Blocking &
VTS Blocks I>1
I>1 Start C
IC
VAB
I>1 Direction Directional
1 I>1 Start
check
VTS Fast Block Timer Settings
I> Blocking &
1 I>1 Trip
VTS Blocks I>1
I>1 Timer Block Note: For the purpose of clarity , this diagram shows
the first relevant stage number for each signal and
V00735 setting name.
344 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
P54x1Z-TM-EN-1 345
Chapter 12 - Current Protection Functions P54x1Z
I2>1 Start
I2
I2> Inhibit
I2>1 Direction
V2
Directional
I2> V2pol Set
check
346 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
For the negative phase sequence directional elements to operate, the device must detect a polarising
voltage above a minimum threshold, I2> V2pol Set. This must be set in excess of any steady state negative
phase sequence voltage. This may be determined during the commissioning stage by viewing the negative
phase sequence measurements in the device.
P54x1Z-TM-EN-1 347
Chapter 12 - Current Protection Functions P54x1Z
Depending on the device model, it will provide one or more of the above means for Earth fault protection.
I
top = 5.8 − 1.35 log e
IN > Setting
where:
348 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
Note:
Although the start point of the characteristic is defined by the "ΙN>" setting, the actual current threshold is a different
setting called "IDG Ιs". The "IDG Ιs" setting is set as a multiple of "ΙN>".
Note:
When using an IDG Operate characteristic, DT is always used with a value of zero for the Rest characteristic.
An additional setting "IDG Time" is also used to set the minimum operating time at high levels of fault
current.
10
8 IDGIsIsSetting
IDG SettingRange
Range
time (seconds)
(seconds)
6
Operating time
5
Operating
3
IDG Time
IDG Time Setting
Setting Range
Range
2
0
1 10 100
I/IN>
V00611
P54x1Z-TM-EN-1 349
Chapter 12 - Current Protection Functions P54x1Z
directional earth fault elements. This is known as Zero Sequence Voltage polarisation, Residual Voltage
polarisation or Neutral Displacement Voltage (NVD) polarisation.
Small levels of residual voltage could be present under normal system conditions due to system imbalances,
VT inaccuracies, device tolerances etc. For this reason, the device includes a user settable threshold (IN>
VNPol set), which must be exceeded in order for the DEF function to become operational. The residual
voltage measurement provided in the MEASUREMENTS 1 column of the menu may assist in determining
the required threshold setting during the commissioning stage, as this will indicate the level of standing
residual voltage present.
Note:
Residual voltage is nominally 180° out of phase with residual current. Consequently, the DEF elements are polarised
from the "-Vres" quantity. This 180° phase shift is automatically introduced within the device.
350 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
IN>1 Start
IN
Inhibit IN >1
IN>1 Directional
VN
IN Directional
check
Low Current
V2
I2
Negative Sequence Polarisation Note: For the purpose of clarity , this diagram shows
the first relevant stage number for each signal and
V00737 setting name.
P54x1Z-TM-EN-1 351
Chapter 12 - Current Protection Functions P54x1Z
352 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
P54x1Z-TM-EN-1 353
Chapter 12 - Current Protection Functions P54x1Z
EPATR Curve
1000
100
Time in Secs
10
1
0.1 1 10 100 1000
Current in Primary A (CT Ratio 100A/1A)
V00616
354 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
IN>1 Start
IN
ISEF>1 Current
& & & IN>1 Trip
CTS Block
Inhibit ISEF>1
ISEF>1 Direction
VN
IN Directional
check
Low Current
ISEF> Blocking
AR Blks ISEF>3 *
Note: For the purpose of clarity , this diagram shows
the first relevant stage number for each signal and
V00738 * Stages 3 and 4 only setting name.
P54x1Z-TM-EN-1 355
Chapter 12 - Current Protection Functions P54x1Z
E00627
356 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
E00628
Figure 194: Phasor diagrams for insulated system with C phase fault
The current imbalance detected by a core balanced current transformer on the healthy feeders is the vector
addition of Ia1 and Ib1. This gives a residual current which lags the polariing voltage (–3Vo) by 90°. As the
healthy phase voltages have risen by a factor of Ö3, the charging currents on these phases are also Ö3 times
larger than their steady state values. Therefore, the magnitude of the residual current IR1, is equal to 3 times
the steady state per phase charging current.
The phasor diagram indicates that the residual currents on the healthy and faulted feeders (IR1 and IR3
respectively) are in anti-phase. A directional element (if available) could therefore be used to provide
discriminative earth fault protection.
If the polarising is shifted through +90°, the residual current seen by the relay on the faulted feeder will lie
within the operate region of the directional characteristic and the current on the healthy feeders will fall within
the restrain region.
The required characteristic angle setting for the SEF element when applied to insulated systems, is +90°.
This is for the case when the protection is connected such that its direction of current flow for operation is
from the source busbar towards the feeder. If the forward direction for operation were set such that it is from
the feeder into the busbar, then a –90° RCA would be required.
Note:
Discrimination can be provided without the need for directional control. This can only be achieved, however, if it is
possible to set the IED in excess of the charging current of the protected feeder and below the charging current for
the rest of the system.
P54x1Z-TM-EN-1 357
Chapter 12 - Current Protection Functions P54x1Z
Cable gland
Cable box
Cable gland/shealth
earth connection
“Incorrect”
No operation
SEF
“Correct”
Operation
SEF
E00614
358 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
Healthy CT Saturated CT
Protected
circuit
A-G
Zm1 Zm2
I = Is + IF
RCT1 RCT2
I IF
RL1 IS RL3
Vs RST
R
RL2 RL4
V00671
High Impedance REF can be used for either delta windings or star windings in both solidly grounded and
resistance grounded systems. The connection to a modern IED are as follows:
P54x1Z-TM-EN-1 359
Chapter 12 - Current Protection Functions P54x1Z
Phase A
Phase A
Phase B
Phase B
Phase C
Phase C
I Phase A
I Phase B
I Phase C
RSTAB I Neutral
I Neutral RSTAB
IED IED
Connecting IED to star winding for High Connecting IED to delta winding for High
Impedance REF Impedance REF
V00680
360 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
I 2 − ( KI FLC )2
t = −τ log
I 2 − I p2
e
where:
● t = time to trip, following application of the overload current I
● t = heating and cooling time constant of the protected plant
● I = largest phase current
● IFLC full load current rating (the Thermal Trip setting)
● K = a constant with the value of 1.05
● Ip = steady state pre-loading before application of the overload
( − t / τ1 ) ( −t / τ 2 )
I 2 − ( KI FLC )2
0.4e + 0.6e = 2 2
I − I p
where:
● t1 = heating and cooling time constant of the transformer windings
● t2 = heating and cooling time constant of the insulating oil
P54x1Z-TM-EN-1 361
Chapter 12 - Current Protection Functions P54x1Z
IA
IB Max RMS
Thermal State
IC
Thermal Trip
Thermal Trip
Characteristic Thermal trip
Disabled Thermal threshold
Single Calculation
Dual
Time Constant 1
Time Constant 2
Reset Thermal
Thermal Alarm
Thermal Alarm
V00630
362 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
E00728
Figure 199: Spreadsheet calculation for dual time constant thermal characteristic
100000
100
10
1
1 10
Current as a Multiple of Thermal Setting
V00629
P54x1Z-TM-EN-1 363
Chapter 12 - Current Protection Functions P54x1Z
An alarm can be raised on reaching a thermal state corresponding to a percentage of the trip threshold. A
typical setting might be "Thermal Alarm" = 70% of thermal capacity.
Note:
The thermal time constants given in the above tables are typical only. Reference should always be made to the plant
manufacturer for accurate information.
θ − θ p
e( − t / τ ) =
e
θ −1
where:
● θ = thermal state = I2/K2IFLC2
● θp = pre-fault thermal state = Ip2/K2IFLC2
Note:
A current of 105%Is (KIFLC) has to be applied for several time constants to cause a thermal state measurement of
100%.
Area mm2 6 - 11 kV 22 kV 33 kV 66 kV
25 – 50 10 minutes 15 minutes 40 minutes –
70 – 120 15 minutes 25 minutes 40 minutes 60 minutes
150 25 minutes 40 minutes 40 minutes 60 minutes
185 25 minutes 40 minutes 60 minutes 60 minutes
240 40 minutes 40 minutes 60 minutes 60 minutes
300 40 minutes 60 minutes 60 minutes 90 minutes
364 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
P54x1Z-TM-EN-1 365
Chapter 12 - Current Protection Functions P54x1Z
I2/I1
I2
Low current
CTS Block
V00739
366 P54x1Z-TM-EN-1
P54x1Z Chapter 12 - Current Protection Functions
Note:
A minimum value of 8% negative phase sequence current is required for successful operation.
Since sensitive settings have been employed, we can expect that the element will operate for any
unbalanced condition occurring on the system (for example, during a single pole autoreclose cycle). For this
reason, a long time delay is necessary to ensure co-ordination with other protection devices. A 60 second
time delay setting may be typical.
The following example was recorded by an IED during commissioning:
Ifull load = 500A
I2 = 50A
therefore the quiescent I2/I1 ratio = 0.1
To allow for tolerances and load variations a setting of 20% of this value may be typical: Therefore set:
I2/I1 = 0.2
In a double circuit (parallel line) application, using a 40% setting will ensure that the broken conductor
protection will operate only for the circuit that is affected. A setting of 0.4 results in no pick-up for the parallel
healthy circuit.
Set I2/I1 Time Delay = 60 s to allow adequate time for short circuit fault clearance by time delayed
protections.
P54x1Z-TM-EN-1 367
Chapter 12 - Current Protection Functions P54x1Z
368 P54x1Z-TM-EN-1
VOLTAGE PROTECTION FUNCTIONS
CHAPTER 13
Chapter 13 - Voltage Protection Functions P54x1Z
370 P54x1Z-TM-EN-1
P54x1Z Chapter 13 - Voltage Protection Functions
1 CHAPTER OVERVIEW
The device provides a wide range of voltage protection functions. This chapter describes the operation of
these functions including the principles, logic diagrams and applications.
This chapter contains the following sections:
Chapter Overview 371
Undervoltage Protection 372
Overvoltage Protection 375
Compensated Overvoltage 378
Residual Overvoltage Protection 379
P54x1Z-TM-EN-1 371
Chapter 13 - Voltage Protection Functions P54x1Z
2 UNDERVOLTAGE PROTECTION
Undervoltage conditions may occur on a power system for a variety of reasons, some of which are outlined
below:
● Undervoltage conditions can be related to increased loads, whereby the supply voltage will decrease
in magnitude. This situation would normally be rectified by voltage regulating equipment such as AVRs
(Auto Voltage Regulators) or On Load Tap Changers. However, failure of this equipment to bring the
system voltage back within permitted limits leaves the system with an undervoltage condition, which
must be cleared.
● If the regulating equipment is unsuccessful in restoring healthy system voltage, then tripping by means
of an undervoltage element is required.
● Faults occurring on the power system result in a reduction in voltage of the faulty phases. The
proportion by which the voltage decreases is dependent on the type of fault, method of system
earthing and its location. Consequently, co-ordination with other voltage and current-based protection
devices is essential in order to achieve correct discrimination.
● Complete loss of busbar voltage. This may occur due to fault conditions present on the incomer or
busbar itself, resulting in total isolation of the incoming power supply. For this condition, it may be
necessary to isolate each of the outgoing circuits, such that when supply voltage is restored, the load
is not connected. Therefore, the automatic tripping of a feeder on detection of complete loss of voltage
may be required. This can be achieved by a three-phase undervoltage element.
● Where outgoing feeders from a busbar are supplying induction motor loads, excessive dips in the
supply may cause the connected motors to stall, and should be tripped for voltage reductions that last
longer than a pre-determined time.
The undervoltage stages can be configured either as phase-to-neutral or phase-to-phase voltages in the V<
Measur't Mode cell.
There is no Timer Hold facility for Undervoltage.
Stage 2 can have definite time characteristics only. This is set in the V<2 Status cell.
Outputs are available for single or three-phase conditions via the V< Operate Mode cell for each stage.
372 P54x1Z-TM-EN-1
P54x1Z Chapter 13 - Voltage Protection Functions
Figure 202: Undervoltage - single and three phase tripping mode (single stage)
The Undervoltage protection function detects when the voltage magnitude for a certain stage falls short of a
set threshold. If this happens a Start signal, signifying the "Start of protection", is produced. This Start signal
can be blocked by the VTS Fast Block signal and an All Poles Dead signal. This Start signal is applied to
the timer module to produce the Trip signal, which can be blocked by the undervoltage timer block signal
(V<(n) Timer Block). For each stage, there are three Phase undervoltage detection modules, one for each
phase. The three Start signals from each of these phases are OR'd together to create a 3-phase Start signal
(V<(n) Start), which can be be activated when any of the three phases start (Any Phase), or when all three
phases start (Three Phase), depending on the chosen V< Operate Mode setting.
The outputs of the timer modules are the trip signals which are used to drive the tripping output relay. These
tripping signals are also OR'd together to create a 3-phase Trip signal, which are also controlled by the V<
Operate Mode setting.
If any one of the above signals is low, or goes low before the timer has counted out, the timer module is
inhibited (effectively reset) until the blocking signal goes high.
In some cases, we do not want the undervoltage element to trip; for example, when the protected feeder is
de-energised, or the circuit breaker is opened, an undervoltage condition would obviously be detected, but
we would not want to start protection. To cater for this, an All Poles Dead signal blocks the Start signal for
each phase. This is controlled by the V<Poledead Inh cell, which is included for each of the stages. If the
cell is enabled, the relevant stage will be blocked by the integrated pole dead logic. This logic produces an
P54x1Z-TM-EN-1 373
Chapter 13 - Voltage Protection Functions P54x1Z
output when it detects either an open circuit breaker via auxiliary contacts feeding the opto-inputs or it
detects a combination of both undercurrent and undervoltage on any one phase.
374 P54x1Z-TM-EN-1
P54x1Z Chapter 13 - Voltage Protection Functions
3 OVERVOLTAGE PROTECTION
Overvoltage conditions are generally related to loss of load conditions, whereby the supply voltage increases
in magnitude. This situation would normally be rectified by voltage regulating equipment such as AVRs (Auto
Voltage Regulators) or On Load Tap Changers. However, failure of this equipment to bring the system
voltage back within permitted limits leaves the system with an overvoltage condition which must be cleared.
Note:
During earth fault conditions on a power system there may be an increase in the healthy phase voltages. Ideally, the
system should be designed to withstand such overvoltages for a defined period of time.
The overvoltage stages can be configured either as phase-to-neutral or phase-to-phase voltages in the V>
Measur't Mode cell.
There is no Timer Hold facility for Overvoltage.
Stage 2 can have definite time characteristics only. This is set in the V>2 Status cell.
Outputs are available for single or three-phase conditions via the V> Operate Mode cell for each stage.
P54x1Z-TM-EN-1 375
Chapter 13 - Voltage Protection Functions P54x1Z
Figure 203: Overvoltage - single and three phase tripping mode (single stage)
The Overvoltage protection function detects when the voltage magnitude for a certain stage exceeds a set
threshold. If this happens a Start signal, signifying the "Start of protection", is produced. This Start signal can
be blocked by the VTS Fast Block signal. This start signal is applied to the timer module to produce the Trip
signal, which can be blocked by the overvoltage timer block signal (V>(n) Timer Block). For each stage,
there are three Phase overvoltage detection modules, one for each phase. The three Start signals from each
of these phases are OR'd together to create a 3-phase Start signal (V>(n) Start), which can then be
activated when any of the three phases start (Any Phase), or when all three phases start (Three Phase),
depending on the chosen V> Operate Mode setting.
The outputs of the timer modules are the trip signals which are used to drive the tripping output relay. These
tripping signals are also OR'd together to create a 3-phase Trip signal, which are also controlled by the V>
Operate Mode setting.
If any one of the above signals is low, or goes low before the timer has counted out, the timer module is
inhibited (effectively reset) until the blocking signal goes high.
376 P54x1Z-TM-EN-1
P54x1Z Chapter 13 - Voltage Protection Functions
This type of protection must be co-ordinated with any other overvoltage devices at other locations on the
system.
P54x1Z-TM-EN-1 377
Chapter 13 - Voltage Protection Functions P54x1Z
4 COMPENSATED OVERVOLTAGE
The Compensated Overvoltage function calculates the positive sequence voltage at the remote terminal
using the positive sequence local current and voltage and the line impedance and susceptance. This can be
used on long transmission lines where Ferranti Overvoltages can develop under remote circuit breaker open
conditions.
The Compensated overvoltage protection function can be set in the VOLT PROTECTION column under the
sub heading COMP OVERVOLTAGE. The remote voltage is calculated using line impedance settings and
the line charging admittance in the LINE PARAMETERS column.
The IED uses the [A,B,C,D] transmission line equivalent model given the following parameters:
● Total Impedance Z = zÐq ohms
● Total Susceptance Y = yÐ90°
● Line Length l
Vr D − C Vs
= ×
Ir
− BA Is
where
● Vr is the voltage at the receiving end
● Ir is the current at the receiving end
● Vs is the measured voltage at the sending end
● Is is the measured current at the sending end
● A= D = cosh(y.l)
● B = Zc.sinh(y.l)
● C = Yc.sinh(y.l)
● y.l = Ö(Z.Y)
● Zc = 1/Yc = Ö(Z/Y)
● Y = total line capacitive charging susceptance
● Zc = characteristic impedance of the line (surge impedance)
There are two stages to provide both alarm and trip stages where required. Both stages can be set
independently.
Stage 1 can be set to IDMT, DT or Disabled, in the V1>1 Cmp Funct cell. Stage 2 is DT only and is
enabled or disabled in the V1>2 Cmp Status cell.
The IDMT characteristic on the first stage is defined by the following formula:
t = K/(M - 1)
where:
● K = Time multiplier setting
● t =Operating time in seconds
● M = Remote Calculated voltage / IED setting voltage
378 P54x1Z-TM-EN-1
P54x1Z Chapter 13 - Voltage Protection Functions
P54x1Z-TM-EN-1 379
Chapter 13 - Voltage Protection Functions P54x1Z
VN>1 Start
VN
380 P54x1Z-TM-EN-1
P54x1Z Chapter 13 - Voltage Protection Functions
IED
E00800
P54x1Z-TM-EN-1 381
Chapter 13 - Voltage Protection Functions P54x1Z
IED
E00801
382 P54x1Z-TM-EN-1
FREQUENCY PROTECTION
FUNCTIONS
CHAPTER 14
Chapter 14 - Frequency Protection Functions P54x1Z
384 P54x1Z-TM-EN-1
P54x1Z Chapter 14 - Frequency Protection Functions
1 CHAPTER OVERVIEW
The device provides a range of frequency protection functions. This chapter describes the operation of these
functions including the principles, logic diagrams and applications.
This chapter contains the following sections:
Chapter Overview 385
Frequency Protection 386
Independent R.O.C.O.F Protection 389
P54x1Z-TM-EN-1 385
Chapter 14 - Frequency Protection Functions P54x1Z
2 FREQUENCY PROTECTION
Power generation and utilisation needs to be well balanced in any industrial, distribution or transmission
network. These electrical networks are dynamic entities, with continually varying loads and supplies, which
are continually affecting the system frequency. Increased loading reduces the system frequency and
generation needs to be increased to maintain the frequency of the supply. Conversely decreased loading
increases the system frequency and generation needs to be reduced. Sudden fluctuations in load can cause
rapid changes in frequency, which need to be dealt with quickly.
Unless corrective measures are taken at the appropriate time, frequency decay can go beyond the point of
no return and cause widespread network collapse, which has dire consequences.
Normally, generators are rated for a particular band of frequency. Operation outside this band can cause
mechanical damage to the turbine blades. Protection against such contingencies is required when frequency
does not improve even after load shedding steps have been taken. This type of protection can be used for
operator alarms or turbine trips in case of severe frequency decay.
Clearly a range of methods is required to ensure system frequency stability. The frequency protection in this
device provides both underfrequency and overfrequency protection.
Frequency Protection is implemented in the FREQ PROTECTION column of the relevant settings group.
386 P54x1Z-TM-EN-1
P54x1Z Chapter 14 - Frequency Protection Functions
Freq
Averaging F<1 Start
DT
F<1 Setting & F<1 Trip
F<1 Status
Enabled
P54x1Z-TM-EN-1 387
Chapter 14 - Frequency Protection Functions P54x1Z
The device provides 2 stages of overfrequency protection. The function uses the following settings (shown
for stage 1 only - other stages follow the same principles).
● F>1 Status: enables or disables underfrequency protection for the relevant stage
● F>1 Setting: defines the frequency pickup setting
● F>1 Time Delay: sets the time delay
F>1 Status
Enabled
388 P54x1Z-TM-EN-1
P54x1Z Chapter 14 - Frequency Protection Functions
● df/dt>1 Dir'n: sets the direction of change you wish to check (positive, negative, or both)
In addition, start, trip and timer block DDB signals are available for each stage, as well as an inhibit signal to
inhibit all four stages.
df /dt>1 Dir’n 1
Positive
Both
1
Negative
Freq High 1
Freq Low
V00869
P54x1Z-TM-EN-1 389
Chapter 14 - Frequency Protection Functions P54x1Z
390 P54x1Z-TM-EN-1
CURRENT TRANSFORMER
REQUIREMENTS
CHAPTER 15
Chapter 15 - Current Transformer Requirements P54x1Z
392 P54x1Z-TM-EN-1
P54x1Z Chapter 15 - Current Transformer Requirements
1 CHAPTER OVERVIEW
P54x1Z-TM-EN-1 393
Chapter 15 - Current Transformer Requirements P54x1Z
2 RECOMMENDED CT CLASSES
You can use Class X current transformers with a knee point voltage greater or equal to that calculated. You
can also use class 5P protection CT. These have a knee-point voltage equivalent, which can be
approximated from the following calculations:
Vk = (VA ´ ALF)/In + (RCT ´ ALF ´ In)
where:
● Vk = Knee-point voltage
● VA = Voltampere burden rating
● ALF = Accuracy limit factor
● In = CT nominal secondary current
● RCT = CT resistance
394 P54x1Z-TM-EN-1
P54x1Z Chapter 15 - Current Transformer Requirements
For IEDs with the settings: Is1 = 20%, Is2 = 2In, k1 = 30%, k2 = 100% and for (If ´ X/R) £ 600 (3-end
applications):
K must have the value 65 or as calculated by: K = 40 + (0.35(If ´ X/R))
For higher (If ´ X/R) up to 2600, K = 256
P54x1Z-TM-EN-1 395
Chapter 15 - Current Transformer Requirements P54x1Z
Note:
It is not necessary to repeat the calculation for earth faults, as the phase reach calculation is the worst-case for CT
dimensioning.
396 P54x1Z-TM-EN-1
P54x1Z Chapter 15 - Current Transformer Requirements
P54x1Z-TM-EN-1 397
Chapter 15 - Current Transformer Requirements P54x1Z
6 WORKED EXAMPLES
The power system and the line parameters used in these examples are as follows:
● Single circuit operation between Green Valley and Blue River
● System voltage = 230 kV
● System frequency = 50 Hz
● System grounding = solid
● CT ratio = 1200/1
● Line length = 100 km
● Line positive sequence impedance Z1 = 0.089 + j 0.476 ohm per km
● Bus fault level = 40 kA
● Primary time constant = 120 ms
398 P54x1Z-TM-EN-1
P54x1Z Chapter 15 - Current Transformer Requirements
P54x1Z-TM-EN-1 399
Chapter 15 - Current Transformer Requirements P54x1Z
400 P54x1Z-TM-EN-1
MONITORING AND CONTROL
CHAPTER 16
Chapter 16 - Monitoring and Control P54x1Z
402 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
1 CHAPTER OVERVIEW
As well as providing a range of protection functions, the product includes comprehensive monitoring and
control functionality.
This chapter contains the following sections:
Chapter Overview 403
Event Records 404
Disturbance Recorder 408
Measurements 409
CB Condition Monitoring 410
CB State Monitoring 417
Circuit Breaker Control 419
Pole Dead Function 424
System Checks 425
P54x1Z-TM-EN-1 403
Chapter 16 - Monitoring and Control P54x1Z
2 EVENT RECORDS
Alstom Grid devices record events in an event log. This allows you to establish the sequence of events that
led up to a particular situation. For example, a change in a digital input signal or protection element output
signal would cause an event record to be created and stored in the event log. This could be used to analyse
how a particular power system condition was caused. These events are stored in the IED's non-volatile
memory. Each event is time tagged.
The event records can be displayed on an IED's front panel but it is easier to view them through the settings
application software. This can extract the events log from the device and store it as a single .evt file for
analysis on a PC.
The event records are detailed in the VIEW RECORDS column. The first event (0) is always the latest event.
After selecting the required event, you can scroll through the menus to obtain further details.
If viewing the event with the settings application software, simply open the extracted event file. All the events
are displayed chronologically. Each event is summarised with a time stamp (obtained from the Time & Date
cell) and a short description relating to the event (obtained from the Event Text cell. You can expand the
details of the event by clicking on the + icon to the left of the time stamp.
The following table shows the correlation between the fields in the setting application software's event viewer
and the cells in the menu database.
Field in Event Viewer Equivalent cell in menu DB Cell reference User settable?
Left hand column header VIEW RECORDS ® Time & Date 01 03 No
Right hand column header VIEW RECORDS ® Event Text 01 04 No
Description SYSTEM DATA ® Description 00 04 Yes
Plant reference SYSTEM DATA ® Plant Reference 00 05 Yes
Model number SYSTEM DATA ® Model Number 00 06 No
Address Displays the Courier address relating to the event N/A No
Event type VIEW RECORDS ® Menu Cell Ref 01 02 No
Event Value VIEW RECORDS ® Event Value 01 05 No
Evt Unique Id VIEW RECORDS ® Evt Unique ID 01 FE No
404 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
Standard events are further sub-categorised internally to include different pieces of information. These are:
● Protection events (starts and trips)
● Maintenance record events
● Platform events
Note:
The first event in the list (event 0) is the most recent event to have occurred.
P54x1Z-TM-EN-1 405
Chapter 16 - Monitoring and Control P54x1Z
The same information is also shown in the Alarm Status (n) cells in the SYSTEM DATA column. This
information is updated continuously, whereas the information in the event log is a snapshot at the time when
the event was created.
V01234
Note:
We recommend that you do not set the triggering contact to latching. This is because if you use a latching contact,
the fault record would not be generated until the contact has been fully reset.
406 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
P54x1Z-TM-EN-1 407
Chapter 16 - Monitoring and Control P54x1Z
3 DISTURBANCE RECORDER
The disturbance recorder feature allows you to record selected current and voltage inputs to the protection
elements, together with selected digital signals. The digital signals may be inputs, outputs, or internal DDB
signals. The disturbance records can be extracted using the disturbance record viewer in the settings
application software. The disturbance record file can also be stored in the COMTRADE format. This allows
the use of other packages to view the recorded data.
The integral disturbance recorder has an area of memory specifically set aside for storing disturbance
records. The number of records that can be stored is dependent on the recording duration. The minimum
duration is 0.1 s and the maximum duration is 10.5 s.
When the available memory is exhausted, the oldest records are overwritten by the newest ones.
Each disturbance record consists of a number of analogue data channels and digital data channels. The
relevant CT and VT ratios for the analogue channels are also extracted to enable scaling to primary
quantities.
The fault recording times are set by a combination of the Duration and Trigger Position cells. The Duration
cell sets the overall recording time and the Trigger Position cell sets the trigger point as a percentage of the
duration. For example, the default settings show that the overall recording time is set to 1.5 s with the trigger
point being at 33.3% of this, giving 0.5 s pre-fault and 1 s post fault recording times.
With the Trigger Mode set to Single, if further triggers occurs whilst a recording is taking place, the
recorder will ignore the trigger. However, with the Trigger Mode set to Extended, the post trigger timer will
be reset to zero, extending the recording time.
You can select any of the IED's analogue inputs as analogue channels to be recorded. You can also map
any of the opto-inputs output contacts to the digital channels. In addition, you may also map a number of
DDB signals such as Starts and LEDs to digital channels.
You may choose any of the digital channels to trigger the disturbance recorder on either a low to high or a
high to low transition, via the Input Trigger cell. The default settings are such that any dedicated trip output
contacts will trigger the recorder.
It is not possible to view the disturbance records locally via the front panel LCD. You must extract these
using suitable setting application software such as MiCOM S1 Agile.
408 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
4 MEASUREMENTS
P54x1Z-TM-EN-1 409
Chapter 16 - Monitoring and Control P54x1Z
5 CB CONDITION MONITORING
The device records various statistics related to each circuit breaker trip operation, allowing an accurate
assessment of the circuit breaker condition to be determined. These statistics are available in the CB
CONDITION column. The menu cells are register values only and cannot be set directly. They may be reset,
however, during maintenance. The statistics monitored are:
● Total Current Broken: A register stores the total amount of current that the CB has broken is stored in
an accumulator, giving at any time a measure of the total amount of current that the CB has broken
since the value was last reset.
● Number of CB operations: A counter registers the number of CB trips that have been performed for
each phase, giving at any time the total number of trips that the CB has performed since the value was
last reset.
● CB Operate Time: A register stores the total amount of time the CB has transitioned from closed to
open is stored in an accumulator, giving at any time a measure of the total time that the CB has spent
tripping since the values was last reset.
● Excessive Fault Frequency: A counter registers the number of CB trips that have been performed for
all phases, giving at any time the total number of trips performed since the value was last reset.
These statistics are available in the CB CONDITION column. The menu cells are register values only and
cannot be set directly. They may be reset, however, during maintenance.
Note:
When in Commissioning test mode the CB condition monitoring registers are not updated.
Circuit breaker lockout, can be caused by the following circuit breaker condition monitoring functions:
● Maintenance lockout
● Excessive fault frequency lockout
● Broken current lockout
If the circuit breaker is locked out, the logic generates a lockout alarm
410 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
PhaseACurrent
Set Set Cumulative IA broken In
Reset
PhaseBCurrent
Set Set Cumulative IB broken In
Reset
PhaseCCurrent
Set Set Cumulative IC broken In
Trip 3 ph t Reset
1
External Trip3 ph 0
Trip Output A t 1 Note: Broken current totals not incremented when device is in test mode
1
External Trip A 0
Trip Output B t 1
1
External Trip B 0
Trip Output C t 1
1
External Trip C 0
Reset CB Data
1 Note: All timers have 1 cycle pickup delay
Reset CB Data V01272
V01276
P54x1Z-TM-EN-1 411
Chapter 16 - Monitoring and Control P54x1Z
Reset CB Data
1
Reset CB Data
V01274
Trip Output B
1 S t
External Trip B Q
R 0 1
Trip Output C
1
External Trip C
Lockout Alarm
V01278
412 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
CB mon LO reset
Yes
1 Reset Lockout Alarm
Clear Alarms
CB Failed to Trip
&
CB Open 3 ph
Lockout Alarm
CB Closed 3 ph
1
CB Closed A ph
CB Closed B ph &
CB Closed C ph
Rst CB mon LO by
CB Close
CB mon LO RstDly
V01280
P54x1Z-TM-EN-1 413
Chapter 16 - Monitoring and Control P54x1Z
I^ Maintenance S
Q 1 CB Monitor Alarm
R
I^ Lockout
Alarm Enabled
& CB I^ Lockout
I^ Lockout
&
1 Pre-Lockout
-1
Fault Freq Lock
Alarm Enabled
& S
Fault frequency count Q CB FaultFreqLock
R
Fault Freq Count
&
-1 1 CB Mon LO Alarm
CB Time Maint
Alarm Enabled
&
Greatest CB travel time & CB Time Maint
S
CB Time Maint Q
R
CB Time Lockout
Alarm Enabled
& CB Time Lockout
CB Time Lockout
Reset Indication 1
Yes
Reset CB Data
Yes 1
Reset CB Data
S
Q Lockout Alarm
Reset lockout Alarm R
Control CB Unhealthy
CB failed to trip
414 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
Res LO by CB IS
Enabled
&
CB1CRLO
Res LO by UI
Enabled
&
Reset CB LO
Yes
Res LO by NoAR
Enabled
& 1 RESCB1LO
AR Disabled
1
Num CBs
CB2 Only
Res LO by ExtDDB
Enabled
&
Reset Lockout
Res LO by TDelay
Enabled
&
LO Reset Time
t
A/ R Lockout
0
V03382
Figure 217: Reset Circuit Breaker Lockout Logic Diagram (Module 57)
P54x1Z-TM-EN-1 415
Chapter 16 - Monitoring and Control P54x1Z
The dielectric withstand of the oil generally decreases as a function of I2t, where ‘I’ is the broken fault current
and ‘t’ is the arcing time within the interrupter tank. The arcing time cannot be determined accurately, but is
generally dependent on the type of circuit breaker being used. Instead, you set a factor (Broken I^) with a
value between 1 and 2, depending on the circuit breaker.
Most circuit breakers would have this value set to '2', but for some types of circuit breaker, especially those
operating on higher voltage systems, a value of 2 may be too high. In such applications Broken I^ may be
set lower, typically 1.4 or 1.5.
The setting range for Broken I^ is variable between 1.0 and 2.0 in 0.1 steps.
Note:
Any maintenance program must be fully compliant with the switchgear manufacturer’s instructions.
416 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
6 CB STATE MONITORING
CB State monitoring is used to verify the open or closed state of a circuit breaker. Most circuit breakers have
auxiliary contacts through which they transmit their status (open or closed) to control equipment such as
IEDs. These auxiliary contacts are known as:
● 52A for contacts that follow the state of the CB
● 52B for contacts that are in opposition to the state of the CB
This device can be set to monitor both of these types of circuit breaker state indication. If the state is
unknown for some reason, an alarm can be raised.
Some CBs provide both sets of contacts. If this is the case, these contacts will normally be in opposite
states. Should both sets of contacts be open, this would indicate one of the following conditions:
● Auxiliary contacts/wiring defective
● Circuit Breaker (CB) is defective
● CB is in isolated position
Should both sets of contacts be closed, only one of the following two conditions would apply:
● Auxiliary contacts/wiring defective
● Circuit Breaker (CB) is defective
If any of the above conditions exist, an alarm will be issued after a 5 s time delay. An output contact can be
assigned to this function via the programmable scheme logic (PSL). The time delay is set to avoid unwanted
operation during normal switching duties.
In the CB CONTROL column there is a setting called CB Status Input. This cell can be set at one of the
following four options:
● None
● 52A
● 52B
● Both 52A and 52B
Where None is selected no CB status is available. Where only 52A is used on its own then the device will
assume a 52B signal opposite to the 52A signal. Circuit breaker status information will be available in this
case but no discrepancy alarm will be available. The above is also true where only a 52B is used. If both 52A
and 52B are used then status information will be available and in addition a discrepancy alarm will be
possible, according to the following table:
Auxiliary Contact Position CB State Detected Action
52A 52B
Open Closed Breaker open Circuit breaker healthy
Closed Open Breaker closed Circuit breaker healthy
Closed Closed CB failure Alarm raised if the condition persists for greater than 5 s
Open Open State unknown Alarm raised if the condition persists for greater than 5 s
P54x1Z-TM-EN-1 417
Chapter 16 - Monitoring and Control P54x1Z
CB Aux 3ph(52- B)
& 1
1 CB Closed 3 ph
XOR
&
CB Status Input
&
52A 3 pole
52B 3 pole
52A & 52B 3 pole & 1
1 CB Open 3 ph
&
&
CB Aux A(52-A)
&
CB Status Input
&
52A 1 pole
52B 1 pole
1 CB Open A ph
52A & 52B 1 pole & 1
&
&
&
CB Aux B(52-B)
Phase B 1 CB Open B ph
CB Status Input
(Same logic as phase A )
52A 1 pole
52B 1 pole
52A & 52B 1 pole
CB Aux C(52- B)
Phase C 1 CB Open C ph
CB Status Input
(Same logic as phase A )
52A 1 pole
52B 1 pole
1 CB Status Alm
52A & 52B 1 pole
418 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
Circuit Breaker control is only possible if the circuit breaker in question provides auxiliary contacts. The CB
Status Input cell in the CB CONTROL column must be set to the type of circuit breaker. If no CB auxiliary
contacts are available then this cell should be set to None, and no CB control will be possible.
For local control, the CB control by cell should be set accordingly.
The output contact can be set to operate following a time delay defined by the setting Man Close Delay.
One reason for this delay is to give personnel time to safely move away from the circuit breaker following a
CB close command.
The control close cycle can be cancelled at any time before the output contact operates by any appropriate
trip signal, or by activating the Reset Close Dly DDB signal.
The length of the trip and close control pulses can be set via the Trip Pulse Time and Close Pulse Time
settings respectively. These should be set long enough to ensure the breaker has completed its open or
close cycle before the pulse has elapsed.
If an attempt to close the breaker is being made, and a protection trip signal is generated, the protection trip
command overrides the close command.
The Reset Lockout by setting is used to enable or disable the resetting of lockout automatically from a
manual close after the time set by Man Close RstDly.
If the CB fails to respond to the control command (indicated by no change in the state of CB Status inputs)
an alarm is generated after the relevant trip or close pulses have expired. These alarms can be viewed on
the LCD display, remotely, or can be assigned to output contacts using the programmable scheme logic
(PSL).
Note:
The CB Healthy Time and Sys Check time set under this menu section are applicable to manual circuit breaker
operations only. These settings are duplicated in the AUTORECLOSE menu for autoreclose applications.
The Lockout Reset and Reset Lockout by settings are applicable to CB Lockouts associated with manual
circuit breaker closure, CB Condition monitoring (Number of circuit breaker operations, for example) and
autoreclose lockouts.
The device includes the following options for control of a single circuit breaker:
● The IED menu (local control)
● The Hotkeys (local control)
● The function keys (local control)
● The opto-inputs (local control)
● SCADA communication (remote control)
P54x1Z-TM-EN-1 419
Chapter 16 - Monitoring and Control P54x1Z
For this to work you have to set the CB control by cell to option 1 Local, option 3 Local + Remote,
option 5 Opto+Local, or option 7 Opto+Local+Remote in the CB CONTROL column.
If the CB is currently closed, the command text on the bottom right of the LCD screen will read Trip.
Conversely, if the CB is currently open, the command text will read Close.
If you execute a Trip, a screen with the CB status will be displayed once the command has been
completed. If you execute a Close, a screen with a timing bar will appear while the command is being
executed. This screen also gives you the option to cancel or restart the close procedure. The time delay is
determined by the Man Close Delay setting in the CB CONTROL menu. When the command has been
executed, a screen confirming the present status of the circuit breaker is displayed. You are then prompted
to select the next appropriate command or exit.
If no keys are pressed for a period of 5 seconds while waiting for the command confirmation, the device will
revert to showing the CB Status. If no key presses are made for a period of 25 seconds while displaying the
CB status screen, the device will revert to the default screen.
To avoid accidental operation of the trip and close functionality, the hotkey CB control commands are
disabled for 10 seconds after exiting the hotkey menu.
The hotkey functionality is summarised graphically below:
Default Display
HOTKEY CB CTRL
Hotkey Menu
CB closed CB open
TRIP EXIT CONFIRM CANCEL EXIT CLOSE CANCEL CONFIRM CANCEL RESTART
E01209
420 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
Note:
Not all models provide function keys.
P54x1Z-TM-EN-1 421
Chapter 16 - Monitoring and Control P54x1Z
Protection Trip
Trip
Remote
Control
Trip Close
Remote
Control
Close
Local
Remote
Trip Close
E01207
422 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
Following manual circuit breaker closure, if either a single phase or a three phase fault occur, the circuit
breaker is tripped three phase, but Autoreclose is not locked out for this condition.
&
Init close CB Man Close Delay Close Pulse Time
1 Close in Prog
HMI Close
& S t
CB ARIP Q
RD 0 & Control Close
1 S t
Auto Close Q
RD 0
Reset Close Dly
External Trip3Ph 1
1
External Trip A
External Trip B
External Trip C
1 1
CB Open 3 ph
CB Open A ph
CB Open B ph &
CB Open C ph
CB Closed 3 ph
1
CB Closed A ph
CB Closed C ph
t
& Man CB Unhealthy
CB Healthy 0
t
& No C/S Man Close
CB Man SCOK 0
V03369
P54x1Z-TM-EN-1 423
Chapter 16 - Monitoring and Control P54x1Z
It can also be used to block operation of underfrequency and undervoltage elements where applicable.
V<
CB Open A ph
IB 20 ms
V<
CB Open B ph
IC 20 ms
CB Open 3 ph
V 01247
424 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
9 SYSTEM CHECKS
In some situations it is possible for both "bus" and "line" sides of a circuit breaker to be live when a circuit
breaker is open - for example at the ends of a feeder that has a power source at each end. Therefore, it is
normally necessary to check that the network conditions on both sides are suitable, before closing the circuit
breaker. This applies to both manual circuit breaker closing and autoreclosing. If a circuit breaker is closed
when the line and bus voltages are both live, with a large phase angle, frequency or magnitude difference
between them, the system could be subjected to an unacceptable shock, resulting in loss of stability, and
possible damage to connected machines.
The System Checks functionality involves monitoring the voltages on both sides of a circuit breaker, and if
both sides are live, performing a synchronisation check to determine whether any differences in voltage
magnitude, phase angle or frequency are within permitted limits.
The pre-closing system conditions for a given circuit breaker depend on the system configuration, and for
autoreclosing, on the selected autoreclose program. For example, on a feeder with delayed autoreclosing,
the circuit breakers at the two line ends are normally arranged to close at different times. The first line end to
close usually has a live bus and a dead line immediately before reclosing. The second line end circuit
breaker now sees a live bus and a live line.
If there is a parallel connection between the ends of the tripped feeder the frequencies will be the same, but
any increased impedance could cause the phase angle between the two voltages to increase. Therefore just
before closing the second circuit breaker, it may be necessary to perform a synchronisation check, to ensure
that the phase angle between the two voltages has not increased to a level that would cause unacceptable
shock to the system when the circuit breaker closes.
If there are no parallel interconnections between the ends of the tripped feeder, the two systems could lose
synchronism altogether and the frequency at one end could "slip" relative to the other end. In this situation,
the second line end would require a synchronism check comprising both phase angle and slip frequency
checks.
If the second line-end busbar has no power source other than the feeder that has tripped; the circuit breaker
will see a live line and dead bus assuming the first circuit breaker has re-closed. When the second line end
circuit breaker closes the bus will charge from the live line (dead bus charge).
9.1.1 VT CONNECTIONS
The device provides inputs for a three-phase "Main VT" and at least one single-phase VT for check
synchronisation. Depending on the primary system arrangement, the Main VT may be located on either the
line-side of the busbar-side of the circuit breaker, with the Check Sync VT on the other. Normally, the Main
VT is located on the line-side (as per the default setting), but this is not always the case. For this reason, a
setting is provided where you can define this. This is the Main VT Location setting, which is found in the CT
AND VT RATIOS column.
P54x1Z-TM-EN-1 425
Chapter 16 - Monitoring and Control P54x1Z
The Check Sync VT may be connected to one of the phase-to-phase voltages or phase-to-neutral voltages.
This needs to be defined using the CS Input setting in the CT AND VT RATIOS column. Options are, A-B, B-
C, C-A, A-N, B-N, or C-N.
426 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
E01204
P54x1Z-TM-EN-1 427
Chapter 16 - Monitoring and Control P54x1Z
VAN
Live Line & Live Line
VBN
VCN
Select Dead Line & Dead line
VAB
VBC
Live Bus & Live Bus
VCA
Voltage Monitors
MCB/VTS
MCB/VTS CB CS
1
Inhibit LL
1
Inhibit DL
1
Inhibit LB
1
Inhibit DB
V 01257
428 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
CS1 Criteria OK
VAN &
VBN CS2 Criteria OK
&
VCN
Select CS1 SlipF>
VAB & CS1 SlipF>
CS Vline>
& CS Vline>
CS Vbus>
& CS Vbus>
CS Vline<
& CS Vline<
Check Synchronisation Function
CS Vbus<
& CS Vbus<
CS1 Vl>Vb
& CS1 Vl>Vb
CS1 Vl<Vb
& CS1 Vl<Vb
CS1 Fl>Fb
& CS1 Fl>Fb
CS1 Fl<Fb
& CS1 Fl<Fb
CS1 AngHigh+
& CS1 AngHigh+
CS1 AngHigh-
& CS1 AngHigh-
CS2 Fl>Fb
& CS2 Fl>Fb
CS2 Fl<Fb
& CS2 Fl<Fb
CS2 AngHigh+
& CS2 AngHigh+
CS2 AngHigh-
& CS2 AngHigh-
CS AngRotACW
MCB/VTS CB CS & CS AngRotACW
MCB/VTS CS AngRotCW
& CS AngRotCW
VTS Fast Block
1 CS2 Vl>Vb
F out of Range & CS2 Vl>Vb
CS2 Vl<Vb
& CS2 Vl<Vb
CS1 Status
Enabled
& Check Sync 1 OK
CS1 Enabled
CS2 Status
Enabled & Check Sync 2 OK
P54x1Z-TM-EN-1 429
Chapter 16 - Monitoring and Control P54x1Z
SysChks Inactive
Check Sync 1 OK
Check Sync 2 OK
&
Dead Line
&
Live Bus
V02028
Examples
For CS1, where the Phase Angle setting is 30° and the Timer setting is 3.3 s, the “slipping” vector has to
remain within +/- 30° of the reference vector for at least 3.3 seconds. Therefore a synchronisation check
output will not be given if the slip is greater than 2 x 30° in 3.3 seconds.
Therefore, the maximum slip frequency = 2x30/360x3.3 = 0.0505 hz.
For CS2, where the Phase Angle setting is 10° and the Timer setting is 0.1 sec., the slipping vector has to
remain within 10° of the reference vector, with the angle decreasing, for 0.1 sec. When the angle passes
through zero and starts to increase, the synchronisation check output is blocked. Therefore an output will not
be given if the slip is greater than 10° in 0.1 second.
Therefore, the maximum slip frequency = 10/360x0.1 = 0.278 Hz.
Slip control by Timer is not practical for “large slip/small phase angle” applications, because the timer
settings required are very small, sometimes less than 0.1 seconds. For these situations, slip control by
frequency is better.
430 P54x1Z-TM-EN-1
P54x1Z Chapter 16 - Monitoring and Control
If Slip Control by Frequency + Timer is selected, for an output to be given, the slip frequency must be less
than BOTH the set Slip Freq. value and the value determined by the Phase Angle and Timer settings.
By enabling both CS1 and CS2, the device can be configured to allow CB closure if either of the two
conditions is detected.
For manual circuit breaker closing with synchronism check, some utilities might prefer to arrange the logic to
check initially for condition 1 only. However, if a System Split is detected before the condition 1 parameters
are satisfied, the device will switch to checking for condition 2 parameters instead, based on the assumption
that a significant degree of slip must be present when system split conditions are detected. This can be
arranged by suitable PSL logic, using the System Check DDB signals.
P54x1Z-TM-EN-1 431
Chapter 16 - Monitoring and Control P54x1Z
432 P54x1Z-TM-EN-1
SUPERVISION
CHAPTER 17
Chapter 17 - Supervision P54x1Z
434 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
1 CHAPTER OVERVIEW
This chapter describes the supervison functions.
This chapter contains the following sections:
Chapter Overview 435
Current Differential Supervision 436
Voltage Transformer Supervision 444
Current Transformer Supervision 448
Trip Circuit Supervision 452
P54x1Z-TM-EN-1 435
Chapter 17 - Supervision P54x1Z
Which starter elements are used and in which combination depend on the specific application and customer
requirements. The device provides complete flexibility, allowing you to use each of them individually or in
combination with one another using PSL.
The starter element settings are located in the CURRENT DIFF column. You can choose to enable, or
disable them, or select Idiff Permit (discussed later). They are disabled by default.
436 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
If a starter element picks up, the associated DDB signal is asserted. These can be used to block the current
differential protection. These DDB signals are:
● I1 Lo Start (Positive phase-sequence fixed threshold start)
● Del I1 Lo Start (Rate-of-change of positive phase-sequence current)
● I2 Lo Start (Negative phase-sequence fixed threshold start)
● Del I2 Lo Start (Rate-of-change of negative phase-sequence current)
If elements are set to Disabled, then the DDB signals cannot be asserted.
If elements are set to Enabled, then the DDB signals will be asserted if appropriate conditions are met. This
will allow you to use PSL to customize supervision of Current Differential protection operation. These signals
do not directly affect the operation of the Current Differential function. In order to directly influence the
operation of the current differential function you need to set one or more of the starter elements to Idiff
Permit.
If elements are set to Idiff Permit, then the DDB Start signals will also be asserted if the appropriate
conditions are met, so you can use the PSL to customise supervision of Current Differential protection
operation. In addition however, if any one or more elements are set to IDiff Permit, then fixed internal
logic is employed to produce an internal signal (Permit CDiff) that supervises the Current Differential
protection by either inhibiting it or permitting it.
P54x1Z-TM-EN-1 437
Chapter 17 - Supervision P54x1Z
I1
& I1 Lo Start
Start I1 low
Start I1
Disabled
1/ 8 cycle
I1 Delta
PU
S
Q Del I1 Lo Start
Delta I1 low & R
1
Block Delta PU
Delta I1
Disabled
Reset Low Time
I2
& I2 Lo Start
Start I2 low
Start I2
Disabled
1/ 8 cycle
I2 Delta
PU
S
Q Del I2 Lo Start
Delta I2 low & R
Block Delta 1
PU
Block Start I2 1 Any Low Set Start
Delta I2 1
Reset Low Time
Disabled
1 Any Delta Start
Start I1
Idiff Permit
1 Any Thresh Start
Delta I1
Idiff
Start
Permit
I1
&
Start I2
Idiff Permit
Delta I2
Idiff Permit
I1
&
Start I1 low
I1 Delta
&
1 Permit Cdiff
Delta I1 low
I2
&
Start I2 low
I2 Delta
&
Delta I2 low
V 02600
438 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
Permit Cdiff SD
Q
1 R
& IDiff>Start A
Phase A Current Differential threshold reached
& IDiff>Start B
Phase B Current Differential threshold reached
& IDiff>Start C
Phase C Current Differential threshold reached
V02601
P54x1Z-TM-EN-1 439
Chapter 17 - Supervision P54x1Z
Operate
Region
K2 slope
Supervise
Region
Restrain
K1 Slope
Region
IS1
IS2 Ibias
V02603
440 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
exceeds the criteria for tripping, maloperation will occur. If the level is less, it can be assumed to be caused
by asymmetric communications paths and the restraint characteristic can be changed to prevent tripping
should the effect of increasing load current with communications asymmetry take the apparent differential
current above the operate threshold.
Referring to the Switched Communication Path Supervision feature, if communication switching takes place,
the Current Differential protection will detect a propagation delay change and invoke a temporary increase in
the tripping threshold for a period set in the Char Mod Time setting column. When the timer expires, the
standard characteristic is restored. Whilst the timer is active, the differential protection will be stable for
asymmetric communication paths but if the asymmetry persists when the characteristic switches back, the
protection might trip. Using the current differential supervision feature, the condition can be detected and
maloperation can be prevented.
The function superimposes a second dual slope characteristic (defined by the settings IDiff Isup1 and IDiff
Isup2) onto the standard operating characteristic as shown in the figure below:
Idiff
K2 slope
Operate
Supervise
(Block or Alarm)
K1 Slope
Restrain
IS1
Isup1
Note:
Idiff Sup TDelay must always be set greater than the value set in Char Mod time.
P54x1Z-TM-EN-1 441
Chapter 17 - Supervision P54x1Z
If the GPS signal is available, terminals will be synchronised, and the communications paths propagation
delay times (tp1 and tp2) will be continuously calculated and retained by each terminal. Should there be a
failure of the GPS input, the synchronisation might be lost and the product will adapt its operation according
to the chosen GPS Sync setting as explained below.
GPS Standard
If GPS -> Standard is selected, the time alignment of the current data is performed by using the values of
propagation delay times (tp1, tp2) that were calculated and stored prior to the GPS failure. Each terminal
continues to measure the overall propagation delay (tp1+tp2). If the overall propagation delay remains
unchanged, the differential protection will continue to use the stored values until the GPS synchronisation is
restored.
A communications delay tolerance setting (Comm Delay Tol) is provided. If the overall propagation delay
changes but by an amount less than this setting, the differential protection will continue to use the stored
values of tp1 and tp2 until GPS synchronisation is restored. If the overall propagation delay changes by an
amount more than this setting, the differential protection will be blocked until GPS synchronisation is
restored.
GPS Inhibit
With GPS -> Inhibit selected, if the propagation delay times are equal when the GPS synchronisation is
lost, the product reverts to the ping-pong method of time alignment. If the propagation delays are not equal
when the GPS signal is lost, the product performs in the same way as if GPS -> Standard had been
selected, using the stored propagation delay times.
If the propagation delay changes by more than the Comm Delay Tol setting, the differential protection is
blocked until GPS synchronisation is restored.
GPS Restrain
If GPS -> Restrain is selected in the GPS Sync setting, the supervision applied to the Current Differential
function is the same as that for Switched Communications Paths Supervision described previously, and
based on increasing the bias quantity if path switching is detected.
In this case, if GPS has failed, and if the difference between successive propagation delay time
measurements exceeds the user settable Comm Delay Tol value, the device asserts the Comm Delay
Alarm DDB signal and initiates the temporary change in the bias characteristic managed by the Char Mod
Time and Char Mod RstTime settings.
442 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
Setting Description.
When the protection communications are enabled, and where used, the overall propagation delay divided by 2 is
calculated for channel 2. The maximum value is determined and displayed in the MEASUREMENTS 4 column.
MaxCh2 PropDelay
The value is compared against the MaxCh2 PropDelay setting. If the setting is exceeded, an alarm MaxCh2
PropDelay DDB is raised.
This is used to enable (activate) or disable (turn off) the alarms of absolute difference between the Transmission
TxRx Delay Stats
and Reception propagation delay. This setting is not visible if GPS Sync is disabled.
When Current Diff is enabled and if GPS Sync is not disabled, the absolute difference between the Transmission
and Reception propagation delay on channel 1 is calculated. The maximum value is displayed in the
MaxCh1 Tx-RxTime
MEASUREMENTS 4 column. The value is compared against the MaxCh1 Tx-RxTime setting. If the setting is
exceeded, an alarm, MaxCh1 Tx-RxTime DDB is raised.
When Current Diff is enabled and if GPS Sync is not disabled, if channel 2 is used, the absolute difference
between the Transmission and Reception propagation delay is calculated. The maximum value is displayed in the
MaxCh2 Tx-RxTime
MEASUREMENTS 4 column. The value is compared against the MaxCh2 Tx-RxTime setting. If the setting is
exceeded, an alarm, MaxCh2 Tx-RxTime DDB is raised.
This sets the time delay after which the GPS Alarm signal is asserted following a loss of GPS signal or by
GPS Fail Timer
initiation by the GPS transient fail alarm function described by the setting GPS Trans Fail.
To enable (activate) or disable (turn off) the transient GPS Fail alarm function described by the GPS Trans Count
GPS Trans Fail
and GPS Trans Timer settings.
Sets the count for the number of failed GPS signals which must be exceeded in the GPS Trans Timer setting
GPS Trans Count
window after which the GPS Fail Timer is initiated.
Sets the rolling time window in which the GPS Trans Count must be exceeded after which the GPS Fail Timer is
GPS Trans Timer
initiated.
P54x1Z-TM-EN-1 443
Chapter 17 - Supervision P54x1Z
The first condition would require VTS to block the voltage-dependent functions.
444 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
In the second condition, voltage dependent functions should not be blocked, as tripping is required.
To differentiate between these two conditions an overcurrent level detector is used (VTS I> Inhibit). This
prevents a VTS block from being issued in case of a genuine fault. This overcurrent level detector is only
enabled for 240 ms following line energization (based on an All Poles Dead signal drop off). It must still be
set in excess of any non-fault based currents on line energisation (load, line charging current, transformer
inrush current if applicable), but below the level of current produced by a close-up three-phase fault.
If the line is closed where a three-phase VT failure is present, the overcurrent detector will not operate and a
VTS block will be applied. Closing onto a three-phase fault will result in operation of the overcurrent detector
and prevent a VTS block being applied.
Thresholds
The negative sequence thresholds used by the element are:
● V2 = 10 V (fixed)
● I2 = 0.05 to 0.5 In settable (default 0.05 In).
Fuse Fail
The device includes a setting (VT Connected ) in the CT AND VT RATIOS column, which determines
whether there are voltage transformers connected to it. If set to Yes, this setting has no effect.
If set to No it causes the VTS logic to set the VTS Slow Block and VTS Fast Block DDBs, but not raise any
alarms. It also disables the VTS function. This prevents the pole dead logic working incorrectly if there is no
voltage or current. It also blocks the distance, under voltage and other voltage-dependant functions.
However, it does not affect the CB open part of the logic.
A VTS condition can be raised by a mini circuit breaker (MCB) status input, by internal logic using IED
measurement, or both. The setting VTS Mode is used to select the method of indicating VT failure.
P54x1Z-TM-EN-1 445
Chapter 17 - Supervision P54x1Z
IA
240ms
VTS I> Inhibit
IB &
1
VTS I> Inhibit
IC
VA
VB
&
Hardcoded threshold 1 & S
Q
VC R 1
& VTS Slow Block
Hardcoded threshold
Delta IA
Delta IB
1 & S
Q
Hardcoded threshold
R
Delta IC
Hardcoded threshold
&
V2
MCB/VTS
VTS Status
Indication
Blocking
1 S 1 VT Fail Alarm
Any Pole Dead & Q
240ms R
& 20 ms
VTS Acc Ind V01261
446 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
Note:
All non-distance voltage-dependent elements are blocked by the VTS Fast Block DDB.
If a miniature circuit breaker (MCB) is used to protect the voltage transformer output circuits, MCB auxiliary
contacts can be used to indicate a three-phase output disconnection. It is possible for the VTS logic to
operate correctly without this input, but this facility has been provided to maintain compatibility with some
practises. Energising an opto-isolated input assigned to the MCB/VTS provides the necessary block.
The VTS function is inhibited if:
● An All Poles Dead DDB signal is present
● Any phase overcurrent condition exists
● A Negative Phase Sequence current exists
● If the phase current changes over the period of 1 cycle
P54x1Z-TM-EN-1 447
Chapter 17 - Supervision P54x1Z
If the ratio is non-zero, we can assume one of two conditions are present:
● The system has an unbalanced fault (both I2 and I1 are non-zero)
● There is a 1 or 2 phase CT problem (both I2 and I1 are non-zero)
Measurement at a single end cannot provide any more information than this. However, if the ratio is
calculated at all ends and compared, the device can make a decision based on the following criteria:
● If the ratio is non-zero at more than two ends, it is almost certainly a genuine fault condition and so the
CT supervision is prevented from operating.
● If the ratio is non-zero at one end, there is a chance of either a CT problem or a single-end fed fault
condition.
A second criterion looks to see whether the differential system is loaded or not. For this purpose the device
looks at the positive sequence current I1. If load current is detected at one-end only, the device assumes that
this is an internal fault condition and prevents CTS operation. However, if load current is detected at two or
more ends, this indicates CT failure, so CTS operation is allowed.
There are two modes of operation, Indication and Restrain. You determine the mode of operation with
the CTS Status setting. In Indication mode, a CTS alarm is raised but there is no effect on tripping. In
448 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
Restrain mode, the differential protection is blocked for 20 ms after CT failure detection, then the Current
Differential threshold setting is raised above the load current.
For correct operation of the scheme, Differential CTS must be enabled at each end of the protected zone.
Inhibit CTS
&
Any Trip
Disable CTS
CT1 L i1>
1
CT1 R1 i1>
>
=
2
CT1 R2 i1>
CT1 L i2/i1>>
CTS Status CTS Time Delay
Indication
CT1 R1 i2/i1> S
& Pickup
Q CT Fail Alarm
CT1 R2 i2/i1> & R
1
CTS Reset Mode CTS Status & CTS Block
Manual Restrain
CT1 R1 i2 /i1 >>
CT1 L i2/i1>
Auto 1
&
CTS Status
CT1 R2 i2/i1>
Restrain
CTS Restrain
& Pickup
CTS Status 1 & CTS Block Diff
Indication
1 Pickup S
Q Remote CT Alarm
& R
*
CT1 R2 i2 /i1 >>
CT1 L i2/i1>
& 1
CT1 R1 i2/i1> CTS Reset Mode *In indication mode, timer is set to 20ms
Manual
Auto V01262
P54x1Z-TM-EN-1 449
Chapter 17 - Supervision P54x1Z
system phase currents are healthy. Standard CTS works by detecting a derived zero sequence current
where there is no corresponding derived zero sequence voltage.
The voltage transformer connection used must be able to refer zero sequence voltages from the primary to
the secondary side. Therefore, this element should only be enabled where the VT is of a five-limb
construction, or comprises three single-phase units with the primary star point earthed.
The CTS function is implemented in the SUPERVISION column of the relevant settings group, under the
sub-heading CT SUPERVISION.
The following settings are relevant for CT Supervision:
● CTS Status: to disable or enable CTS
● CTS VN< Inhibit: inhibits CTS if the zero sequence voltage exceeds this setting
● CTS IN> Set: determines the level of zero sequence current
● CTS Time Delay: determines the operating time delay
& Pickup S
CTS IN> Set
Q CT Fail Alarm
VN * & R
CTS Status 1
* In indication mode, timer is set to20ms
Indication
Restrain
V 01263
450 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
Where the magnitude of residual voltage during an earth fault is unpredictable, the element can be disabled
to prevent protection elements being blocked during fault conditions.
Note:
The minimum generated i2/i1 ratio will be 50% (case of one CT secondary phase lead being lost), and therefore a
setting of 40% is considered appropriate to guarantee sufficient operating speed.
P54x1Z-TM-EN-1 451
Chapter 17 - Supervision P54x1Z
Note:
A 52a CB auxiliary contact follows the CB position. A 52b auxiliary contact is the opposite.
+ve
Blocking diode
52B
452 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
Trip Circuit Voltage Opto Voltage Setting with R1 Fitted Resistor R1 (ohms)
48/54 24/27 1.2k
110/125 48/54 2.7k
220/250 110/125 5.2k
Warning:
This Scheme is not compatible with Trip Circuit voltages of less than 48 V.
0 0
Opto Input dropoff straight *Output Relay
400 0
50
& pickup Latching LED
0
User Alarm
P54x1Z-TM-EN-1 453
Chapter 17 - Supervision P54x1Z
+ve
52B
R1 Opto-input 1
Circuit Breaker
-ve
R2 Opto-input 2
V01215
Warning:
This Scheme is not compatible with Trip Circuit voltages of less than 48 V.
50
& pickup Latching LED
0
User Alarm
454 P54x1Z-TM-EN-1
P54x1Z Chapter 17 - Supervision
+ve
R3
Output Relay Trip coil
Trip path 52A
R2
52B
Warning:
This Scheme is not compatible with Trip Circuit voltages of less than 48 V.
0 0
Opto Input dropoff straight *Output Relay
400 0
50
& pickup Latching LED
0
User Alarm
P54x1Z-TM-EN-1 455
Chapter 17 - Supervision P54x1Z
456 P54x1Z-TM-EN-1
DIGITAL I/O AND PSL
CONFIGURATION
CHAPTER 18
Chapter 18 - Digital I/O and PSL Configuration P54x1Z
458 P54x1Z-TM-EN-1
P54x1Z Chapter 18 - Digital I/O and PSL Configuration
1 CHAPTER OVERVIEW
This chapter introduces the PSL (Programmable Scheme Logic) Editor, and describes the configuration of
the digital inputs and outputs. It provides an outline of scheme logic concepts and the PSL Editor. This is
followed by details about allocation of the digital inputs and outputs, which require the use of the PSL Editor.
A separate "Settings Application Software" document is available that gives a comprehensive description of
the PSL, but enough information is provided in this chapter to allow you to allocate the principal digital inputs
and outputs.
This chapter contains the following sections:
Chapter Overview 459
Configuring Digital Inputs and Outputs 460
Scheme Logic 461
Configuring the Opto-Inputs 464
Assigning the Output Relays 465
Fixed Function LEDs 466
Configuring Programmable LEDs 467
Function Keys 469
Control Inputs 470
P54x1Z-TM-EN-1 459
Chapter 18 - Digital I/O and PSL Configuration P54x1Z
460 P54x1Z-TM-EN-1
P54x1Z Chapter 18 - Digital I/O and PSL Configuration
3 SCHEME LOGIC
The product is supplied with pre-loaded Fixed Scheme Logic (FSL) and Programmable Scheme Logic (PSL).
The Scheme Logic is a functional module within the IED, through which all mapping of inputs to outputs is
handled. The scheme logic can be split into two parts; the Fixed Scheme Logic (FSL) and the Programmable
Scheme Logic (PSL). It is built around a concept called the digital data bus (DDB). The DDB encompasses
all of the digital signals (DDBs) which are used in the FSL and PSL. The DDBs included digital inputs,
outputs, and internal signals.
The FSL is logic that has been hard-coded in the product. It is fundamental to correct interaction between
various protection and/or control elements. It is fixed and cannot be changed.
The PSL gives you a facility to develop custom schemes to suit your application if the factory-programmed
default PSL schemes do not meet your needs. Default PSL schemes are programmed before the product
leaves the factory. These default PSL schemes have been designed to suit typical applications and if these
schemes suit your requirements, you do not need to take any action. However, if you want to change the
input-output mappings, or to implement custom scheme logic, you can change these, or create new PSL
schemes using the PSL editor.
The PSL consists of components such as logic gates and timers, which combine and condition DDB signals.
The logic gates can be programmed to perform a range of different logic functions and. The number of inputs
to a logic gate are not limited. The timers can be used either to create a programmable delay or to condition
the logic outputs. Output contacts and programmable LEDs have dedicated conditioners.
The PSL logic is event driven. Only the part of the PSL logic that is affected by the particular input change
that has occurred is processed. This minimises the amount of processing time used by the PSL ensuring
industry leading performance.
The following diagram shows how the scheme logic interacts with the rest of the IED.
P54x1Z-TM-EN-1 461
Chapter 18 - Digital I/O and PSL Configuration P54x1Z
SL outputs
SL inputs
Opto-inputs Programmable LEDs
PSL and FSL
Goose outputs
Control inputs
Goose inputs
V02011
462 P54x1Z-TM-EN-1
P54x1Z Chapter 18 - Digital I/O and PSL Configuration
Example:
Date/time: This cell displays the date and time when the PSL scheme was downloaded to the IED.
Example:
18 Nov 2002
08:59:32.047
Grp(n) PSL ID: This cell displays a unique ID number for the downloaded PSL scheme.
Example:
Grp(n) PSL ID
ID - 2062813232
P54x1Z-TM-EN-1 463
Chapter 18 - Digital I/O and PSL Configuration P54x1Z
464 P54x1Z-TM-EN-1
P54x1Z Chapter 18 - Digital I/O and PSL Configuration
Note:
Contact Conditioners are only available if they have not all been used. In some default PSL schemes, all Contact
Conditioners might have been used. If that is the case, and you want to use them for something else, you will need to
re-assign them.
On the toolbar there is another button associated with the relay outputs. The button looks like this:
This is the "Contact Signal" button. It allows you to put replica instances of a conditioned output relay into the
PSL, preventing you having to make cross-page connections which might detract from the clarity of the
scheme.
P54x1Z-TM-EN-1 465
Chapter 18 - Digital I/O and PSL Configuration P54x1Z
You enable the automatic self-resetting with the Sys Fn Links cell in the SYSTEM DATA column. A '0'
disables self resetting and a '1' enables self resetting.
The reset occurs when the circuit is reclosed and the Any Pole Dead signal has been reset for three
seconds providing the Any Start signal is inactive. The reset is prevented if the Any Start signal is active
after the breaker closes.
The Trip LED logic is as follows:
Any Trip
Trip LED Trigger
Reset
1
Reset Relays/LED
Sys Fn Links
Trip LED S/Reset
&
Any Start
V01211
466 P54x1Z-TM-EN-1
P54x1Z Chapter 18 - Digital I/O and PSL Configuration
DDB signals are mapped in the PSL and used to illuminate the LEDs. For single-coloured programmable
LEDs there is one DDB signal per LED. For tri-coloured LEDs there are two DDB signals associated with the
LED. Asserting LED # Grn will illuminate the LED green. Asserting LED # Red will illuminate the LED red.
Asserting both DDB signals will illuminate the LED amber.
The illumination of an LED is controlled by means of a conditioner. Using the conditioner, you can decide
whether the LEDs reflect the real-time state of the DDB signals, or whether illumination is latched pending
user intervention.
To map an LED in the PSL you should use the LED Conditioner button in the toolbar to import it. You then
condition it according to your needs. The output(s) of the conditioner respect the attribute you have
assigned.
The toolbar button for a tri-colour LED looks like this:
Note:
LED Conditioners are only available if they have not all been used up, and in some default PSL schemes they might
be. If that is the case and you want to use them for something else, you will need to re-assign them.
On the toolbar there is another button associated with the LEDs. For a tri-coloured LED the button looks like
this:
P54x1Z-TM-EN-1 467
Chapter 18 - Digital I/O and PSL Configuration P54x1Z
It is the "LED Signal" button. It allows you to put replica instances of a conditioned LED into the PSL,
preventing you having to make cross-page connections which might detract from the clarity of the scheme.
468 P54x1Z-TM-EN-1
P54x1Z Chapter 18 - Digital I/O and PSL Configuration
8 FUNCTION KEYS
For most models, a number of programmable function keys are available. This allows you to assign function
keys to control functionality via the programmable scheme logic (PSL). Each function key is associated with
a programmable tri-colour LED, which you can program to give the desired indication on activation of the
function key.
These function keys can be used to trigger any function that they are connected to as part of the PSL. The
function key commands are found in the FUNCTION KEYS column.
Each function key is associated with a DDB signal as shown in the DDB table. You can map these DDB
signals to any function available in the PSL.
The Fn Key Status cell displays the status (energised or de-energised) of the function keys by means of a
binary string, where each bit represents a function key starting with bit 0 for function key 1.
Each function key has three settings associated with it, as shown:
● Fn Key (n), which enables or disables the function key
● Fn Key (n) Mode, which allows you to configure the key as toggled or normal
● Fn Key (n) label, which allows you to define the function key text that is displayed
The Fn Key (n) cell is used to enable (unlock) or disable (unlock) the function key signals in PSL. The Lock
setting has been provided to prevent further activation on subsequent key presses. This allows function keys
that are set to Toggled mode and their DDB signal active ‘high’, to be locked in their active state therefore
preventing any further key presses from deactivating the associated function. Locking a function key that is
set to the “Normal” mode causes the associated DDB signals to be permanently off. This safety feature
prevents any inadvertent function key presses from activating or deactivating critical functions.
When the Fn Key (n) Mode cell is set to Toggle, the function key DDB signal output will remain in the set
state until a reset command is given. In the Normal mode, the function key DDB signal will remain energised
for as long as the function key is pressed and will then reset automatically. In this mode, a minimum pulse
duration can be programmed by adding a minimum pulse timer to the function key DDB output signal.
The Fn Key Label cell makes it possible to change the text associated with each individual function key. This
text will be displayed when a function key is accessed in the function key menu, or it can be displayed in the
PSL.
The status of all function keys are recorded in non-volatile memory. In case of auxiliary supply interruption
their status will be maintained.
P54x1Z-TM-EN-1 469
Chapter 18 - Digital I/O and PSL Configuration P54x1Z
9 CONTROL INPUTS
The control inputs are software switches, which can be set or reset locally or remotely. These inputs can be
used to trigger any PSL function to which they are connected. There are three setting columns associated
with the control inputs: CONTROL INPUTS, CTRL I/P CONFIG and CTRL I/P LABELS. These are listed in
the Settings and Records appendix at the end of this manual.
470 P54x1Z-TM-EN-1
FIBRE TELEPROTECTION
CHAPTER 19
Chapter 19 - Fibre Teleprotection P54x1Z
472 P54x1Z-TM-EN-1
P54x1Z Chapter 19 - Fibre Teleprotection
1 CHAPTER OVERVIEW
This chapter provides information about the fibre-optic communication mechanism,which is used to provide
unit schemes and general-purpose teleprotection signalling for protection of transmission lines and
distribution feeders. The feature is called Fibre Teleprotection.
This chapter contains the following sections:
Chapter Overview 473
Protection Signalling Introduction 474
Fibre Teleprotection Implementation 476
IM64 Logic 485
Application Notes 487
P54x1Z-TM-EN-1 473
Chapter 19 - Fibre Teleprotection P54x1Z
Direct Tripping
In direct tripping applications (also known as intertripping), signals are sent directly to the master trip relay.
Receipt of the command causes circuit breaker operation. The method of communication must be reliable
and secure because any signal detected at the receiving end causes a trip of the circuit at that end. The
communications system must be designed so that interference on the communication circuit does not cause
spurious trips. If a spurious trip occurs, the primary system might be unnecessarily isolated.
Permissive Tripping
Permissive trip commands are always monitored by a protection relay. The circuit breaker is tripped when
receipt of the command coincides with a ‘start’ condition being detected by the protection relay at the
receiving end responding to a system fault. Requirements for the communications channel are less onerous
474 P54x1Z-TM-EN-1
P54x1Z Chapter 19 - Fibre Teleprotection
than for direct tripping schemes, since receipt of an incorrect signal must coincide with a ‘start’ of the
receiving end protection for a trip operation to take place. The intention of these schemes is to speed up
tripping for faults occurring within the protected zone.
Blocking Scheme
Blocking commands are initiated by a protection element that detects faults external to the protected zone.
Detection of an external fault at the local end of a protected circuit results in a blocking signal being
transmitted to the remote end. At the remote end, receipt of the blocking signal prevents the remote end
protection operating if it had detected the external fault. Loss of the communications channel is less serious
for this scheme than in others as loss of the channel does not result in a failure to trip when required.
However, the risk of a spurious trip is higher.
Historically, pilot wires and channels (discontinuous pilot wires with isolation transformers or repeaters along
the route between signalling points) have been the most widely used due to their availability, followed by
Power Line Carrier Communications (PLCC) techniques and radio. In recent years, fibre-optic systems have
become the usual choice for new installations, primarily due to their complete immunity from electrical
interference. The use of fibre-optic cables also greatly increases the number of communication channels
available for each physical fibre connection and thus enables more comprehensive monitoring of the power
system to be achieved by the provision of a large number of communication channels.
P54x1Z-TM-EN-1 475
Chapter 19 - Fibre Teleprotection P54x1Z
476 P54x1Z-TM-EN-1
P54x1Z Chapter 19 - Fibre Teleprotection
In a three terminal scheme, channel 1 of one device should always connect to channel 2 of another device
as shown in the figure below.
RX CH 1 CH 2 TX
IED B
TX RX
Remote 1
TX RX TX RX
CH 2 CH 1
CH 1 CH 2
RX TX RX TX
V02500
P54x1Z-TM-EN-1 477
Chapter 19 - Fibre Teleprotection P54x1Z
scheme must share the same group. For addressing, the different devices are referenced as ‘A’, ‘B’, and ‘C’
for three-terminal schemes. Their addresses should recognise the referencing.
So for a two-terminal scheme, if one device has the address set to ‘5-A’ the other should have the address to
‘5-B’.
Similarly, in a three-terminal scheme if one device has address ‘1-A’, the other devices would have
addresses ‘1-B’ and ‘1-C’. The address is set using the address setting in the PROT COMMS/IM64 column.
Note:
A universal address (0-0) is used as default. If this is used all products use the same address ‘0-0’. This is primarily
intended to help test the product before it goes into service. We strongly recommend not to use 0-0 in service since
any communications switching or loopback condition will not be detected and may cause false tripping.
Note:
For a three-terminal scheme, the A, B, and C parts of the address group should match the figure shown earlier for a
triangulated scheme where device A has address A, device B has address B, and device C has address C.
478 P54x1Z-TM-EN-1
P54x1Z Chapter 19 - Fibre Teleprotection
P54x1Z-TM-EN-1 479
Chapter 19 - Fibre Teleprotection P54x1Z
In this application the command bits are packaged with the Current Differential signals. Current Differential
protection and the IM64 signalling will be maintained in the event of a single communication channel failure.
Connections are made using appropriate fibre-optic cables terminated with BFOC/2.5 connectors. The
transmitter of one device (for example Tx1) is connected to the receiver of another (Rx1 or Rx2 according to
the scheme set-up)
Products can be supplied with the following fibre-optic channel arrangements:
480 P54x1Z-TM-EN-1
P54x1Z Chapter 19 - Fibre Teleprotection
Ch 1 Ch2
850 nm 850 nm
1300 nm multi-mode Not fitted
1300 nm multi-mode 1300 nm multi-mode
1300 nm single-mode Not fitted
1300 nm single-mode 1300 nm single-mode
1550 nm single-mode Not fitted
1550 nm single-mode 1550 nm single-mode
850 nm 1300 nm multi-mode
850 nm 1300 nm single-mode
850 nm 1550 nm single-mode
1300 nm multi-mode 850 nm
1300 nm single-mode 850 nm
1550 nm single-mode 850 nm
P54x1Z-TM-EN-1 481
Chapter 19 - Fibre Teleprotection P54x1Z
Multiplexer or Multiplexer or
Multiplexer
xDSL modem xDSL modem
Multiplexer or Multiplexer or
Multiplexer
xDSL modem xDSL modem
V02501
Note:
P59x interface units should be mounted as close as possible to the telecommunications equipment to minimise
interference on the electrical connections.
482 P54x1Z-TM-EN-1
P54x1Z Chapter 19 - Fibre Teleprotection
Note:
To use this configuration, you need to set Comms Mode to ‘IEEE C37.94’. You then need to remove the power
supply from the product and then re-apply the power. The setting is now effective. If ‘IEEE C37.94’ is used, it applies
to both communication channels.
The IEEE C37.94 standard defines an N*64 kbits/s selection, where N is a number between 1 and 12 and
selects the channel used in the multiplexer. The value of N is set on a per channel basis by setting Ch1
N*64kbits/s (and Ch2 N*64kbits/s where applicable) to N (1 to 12). For convenience an auto-detect setting
is provided. Setting to Auto means that the device will automatically determine which multiplexer channel to
use.
When P59x units are used in the communications channel of the protection scheme, the following must be
set:
● Comms Mode
● Baud Rate Chn (n = 1 or 2)
● Clock Source Chn (n = 1 or 2)
You should set the Comms Mode setting to Standard, and you should match the Baud Rate to the channel
data rate.
For V.35, you should set the Clock Source to External for a multiplexer network which is supplying a
master clock signal, or to Internal for a multiplexer network recovering signal timing from the equipment
(clock recovery). For G.703 and X.21, you always set the clock source to External.
P54x1Z-TM-EN-1 483
Chapter 19 - Fibre Teleprotection P54x1Z
A communication alarm is raised if the message error rate exceeds the IM Msg Alarm Lvl setting and
persists for the period defined by the Comm Fail Timer setting. Using the default settings will raise an alarm
for a persistent Bit Error Rate (BER) of 1.5 x 10 –3.
The alarm will be apparent at the receiving device, which will reflect the alarm back to the transmitting
device.
Note:
The Comm Fail Mode setting applies only to devices configured for dual redundant or three-terminal configuration. It
defines what combination of failures on the two communications channels is used to indicate an alarm.
Note:
The MaxCh1 PropDelay and MaxCh2 PropDelay settings for Channel 1 (and Channel 2 if fitted) are only visible if
the Prop Delay Stats setting is Enabled.
484 P54x1Z-TM-EN-1
P54x1Z Chapter 19 - Fibre Teleprotection
4 IM64 LOGIC
Channel Timeout
t
No Received Messages Ch 1 Ch1 Timeout
0 t
1
Poor Channel Quality Ch 1 0 1 Signalling Fail
Ch1 Degraded
Channel Timeout
1
Scheme Setup &
3 terminal
&
V02502
Loopback Mode
Internal
1 Test Loopback
External
Scheme Setup
3 terminal
& Ch2 Passthrough
Channel 2 IM64 Bits
received from channel 1
V02503
P54x1Z-TM-EN-1 485
Chapter 19 - Fibre Teleprotection P54x1Z
Message Evaluation
message (IEEE C37.94) Ch1 Signal Lost
Message Info
Channel 1
Error in Transit
Ch1 Path Yellow
Message Info
Comms Mode
IEEE C37 .94 Channel Mismatch Ch1 Mismatch RxN
Error in Receive
Message Evaluation
Ch2 Signal Lost
Message Info
Channel 1
Error in Transit
Ch2 Path Yellow
Message Info
Channel 2 Communication Channel Mismatch Ch2 Mismatch RxN
message (IEEE C37 .94 )
Comms Mode
Standard S
Q
IEEE C37 .94 RD & Comms Changed
S
Q
RD
Relay Power Up
Fixed Pulse
V02504
Figure 247: IM64 communications mode and IEEE C37.94 alarm signals
486 P54x1Z-TM-EN-1
P54x1Z Chapter 19 - Fibre Teleprotection
5 APPLICATION NOTES
Effective communications are essential for the performance of teleprotection schemes. Disturbances on the
communications links need to be detected and reported so that appropriate actions can be taken to ensure
that the power system does not go unprotected.
P54x1Z-TM-EN-1 487
Chapter 19 - Fibre Teleprotection P54x1Z
between the different communication modes requires a power cycle to be performed before the change is
activated.
Opto 1
Control Input 1
Non-
Signalling Fail & LED 8
Latching
IM64 Ch1 Input 8 Aided 1 COS/LGS
1
IM64 Ch2 Input 8
V02505
488 P54x1Z-TM-EN-1
P54x1Z Chapter 19 - Fibre Teleprotection
Opto 1
Control Input 1
Non-
Signalling Fail & Latching
LED 8
V02506
P54x1Z-TM-EN-1 489
Chapter 19 - Fibre Teleprotection P54x1Z
490 P54x1Z-TM-EN-1
ELECTRICAL TELEPROTECTION
CHAPTER 20
Chapter 20 - Electrical Teleprotection P54x1Z
492 P54x1Z-TM-EN-1
P54x1Z Chapter 20 - Electrical Teleprotection
1 CHAPTER OVERVIEW
This chapter contains the following sections:
Chapter Overview 493
Introduction 494
Teleprotection Scheme Principles 495
Implementation 496
Configuration 497
Connecting to Electrical InterMiCOM 499
Application Notes 500
P54x1Z-TM-EN-1 493
Chapter 20 - Electrical Teleprotection P54x1Z
2 INTRODUCTION
Electrical Teleprotection is an optional feature that uses communications links to create protection schemes.
It can be used to replace hard wiring between dedicated relay output contacts and digital input circuits. Two
products equipped with electrical teleprotection can connect and exchange commands using a
communication link. It is typically used to implement teleprotection schemes.
Using full duplex communications, eight binary command signals can be sent in each direction between
connected products. The communication connection complies with the EIA(RS)232 standard. Ports may be
connected directly, or using modems. Alternatively EIA(RS)232 converters can be used for connecting to
other media such as optical fibres.
Communications statistics and diagnostics enable you to monitor the integrity of the communications link,
and a loopback feature is available to help with testing.
494 P54x1Z-TM-EN-1
P54x1Z Chapter 20 - Electrical Teleprotection
P54x1Z-TM-EN-1 495
Chapter 20 - Electrical Teleprotection P54x1Z
4 IMPLEMENTATION
Electrical InterMiCOM is configured using a combination of settings in the INTERMICOM COMMS column,
settings in the INTERMICOM CONF column, and the programmable scheme logic (PSL).
The eight command signals are mapped to DDB signals within the product using the PSL.
Signals being sent to a remote terminal are referenced in the PSL as IM Output 1 - IM Output 8. Signals
received from the remote terminal are referenced as IM Input 1 - IM Input 8.
Note:
As well as the optional Modem InterMiCOM, some products are available with a feature called InterMiCOM64 (IM64).
The functionality and assignment of commands in InterMiCOM and InterMiCOM64 are similar, but they act
independently and are configured independently.
496 P54x1Z-TM-EN-1
P54x1Z Chapter 20 - Electrical Teleprotection
5 CONFIGURATION
Electrical Teleprotection is compliant with IEC 60834-1:1999. For your application, you can customise
individual command signals to the differing requirements of security, speed, and dependability as defined in
this standard.
You customise the command signals using the IM# Cmd Type cell in the INTERMICOM CONF column.
Any command signal can be configured for:
● Direct intertripping by selecting ‘Direct’. (this is the most secure signalling but incurs a time delay to
deliver the security).
● Blocking applications by selecting ‘Blocking’. (this is the fastest signalling)
● Permissive intertripping applications by selecting ‘Permissive. (this is dependable signalling that
balances speed and security)
Note:
When used in the context of a setting, ‘#’ specifies which command signal (1-8) bit is being configured.
To ensure that command signals are processed only by their intended recipient, the command signals are
packaged into a message (sometimes referred to as a telegram) which contains an address field. A sending
device sets a pattern in this field. A receiving device must be set to match this pattern in the address field
before the commands will be acted upon. 10 patterns have been carefully chosen for maximum security. You
need to choose which ones to use, and set them using the Source Address and Receive Address cells in
the INTERMICOM COMMS column.
The value set in the Source Address of the transmitting device should match that set in the Receive
Address of the receiving device. For example set Source Address to 1 at a local terminal and set Receive
Address to 1 at the remote terminal.
The Source Address and Receive Address settings in the device should be set to different values to avoid
false operation under inadvertent loopback conditions.
Where more than one pair of devices is likely to share a communication link, you should set each pair to use
a different pair of address values.
Electrical InterMiCOM has been designed to be resilient to noise on communications links, but during severe
noise conditions, the communication may fail. If this is the case, an alarm is raised and you can choose how
the input signals are managed using the IM# FallBackMode cell in the INTERMICOM CONF column:
• If you choose Latched, the last valid command to be received can be maintained until a new valid
message is received.
• If you choose Default, the signal will revert to a default value after the period defined in the IM#
FrameSyncTim setting has expired. You choose the default value using the IM# DefaultValue setting.
Subsequent receipt of a full valid message will reset the alarm, and the new command signals will be used.
As well as the settings described above, you will need to assign input and output signals in the
Programmable Scheme Logic (PSL). Use the ‘Integral Tripping’ buttons to create the logic you want to apply.
A typical example is shown below.
P54x1Z-TM-EN-1 497
Chapter 20 - Electrical Teleprotection P54x1Z
E002521
Note:
When an Electrical InterMiCOM signal is sent from a local terminal, only the remote terminal will react to the
command. The local terminal will only react to commands initiated at the remote terminal.
498 P54x1Z-TM-EN-1
P54x1Z Chapter 20 - Electrical Teleprotection
IED IED
E02522
E02523
P54x1Z-TM-EN-1 499
Chapter 20 - Electrical Teleprotection P54x1Z
7 APPLICATION NOTES
Electrical InterMiCOM settings are contained within two columns; INTERMICOM COMMS and
INTERMICOM CONF. The INTERMICOM COMMS column contains all the settings needed to configure the
communications, as well as the channel statistics and diagnostic facilities. The INTERMICOM CONF column
sets the mode of each command signal and defines how they operate in case of signalling failure.
Short metallic direct connections and connections using fire-optic converters will generally be set to have the
highest signalling speed of 19200b/s. Due to this high signalling rate, the difference in operating time
between the direct, permissive, and blocking type signals is small. This means you can select the most
secure signalling command type (‘Direct’ intertrip) for all commands. You do this with the IM# Cmd Type
settings. For these applications you should set the IM# Fallback Mode to Default. You should also set a
minimal intentional delay by setting IM# FrameSyncTim to 10 msecs. This ensures that whenever two
consecutive corrupt messages are received, the command will immediately revert to the default value until a
new valid message is received.
For applications that use Modem and/or multiplexed connections, the trade-off between speed, security, and
dependability is more critical. Choosing the fastest baud rate (data rate) to achieve maximum speed may
appear attractive, but this is likely to increase the cost of the telecommunications equipment. Also,
telecommunication services operating at high data rates are more prone to interference and suffer from
longer re-synchronisation times following periods of disruption. Taking into account these factors we
recommend a maximum baud rate setting of 9600 bps. As baud rates decrease, communications become
more robust with fewer interruptions, but overall signalling times increase.
At slower baud rates, the choice of signalling mode becomes significant. You should also consider what
happens during periods of noise when message structure and content can be lost.
● In ‘Blocking’ mode, the likelihood of receiving a command in a noisy environment is high. In this case,
we recommend you set IM# Fallback Mode to Default, with a reasonably long IM# FrameSyncTim
setting. Set IM# DefaultValue to ‘1’. This provides a substitute for a received blocking signal, applying
a failsafe for blocking schemes.
● In ‘Direct’ mode, the likelihood of receiving commands in a noisy environment is small. In this case, we
recommend you set IM# Fallback Mode to Default with a short IM# FrameSyncTim setting. Set
IM# DefaultValue to ‘0’. This means that if a corrupt message is received, InterMiCOM will use the
default value. This provides a substitute for the intertrip signal not being received, applying a failsafe
for direct intertripping schemes.
● In ‘Permissive’ mode, the likelihood of receiving a valid command under noisy communications
conditions is somwhere between that of the ‘Blocking’ mode and the ‘Direct’ intertrip mode. In this
case, we recommended you set IM# Fallback Mode to Latched.
The table below presents recommended IM# FrameSyncTim settings for the different signalling modes and
baud rates:
Minimum Recommended "IM# FrameSyncTim" Setting
Minimum Setting Maximum
Baud Rate Direct Intertrip Mode Blocking Mode
(ms) Setting (ms)
600 100 250 100 1500
1200 50 130 50 1500
2400 30 70 30 1500
4800 20 40 20 1500
9600 10 20 10 1500
19200 10 10 10 1500
500 P54x1Z-TM-EN-1
P54x1Z Chapter 20 - Electrical Teleprotection
Note:
As we have recommended Latched operation, the table does not contain recommendations for ‘Permissive’ mode.
However, if you do select ‘Default’ mode, you should set IM# FrameSyncTim greater than those listed above. If you
set IM# FrameSyncTim lower than the minimum setting listed above, the device could interpret a valid change in a
message as a corrupted message.
P54x1Z-TM-EN-1 501
Chapter 20 - Electrical Teleprotection P54x1Z
502 P54x1Z-TM-EN-1
COMMUNICATIONS
CHAPTER 21
Chapter 21 - Communications P54x1Z
504 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
1 CHAPTER OVERVIEW
This product supports Substation Automation System (SAS), and Supervisory Control and Data Acquisition
(SCADA) communication. The support embraces the evolution of communications technologies that have
taken place since microprocessor technologies were introduced into protection, control, and monitoring
devices which are now ubiquitously known as Intelligent Electronic Devices for the substation (IEDs).
As standard, all products support rugged serial communications for SCADA and SAS applications. By option,
any product can support Ethernet communications for more advanced SCADA and SAS applications.
P54x1Z-TM-EN-1 505
Chapter 21 - Communications P54x1Z
2 COMMUNICATION INTERFACES
The products have a number of standard and optional communication interfaces. The standard and optional
hardware and protocols are summarised below:
Port Availability Physical layer Use Data Protocols
Front Standard RS232 Local settings Courier
Rear Port 1 RS232 / RS485 / SCADA Courier, MODBUS, IEC60870-5-103, DNP3.0
Standard
(RP1 copper) K-Bus Remote settings (order option)
Rear Port 1 SCADA Courier, MODBUS, IEC60870-5-103, DNP3.0
Optional Fibre
(RP1 fibre) Remote settings (order option)
Rear Port 2 RS232 / RS485 / SCADA SK4: Courier only
Optional
(RP2) K-Bus Remote settings SK5: InterMicom only
IEC 61850 or DNP3 IEC 61850, Courier (tunnelled) or DNP3.0
Ethernet Optional Ethernet
Remote settings (order option)
Note:
Optional communications boards are always fitted into slot A.
Note:
When the optional fibre board is used for serial SCADA communication over optical fibre, the fibre port assumes
designation RP1. The RP1 copper ports on the power supply board are then disabled.
Note:
It is only possible to fit one optional communications board, therefore RP2 and Ethernet communications are mutually
exclusive.
506 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
3 SERIAL COMMUNICATION
The physical layer standards that are used for serial communications for SCADA purposes are:
● EIA(RS)485 (often abbreviated to RS485)
● K-Bus (a proprietary customization of RS485)
EIA(RS)232 is used for local communication with the IED (for transferring settings and downloading firmware
updates).
RS485 is similar to RS232 but for longer distances and it allows daisy-chaining and multi-dropping of IEDs.
K-Bus is a proprietary protocol quite similar to RS485, but it cannot be mixed on the same link as RS485.
Unlike RS485, K-Bus signals applied across two terminals are not polarised.
It is important to note that these are not data protocols. They only describe the physical characteristics
required for two devices to communicate with each other.
For a description of the K-Bus standard see K-Bus (on page508) and Alstom Grid's K-Bus interface guide
reference R6509.
A full description of the RS485 is available in the published standard.
P54x1Z-TM-EN-1 507
Chapter 21 - Communications P54x1Z
(due to retries), increasing message error counts, erratic communications, and in the worst case, complete
failure to communicate.
Note:
Some devices may be able to provide the bus bias, in which case external components would not be required.
6 – 9 V DC
180 Ω bias
Master 120 Ω
180 Ω bias
0V 120 Ω
V01000
Warning:
It is extremely important that the 120 Ω termination resistors are fitted.
Otherwise the bias voltage may be excessive and may damage the devices
connected to the bus.
3.3 K-BUS
K-Bus is a robust signalling method based on RS485 voltage levels. K-Bus incorporates message framing,
based on a 64 kbps synchronous HDLC protocol with FM0 modulation to increase speed and security.
The rear interface is used to provide a permanent connection for K-Bus, which allows multi-drop connection.
A K-Bus spur consists of up to 32 IEDs connected together in a multi-drop arrangement using twisted pair
wiring. The K-Bus twisted pair connection is non-polarised.
It is not possible to use a standard EIA(RS)232 to EIA(RS)485 converter to convert IEC 60870-5 FT1.2
frames to K-Bus. A protocol converter, namely the KITZ101, KITZ102 or KITZ201, must be used for this
purpose. Please consult Alstom Grid for information regarding the specification and supply of KITZ devices.
The following figure demonstrates a typical K-Bus connection.
508 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
RS232 K-Bus
Note:
An RS232-USB converter is only needed if the local computer does not provide an RS232 port.
Further information about K-Bus is available in the publication R6509: K-Bus Interface Guide, which is
available on request.
P54x1Z-TM-EN-1 509
Chapter 21 - Communications P54x1Z
510 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
PRP and HSR are open standards, so their implementation is compatible with any standard PRP or HSR
device respectively. PRP provides "bumpless" redundancy. RSTP is also an open standard, so its
implementation is compatible with any standard RSTP devices. RSTP provides redundancy, however, it is
not "bumpless".
SHP and DHP are proprietary protocols intended for use with specific Alstom Grid products:
● SHP is compatible with the C264-SWR212 as well as H35x multimode switches.
● DHP is compatible with the C264-SWD212 as well as H36x multimode switches.
Note:
The protocol you require must be selected at the time of ordering.
P54x1Z-TM-EN-1 511
Chapter 21 - Communications P54x1Z
DAN DAN
SAN DAN
LAN B
LAN A
REDUNDANCY
BOX
VDAN
VDAN
E01028
512 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Source
Singly Attached
Nodes
P54x1Z-TM-EN-1 513
Chapter 21 - Communications P54x1Z
Source
C frame
A frame B frame
Singly Attached
Nodes
D frame
Destination V01031
514 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
T1000 switch
PC SCADA
DS Agile gateways
P54x1Z-TM-EN-1 515
Chapter 21 - Communications P54x1Z
MiCOM MiCOM
H35 H35
Px4x Px4x
E01011
Figure 260: IED, bay computer and Ethernet switch with self healing ring facilities
A Self-Healing Management function (SHM) manages the ring.
Under healthy conditions, frames are sent on the main ring (primary fibre) in one direction, with short check
frames being sent every 5 μs in the opposite direction on the back-up ring (secondary fibre).
If the main ring breaks, the SHMs at either side of the break start the network self-healing. On one side of
the break, received messages are no longer sent to the main ring, but are sent to the back-up ring instead.
On the other side of the break, messages received on the back-up ring are sent to the main ring and
communications are re-established. This takes place in less than 1 ms and can be described as “bumpless”.
The principle of SHP is outlined in the figures below.
Primary Fibre
1 2 3 1 2 3 1 2 3
A B C D E
Tx (Es) Rx (Rs)
Hx5x IED C264 IED Hx5x
Secondary Fibre
V01013
Figure 261: Redundant Ethernet ring architecture with IED, bay computer and Ethernet switches
516 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Primary Fibre
1 2 3 1 2 3 1 2 3
A B C D E
Tx (Es) Rx (Rs)
Hx5x IED C264 IED Hx5x
Secondary Fibre
V01014
Figure 262: Redundant Ethernet ring architecture with IED, bay computer and Ethernet switches after
failure
P54x1Z-TM-EN-1 517
Chapter 21 - Communications P54x1Z
Network 1 Network 2
518 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
MiCOM H382
SCADA or PACiS OI
DS Agile gateways
Ethernet
Up to
6 links C264 *
RS485
TX copper link
FX optical fibre Ethernet
E01017 RS485, RS422
* For PRP this is SRP, for DHP this is SWD
** For PRP this is PRP REB, for DHP this is DHP REB
P54x1Z-TM-EN-1 519
Chapter 21 - Communications P54x1Z
Note:
IP1 and IP2 are different but use the same subnet mask.
PRP/HSR
If using PRP or HSR, you configure the REB IP address using the PRP/HSR Configurator software.
RSTP
If using RSTP, the first two octets are set by the RSTP configurator or an SNMP MIB browser. The third octet
is fixed at 254 (FE hex, 11111110 binary), and the fourth octet is set by the on-board dip switch.
SHP or DHP
If using SHP or DHP the first two octets are set by the Switch Manager software or an SNMP MIB browser.
The third octet is fixed at 254 (FE hex, 11111110 binary), and the fourth octet is set by the on-board dip
switch.
Note:
An H35 (SHP) or H36 (DHP) network device is needed in the network to configure the REB IP address if you are
using SNMP.
520 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Warning:
Configure the hardware settings before the device is installed.
E01019
5. Lift the upper and lower flaps. Remove the six screws securing the front panel and pull the front panel
outwards.
P54x1Z-TM-EN-1 521
Chapter 21 - Communications P54x1Z
E01020
6. Press the levers either side of the connector to disconnect the ribbon cable from the front panel.
E01021
522 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
7. Remove the redundant Ethernet board. Set the last octet of IP address using the DIP switches. The
available range is 1 to 127.
1 Example address 1 + 4 + 16 + 64 = 85
2 decimal 85
4
8
16
32
64
Unused
ON
V01022 SW2 Top view
8. Once you have set the IP address, reassemble the IED, following theses instructions in the reverse
order.
Warning:
Take care not to damage the pins of the ribbon cable connector on the front panel when
reinserting the ribbon cable.
P54x1Z-TM-EN-1 523
Chapter 21 - Communications P54x1Z
RJ45
Ethernet switch
Media
Converter
TXA RXA TXB RXB
TX RX
IED IED
(a) (b)
V01806
Figure 266: Connection using (a) an Ethernet switch and (b) a media converter
524 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Select the device you wish to configure. The MAC address of the selected device is highlighted.
P54x1Z-TM-EN-1 525
Chapter 21 - Communications P54x1Z
General tab
The Filtering Database contains two types of entry; static and dynamic. The Static Entries are the source
addresses entered by an administrator. The Dynamic Entries are the source addresses learnt by the switch
process. The Dynamic Entries are removed from the Filtering Database after the Ageing Time. The
Database holds a maximum of 1024 entries.
1. To access the forwarding database functions, if required, click the Filtering Database button in the
main window.
2. To view the Forwarding Database Size, Number of Static Entries and Number of Dynamic Entries,
click Read Database Info.
3. To set the Aging Time, enter the number of seconds in the text box and click the Set button.
526 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
P54x1Z-TM-EN-1 527
Chapter 21 - Communications P54x1Z
RJ45
Ethernet switch
Media
Converter
TX1 RX1 TX2 RX2
TX RX
IED IED
(a) (b)
V01803
Figure 267: Connection using (a) an Ethernet switch and (b) a media converter
528 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Note:
Due to the time needed to establish the RSTP protocol, wait 25 seconds between connecting the PC to the IED and
clicking the Identify Device button.
The redundant Ethernet board connected to the PC is identified and its details are listed.
● Device address
● MAC address
● Version number of the firmware
● SNTP IP address
● Date & time of the real-time clock, from the board.
P54x1Z-TM-EN-1 529
Chapter 21 - Communications P54x1Z
Note:
When assigning the bridge priority, make sure the root of the network is the Ethernet switch, not the IEDs. This
reduces the number of hops to reach all devices in the network. Also make sure the priority values for all IEDs are
higher than that of the switch.
530 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
The Switch Manager tool is also intended for MiCOM Px4x IEDs with redundant Ethernet using Self Healing
Protocol (SHP) and Dual Homing Protocol (DHP). This tool is used to identify IEDs and Alstom Switches,
and to configure the redundancy IP address for the Alstom proprietary Self Healing Protocol and Dual
Homing Protocol.
Switch hardware
Alstom switches are stand-alone devices (H3xx, H6x families) or embedded in a computer device rack, for
example MiCOM C264 (SWDxxx, SWRxxx, SWUxxx Ethernet boards) or PC board (MiCOM H14x, MiCOM
H15x, MiCOM H16x).
Switch range
There are 3 types of Alstom switches:
● Standard switches: SWU (in C264), H14x (PCI), H34x, H6x
● Redundant Ring switches: SWR (in C264), H15x (PCI), H35x,
● Redundant Dual Homing switches: SWD (in C264), H16x (PCI), H36x
Switch Manager allows you to allocate an IP addresses for Alstom switches. Switches can then be
synchronized using the Simple Network Time Protocol (SNTP) or they can be administrated using the Simple
Network Management Protocol (SNMP).
All switches have a single 6-byte MAC address.
Redundancy Management
Standard Ethernet does not support a loop at the OSI link layer (layer 2 of the 7 layer model). A mesh
topology cannot be created using a standard Hub and switch. Redundancy needs separate networks using
hardware in routers or software in dedicated switches using STP (Spanning Tree Protocol). However, this
redundancy mechanism is too slow for one link failure in electrical automation networks.
Alstom has developed its own Redundancy ring and star mechanisms using two specific Ethernet ports of
the redundant switches. This redundancy works between Alstom switches of the same type. The two
redundant Ethernet connections between Alstom switches create one private redundant Ethernet LAN.
The Ethernet ports dedicated to the redundancy are optical Ethernet ports. The Alstom redundancy
mechanism uses a single specific address for each Ethernet switch of the private LAN. This address is set
using DIP switches or jumpers.
Switch Manager monitors the redundant address of the switches and the link topology between switches.
5.10.1 INSTALLATION
Network IP address
IP addressing is needed for time synchronization of Alstom switches and for SNMP management.
Switch Manager is used to define IP addresses of Alstom switches. These addresses must be in the range of
the system IP, depending on the IP mask of the engineering PC for substation maintenance.
Alstom switches have a default multicast so the 3rd word of the IP address is always 254.
P54x1Z-TM-EN-1 531
Chapter 21 - Communications P54x1Z
Installation procedure
Run Setup.exe and follow the on-screen instructions.
5.10.2 SETUP
1. Make sure the PC has one Ethernet port connected to the Alstom switch.
2. Configure the PC's Ethernet port on the same subnet as the Alstom switch.
3. Select User or Admin mode. In User mode enter the user name as User, leave the password blank
and click OK. In Admin mode you can not upload the firmware on the Ethernet repeaters.
4. In Admin mode enter the user name as Admin, enter the password and click OK. All functions are
available including Expert Maintenance facilities.
5. Click the Language button in the bottom right of the screen and select your language.
6. If several Ethernet interfaces are used, in the Network board drop-down box, select the PC Network
board connected to the Alstom switch. The IP and MAC addresses are displayed below the drop-down
box.
7. Periodically click the Ring Topology button (top left) to display or refresh the list of Alstom switches
that are connected.
532 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
5.10.9 VLAN
The Virtual Local Area Network (VLAN) is a technique used to split an interconnected physical network into
several networks. This technique can be used at all ISO/OSI levels. The VLAN switch is mainly at OSI level 1
(physical VLAN) which allows communication only between some Ethernet physical ports.
Ports on the switch can be grouped into Physical VLANs to limit traffic flooding. This is because it is limited to
ports belonging to that VLAN and not to other ports.
Port-based VLANs are VLANs where the packet forwarding decision is based on the destination MAC
address and its associated port. You must define outgoing ports allowed for each port when using port-based
VLANs. The VLAN only governs the outgoing traffic so is unidirectional. Therefore, if you wish to allow two
subscriber ports to talk to each other, you must define the egress port for both ports. An egress port is an
outgoing port, through which a data packet leaves.
To assign a physical VLAN to a set of ports:
1. Select the address of the device in the main window.
2. Click the VLAN button, a new screen appears.
3. Use the checkboxes to select which ports will be in the same VLAN. By default all the ports share the
same VLAN.
P54x1Z-TM-EN-1 533
Chapter 21 - Communications P54x1Z
534 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Trigger
Address Name
Trap?
10 Access Level (UI) YES
2 Date and Time
1 Date Time NO
2 IRIG-B Status YES
3 Battery Status YES
4 Active Sync source YES
5 SNTP Server 1 NO
6 SNTP Server 2 NO
7 SNTP Status YES
8 PTP Status YES
3 System Alarms
1 Invalid Message Format YES
2 Main Protection Fail YES
3 Comms Changed YES
4 Max Prop. Alarm YES
5 9-2 Sample Alarm YES
6 9-2LE Cfg Alarm YES
7 Battery Fail YES
8 Rear Communication Fail YES
9 GOOSE IED Missing YES
10 Intermicom loopback YES
11 Intermicom message fail YES
12 Intermicom data CD fail YES
13 Intermicom Channel fail YES
14 Backup setting fail YES
15 User Curve commit to flash failure YES
16 SNTP time Sync fail YES
17 PTP failure alarm YES
4 Device Mode
1 IED Mod/Beh YES
2 Simulation Mode of Subscription YES
P54x1Z-TM-EN-1 535
Chapter 21 - Communications P54x1Z
Address Name
3 Org
6 DOD
1 Internet
2 mgmt
1 Mib-2
1 sys
1 sysDescr
3 sysUpTime
4 sysName
Remote Monitoring
16 RMON
1 statistics
1 etherstat
1 etherStatsEntry
9 etherStatsUndersizePkts
10 etherStatsOversizePkts
12 etherStatsJabbers
13 etherStatsCollisions
14 etherStatsPkts64Octets
15 etherStatsPkts65to127Octets
16 etherStatsPkts128to255Octets
17 etherStatsPkts256to511Octets
18 etherStatsPkts512to1023Octets
536 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Address Name
4 lreNodeName
5 lreVersionName
6 lreMacAddressA
7 lreMacAddressB
8 lreAdapterAdminStateA
9 lreAdapterAdminStateB
10 lreLinkStatusA
11 lreLinkStatusB
12 lreDuplicateDiscard
13 lreTransparentReception
14 lreHsrLREMode
15 lreSwitchingEndNode
16 lreRedBoxIdentity
17 lreSanA
18 lreSanB
19 lreEvaluateSupervision
20 lreNodesTableClear
21 lreProxyNodeTableClear
1 lreStatistics
1 lreStatisticsInterfaceGroup
0 lreStatisticsInterfaces
1 lreInterfaceStatsTable
1 lreInterfaceStatsIndex
2 lreCntTotalSentA
3 lreCntTotalSentB
4 lreCntErrWrongLANA
5 lreCntErrWrongLANB
6 lreCntReceivedA
7 lreCntReceivedB
8 lreCntErrorsA
9 lreCntErrorsB
10 lreCntNodes
11 IreOwnRxCntA
12 IreOwnRxCntB
3 lreProxyNodeTable
1 lreProxyNodeEntry
1 reProxyNodeIndex
2 reProxyNodeMacAddress
3 Org
6 Dod
1 Internet
2 mgmt
1 mib-2
P54x1Z-TM-EN-1 537
Chapter 21 - Communications P54x1Z
Address Name
1 System
1 sysDescr
3 sysUpTime
5 sysName
7 sysServices
2 interfaces
2 ifTable
1 ifEntry
1 ifIndex
2 ifDescr
3 ifType
4 ifMtu
5 ifSpeed
6 ifPhysAddress
7 ifAdminStatus
8 ifOpenStatus
9 ifLastChange
10 ifInOctets
11 ifInUcastPkts
12 ifInNUcastPkts
13 ifInDiscards
14 ifInErrors
15 ifInUnknownProtos
16 ifOutOctets
17 ifOutUcastPkts
18 ifOutNUcastPkts
19 ifOutDiscards
20 ifOutErrors
21 ifOutQLen
22 ifSpecific
16 rmon
1 statistics
1 etherStatsTable
1 etherStatsEntry
1 etherStatsIndex
2 etherStatsDataSource
3 etherStatsDropEvents
4 etherStatsOctets
5 etherStatsPkts
6 etherStatsBroadcastPkts
7 etherStatsMulticastPkts
8 etherStatsCRCAlignErrors
9 etherStatsUndersizePkts
538 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Address Name
10 etherStatsOversizePkts
11 etherStatsFragments
12 etherStatsJabbers
13 etherStatsCollisions
14 etherStatsPkts64Octets
15 etherStatsPkts65to127Octets
16 etherStatsPkts128to255Octets
17 etherStatsPkts256to511Octets
18 etherStatsPkts512to1023Octets
19 etherStatsPkts1024to1518Octets
20 etherStatsOwner
21 etherStatsStatus
Note:
There are two IP addresses visible when communicating with the Redundant Ethernet Card via the fibre optic ports:
Use the one for the IED itself to the Main Processor SNMP interface, and use the one for the on-board Ethernet
switch to access the Redundant Ethernet Board SNMP interface. See the configuration chapter for more information.
P54x1Z-TM-EN-1 539
Chapter 21 - Communications P54x1Z
Authentication is used to check the identity of users, privacy allows for encryption of SNMP messages. Both
are optional, however you must enable authentication in order to enable privacy. To configure these security
options:
1. If SNMPv3 has been enabled, set the Security Level setting. There are three levels; without
authentication and without privacy (noAuthNoPriv), with authentication but without privacy
(authNoPriv), and with authentication and with privacy (authPriv).
2. If Authentication is enabled, use the Auth Protocol setting to select the authentication type. There are
two options: HMAC-MD5-96 or HMAC-SHA-96.
3. Using the Auth Password setting, enter the 8-character password to be used by the IED for
authentication.
4. If privacy is enabled, use the Encrypt Protocol setting to set the 8-character password that will be
used by the IED for encryption.
540 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
7 DATA PROTOCOLS
The products supports a wide range of protocols to make them applicable to many industries and
applications. The exact data protocols supported by a particular product depend on its chosen application,
but the following table gives a list of the data protocols that are typically available.
The relationship of these protocols to the lower level physical layer protocols are as follows:
IEC 60870-5-103
MODBUS IEC 61850
Data Protocols
DNP3.0 DNP3.0
Courier Courier Courier Courier
Data Link Layer EIA(RS)485 Ethernet EIA(RS)232 K-Bus
Physical Layer Copper or Optical Fibre
7.1 COURIER
This section should provide sufficient detail to enable understanding of the Courier protocol at a level
required by most users. For situations where the level of information contained in this manual is insufficient,
further publications (R6511 and R6512) containing in-depth details about the protocol and its use, are
available on request.
Courier is an Alstom Grid proprietary communication protocol. Courier uses a standard set of commands to
access a database of settings and data in the IED. This allows a master to communicate with a number of
slave devices. The application-specific elements are contained in the database rather than in the commands
used to interrogate it, meaning that the master station does not need to be preconfigured. Courier also
provides a sequence of event (SOE) and disturbance record extraction mechanism.
For either of the rear ports, both the IED address and baud rate can be selected using the front panel menu
or by the settings application software.
P54x1Z-TM-EN-1 541
Chapter 21 - Communications P54x1Z
With the exception of the Disturbance Recorder settings, changes made to the control and support settings
are implemented immediately and stored in non-volatile memory. Changes made to the Protection settings
and the Disturbance Recorder settings are stored in ‘scratchpad’ memory and are not immediately
implemented. These need to be committed by writing to the Save Changes cell in the CONFIGURATION
column.
Method 1
This uses a combination of three commands to perform a settings change:
First, enter Setting mode: This checks that the cell is settable and returns the limits.
1. Preload Setting: This places a new value into the cell. This value is echoed to ensure that setting
corruption has not taken place. The validity of the setting is not checked by this action.
2. Execute Setting: This confirms the setting change. If the change is valid, a positive response is
returned. If the setting change fails, an error response is returned.
3. Abort Setting: This command can be used to abandon the setting change.
This is the most secure method. It is ideally suited to on-line editors because the setting limits are extracted
before the setting change is made. However, this method can be slow if many settings are being changed
because three commands are required for each change.
Method 2
The Set Value command can be used to change a setting directly. The response to this command is either a
positive confirm or an error code to indicate the nature of a failure. This command can be used to implement
a setting more rapidly than the previous method, however the limits are not extracted. This method is
therefore most suitable for off-line setting editors such as MiCOM S1 Agile, or for issuing preconfigured
control commands.
542 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Event Types
The IED generates events under certain circumstances such as:
● Change of state of output contact
● Change of state of opto-input
● Protection element operation
● Alarm condition
● Setting change
● Password entered/timed-out
P54x1Z-TM-EN-1 543
Chapter 21 - Communications P54x1Z
The Menu Database contains tables of possible events, and shows how the contents of the above fields are
interpreted. Fault and Maintenance records return a Courier Type 3 event, which contains the above fields
plus two additional fields:
● Event extraction column
● Event number
These events contain additional information, which is extracted from the IED using the RECORDER
EXTRACTION column B4. Row 01 of the RECORDER EXTRACTION column contains a Select Record
setting that allows the fault or maintenance record to be selected. This setting should be set to the event
number value returned in the record. The extended data can be extracted from the IED by uploading the text
and data from the column.
The PSL settings can be uploaded and downloaded to and from the IED using this mechanism. The settings
application software must be used to edit the settings. It also performs checks on the validity of the settings
before they are transferred to the IED.
544 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
COMMUNICATIONS
RP1 Protocol
Courier
4. Move down to the next cell (RP1 Address). This cell controls the address of the RP1 port on thje
device. Up to 32 IEDs can be connected to one spur. It is therefore necessary for each IED to have a
unique address so that messages from the master control station are accepted by one IED only.
Courier uses an integer number between 1 and 254 for the Relay Address. It is set to 255 by default,
which has to be changed. It is important that no two IEDs share the same address.
COMMUNICATIONS
RP1 Address
100
5. Move down to the next cell (RP1 InactivTimer). This cell controls the inactivity timer. The inactivity
timer controls how long the IED waits without receiving any messages on the rear port before revoking
any password access that was enabled and discarding any changes. For the rear port this can be set
between 1 and 30 minutes.
COMMUNICATIONS
RP1 Inactivtimer
10.00 mins.
6. If the optional fibre optic connectors are fitted, the RP1 PhysicalLink cell is visible. This cell controls
the physical media used for the communication (Copper or Fibre optic).
COMMUNICATIONS
RP1 PhysicalLink
Copper
7. Move down to the next cell (RP1 Card Status). This cell is not settable. It displays the status of the
chosen physical layer protocol for RP1.
COMMUNICATIONS
RP1 Card Status
K-Bus OK
8. Move down to the next cell (RP1 Port Config). This cell controls the type of serial connection. Select
between K-Bus or RS485.
P54x1Z-TM-EN-1 545
Chapter 21 - Communications P54x1Z
COMMUNICATIONS
RP1 Port Config
K-Bus
9. If using EIA(RS)485, the next cell (RP1 Comms Mode) selects the communication mode. The choice
is either IEC 60870 FT1.2 for normal operation with 11-bit modems, or 10-bit no parity. If using K-Bus
this cell will not appear.
COMMUNICATIONS
RP1 Comms Mode
IEC 60870 FT1.2
10. If using EIA(RS)485, the next cell down controls the baud rate. Three baud rates are supported; 9600,
19200 and 38400. If using K-Bus this cell will not appear as the baud rate is fixed at 64 kbps.
COMMUNICATIONS
RP1 Baud rate
19200
546 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
If the optional fibre optic port is fitted, a menu item appears in which the active port can be selected.
However the selection is only effective following the next power up.
The IED address and baud rate can be selected using the front panel menu or by the settings application
software.
7.2.2 INITIALISATION
Whenever the device has been powered up, or if the communication parameters have been changed a reset
command is required to initialize the communications. The device will respond to either of the two reset
commands; Reset CU or Reset FCB (Communication Unit or Frame Count Bit). The difference between the
two commands is that the Reset CU command will clear any unsent messages in the transmit buffer,
whereas the Reset FCB command does not delete any messages.
The device will respond to the reset command with an identification message ASDU 5. The Cause of
Transmission (COT) of this response will be either Reset CU or Reset FCB depending on the nature of the
reset command. The content of ASDU 5 is described in the IEC 60870-5-103 section of the Menu Database,
available from Alstom Grid separately if required.
In addition to the above identification message, it will also produce a power up event.
The IEC 60870-5-103 profile in the Menu Database contains a complete listing of all events produced by the
device.
P54x1Z-TM-EN-1 547
Chapter 21 - Communications P54x1Z
7.2.7 COMMANDS
A list of the supported commands is contained in the Menu Database. The device will respond to other
commands with an ASDU 1, with a cause of transmission (COT) indicating ‘negative acknowledgement’.
Note:
IEC 60870-5-103 only supports up to 8 records.
COMMUNICATIONS
RP1 Protocol
IEC 60870-5-103
4. Move down to the next cell (RP1 Address). This cell controls the IEC 60870-5-103 address of the
IED. Up to 32 IEDs can be connected to one spur. It is therefore necessary for each IED to have a
unique address so that messages from the master control station are accepted by one IED only.
IEC 60870-5-103 uses an integer number between 0 and 254 for the address. It is important that no
two IEDs have the same IEC 60870 5 103 address. The IEC 60870-5-103 address is then used by the
master station to communicate with the IED.
548 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
COMMUNICATIONS
RP1 address
162
5. Move down to the next cell (RP1 Baud Rate). This cell controls the baud rate to be used. Two baud
rates are supported by the IED, 9600 bits/s and 19200 bits/s. Make sure that the baud rate
selected on the IED is the same as that set on the master station.
COMMUNICATIONS
RP1 Baud rate
9600 bits/s
6. Move down to the next cell (RP1 Meas Period). The next cell down controls the period between
IEC 60870-5-103 measurements. The IEC 60870-5-103 protocol allows the IED to supply
measurements at regular intervals. The interval between measurements is controlled by this cell, and
can be set between 1 and 60 seconds.
COMMUNICATIONS
RP1 Meas Period
30.00 s
7. If the optional fibre optic connectors are fitted, the RP1 PhysicalLink cell is visible. This cell controls
the physical media used for the communication (Copper or Fibre optic).
COMMUNICATIONS
RP1 PhysicalLink
Copper
8. The next cell down (RP1 CS103Blcking) can be used for monitor or command blocking.
COMMUNICATIONS
RP1 CS103Blcking
Disabled
9. There are three settings associated with this cell; these are:
Setting: Description:
Disabled No blocking selected.
When the monitor blocking DDB Signal is active high, either by energising an opto input or control input,
Monitor Blocking reading of the status information and disturbance records is not permitted. When in this mode the device
returns a "Termination of general interrogation" message to the master station.
When the command blocking DDB signal is active high, either by energising an opto input or control input, all
Command Blocking remote commands will be ignored (i.e. CB Trip/Close, change setting group etc.). When in this mode the
device returns a "negative acknowledgement of command" message to the master station.
P54x1Z-TM-EN-1 549
Chapter 21 - Communications P54x1Z
The descriptions given here are intended to accompany the device profile document that is included in the
Menu Database document. The DNP 3.0 protocol is not described here, please refer to the documentation
available from the user group. The device profile document specifies the full details of the DNP 3.0
implementation. This is the standard format DNP 3.0 document that specifies which objects; variations and
qualifiers are supported. The device profile document also specifies what data is available from the device
using DNP 3.0. The IED operates as a DNP 3.0 slave and supports subset level 2, as described in the
DNP 3.0 standard, plus some of the features from level 3.
The DNP 3.0 protocol is defined and administered by the DNP Users Group. For further information on
DNP 3.0 and the protocol specifications, please see the DNP website (www.dnp.org).
The IED address and baud rate can be selected using the front panel menu or by the settings application
software.
When using a serial interface, the data format is: 1 start bit, 8 data bits, 1 stop bit and optional configurable
parity bit.
550 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Control Input
(Latched)
Aliased Control
Input
(Latched)
Control Input
(Pulsed )
Aliased Control
Input
(Pulsed )
The pulse width is equal to the duration of one protection iteration
V01002
P54x1Z-TM-EN-1 551
Chapter 21 - Communications P54x1Z
Analogue values can be reported to the master station as primary, secondary or normalized values (which
takes into account the IED’s CT and VT ratios), and this is settable in the COMMUNICATIONS column in the
IED. Corresponding deadband settings can be displayed in terms of a primary, secondary or normalized
value. Deadband point values can be reported and written using Object 34 variations.
The deadband is the setting used to determine whether a change event should be generated for each point.
The change events can be read using Object 32 or Object 60. These events are generated for any point
which has a value changed by more than the deadband setting since the last time the data value was
reported.
Any analogue measurement that is unavailable when it is read is reported as offline. For example, the
frequency would be offline if the current and voltage frequency is outside the tracking range of the IED. All
Object 30 points are reported as secondary values in DNP 3.0 (with respect to CT and VT ratios).
DNP 3.0
Device Profile Document
Vendor Name: ALSTOM GRID
552 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
DNP 3.0
Device Profile Document
Device Name: MiCOM P40Agile Protection Relays – compact and modular range
Models Covered: All models
Highest DNP Level Supported*: For Requests: Level 2
*This is the highest DNP level FULLY supported. Parts of level 3 are For Responses: Level 2
also supported
Device Function: Slave
Notable objects, functions, and/or qualifiers supported in addition to the highest DNP levels supported (the complete list is described in the DNP
3.0 Implementation Table):
For static (non-change event) object requests, request qualifier codes 00 and 01 (start-stop), 07 and 08 (limited quantity), and 17 and 28 (index)
are supported in addition to the request qualifier code 06 (no range (all points))
Static object requests sent with qualifiers 00, 01, 06, 07, or 08 will be responded with qualifiers 00 or 01
Static object requests sent with qualifiers 17 or 28 will be responded with qualifiers 17 or 28
For change-event object requests, qualifiers 17 or 28 are always responded
16-bit and 32-bit analogue change events with time may be requested
The read function code for Object 50 (time and date) variation 1 is supported
Analogue Input Deadbands, Object 34, variations 1 through 3, are supported
Floating Point Analogue Output Status and Output Block Objects 40 and 41 are supported
Sequential file transfer, Object 70, variations 2 through 7, are supported
Device Attribute Object 0 is supported
Maximum Data Link Frame Size (octets): Transmitted: 292
Received: 292
Maximum Application Fragment Size (octets) Transmitted: Configurable (100 to 2048). Default 2048
Received: 249
Maximum Data Link Retries: Fixed at 2
Maximum Application Layer Retries: None
Requires Data Link Layer Confirmation: Configurable to Never or Always
Requires Application Layer Confirmation: When reporting event data (Slave devices only)
When sending multi-fragment responses (Slave devices only)
Timeouts while waiting for:
Data Link Confirm: Configurable
Complete Application Fragment: None
Application Confirm: Configurable
Complete Application Response: None
Others:
Data Link Confirm Timeout: Configurable from 0 (Disabled) to 120s, default 10s.
Application Confirm Timeout: Configurable from 1 to 120s, default 2s.
Select/Operate Arm Timeout: Configurable from 1 to 10s, default 10s.
Need Time Interval (Set IIN1-4): Configurable from 1 to 30, default 10min.
Application File Timeout 60 s
Analog Change Event Scan Period: Fixed at 0.5s
Counter Change Event Scan Period Fixed at 0.5s
Frozen Counter Change Event Scan Period Fixed at 1s
Maximum Delay Measurement Error: 2.5 ms
Time Base Drift Over a 10-minute Interval: 7 ms
Sends/Executes Control Operations:
Write Binary Outputs: Never
P54x1Z-TM-EN-1 553
Chapter 21 - Communications P54x1Z
DNP 3.0
Device Profile Document
Select/Operate: Always
Direct Operate: Always
Direct Operate - No Ack: Always
Count > 1 Never
Pulse On Always
Pulse Off Sometimes
Latch On Always
Latch Off Always
Queue Never
Clear Queue Never
Note: Paired Control points will accept Pulse On/Trip and Pulse On/Close, but only single point will accept the Pulse Off control command.
Reports Binary Input Change Events when no specific variation Configurable to send one or the other
requested:
Reports time-tagged Binary Input Change Events when no specific Binary input change with time
variation requested:
Sends Unsolicited Responses: Never
Sends Static Data in Unsolicited Responses: Never
No other options are permitted
Default Counter Object/Variation: Configurable, Point-by-point list attached
Default object: 20
Default variation: 1
Counters Roll Over at: 32 bits
Sends multi-fragment responses: Yes
Sequential File Transfer Support:
Append File Mode No
Custom Status Code Strings No
Permissions Field Yes
File Events Assigned to Class No
File Events Send Immediately Yes
Multiple Blocks in a Fragment No
Max Number of Files Open 1
554 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Request Response
Object
(Library will parse) (Library will respond with)
Object Variation Function Codes (dec) Qualifier Codes Function Codes Qualifier Codes (hex)
Description (dec)
Number Number (hex)
1 2 Binary Input with Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 28 (index)
2 0 Binary Input Change - Any 1 (read) 06 (no range, or all)
Variation 07, 08 (limited qty)
2 1 Binary Input Change without Time 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
07, 08 (limited qty)
2 2 Binary Input Change with Time 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
07, 08 (limited qty)
10 0 Binary Output Status - Any 1 (read) 00, 01 (start-stop)
Variation 06 (no range, or all)
07, 08 (limited qty)
17, 27, 28 (index)
10 2 Binary Output Status 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
(default - see 06 (no range, or all) 17, 28 (index - see note 2)
note 1) 07, 08 (limited qty)
17, 28 (index)
12 1 Control Relay Output Block 3 (select) 17, 28 (index) 129 response echo of request
4 (operate)
5 (direct op)
6 (dir. op, noack)
20 0 Binary Counter - Any Variation 1 (read) 00, 01 (start-stop)
22 (assign class) 06 (no range, or all)
07, 08 (limited qty)
17, 27, 28 (index)
7 (freeze) 00, 01 (start-stop)
8 (freeze noack) 06 (no range, or all)
9 (freeze clear) 07, 08 (limited qty)
10 (frz. cl. Noack)
20 1 32-Bit Binary Counter with Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
20 2 16-Bit Binary Counter with Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
20 5 32-Bit Binary Counter without Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
(default - see 06 (no range, or all) 17, 28 (index - see note 2)
note 1) 07, 08 (limited qty)
17, 27, 28 (index)
20 6 16-Bit Binary Counter without Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
21 0 Frozen Counter - Any Variation 1 (read) 00, 01 (start-stop)
06 (no range, or all)
07, 08 (limited qty)
17, 27, 28 (index)
21 1 32-Bit Frozen Counter with Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
21 2 16-Bit Frozen Counter with Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
21 5 32-Bit Frozen Counter with Time of 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
Freeze 06 (no range, or all) 17, 28 (index - see note 1)
07, 08 (limited qty)
17, 27, 28 (index)
21 6 16-Bit Frozen Counter with Time of 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
Freeze 06 (no range, or all) 17, 28 17, 28 (index - see note 1)
07, 08 (limited qty)
17, 27, 28 (index)
P54x1Z-TM-EN-1 555
Chapter 21 - Communications P54x1Z
Request Response
Object
(Library will parse) (Library will respond with)
Object Variation Function Codes (dec) Qualifier Codes Function Codes Qualifier Codes (hex)
Description (dec)
Number Number (hex)
21 9 32-Bit Frozen Counter without Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
(default - see 06 (no range, or all) 17, 28 (index - see note 2)
note 1) 07, 08 (limited qty)
17, 27, 28 (index)
21 10 16-Bit Frozen Counter without Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
`22 0 Counter Change Event - Any 1 (read) 06 (no range, or all)
Variation 07, 08 (limited qty)
22 1 32-Bit Counter Change Event 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
(default - see without Time 07, 08 (limited qty)
note 1)
22 2 16-Bit Counter Change Event 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
without Time 07, 08 (limited qty)
22 5 32-Bit Counter Change Event with 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
Time 07, 08 (limited qty)
22 6 16-Bit Counter Change Event with 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
Time 07, 08 (limited qty)
23 0 Frozen Counter Event (Variation 0 1 (read) 06 (no range, or all)
is used to request default variation) 07, 08 (limited qty)
23 1 32-Bit Frozen Counter Event 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
(default - see 07, 08 (limited qty)
note 1)
23 2 16-Bit Frozen Counter Event 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
07, 08 (limited qty)
23 5 32-Bit Frozen Counter Event with 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
Time 07, 08 (limited qty)
23 6 16-Bit Frozen Counter Event with 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
Time 07, 08 (limited qty)
30 0 Analog Input - Any Variation 1 (read) 00, 01 (start-stop)
22 (assign class) 06 (no range, or all)
07, 08 (limited qty)
17, 27, 28 (index)
30 1 32-Bit Analog Input 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
30 2 16-Bit Analog Input 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
30 3 32-Bit Analog Input without Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
(default - see 06 (no range, or all) 17, 28 (index - see note 2)
note 1) 07, 08 (limited qty)
17, 27, 28 (index)
30 4 16-Bit Analog Input without Flag 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
30 5 Short floating point 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
32 0 Analog Change Event - Any 1 (read) 06 (no range, or all)
Variation 07, 08 (limited qty)
32 1 32-Bit Analog Change Event 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
(default - see without Time 07, 08 (limited qty)
note 1)
32 2 16-Bit Analog Change Event 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
without Time 07, 08 (limited qty)
32 3 32-Bit Analog Change Event with 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
Time 07, 08 (limited qty)
32 4 16-Bit Analog Change Event with 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
Time 07, 08 (limited qty)
556 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Request Response
Object
(Library will parse) (Library will respond with)
Object Variation Function Codes (dec) Qualifier Codes Function Codes Qualifier Codes (hex)
Description (dec)
Number Number (hex)
32 5 Short floating point Analog Change 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
Event without Time 07, 08 (limited qty)
32 7 Short floating point Analog Change 1 (read) 06 (no range, or all) 129 response 17, 28 (index)
Event with Time 07, 08 (limited qty)
34 0 Analog Input Deadband (Variation 0 1 (read) 00, 01 (start-stop)
is used to request default variation) 06 (no range, or all)
07, 08 (limited qty)
17, 27, 28 (index)
34 1 16 Bit Analog Input Deadband 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
2 (write) 00, 01 (start-stop)
07, 08 (limited qty)
17, 27, 28 (index)
34 2 32 Bit Analog Input Deadband 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
(default - see 06 (no range, or all) 17, 28 (index - see note 2)
note 1) 07, 08 (limited qty)
17, 27, 28 (index)
2 (write) 00, 01 (start-stop)
07, 08 (limited qty)
17, 27, 28 (index)
34 3 Short Floating Point Analog Input 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
Deadband 06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
2 (write) 00, 01 (start-stop)
07, 08 (limited qty)
17, 27, 28 (index)
40 0 Analog Output Status (Variation 0 is 1 (read) 00, 01 (start-stop)
used to request default variation) 06 (no range, or all)
07, 08 (limited qty)
17, 27, 28 (index)
40 1 32-Bit Analog Output Status 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
(default - see 06 (no range, or all) 17, 28 (index - see note 2)
note 1) 07, 08 (limited qty)
17, 27, 28 (index)
40 2 16-Bit Analog Output Status 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
40 3 Short Floating Point Analog Output 1 (read) 00, 01 (start-stop) 129 response 00, 01 (start-stop)
Status 06 (no range, or all) 17, 28 (index - see note 2)
07, 08 (limited qty)
17, 27, 28 (index)
41 1 32-Bit Analog Output Block 3 (select) 17, 28 (index) 129 response echo of request
4 (operate) 27 (index)
5 (direct op)
6 (dir. op, noack)
41 2 16-Bit Analog Output Block 3 (select) 17, 28 (index) 129 response echo of request
4 (operate) 27 (index)
5 (direct op)
6 (dir. op, noack)
41 3 Short Floating Point Analog Output 3 (select) 17, 27, 28 (index) 129 response echo of request
Block 4 (operate)
5 (direct op)
6 (dir. op, noack)
1 1 (read) 07 (limited qty = 1) 129 response 07 (limited qty = 1)
50 (default - see Time and Date
note 1)
2 (write) 07 (limited qty = 1)
60 0 Not defined
60 1 Class 0 Data 1 (read) 06 (no range, or all)
60 2 Class 1 Data 1 (read) 06 (no range, or all)
07, 08 (limited qty)
22 (assign class) 06 (no range, or all)
P54x1Z-TM-EN-1 557
Chapter 21 - Communications P54x1Z
Request Response
Object
(Library will parse) (Library will respond with)
Object Variation Function Codes (dec) Qualifier Codes Function Codes Qualifier Codes (hex)
Description (dec)
Number Number (hex)
60 3 Class 2 Data 1 (read) 06 (no range, or all)
07, 08 (limited qty)
22 (assign class) 06 (no range, or all)
60 4 Class 3 Data 1 (read) 06 (no range, or all)
07, 08 (limited qty)
22 (assign class) 06 (no range, or all)
70 0 File Event - Any Variation 1 (read) 06 (no range, or all)
07, 08 (limited qty)
22 (assign class) 06 (no range, or all)
70 2 File Authentication 29 (authenticate) 5b (free-format) 129 response 5B (free-format)
70 3 File Command 25 (open) 5b (free-format)
27 (delete)
70 4 File Command Status 26 (close) 5b (free-format) 129 response 5B (free-format)
30 (abort)
70 5 File Transfer 1 (read) 5b (free-format) 129 response 5B (free-format)
70 6 File Transfer Status 129 response 5B (free-format)
70 7 File Descriptor 28 (get file info) 5b (free-format) 129 response 5B (free-format)
Note:
A Default variation refers to the variation responded to when variation 0 is requested and/or in class 0, 1, 2, or 3
scans.
Note:
For static (non-change-event) objects, qualifiers 17 or 28 are only responded to when a request is sent with qualifiers
17 or 28, respectively. Otherwise, static object requests sent with qualifiers 00, 01, 06, 07, or 08, will be responded to
with qualifiers 00 or 01. For change-event objects, qualifiers 17 or 28 are always responded to.
558 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
P54x1Z-TM-EN-1 559
Chapter 21 - Communications P54x1Z
Note:
Code numbers 10 through to 126 are reserved for future use.
COMMUNICATIONS
RP1 Protocol
DNP3.0
4. Move down to the next cell (RP1 Address). This cell controls the DNP3.0 address of the IED. Up to 32
IEDs can be connected to one spur, therefore it is necessary for each IED to have a unique address
so that messages from the master control station are accepted by only one IED. DNP3.0 uses a
decimal number between 1 and 65519 for the Relay Address. It is important that no two IEDs have the
same address.
560 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
COMMUNICATIONS
RP1 Address
1
5. Move down to the next cell (RP1 Baud Rate). This cell controls the baud rate to be used. Six baud
rates are supported by the IED 1200 bps, 2400 bps, 4800 bps, 9600 bps, 19200 bps and 38400 bps.
Make sure that the baud rate selected on the IED is the same as that set on the master station.
COMMUNICATIONS
RP1 Baud rate
9600 bits/s
6. Move down to the next cell (RP1 Parity). This cell controls the parity format used in the data frames.
The parity can be set to be one of None, Odd or Even. Make sure that the parity format selected on
the IED is the same as that set on the master station.
COMMUNICATIONS
RP1 Parity
None
7. If the optional fibre optic connectors are fitted, the RP1 PhysicalLink cell is visible. This cell controls
the physical media used for the communication (Copper or Fibre optic).
COMMUNICATIONS
RP1 PhysicalLink
Copper
8. Move down to the next cell (RP1 Time Sync). This cell affects the time synchronisation request from
the master by the IED. It can be set to enabled or disabled. If enabled it allows the DNP3.0
master to synchronise the time on the IED.
COMMUNICATIONS
RP1 Time Sync
Enabled
P54x1Z-TM-EN-1 561
Chapter 21 - Communications P54x1Z
The standard adheres to the requirements laid out by the ISO OSI model and therefore provides complete
vendor interoperability and flexibility on the transmission types and protocols used. This includes mapping of
data onto Ethernet, which is becoming more and more widely used in substations, in favour of RS485. Using
Ethernet in the substation offers many advantages, most significantly including:
● Ethernet allows high-speed data rates (currently 100 Mbps, rather than tens of kbps or less used by
most serial protocols)
● Ethernet provides the possibility to have multiple clients
● Ethernet is an open standard in every-day use
● There is a wide range of Ethernet-compatible products that may be used to supplement the LAN
installation (hubs, bridges, switches)
562 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Data Attributes
stVal q t PhA PhB PhC
Data Objects
Pos A
Logical Nodes : 1 to n
LN1: XCBR LN2: MMXU
V01008
P54x1Z-TM-EN-1 563
Chapter 21 - Communications P54x1Z
The IEC 61850 compatible interface standard provides capability for the following:
● Read access to measurements
● Refresh of all measurements at the rate of once per second.
● Generation of non-buffered reports on change of status or measurement
● SNTP time synchronization over an Ethernet link. (This is used to synchronize the IED's internal real
time clock.
● GOOSE peer-to-peer communication
● Disturbance record extraction by file transfer. The record is extracted as an ASCII format COMTRADE
file
Note:
Setting changes are not supported in the current IEC 61850 implementation. Currently these setting changes are
carried out using the settings application software.
564 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
● UINT16
● UINT32
● UINT8
Note:
Some configuration data is available in the IEC61850 CONFIG. column, allowing read-only access to basic
configuration data.
P54x1Z-TM-EN-1 565
Chapter 21 - Communications P54x1Z
Any new configuration sent to the IED is automatically stored in the inactive configuration bank, therefore not
immediately affecting the current configuration.
Following an upgrade, the IEC 61850 Configurator tool can be used to transmit a command, which
authorises activation of the new configuration contained in the inactive configuration bank. This is done by
switching the active and inactive configuration banks. The capability of switching the configuration banks is
also available using the IEC61850 CONFIG. column of the HMI.
The SCL Name and Revision attributes of both configuration banks are available in the IEC61850 CONFIG.
column of the HMI.
Edition 2 implementation requires use of version 3.2 of the IEC 61850 configurator, which is installed with
version 1.2 of MiCOM S1 Agile.
566 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
V01056
V01057
P54x1Z-TM-EN-1 567
Chapter 21 - Communications P54x1Z
Of these, only ENS and ENC types are available from a MiCOM P40 IED when publishing GOOSE
messages, so Data Objects using these Common Data Classes should not be published in mixed Edition 1
and Edition 2 systems.
For compatibility between Edition 1 and Edition 2 IEDs, SCL files using SCL schema version 2.1 must be
used. For a purely Edition 2 system, use the schema version 3.1.
V01059
568 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
V01060
P54x1Z-TM-EN-1 569
Chapter 21 - Communications P54x1Z
Note:
For IEC 60870-5-103, Read Only Mode function is different from the existing Command block feature.
570 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
Using the PSL, these signals can be activated by opto-inputs, Control Inputs and function keys if required.
P54x1Z-TM-EN-1 571
Chapter 21 - Communications P54x1Z
9 TIME SYNCHRONISATION
In modern protection schemes it is necessary to synchronise the IED's real time clock so that events from
different devices can be time stamped and placed in chronological order. This is achieved in various ways
depending on the chosen options and communication protocols.
● Using the IRIG-B input (if fitted)
● Using the SNTP time protocol (for Ethernet IEC 61850 versions + DNP3 OE)
● By using the time synchronisation functionality inherent in the data protocols
IRIG-B
V01040
The first four time-slots define the time in BCD (Binary Coded Decimal). Time-slots 5 and 6 are used for
control functions, which control deletion commands and allow different data groupings within the
synchronisation strings. Time-slots 7-10 define the time in SBS (Straight Binary Second of day).
572 P54x1Z-TM-EN-1
P54x1Z Chapter 21 - Communications
9.2 SNTP
SNTP is used to synchronise the clocks of computer systems over packet-switched, variable-latency data
networks, such as IP. SNTP can be used as the time synchronisation method for models using IEC 61850
over Ethernet.
The device is synchronised by the main SNTP server. This is achieved by entering the IP address of the
SNTP server into the IED using the IEC 61850 Configurator software described in the settings application
software manual. A second server is also configured with a different IP address for backup purposes.
This function issues an alarm when there is a loss of time synchronisation on the SNTP server. This could be
because there is no response or no valid clock signal.
The HMI menu does not contain any configurable settings relating to SNTP, as the only way to configure it is
using the IEC 61850 Configurator. However it is possible to view some parameters in the
COMMUNICATIONS column under the sub-heading SNTP parameters. Here you can view the SNTP server
addresses and the SNTP poll rate in the cells SNTP Server 1, SNTP Server 2 and SNTP Poll rate
respectively.
The SNTP time synchronisation status is displayed in the SNTP Status cell in the DATE AND TIME column.
P54x1Z-TM-EN-1 573
Chapter 21 - Communications P54x1Z
independently calculate delays. The main disadvantage is that more inaccuracy is introduced, because the
method assumes that forward and reverse delays are always the same, which may not always be correct.
When using end-to-end mode, the IED can be connected in a ring or line topology using RSTP or Self
Healing Protocol without any additional Transparent Clocks. But because the IED is a slave-only device,
additional inaccuracy is introduced. The additional error will be less than 1ms for a network of eight devices.
V01061
574 P54x1Z-TM-EN-1
CYBER-SECURITY
CHAPTER 22
Chapter 22 - Cyber-Security P54x1Z
576 P54x1Z-TM-EN-1
P54x1Z Chapter 22 - Cyber-Security
1 OVERVIEW
In the past, substation networks were traditionally isolated and the protocols and data formats used to
transfer information between devices were often proprietary.
For these reasons, the substation environment was very secure against cyber-attacks. The terms used for
this inherent type of security are:
● Security by isolation (if the substation network is not connected to the outside world, it cannot be
accessed from the outside world).
● Security by obscurity (if the formats and protocols are proprietary, it is very difficult to interpret them).
The increasing sophistication of protection schemes, coupled with the advancement of technology and the
desire for vendor interoperability, has resulted in standardisation of networks and data interchange within
substations. Today, devices within substations use standardised protocols for communication. Furthermore,
substations can be interconnected with open networks, such as the internet or corporate-wide networks,
which use standardised protocols for communication. This introduces a major security risk making the grid
vulnerable to cyber-attacks, which could in turn lead to major electrical outages.
Clearly, there is now a need to secure communication and equipment within substation environments. This
chapter describes the security measures that have been put in place for our range of Intelligent Electronic
Devices (IEDs).
Note:
Cyber-security compatible devices do not enforce NERC compliance, they merely facilitate it. It is the responsibility of
the user to ensure that compliance is adhered to as and when necessary.
P54x1Z-TM-EN-1 577
Chapter 22 - Cyber-Security P54x1Z
The threats to cyber-security may be unintentional (e.g. natural disasters, human error), or intentional (e.g.
cyber-attacks by hackers).
Good cyber-security can be achieved with a range of measures, such as closing down vulnerability
loopholes, implementing adequate security processes and procedures and providing technology to help
achieve this.
Examples of vulnerabilities are:
● Indiscretions by personnel (users keep passwords on their computer)
● Bad practice (users do not change default passwords, or everyone uses the same password to access
all substation equipment)
● Bypassing of controls (users turn off security measures)
● Inadequate technology (substation is not firewalled)
To help tackle these issues, standards organisations have produced various standards. Compliance with
these standards significantly reduces the threats associated with lack of cyber-security.
578 P54x1Z-TM-EN-1
P54x1Z Chapter 22 - Cyber-Security
3 STANDARDS
There are several standards, which apply to substation cyber-security. The standards currently applicable to
Alstom Grid IEDs are NERC and IEEE1686.
Standard Country Description
NERC CIP (North American Electric Reliability
USA Framework for the protection of the grid critical Cyber Assets
Corporation)
BDEW (German Association of Energy and Water
Germany Requirements for Secure Control and Telecommunication Systems
Industries)
ICS oriented then Relevant for EPU completing existing standard
ANSI ISA 99 USA
and identifying new topics such as patch management
IEEE 1686 International International Standard for substation IED cyber-security capabilities
IEC 62351 International Power system data and Comm. protocol
ISO/IEC 27002 International Framework for the protection of the grid critical Cyber Assets
NIST SP800-53 (National Institute of Standards and
USA Complete framework for SCADA SP800-82and ICS cyber-security
Technology)
CPNI Guidelines (Centre for the Protection of National Clear and valuable good practices for Process Control and SCADA
UK
Infrastructure) security
P54x1Z-TM-EN-1 579
Chapter 22 - Cyber-Security P54x1Z
580 P54x1Z-TM-EN-1
P54x1Z Chapter 22 - Cyber-Security
P54x1Z-TM-EN-1 581
Chapter 22 - Cyber-Security P54x1Z
● IED functions and features are assigned to different password levels. The assignment is fixed.
● The audit trail is recorded, listing events in the order in which they occur, held in a circular buffer.
● Records contain all defined fields from the standard and record all defined function event types where
the function is supported.
● No password defeat mechanism exists. Instead a secure recovery password scheme is implemented.
● Unused ports (physical and logical) may be disabled.
582 P54x1Z-TM-EN-1
P54x1Z Chapter 22 - Cyber-Security
4 CYBER-SECURITY IMPLEMENTATION
The Alstom Grid IEDs have always been and will continue to be equipped with state-of-the-art security
measures. Due to the ever-evolving communication technology and new threats to security, this requirement
is not static. Hardware and software security measures are continuously being developed and implemented
to mitigate the associated threats and risks.
This section describes the current implementation of cyber-security. This is valid for the release of platform
software to which this manual pertains. This current cyber-security implementation is known as Cyber-
security Phase 1.
At the IED level, these cyber-security measures have been implemented:
● NERC-compliant default display
● Four-level access
● Enhanced password security
● Password recovery procedure
● Disabling of unused physical and logical ports
● Inactivity timer
● Security events management
External to the IEDs, the following cyber-security measures have been implemented:
● Antivirus
● Security patch management
If you try to change the default display from the NERC-compliant one, a further warning is displayed:
The default display navigation map shows how NERC-compliance is achieved with the product's default
display concept.
P54x1Z-TM-EN-1 583
Chapter 22 - Cyber-Security P54x1Z
NERC compliant
banner
System Current
Access Level
Measurements
System Voltage
System Frequency
Measurements
System Power
Plant Reference
Measurements
V00403
Password levels
Level Meaning Read Operation Write Operation
SYSTEM DATA column:
Description
Plant Reference
Model Number
Serial Number
S/W Ref.
Access Level Password Entry
Read Some
0 Security Feature LCD Contrast (UI only)
Write Minimal
SECURITY CONFIG column:
User Banner
Attempts Remain
Blk Time Remain
Fallback PW level
Security Code (UI only)
584 P54x1Z-TM-EN-1
P54x1Z Chapter 22 - Cyber-Security
BLANK PASSWORD
ENTERED CONFIRM
Blank passwords cannot be configured if the lower level password is not blank.
Blank passwords affect the fall back level after inactivity timeout or logout.
The ‘fallback level’ is the password level adopted by the IED after an inactivity timeout, or after the user logs
out. This will be either the level of the highest-level password that is blank, or level 0 if no passwords are
blank.
P54x1Z-TM-EN-1 585
Chapter 22 - Cyber-Security P54x1Z
Key:
HMI = Human Machine Interface
FPort = Front Port
RPrt = Rear Port
Lvl = Level
586 P54x1Z-TM-EN-1
P54x1Z Chapter 22 - Cyber-Security
NERC COMPLIANT
P/WORD WAS SAVED
If the password entered is not NERC-compliant, the user is required to actively confirm this, in which case
the non-compliance is logged.
If the entered password is not NERC compliant, the following text is displayed:
NERC COMPLIANCE
NOT MET CONFIRM?
On confirmation, the non-compliant password is stored and the following acknowledgement message is
displayed for 2 seconds.
NON-NERC P/WORD
SAVED OK
If the action is cancelled, the password is rejected and the following message is displayed for 2 seconds.
NON-NERC P/WORD
NOT SAVE
If the password is entered through a communications port using Courier or Modbus protocols, the device will
store the password, irrespective of whether it is NERC-compliant or not. It then uses appropriate response
codes to inform the client of the NERC-compliancy status. You can then choose to enter a new NERC-
compliant password or accept the non-NERC compliant password just entered.
P54x1Z-TM-EN-1 587
Chapter 22 - Cyber-Security P54x1Z
If you try to enter the password while the interface is blocked, the following message is displayed for 2
seconds.
NOT ACCEPTED
ENTRY IS BLOCKED
A similar response occurs if you try to enter the password through a communications port.
The parameters can then be configured using the Attempts Count, Attempts Timer and Blocking Timer
settings in the SYSTEM CONFIG column.
As soon as the security code is displayed on the LCD, a validity timer is started. This validity timer is set to
72 hours and is not configurable. This provides enough time for the contact centre to manually generate and
send a recovery password. The Service Level Agreement (SLA) for recovery password generation is one
working day, so 72 hours is sufficient time, even allowing for closure of the contact centre over weekends
and bank holidays.
To prevent accidental reading of the IED security code, the cell will initially display a warning message:
PRESS ENTER TO
READ SEC. CODE
The security code is displayed on confirmation. The validity timer is then started. The security code can only
be read from the front panel.
588 P54x1Z-TM-EN-1
P54x1Z Chapter 22 - Cyber-Security
passwords. Each password should be appropriate for its intended function, ensuring NERC compliance, if
required.
On this action, the following message is displayed:
PASSWORDS HAVE
BEEN SET TO
DEFAULT
The recovery password can be applied through any interface, local or remote. It will achieve the same result
irrespective of which interface it is applied through.
REAR PORT 1 TO BE
DISABLED.CONFIRM
Note:
It is not possible to disable a port from which the disabling port command originates.
Note:
We do not generally advise disabling the physical Ethernet port.
Note:
The port disabling setting cells are not provided in the settings file. It is only possible to do this using the HMI front
panel.
P54x1Z-TM-EN-1 589
Chapter 22 - Cyber-Security P54x1Z
Note:
If any of these protocols are enabled or disabled, the Ethernet card will reboot.
590 P54x1Z-TM-EN-1
P54x1Z Chapter 22 - Cyber-Security
where:
● int is the interface definition (UI, FP, RP1, RP2, TNL, TCP)
● prt is the port ID (FP, RP1, RP2, TNL, DNP3, IEC, ETHR)
● grp is the group number (1, 2, 3, 4)
● crv is the Curve group number (1, 2, 3, 4)
P54x1Z-TM-EN-1 591
Chapter 22 - Cyber-Security P54x1Z
Each new event has an incremented unique number, therefore missing events appear as ‘gap’ in the
sequence. The unique identifier forms part of the event record that is read or uploaded from the IED.
Note:
It is no longer possible to clear Event, Fault, Maintenance, and Disturbance Records.
DO YOU WANT TO
LOG OUT?
You will only be asked this question if your password level is higher than the fallback level.
If you confirm, the following message is displayed for 2 seconds:
LOGGED OUT
Access Level #
LOGOUT CANCELLED
Access Level #
592 P54x1Z-TM-EN-1
INSTALLATION
CHAPTER 23
Chapter 23 - Installation P54x1Z
594 P54x1Z-TM-EN-1
P54x1Z Chapter 23 - Installation
1 CHAPTER OVERVIEW
This chapter provides information about installing the product.
This chapter contains the following sections:
Chapter Overview 595
Handling the Goods 596
Mounting the Device 597
Cables and Connectors 602
Case Dimensions 607
P54x1Z-TM-EN-1 595
Chapter 23 - Installation P54x1Z
Caution:
Before lifting or moving the equipment you should be familiar with the Safety
Information chapter of this manual.
596 P54x1Z-TM-EN-1
P54x1Z Chapter 23 - Installation
V01412
Caution:
Do not use conventional self-tapping screws, because they have larger heads
and could damage the faceplate.
Alternatively, you can use tapped holes if the panel has a minimum thickness of 2.5 mm.
For applications where the product needs to be semi-projection or projection mounted, a range of collars are
available.
If several products are mounted in a single cut-out in the panel, mechanically group them horizontally or
vertically into rigid assemblies before mounting in the panel.
P54x1Z-TM-EN-1 597
Chapter 23 - Installation P54x1Z
Caution:
Do not fasten products with pop rivets because this makes them difficult to
remove if repair becomes necessary.
If the product is mounted on a BS EN60529 IP52 compliant panel, fit a metallic sealing strip between
adjoining products (part no GN2044 001) and fit a sealing ring around the complete assembly, according to
the following table.
Width Sealing ring for single tier Sealing ring for double tier
598 P54x1Z-TM-EN-1
P54x1Z Chapter 23 - Installation
Width Sealing ring for single tier Sealing ring for double tier
Caution:
Risk of damage to the front cover molding. Do not use conventional self-tapping
screws, including those supplied for mounting MiDOS products because they
have slightly larger heads.
Once the tier is complete, the frames are fastened into the racks using mounting angles at each end of the
tier.
P54x1Z-TM-EN-1 599
Chapter 23 - Installation P54x1Z
600 P54x1Z-TM-EN-1
P54x1Z Chapter 23 - Installation
P54x1Z-TM-EN-1 601
Chapter 23 - Installation P54x1Z
Caution:
Before carrying out any work on the equipment you should be familiar with the
Safety Section and the ratings on the equipment’s rating label.
602 P54x1Z-TM-EN-1
P54x1Z Chapter 23 - Installation
Caution:
Protect the auxiliary power supply wiring with a maximum 16 A high rupture
capacity (HRC) type NIT or TIA fuse.
Use a wire size of at least 2.5 mm2 terminated with a ring terminal.
Due to the physical limitations of the ring terminal, the maximum wire size you can use is 6.0 mm2 using ring
terminals that are not pre-insulated. If using pre insulated ring terminals, the maximum wire size is reduced
to 2.63 mm2 per ring terminal. If you need a greater cross-sectional area, use two wires in parallel, each
terminated in a separate ring terminal.
The wire should have a minimum voltage rating of 300 V RMS.
Note:
To prevent any possibility of electrolytic action between brass or copper ground conductors and the rear panel of the
product, precautions should be taken to isolate them from one another. This could be achieved in several ways,
including placing a nickel-plated or insulating washer between the conductor and the product case, or using tinned
ring terminals.
Due to the physical limitations of the ring terminal, the maximum wire size you can use is 6.0 mm2 using ring
terminals that are not pre-insulated. If using pre insulated ring terminals, the maximum wire size is reduced
to 2.63 mm2 per ring terminal. If you need a greater cross-sectional area, use two wires in parallel, each
terminated in a separate ring terminal.
The wire should have a minimum voltage rating of 300 V RMS.
Caution:
Current transformer circuits must never be fused.
Note:
If there are CTs present, spring-loaded shorting contacts ensure that the terminals into which the CTs connect are
shorted before the CT contacts are broken.
Note:
For 5A CT secondaries, we recommend using 2 x 2.5 mm2 PVC insulated multi-stranded copper wire.
P54x1Z-TM-EN-1 603
Chapter 23 - Installation P54x1Z
Caution:
Protect the opto-inputs and their wiring with a maximum 16 A high rupture
capacity (HRC) type NIT or TIA fuse.
604 P54x1Z-TM-EN-1
P54x1Z Chapter 23 - Installation
Note:
For models equipped with redundant Ethernet connections the product must be partially dismantled to set the fourth
octet of the second IP address. This ideally, should be done before installation.
P54x1Z-TM-EN-1 605
Chapter 23 - Installation P54x1Z
606 P54x1Z-TM-EN-1
P54x1Z Chapter 23 - Installation
5 CASE DIMENSIONS
Not all products are available in all case sizes.
All dimensons in mm
max.
Side view
E01411
P54x1Z-TM-EN-1 607
Chapter 23 - Installation P54x1Z
E01409
608 P54x1Z-TM-EN-1
74.95 116.55 142.45 12 OFF HOLES 3.40
5.3
E01410
P54x1Z
P54x1Z-TM-EN-1
159.00 168.00
SECONDARY COVER
(WHEN FITTED)
413.2
30.00
FRONT VIEW SIDE VIEW
609
Chapter 23 - Installation
Chapter 23 - Installation P54x1Z
610 P54x1Z-TM-EN-1
COMMISSIONING INSTRUCTIONS
CHAPTER 24
Chapter 24 - Commissioning Instructions P54x1Z
612 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
1 CHAPTER OVERVIEW
This chapter contains the following sections:
Chapter Overview 613
General Guidelines 614
Commissioning Test Menu 615
Commissioning Equipment 619
Product Checks 620
Electrical Intermicom Communication Loopback 629
Intermicom 64 Communication 631
GPS Synchronisation 633
Setting Checks 634
IEC 61850 Edition 2 Testing 636
Current Differential Protection 642
Distance Protection 645
Delta Directional Comparison 652
DEF Aided Schemes 655
Out of Step Protection 658
Protection Timing Checks 660
System Check and Check Synchronism 662
Check Trip and Autoreclose Cycle 663
End-to-End Communication Tests 664
End-to-End Scheme Tests 667
Onload Checks 669
Final Checks 672
Commmissioning the P59x 673
P54x1Z-TM-EN-1 613
Chapter 24 - Commissioning Instructions P54x1Z
2 GENERAL GUIDELINES
Alstom Grid IEDs are self-checking devices and will raise an alarm in the unlikely event of a failure. This is
why the commissioning tests are less extensive than those for non-numeric electronic devices or electro-
mechanical relays.
To commission the devices, you (the commissioning engineer) do not need to test every function. You need
only verify that the hardware is functioning correctly and that the application-specific software settings have
been applied. You can check the settings by extracting them using the settings application software, or by
means of the front panel interface (HMI panel).
The menu language is user-selectable, so you can change it for commissioning purposes if required.
Note:
Remember to restore the language setting to the customer’s preferred language on completion.
Caution:
Before carrying out any work on the equipment you should be familiar with
the contents of the Safety Section or Safety Guide SFTY/4LM as well as the
ratings on the equipment’s rating label.
Warning:
With the exception of the CT shorting contacts check, do not disassemble the
device during commissioning.
614 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Note:
When the Test Mode cell is set to Contacts Blocked, the relay output status indicates which contacts would
operate if the IED was in-service. It does not show the actual status of the output relays, as they are blocked.
P54x1Z-TM-EN-1 615
Chapter 24 - Commissioning Instructions P54x1Z
Caution:
The monitor/download port is not electrically isolated against induced
voltages on the communications channel. It should therefore only be used for
local communications.
Caution:
When the cell is in Test Mode, the Scheme Logic still drives the output relays,
which could result in tripping of circuit breakers. To avoid this, set the Test
Mode cell to Contacts Blocked.
Note:
Test mode and Contacts Blocked mode can also be selected by energising an opto-input mapped to the Test
Mode signal, and the Contact Block signal respectively.
Note:
When the Test Mode cell is set to Contacts Blocked the Relay O/P Status cell does not show the current status
of the output relays and therefore cannot be used to confirm operation of the output relays. Therefore it will be
necessary to monitor the state of each contact in turn.
616 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Note:
The default settings for the programmable scheme logic has the AR Trip Test signals mapped to the Trip
Input signals. If the programmable scheme logic has been changed, it is essential that these signals retain this
mapping for the Test Autoreclose facility to work.
Note:
Trip times may be up to ½ cycle longer when tested in the static mode, due to the nature of the test voltage and
current, and the slower filtering. This is normal, and perfectly acceptable.
P54x1Z-TM-EN-1 617
Chapter 24 - Commissioning Instructions P54x1Z
Note:
If the cell is set to Internal, only the IED software is checked. If the cell is set to External, both the software and
hardware are checked.
When the device is switched into Loopback Mode, it automatically uses generic addresses 0-0. It responds
as if it is connected to a remote device. The sent and received IM64 signals continue to be routed to and from
the signals defined in the programmable logic.
Note:
Loopback mode can also be selected by energising an opto-input mapped to the Loopback signal.
Note:
When the status in both Red LED Status and Green LED Status cells is ‘1’, this indicates the LEDs illumination is
yellow.
618 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
4 COMMISSIONING EQUIPMENT
P54x1Z-TM-EN-1 619
Chapter 24 - Commissioning Instructions P54x1Z
5 PRODUCT CHECKS
These product checks are designed to ensure that the device has not been physically damaged prior to
commissioning, is functioning correctly and that all input quantity measurements are within the stated
tolerances.
If the application-specific settings have been applied to the IED prior to commissioning, you should make a
copy of the settings. This will allow you to restore them at a later date if necessary. This can be done by:
● Obtaining a setting file from the customer.
● Extracting the settings from the IED itself, using a portable PC with appropriate setting software.
If the customer has changed the password that prevents unauthorised changes to some of the settings,
either the revised password should be provided, or the original password restored before testing.
Note:
If the password has been lost, a recovery password can be obtained from Alstom Grid.
Warning:
The following group of tests should be carried out without the auxiliary supply
being applied to the IED and, if applicable, with the trip circuit isolated.
The current and voltage transformer connections must be isolated from the IED for these checks. If a P991
test block is provided, the required isolation can be achieved by inserting test plug type P992. This open
circuits all wiring routed through the test block.
Before inserting the test plug, you should check the scheme diagram to ensure that this will not cause
damage or a safety hazard (the test block may, for example, be associated with protection current
transformer circuits). The sockets in the test plug, which correspond to the current transformer secondary
windings, must be linked before the test plug is inserted into the test block.
Warning:
Never open-circuit the secondary circuit of a current transformer since the
high voltage produced may be lethal and could damage insulation.
If a test block is not provided, the voltage transformer supply to the IED should be isolated by means of the
panel links or connecting blocks. The line current transformers should be short-circuited and disconnected
from the IED terminals. Where means of isolating the auxiliary supply and trip circuit (for example isolation
links, fuses and MCB) are provided, these should be used. If this is not possible, the wiring to these circuits
must be disconnected and the exposed ends suitably terminated to prevent them from being a safety hazard.
620 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Warning:
Check the rating information under the top access cover on the front of the
IED.
Warning:
Check that the IED being tested is correct for the line or circuit.
Warning:
Record the circuit reference and system details.
Warning:
Check the CT secondary current rating and record the CT tap which is in use.
Carefully examine the IED to see that no physical damage has occurred since installation.
Ensure that the case earthing connections (bottom left-hand corner at the rear of the IED case) are used to
connect the IED to a local earth bar using an adequate conductor.
Note:
Use a magnetic bladed screwdriver to minimise the risk of the screws being left in the terminal block or lost.
Pull the terminal block away from the rear of the case and check with a continuity tester that all the shorting
switches being used are closed.
5.1.3 INSULATION
Insulation resistance tests are only necessary during commissioning if explicitly requested.
Isolate all wiring from the earth and test the insulation with an electronic or brushless insulation tester at a
DC voltage not exceeding 500 V. Terminals of the same circuits should be temporarily connected together.
The insulation resistance should be greater than 100 MW at 500 V.
On completion of the insulation resistance tests, ensure all external wiring is correctly reconnected to the
IED.
P54x1Z-TM-EN-1 621
Chapter 24 - Commissioning Instructions P54x1Z
Caution:
Check that the external wiring is correct according to the relevant IED and
scheme diagrams. Ensure that phasing/phase rotation appears to be as
expected.
Note:
The IED can withstand an AC ripple of up to 12% of the upper rated voltage on the DC auxiliary supply.
Warning:
Do not energise the IED or interface unit using the battery charger with the
battery disconnected as this can irreparably damage the power supply
circuitry.
Caution:
Energise the IED only if the auxiliary supply is within the specified operating
ranges. If a test block is provided, it may be necessary to link across the front
of the test plug to connect the auxiliary supply to the IED.
Warning:
The current and voltage transformer connections must remain isolated from
the IED for these checks. The trip circuit should also remain isolated to
prevent accidental operation of the associated circuit breaker.
622 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
The following group of tests verifies that the IED hardware and software is functioning correctly and should
be carried out with the supply applied to the IED.
Caution:
Before applying a contrast setting, make sure that it will not make the display
so light or dark such that menu text becomes unreadable. It is possible to
restore the visibility of a display by downloading a setting file, with the LCD
Contrast set within the typical range of 7 - 11.
Note:
If the auxiliary supply fails, the time and date will be maintained by the auxiliary battery. Therefore, when the auxiliary
supply is restored, you should not have to set the time and date again. To test this, remove the IRIG-B signal, and
then remove the auxiliary supply. Leave the device de-energised for approximately 30 seconds. On re energisation,
the time should be correct.
P54x1Z-TM-EN-1 623
Chapter 24 - Commissioning Instructions P54x1Z
When using IRIG-B to maintain the clock, the IED must first be connected to the satellite clock equipment
(usually a P594), which should be energised and functioning.
1. Set the IRIG-B Sync cell in the DATE AND TIME column to Enabled.
2. Ensure the IED is receiving the IRIG-B signal by checking that cell IRIG-B Status reads Active.
3. Once the IRIG-B signal is active, adjust the time offset of the universal co coordinated time (satellite
clock time) on the satellite clock equipment so that local time is displayed.
4. Check that the time, date and month are correct in the Date/Time cell. The IRIG-B signal does not
contain the current year so it will need to be set manually in this cell.
5. Reconnect the IRIG-B signal.
If the time and date is not being maintained by an IRIG-B signal, ensure that the IRIG-B Sync cell in the
DATE AND TIME column is set to Disabled.
1. Set the date and time to the correct local time and date using Date/Time cell or using the serial
protocol.
624 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
P54x1Z-TM-EN-1 625
Chapter 24 - Commissioning Instructions P54x1Z
RS232 K-Bus
626 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Fibre Connection
Some models have an optional fibre optic communications port fitted (on a separate communications board).
The communications port to be used is selected by setting the Physical Link cell in the COMMUNICATIONS
column, the values being Copper or K-Bus for the RS485/K-bus port and Fibre Optic for the fibre optic
port.
P54x1Z-TM-EN-1 627
Chapter 24 - Commissioning Instructions P54x1Z
Note:
If a PC connected to the IED using the rear communications port is being used to display the measured current, the
process will be similar. However, the setting of the Remote Values cell in the MEASURE’T SETUP column will
determine whether the displayed values are in primary or secondary Amperes.
The measurement accuracy of the IED is +/- 1%. However, an additional allowance must be made for the
accuracy of the test equipment being used.
Note:
If a PC connected to the IED using the rear communications port is being used to display the measured current, the
process will be similar. However, the setting of the Remote Values cell in the MEASURE’T SETUP column will
determine whether the displayed values are in primary or secondary Amperes.
The measurement accuracy of the IED is +/- 1%. However, an additional allowance must be made for the
accuracy of the test equipment being used.
628 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Note:
If INTERMICOM COMMS > Loopback Mode is set to Internal, only the internal software of the device is checked.
This is useful for testing functionality if no communications connections are made. Use the 'External' setting during
commissioning because it checks both the software and hardware. When the IED is switched into either Internal or
External Loopback Mode it automatically inhibits InterMiCOM messages to the PSL by setting all eight InterMiCOM
message command states to zero.
Set INTERMICOM COMMS > Loopback Mode to External and form a communications loopback by
connecting the transmit signal (pin 2) to the receive signal (pin 3).
Note:
The DCD signal must be held high (by connecting pin 1 to pin 4) if the connected equipment does not support DCD.
E01450
P54x1Z-TM-EN-1 629
Chapter 24 - Commissioning Instructions P54x1Z
Note:
Some or all of these cells show Fail depending on the communications configuration and the way the link has failed.
630 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
7 INTERMICOM 64 COMMUNICATION
If the IED is used in a scheme with InterMiCOM64 communication, you need to configure a loopback for
testing purposes.
IM64 is fibre-based. Several different fibre-optic interfaces are available. In general, 1550 nm single-mode
fibres, or 1300 nm single-mode or multimode fibres are used for direct connection. 850 nm multimode fibres
are generally used with multiplexing telecommunications equipment.
Note:
It is important that fibres used for testing are correct for the specified interface(s).
Optical fibres should be terminated with BFOC2.5 (ST2.5) connectors. For multimode applications use
50/125 µm core fibre. Make sure fibre test leads used for measurements are long enough for mode stripping
(a method of reducing loss within the core). We recommend a minimum length of 10 m (30ft) for this.
If IEDs communicate using multiplexed electrical communication channels, a bidirectional optical-to-electrical
signal converter, such as a P59x, is used. The P59x range consists of three devices: P591 for G703, P592
for V.35 and P593 for X.21.
The P59x is situated near the multiplexer, between the fibre from the IED and the electrical interface of the
multiplexer. Apply the loopback either at the P59x or the multiplexer to ensure as much of the circuit as
possible is tested. If the IED is connected to a multiplexer, the loopback testing is exactly the same whether
connected directly or via a multiplexer. The P59x interface units require additional tests (see P59x
documentation).
If Current Differential protection is used, set CONFIGURATION > Current Diff to Enable.
If Current Differential protection is not used, set CONFIGURATION > InterMiCOM64 to Enable.
Warning:
NEVER look directly into the transmit port or the end of an optical fibre, as
this could severely damage your eyes.
P54x1Z-TM-EN-1 631
Chapter 24 - Commissioning Instructions P54x1Z
Note:
If CONFIGURATION > InterMiCOM64 is set to Enable, the signals normally sent and received by and from the
communications interface are routed to and from the signals defined in the Programmable Scheme Logic. If,
however, COMMISSION TESTS > IM64 Test Mode is set to Enabled, an IM64 test pattern is transmitted instead.
Note:
The propagation delay measurement is not valid in this mode of operation. The IED responds as if it is connected to a
remote IED. It indicates a loopback alarm which can only be cleared by setting COMMISSION TESTS > Loopback
Mode to Disabled.
Note:
In loopback mode the signals sent and received through the protection communications interface continue to be
routed to and from the signals defined in the programmable logic.
Note:
A test pattern can also be sent to the remote end to test the whole InterMiCOM communication path. To do this, set
COMMISSION TESTS >IM64 Test Mode to Enable and connect two ends. Take special care because the test
pattern is executed using PSL at the remote end.
632 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
8 GPS SYNCHRONISATION
The IED uses GPS timing information to align the local and remote current vectors in the current differential
algorithm. A P594 GPS synchronising unit is used to decode GPS signals and provide the synchronising
signal.
If the IED uses GPS synchronisation, the associated P594 unit needs to be commissioned according to the
instructions in the P594 Technical Manual.
Warning:
NEVER look directly into the transmit port or the end of an optical fibre, as
this could severely damage your eyes.
P54x1Z-TM-EN-1 633
Chapter 24 - Commissioning Instructions P54x1Z
9 SETTING CHECKS
The setting checks ensure that all of the application-specific settings (both the IED’s function and
programmable scheme logic settings) have been correctly applied.
Note:
If applicable, the trip circuit should remain isolated during these checks to prevent accidental operation of the
associated circuit breaker.
Note:
The device name may not already exist in the system shown in System Explorer. In this case, perform a Quick
Connect to the IED, then manually add the settings file to the device name in the system. Refer to the Settings
Application Software help for details of how to do this.
634 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
8. Press the Enter key to confirm the new setting value or the Clear key to discard it. The new setting is
automatically discarded if it is not confirmed within 15 seconds.
9. For protection group settings and disturbance recorder settings, the changes must be confirmed
before they are used. When all required changes have been entered, return to the column heading
level and press the down cursor key. Before returning to the default display, the following prompt
appears.
Update settings?
ENTER or CLEAR
10. Press the Enter key to accept the new settings or press the Clear key to discard the new settings.
Note:
If the menu time-out occurs before the setting changes have been confirmed, the setting values are also discarded.
Control and support settings are updated immediately after they are entered, without the Update settings prompt.
It is not possible to change the PSL using the IED’s front panel HMI.
Caution:
Where the installation needs application-specific PSL, the relevant .psl files,
must be transferred to the IED, for each and every setting group that will be
used. If you do not do this, the factory default PSL will still be resident. This
may have severe operational and safety consequences.
P54x1Z-TM-EN-1 635
Chapter 24 - Commissioning Instructions P54x1Z
The following table summarises the IED behaviour under the different modes:
IED Test Mode Setting Result
Disabled ● Normal IED behaviour
● Protection remains enabled
● Output from the device is still active
Test ● IEC 61850 message output has the 'quality' parameter set to 'test'
● The device only responds to IEC61850 MMS messages from the client with
the 'test' flag set
● Protection remains enabled
● Output from the device is disabled
Contacts Blocked ● IEC 61850 message output has quality set to ‘test’
● The device only responds to IEC 61850 MMS messages from the client with
the 'test' flag set
Setting the Test or Contacts Blocked mode puts the whole IED into test mode. The IEC 61850 data object
Beh in all Logical Nodes (except LPHD and any protection Logical Nodes that have Beh = 5 (off) due to the
function being disabled) will be set to 3 (test) or 4 (test/blocked) as applicable.
636 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
LPHD1
Incoming data
processed
Real GOOSE 2 messages
Reception buffer
V01058
P54x1Z-TM-EN-1 637
Chapter 24 - Commissioning Instructions P54x1Z
V01062
638 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
V01063
P54x1Z-TM-EN-1 639
Chapter 24 - Commissioning Instructions P54x1Z
View COMMISSION TESTS ® IED Mod/Beh, and check that it shows Test
3. Set device into Simulation Listening Mode
Select COMMISSION TESTS ® Subscriber Sim = Enabled
4. If using sampled values set the sampled values test mode
Select IEC 61850-9.2LE ® SV Test Mode ® Enabled
5. Inject simulated signals using a test device connected to the Ethernet network.
The device will continue to listen to ‘real’ GOOSE messages until a simulated message is received.
Once the simulated messages are received, the corresponding ‘real’ messages are ignored until the
device is taken out of IED test mode. Each message is treated separately, but sampled values are
considered as a single message.
6. Verify function based on test signal outputs.
Binary outputs (e.g. CB trips) will operate as normal. All transmitted GOOSE and MMS data items will
be tagged with the 'quality' parameter set to 'test', so that the receiver understands that they have
been issued by a device under test and can respond accordingly. This is summarised in the following
diagram:
V01064
640 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Note:
When the IED Test Mode cell is set to Contacts Blocked, the Relay O/P Status cell does not show the current status
of the output relays so cannot be used to confirm operation of the output relays. Therefore it is necessary to monitor
the state of each contact in turn.
P54x1Z-TM-EN-1 641
Chapter 24 - Commissioning Instructions P54x1Z
P54x IED Ia
Ra
L A
Ph a
Ib
Rb
A
Ph b
V01452
642 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Note:
For 5 A applications, keep the duration of current injections short to avoid overheating of the variac or injection test
set
Phase A
1. Retaining the same test circuit as before, prepare for an instantaneous injection of 3 pu current in the
A phase, with no current in the B phase (B phase switch open).
2. Set a timer to start when the fault injection is applied, and to stop when the trip occurs.
3. To verify the correct output contact mapping, use the trip contacts that would be expected to trip the
circuit breaker(s), as shown below. For two breaker applications, stop the timer once both CB1 and
CB2 trip contacts have closed. This can be achieved by connecting the contacts in series to stop the
timer.
Single breaker Two circuit breakers
Three Pole Tripping Any Trip Any Trip (CB1) and Any Trip (CB2)
Single Pole Tripping Trip A Trip A (CB1) and Trip A (CB2)
P54x1Z-TM-EN-1 643
Chapter 24 - Commissioning Instructions P54x1Z
Phase B
1. Reconfigure the test equipment to inject fault current into the B phase.
2. Repeat the test, this time ensuring that the breaker trip contacts relative to B phase operation close
correctly.
3. Record the B phase trip time.
4. Switch OFF the ac supply and reset the alarms
Phase C
1. Repeat the above procedure for the C phase.
2. Switch OFF the ac supply and reset the alarms.
The average of the recorded operating times for the three phases should be less than 40 ms for 50 Hz, and
less than 35 ms for 60 Hz when set for instantaneous operation.
Note:
For applications using magnetising inrush current restraint, use a test current higher than the Inrush High setting to
obtain fast operating times. A setting of at least twice the Inrush High setting is recommended.
The expected operating time is typically within +/- 5% (for IDMT) or +/-2% (for DT) of that for the curve
equation plus the “instantaneous” delay quoted above.
When the tests are completed, restore the original settings of any elements which were disabled for testing
purposes. Use the CONFIGURATION column.
644 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
12 DISTANCE PROTECTION
If these elements are enabled with a dependency upon the above conditions, it is necessary to simulate the
condition to test the correct operation of the protection function.
A communications failure can be simulated by setting the Test Loopback cell to Disabled and checking that
the IED raises a Comms Fail alarm.
At the end of the test, clear the communications alarms and reset the statistics.
A VTS alarm can be raised by applying a 3-phase voltage to the VT inputs and then removing one phase
voltage for a duration exceeding the VTS Time Delay setting.
At the end of the tests, clear the VTS alarm.
12.2.1 PRELIMINARIES
You should now connect the IED to equipment able to supply phase-phase and phase-neutral volts with
current in the correct phase relation for a particular type of fault on the selected characteristic angle. The
facility for altering the loop impedance (phase-to-ground fault or phase-phase) presented to the IED is
essential.
P54x1Z-TM-EN-1 645
Chapter 24 - Commissioning Instructions P54x1Z
Use a three-phase digital/electronic injection test set to make the commissioning procedure easier.
1. If testing the distance elements using using test sets that do not provide a dynamic model to generate
true fault delta conditions, set COMMISSIONING TESTS > Static Test Mode to Enabled. When set,
this disables phase selector control and forces the device to use a conventional (non-delta) directional
line.
2. For lower specification test equipment that cannot apply a full three phase set of healthy simulated
pre-fault voltages, the VT supervision may need to be disabled to avoid spurious pickup. Set
CONFIGURATION > Supervision to Disabled.
3. Connect the test equipment to the device using the test block(s), taking care not to open-circuit any
CT secondary windings. If using MMLG type test blocks, the live side of the test plug must be provided
with shorting links before it is inserted into the test block.
4. When the test is complete, make sure COMMISSIONING TESTS > Static Test Mode is set back to
Disabled.
646 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Note:
Zone 3 has an independent setting for the forward resistance reach (right-hand resistive reach line), and the reverse
resistance reach (left-hand resistive reach line).
P54x1Z-TM-EN-1 647
Chapter 24 - Commissioning Instructions P54x1Z
12.3.1 PHASE A
1. Prepare a dynamic A-phase-to-neutral fault, as detailed above.
2. Set a timer to start when the fault injection is applied and to stop when the trip occurs.
3. To verify correct output contact mapping use the trip contacts that would be expected to trip the circuit
breaker(s) (Any Trip for 3-pole tripping, Trip A for single pole tripping).
4. For two breaker applications, stop the timer when CB1 and CB2 trip contacts have both closed.
Monitor by connecting the contacts in series to stop the timer if necessary.
5. Record the phase A trip time.
6. Switch OFF the AC supply and reset the alarms.
12.3.2 PHASE B
1. Reconfigure to test a B phase fault.
2. Repeat the test, this time ensuring that the breaker trip contacts relative to B phase operation close
correctly.
3. Record the phase B trip time.
4. Switch OFF the AC supply and reset the alarms.
12.3.3 PHASE C
1. Reconfigure to test a C phase fault.
2. Repeat the test, this time ensuring that the breaker trip contacts relative to C phase operation close
correctly.
3. Record the phase C trip time.
4. Switch OFF the AC supply and reset the alarms.
The average of the recorded operating times for the three phases should typically be less than 20 ms for 50
Hz, and less than 16.7 ms for 60 Hz when set for instantaneous operation.
Note:
Where a non-zero time delay is set in the DISTANCE menu column, the expected operating time is typically within +/-
5% of the delay setting plus the “instantaneous” delay.
648 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Note:
The device allows separate time delay settings for phase (“Ph”) and ground (“Gnd”) fault elements. BOTH must be
checked to ensure that they have been set correctly.
If an InterMiCOM64 scheme is used to provide the signalling, the scheme logic may not use opto-inputs for
the aided scheme implementation. In this case, internal DDB signals need to be set or reset to test the
operation of the protection scheme.
Use the IM64 Test Mode with the IM64 Test Pattern to assert or monitor the relevant signals.
Ensure that the injection test set timer is still connected to measure the time taken for the device to trip. A
series of fault injections are applied, with a Zone 1, end-of-line, or Zone 4 fault simulated. At this stage, note
the method in which each fault is applied, but do not inject yet:
● Zone 1 fault: A dynamic forward A-B fault at half the Zone 1 reach is simulated.
● End of line fault: A dynamic forward A-B fault at the remote end of the line is simulated. The fault
impedance simulated should match the LINE PARAMETERS > Line Impedance setting.
● Zone 4 fault: A dynamic reverse A-B fault at half the Zone 4 reach is simulated.
The following table indicates the expected response for various test situations for a conventional signalling
scheme.
IED RESPONSE
Forward fault in Forward fault at end of line
Fault type simulated Reverse fault in zone 4
zone 1 (within Z1X/Z2)
Signal receive opto ON OFF ON OFF ON OFF
Zone 1 extension Trip Trip No Trip Trip No Trip No Trip
Trip, Trip, No Trip, No Signal Trip, No Trip, Signal No Trip, Signal
Blocking scheme
No Signal Send No Signal Send Send No Signal Send Send Send
Permissive Scheme Trip, No Trip, No Signal No Trip, No Signal No Trip, No Signal
Trip, Signal Send Trip, Signal Send
(PUR/PUTT) No Signal Send Send Send Send
Permissive Scheme No Trip, Signal No Trip, No Signal No Trip, No Signal
Trip, Signal Send Trip, Signal Send Trip, Signal Send
(POR/POTT) Send Send Send
P54x1Z-TM-EN-1 649
Chapter 24 - Commissioning Instructions P54x1Z
Note:
Here a non-zero tZ1 Ph or tZ1 Gnd time delay is set in the DISTANCE column, the expected operating time is
typically within +/- 5% of the tZ1 setting plus the “instantaneous” delay quoted above.
Note:
Where a non-zero Aided Distance Dly time delay is set in the DISTANCE menu column, the expected operating time
is typically within +/- 5% of the tZ1 setting plus the “instantaneous” delay quoted above.
Note:
For blocking schemes, a non-zero Aided Distance Dly time delay is set, so the expected operating time is typically
within +/- 5% of the delay setting plus the “instantaneous” operating delay. The trip time should thus be less than 20
ms for 50 Hz, and less than 16.7 ms for 60 Hz, plus 1.05 x Delay setting.
650 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
P54x1Z-TM-EN-1 651
Chapter 24 - Commissioning Instructions P54x1Z
13.1.1 PRELIMINARIES
Use a three-phase digital/electronic injection test set to make the commissioning procedure easier.
Connect the test equipment to the device using the test block(s) taking care not to open-circuit any CT
secondary. If MMLG type test blocks are used, the live side of the test plug must be provided with shorting
links before it is inserted into the test block.
If an InterMiCOM64 scheme is used to provide the signalling, the scheme logic may not use opto-inputs for
the aided scheme implementation. In this case, internal DDB signals need to be set or reset to test the
operation of the protection scheme.
Use the IM64 Test Mode with the IM64 Test Pattern to assert or monitor the relevant signals.
IED RESPONSE
Direction of fault
Forward fault Reverse fault
test injection
Signal receive opto ON OFF ON OFF
No Trip, Trip, No Trip, No Trip,
Blocking scheme
No Signal Send No Signal Send Signal Send Signal Send
Permissive scheme Trip, No Trip, No Trip, No Trip,
(POR/POTT) Signal Send Signal Send No Signal Send No Signal Send
652 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
13.2.1 PHASE A
1. Prepare a dynamic A-phase-to-neutral fault, as detailed above.
2. Set a timer to start when the fault injection is applied and to stop when the trip occurs.
3. To verify correct output contact mapping use the trip contacts that would be expected to trip the circuit
breaker(s) (Any Trip for 3-pole tripping, Trip A for single pole tripping).
4. For two breaker applications, stop the timer when CB1 and CB2 trip contacts have both closed.
Monitor by connecting the contacts in series to stop the timer if necessary.
5. Record the phase A trip time.
6. Switch OFF the AC supply and reset the alarms.
13.2.2 PHASE B
1. Reconfigure to test a B phase fault.
2. Repeat the test, this time ensuring that the breaker trip contacts relative to B phase operation close
correctly.
3. Record the phase B trip time.
4. Switch OFF the AC supply and reset the alarms.
13.2.3 PHASE C
1. Reconfigure to test a C phase fault.
2. Repeat the test, this time ensuring that the breaker trip contacts relative to C phase operation close
correctly.
3. Record the phase C trip time.
4. Switch OFF the AC supply and reset the alarms.
The average of the recorded operating times for the three phases should typically be less than 20 ms for 50
Hz, and less than 16.7 ms for 60 Hz when set for instantaneous operation.
Note:
Where a non-zero time delay is set in the DISTANCE menu column, the expected operating time is typically within +/-
5% of the delay setting plus the “instantaneous” delay.
P54x1Z-TM-EN-1 653
Chapter 24 - Commissioning Instructions P54x1Z
Caution:
When the tests are completed, restore all settings that were disabled for
testing purposes.
Caution:
Remove any wires or leads temporarily fitted to energise the channel receive
opto-input.
654 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
If these elements are enabled with a dependency upon the above conditions, it is necessary to simulate the
condition to test the correct operation of the protection function.
A communications failure can be simulated by setting the Test Loopback cell to Disabled and checking that
the IED raises a Comms Fail alarm.
At the end of the test, clear the communications alarms and reset the statistics.
A VTS alarm can be raised by applying a 3-phase voltage to the VT inputs and then removing one phase
voltage for a duration exceeding the VTS Time Delay setting.
At the end of the tests, clear the VTS alarm.
If an InterMiCOM64 scheme is used to provide the signalling, the scheme logic may not use opto-inputs for
the aided scheme implementation. In this case, internal logic signals (DDBs) need to be set or reset to test
the operation of the protection scheme.
The IM64 Test Mode in conjunction with the IM64 Test Pattern should be used to assert or monitor the
relevant signals.
This set of injection tests aims to determine that a single device, at one end of the scheme is performing
correctly.
Note:
The device must be tested in isolation, with the communications channel to the remote line terminal disconnected.
P54x1Z-TM-EN-1 655
Chapter 24 - Commissioning Instructions P54x1Z
14.2.1 PRELIMINARIES
1. Determine which output relays have been selected to operate when a DEF trip occurs, by viewing the
programmable scheme logic. If the trip outputs are phase segregated (a different output relay
allocated for each phase), the output relay assigned for tripping on ‘A’ phase faults should be used.
2. Connect the output relay so that its operation will trip the test set and stop the timer.
3. Connect the current output of the test set to the ‘A’ phase current transformer input
4. Connect, all three phase voltages Va, Vb, and Vc.
5. Depending on the test equipment used, make sure the timer is set to start when the current is applied.
656 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Caution:
When the tests are completed, restore all settings that were disabled for
testing purposes.
Caution:
Remove any wires or leads temporarily fitted to energise the channel receive
opto-input.
P54x1Z-TM-EN-1 657
Chapter 24 - Commissioning Instructions P54x1Z
+jX
Z6
Z5
State 4
State 3
State 2
State 1
R
R6' R5' R5 R6
∆R
Z5'
Z6'
V01451
Now apply the 4-state sequence, check that all 3-phases have tripped and that an OST alarm is displayed on
the local LCD.
658 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Note:
The angle in the table above is the angle between voltages and their respective currents. In state 4 the currents are
displaced 180° from their respective voltages.
Now apply the 3-state sequence, check that all 3-phases have tripped and that an OST alarm is displayed on
the local LCD.
P54x1Z-TM-EN-1 659
Chapter 24 - Commissioning Instructions P54x1Z
If these elements are enabled with a dependency upon the above conditions, it is necessary to simulate the
condition to test the correct operation of the protection function.
A communications failure can be simulated by setting the Test Loopback cell to Disabled and checking that
the IED raises a Comms Fail alarm.
At the end of the test, clear the communications alarms and reset the statistics.
A VTS alarm can be raised by applying a 3-phase voltage to the VT inputs and then removing one phase
voltage for a duration exceeding the VTS Time Delay setting.
At the end of the tests, clear the VTS alarm.
Note:
If using the default PSL, use output relay 3 as this is already mapped to the DDB signal Trip Command Out.
660 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Note:
If the timer does not stop when the current is applied and stage 1 has been set for directional operation, the
connections may be incorrect for the direction of operation set. Try again with the current connections reversed.
Note:
With the exception of the definite time characteristic, the operating times given are for a Time Multiplier Setting (TMS)
or Time Dial Setting (TDS) of 1. For other values of TMS or TDS, the values need to be modified accordingly.
Note:
For definite time and inverse characteristics there is an additional delay of up to 0.02 second and 0.08 second
respectively. You may need to add this the IED's acceptable range of operating times.
Caution:
On completion of the tests, you must restore all settings to customer
specifications.
P54x1Z-TM-EN-1 661
Chapter 24 - Commissioning Instructions P54x1Z
In most cases the line VT input is three phase, whereas the bus VTs are single phase.
The bus VT inputs are normally single phase so the system voltage checks are made on single phases and
the VT may be connected to either a phase-to-phase or phase to neutral voltage.
For these reasons, the IED has to be programmed with the appropriate connection. The CS Input setting in
the CT AND VT RATIOS column can be set to A-N, B-N, C-N, A-B, B-C or C-A according to the application.
The single-phase bus VT inputs each have associated phase shift and voltage magnitude compensation
settings to compensate for healthy voltage angle and magnitude differences between the check sync VT
input and the selected main VT reference phase. These are:
● CS VT Ph Shift and CS VT Mag
Any voltage measurements or comparisons using bus VT inputs are made using the compensated values.
Each circuit breaker controlled can have two stages of check synchronism enabled according to the settings:
● System Checks, CS1 Status and CS2 Status
When the system voltage check conditions are satisfied, the relevant DDB signals are asserted high as
follows:
● DDB (883): Check Sync 1 OK
● DDB (884): Check Sync 2 OK
These DDB signals should be mapped to the monitor/download port and used to indicate that the system
check synchronism condition has been satisfied.
662 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
1. To test the first three-phase auto-reclose cycle, set COMMISSION TESTS > Test Autoreclose to
Trip 3 Pole. The IED performs a trip/reclose cycle.
2. Repeat this operation to test the subsequent three-phase auto-reclose cycles.
3. Check all output relays (used for such as circuit breaker tripping and closing, or blocking other
devices) operate at the correct times during the trip/close cycle.
Check the auto-reclose cycles for single phase trip conditions one at a time by sequentially setting
COMMISSION TESTS > Test Autoreclose to Trip Pole A, Trip Pole B and Trip Pole C.
P54x1Z-TM-EN-1 663
Chapter 24 - Commissioning Instructions P54x1Z
If the IED is being used in a scheme with InterMiCOM64 communications you must perform end-to-end
testing of the protection communications channels.
In this section all loopbacks are removed and satisfactory communications between line ends of the IEDs in
the scheme are confirmed.
Note:
End-to-end communication requires a working telecommunication channel between line ends (which may be a
multiplexed link or may be a direct connection). If the telecommunication channel is not available, it is not possible to
establish end-to end communication. Unless otherwise directed by local operational practise, follow the instructions in
this section so the scheme is ready for full operation when the telecommunications channels become available.
Note:
The trip circuit should remain isolated during these checks to prevent accidental operation of the associated circuit
breaker.
Note:
Most of the required optical signal power levels have already been measured and recorded. If all signalling uses
P59x interface units, no further measurements are required. If, however, direct fibre or C37.94 communications are
used, further measurements are needed.
Warning:
NEVER look directly into the transmit port or the end of an optical fibre, as
this could severely damage your eyes.
664 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Warning:
NEVER look directly into the transmit port or the end of an optical fibre, as
this could severely damage your eyes.
P54x1Z-TM-EN-1 665
Chapter 24 - Commissioning Instructions P54x1Z
3. Check that the first two bits in ‘Channel Status’ (Rx and Tx) are displaying ‘1’ (11************ where *
indicates a ‘don’t care’ state).
4. Clear the statistics and record the number of valid messages and the number of errored messages
after a minimum period of 1 hour.
5. Check that the ratio of errored/good messages is better than 10-4.
6. Record the measured message propagation delays for channel 1, and channel 2 (if fitted).
666 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
P54x1Z-TM-EN-1 667
Chapter 24 - Commissioning Instructions P54x1Z
668 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
21 ONLOAD CHECKS
Warning:
Onload checks are potentially very dangerous and may only be carried out by
qualified and authorised personnel.
Onload checks can only be carried out if there are no restrictions preventing the energisation of the plant,
and the other devices in the group have already been commissioned.
Remove all test leads and temporary shorting links, then replace any external wiring that has been removed
to allow testing.
Warning:
If any external wiring has been disconnected for the commissioning process,
replace it in accordance with the relevant external connection or scheme
diagram.
If the Local Values cell is set to Secondary, the values displayed should be equal to the applied secondary
voltage. The values should be within 1% of the applied secondary voltages. However, an additional
allowance must be made for the accuracy of the test equipment being used.
If the Local Values cell is set to Primary, the values displayed should be equal to the applied secondary
voltage multiplied the corresponding voltage transformer ratio set in the CT & VT RATIOS column. The
values should be within 1% of the expected values, plus an additional allowance for the accuracy of the test
equipment being used.
P54x1Z-TM-EN-1 669
Chapter 24 - Commissioning Instructions P54x1Z
670 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
the system. If you do not already know this you must determine it using adjacent instrumentation or
protection already in-service.
● For load current flowing in the Forward direction (power export to the remote line end), the A Phase
Watts cell in the MEASUREMENTS 2 column should show positive power signing.
● For load current flowing in the Reverse direction (power import from the remote line end), the A Phase
Watts cell in the MEASUREMENTS 2 column should show negative power signing.
Note:
This check applies only for Measurement Modes 0 (default), and 2. This should be checked in the MEASURE’T
SETUP column (Measurement Mode = 0 or 2). If measurement modes 1 or 3 are used, the expected power flow
signing would be opposite to that shown above.
In the event of any uncertainty, check the phase angle of the phase currents with respect to their phase
voltage.
P54x1Z-TM-EN-1 671
Chapter 24 - Commissioning Instructions P54x1Z
22 FINAL CHECKS
1. Remove all test leads and temporary shorting leads.
2. If you have had to disconnect any of the external wiring in order to perform the wiring verification tests,
replace all wiring, fuses and links in accordance with the relevant external connection or scheme
diagram.
3. The settings applied should be carefully checked against the required application-specific settings to
ensure that they are correct, and have not been mistakenly altered during testing.
4. Ensure that all protection elements required have been set to Enabled in the CONFIGURATION
column.
5. Ensure that the IED has been restored to service by checking that the Test Mode cell in the
COMMISSION TESTS column is set to ‘Disabled’.
6. If the IED is in a new installation or the circuit breaker has just been maintained, the circuit breaker
maintenance and current counters should be zero. These counters can be reset using the Reset All
Values cell. If the required access level is not active, the device will prompt for a password to be
entered so that the setting change can be made.
7. If the menu language has been changed to allow accurate testing it should be restored to the
customer’s preferred language.
8. If a P991/MMLG test block is installed, remove the P992/MMLB test plug and replace the cover so that
the protection is put into service.
9. Ensure that all event records, fault records, disturbance records, alarms and LEDs and
communications statistics have been reset.
Note:
Remember to restore the language setting to the customer’s preferred language on completion.
672 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
Warning:
Check the rating information under the top access cover on the front of the
IED.
Warning:
Check that the IED being tested is correct for the line or circuit.
Warning:
Record the circuit reference and system details.
Warning:
Check the CT secondary current rating and record the CT tap which is in use.
Carefully examine the IED to see that no physical damage has occurred since installation.
Ensure that the case earthing connections (bottom left-hand corner at the rear of the IED case) are used to
connect the IED to a local earth bar using an adequate conductor.
23.2 INSULATION
Insulation resistance tests are only necessary during commissioning if explicitly requested.
Isolate all wiring from the earth and test the insulation with an electronic or brushless insulation tester at a
DC voltage not exceeding 500 V. Terminals of the same circuits should be temporarily connected together.
The insulation resistance should be greater than 100 MW at 500 V.
On completion of the insulation resistance tests, ensure all external wiring is correctly reconnected to the
IED.
Note:
The V.35 circuits and the X.21 circuits of the P592 and P593 respectively are isolated from all other circuits but are
electrically connected to the outer case. The circuits must therefore not be insulation or impulse tested to the case.
Caution:
Check that the external wiring is correct according to the relevant IED and
scheme diagrams. Ensure that phasing/phase rotation appears to be as
expected.
P54x1Z-TM-EN-1 673
Chapter 24 - Commissioning Instructions P54x1Z
Warning:
Do not energise the device or interface unit using the battery charger with the
battery disconnected as this can irreparably damage the power supply
circuitry.
P592 only
The four red LEDs can be tested by appropriate setting of the DIL switches on the front plate. Set the data
rate switch according to the communication channel bandwidth available. Set all other switches to 0. To
illuminate the ‘DSR OFF’ and ‘CTS OFF’ LED’s, disconnect the V.35 connector from the rear of the P592 and
set the ‘DSR’ and ‘CTS’ switches to ‘0’. The ‘OPTO LOOPBACK’ and ‘V.35 LOOPBACK’ LEDs can be
illuminated by setting their corresponding switches to ‘1’.
Once operation of the LEDs has been established set all DIL switches, except for the ‘OPTO LOOPBACK’
switch, to ‘0’ and reconnect the V.35 connector.
P593 only
Set the ‘X.21 LOOPBACK’ switch to ‘ON’. The green ‘CLOCK’ and red ‘X.21 LOOPBACK’ LED’s should
illuminate. Reset the ‘X.21 LOOPBACK’ switch to the ‘OFF’ position.
Set the ‘OPTO LOOPBACK’ switch to ‘ON’. The red ‘OPTO LOOPBACK’ LED should illuminate. Do not reset
the “OPTO LOOPBACK’ switch as it is required in this position for the next test.
Warning:
NEVER look directly into the transmit port or the end of an optical fibre, as
this could severely damage your eyes.
674 P54x1Z-TM-EN-1
P54x1Z Chapter 24 - Commissioning Instructions
P591
It is necessary to loop the transmitted electrical G.703 signal presented on terminals 3 and 4 of the P591 to
the received signal presented on terminals 7 and 8.
If test links have been designed into the scheme to facilitate this they should be used. Alternatively, remove
any external wiring from terminals 3, 4, 7 and 8 at the rear of each P591 unit. Loopback the G.703 signals on
each device by connecting a wire link between terminals 3 and 7, and a second wire between terminals 4
and 8.
P592
With the ‘OPTO LOOPBACK’ switch in the ‘1’ position, the receive and transmit optical ports are connected
together. This allows the optical fibre communications between the IED and the P592 to be tested, but not
the internal circuitry of the P592 itself.
P593
Set the ‘OPTO LOOPBACK’ switch to ‘OFF’ and ‘X.21 LOOPBACK’ switch to ‘ON’ respectively. With the ‘X.
21 LOOPBACK’ switch in this position the ‘Receive Data’ and ‘Transmit Data’ lines of the X.21
communication interface are connected together. This allows the optical fibre communications between the
IED and the P593, and the internal circuitry of the P593 itself to be tested.
P54x1Z-TM-EN-1 675
Chapter 24 - Commissioning Instructions P54x1Z
676 P54x1Z-TM-EN-1
MAINTENANCE AND
TROUBLESHOOTING
CHAPTER 25
Chapter 25 - Maintenance and Troubleshooting P54x1Z
678 P54x1Z-TM-EN-1
P54x1Z Chapter 25 - Maintenance and Troubleshooting
1 CHAPTER OVERVIEW
The Maintenance and Troubleshooting chapter provides details of how to maintain and troubleshoot products
based on the Px4x and P40Agile platforms. Always follow the warning signs in this chapter. Failure to do so
may result injury or defective equipment.
Caution:
Before carrying out any work on the equipment you should be familiar with the
contents of the Safety Section or the Safety Guide SFTY/4LM and the ratings on
the equipment’s rating label.
The troubleshooting part of the chapter allows an error condition on the IED to be identified so that
appropriate corrective action can be taken.
If the device develops a fault, it is usually possible to identify which module needs replacing. It is not possible
to perform an on-site repair to a faulty module.
If you return a faulty unit or module to the manufacturer or one of their approved service centres, you should
include a completed copy of the Repair or Modification Return Authorization (RMA) form.
This chapter contains the following sections:
Chapter Overview 679
Maintenance 680
Troubleshooting 689
P54x1Z-TM-EN-1 679
Chapter 25 - Maintenance and Troubleshooting P54x1Z
2 MAINTENANCE
Although some functionality checks can be performed from a remote location, these are predominantly
restricted to checking that the unit is measuring the applied currents and voltages accurately, and checking
the circuit breaker maintenance counters. For this reason, maintenance checks should also be performed
locally at the substation.
Caution:
Before carrying out any work on the equipment you should be familiar with the
contents of the Safety Section or the Safety Guide SFTY/4LM and the ratings on
the equipment’s rating label.
2.1.1 ALARMS
First check the alarm status LED to see if any alarm conditions exist. If so, press the Read key repeatedly to
step through the alarms.
After dealing with any problems, clear the alarms. This will clear the relevant LEDs.
2.1.2 OPTO-ISOLATORS
Check the opto-inputs by repeating the commissioning test detailed in the Commissioning chapter.
680 P54x1Z-TM-EN-1
P54x1Z Chapter 25 - Maintenance and Troubleshooting
Caution:
Replacing PCBs requires the correct on-site environment (clean and dry) as well
as suitably trained personnel.
Caution:
If the repair is not performed by an approved service centre, the warranty will be
invalidated.
Caution:
Before carrying out any work on the equipment, you should be familiar with the
contents of the Safety Information section of this guide or the Safety Guide
SFTY/4LM, as well as the ratings on the equipment’s rating label. This should
ensure that no damage is caused by incorrect handling of the electronic
components.
Warning:
Before working at the rear of the device, isolate all voltage and current
supplying it.
Note:
The current transformer inputs are equipped with integral shorting switches which will close for safety reasons, when
the terminal block is removed.
P54x1Z-TM-EN-1 681
Chapter 25 - Maintenance and Troubleshooting P54x1Z
Once the device has been reinstalled, it should be re-commissioned as set out in the Commissioning
chapter.
Caution:
If the top and bottom access covers have been removed, some more screws
with smaller diameter heads are made accessible. Do NOT remove these screws,
as they secure the front panel to the device.
Note:
There are four possible types of terminal block: RTD/CLIO input, heavy duty, medium duty, and MiDOS. The terminal
blocks are fastened to the rear panel with slotted or cross-head screws depending on the type of terminal block. Not
all terminal block types are present on all products.
682 P54x1Z-TM-EN-1
P54x1Z Chapter 25 - Maintenance and Troubleshooting
Warning:
Before removing the front panel to replace a PCB, you must first remove the
auxiliary power supply and wait 5 seconds for the internal capacitors to
discharge. You should also isolate voltage and current transformer connections
and trip circuit.
Caution:
Before removing the front panel, you should be familiar with the contents of the
Safety Information section of this guide or the Safety Guide SFTY/4LM, as well
as the ratings on the equipment’s rating label.
Caution:
Do not remove the screws with the larger diameter heads which are accessible
when the access covers are fitted and open. These screws hold the relay in its
mounting (panel or cubicle).
Caution:
The internal circuitry is now exposed and is not protected against electrostatic
discharge and dust ingress. Therefore ESD precautions and clean working
conditions must be maintained at all times.
P54x1Z-TM-EN-1 683
Chapter 25 - Maintenance and Troubleshooting P54x1Z
Note:
To ensure compatibility, always replace a faulty PCB with one of an identical part number.
Note:
After replacing the main processor board, all the settings required for the application need to be re-entered. This may
be done either manually or by downloading a settings file.
V01601
684 P54x1Z-TM-EN-1
P54x1Z Chapter 25 - Maintenance and Troubleshooting
P54x1Z-TM-EN-1 685
Chapter 25 - Maintenance and Troubleshooting P54x1Z
Caution:
With non-mounted IEDs, the case needs to be held firmly while the module is
withdrawn. Withdraw the input module with care as it suddenly comes loose
once the friction of the terminal blocks is overcome.
Note:
If individual boards within the input module are replaced, recalibration will be necessary. We therefore recommend
replacement of the complete module to avoid on-site recalibration.
Caution:
Before removing the front panel, you should be familiar with the contents of the
Safety Information section of this guide or the Safety Guide SFTY/4LM, as well
as the ratings on the equipment’s rating label.
The power supply board is fastened to an output relay board with push fit nylon pillars. This doubled-up
board is secured on the extreme left hand side, looking from the front of the unit.
1. Remove front panel.
2. Pull the power supply module forward, away from the rear terminal blocks and out of the case. A
reasonable amount of force is needed due to the friction between the contacts of the terminal blocks.
3. Separate the boards by pulling them apart carefully. The power supply board is the one with two large
electrolytic capacitors.
4. Before reassembling the module, check that the number on the round label next to the front edge of
the PCB matches the slot number into which it will be fitted. If the slot number is missing or incorrect,
write the correct slot number on the label
5. Reassemble the module with a replacement PCB. Push the inter-board connectors firmly together. Fit
the four push fit nylon pillars securely in their respective holes in each PCB.
6. Slot the power supply module back into the housing. Push it fully back onto the rear terminal blocks.
7. Refit the front panel.
8. Refit and close the access covers then press the hinge assistance T-pieces so they click back into the
front panel moulding.
9. Once the unit has been reassembled, commission it according to the Commissioning chapter.
686 P54x1Z-TM-EN-1
P54x1Z Chapter 25 - Maintenance and Troubleshooting
2.6 RECALIBRATION
Recalibration is not needed when a PCB is replaced, unless it is one of the boards in the input module. If any
of the boards in the input module is replaced, the unit must be recalibrated.
Although recalibration is needed when a board inside the input module is replaced, it is not needed if the
input module is replaced in its entirety.
Although it is possible to carry out recalibration on site, this requires special test equipment and software. We
therefore recommend that the work be carried out by the manufacturer, or entrusted to an approved service
centre.
Caution:
Only use a type ½AA Lithium battery with a nominal voltage of 3.6 V and safety
approvals such as UL (Underwriters Laboratory), CSA (Canadian Standards
Association) or VDE (Vereinigung Deutscher Elektrizitätswerke).
Note:
Events, disturbance and maintenance records will be lost if the battery is replaced whilst the IED is de-energised.
P54x1Z-TM-EN-1 687
Chapter 25 - Maintenance and Troubleshooting P54x1Z
2.8 CLEANING
Warning:
Before cleaning the device, ensure that all AC and DC supplies and transformer
connections are isolated, to prevent any chance of an electric shock while
cleaning.
Only clean the equipment with a lint-free cloth dampened with clean water. Do not use detergents, solvents
or abrasive cleaners as they may damage the product's surfaces and leave a conductive residue.
688 P54x1Z-TM-EN-1
P54x1Z Chapter 25 - Maintenance and Troubleshooting
3 TROUBLESHOOTING
P54x1Z-TM-EN-1 689
Chapter 25 - Maintenance and Troubleshooting P54x1Z
690 P54x1Z-TM-EN-1
P54x1Z Chapter 25 - Maintenance and Troubleshooting
P54x1Z-TM-EN-1 691
Chapter 25 - Maintenance and Troubleshooting P54x1Z
If the device does not correctly read the opto-input state, test the applied signal. Verify the connections to the
opto-input using the wiring diagram and the nominal voltage settings in the OPTO CONFIG column. To do
this:
1. Select the nominal voltage for all opto-inputs by selecting one of the five standard ratings in the
Global Nominal V cell.
2. Select Custom to set each opto-input individually to a nominal voltage.
3. Using a voltmeter, check that the voltage on its input terminals is greater than the minimum pick-up
level (See the Technical Specifications chapter for opto pick-up levels).
If the signal is correctly applied, this indicates failure of an opto-input, which may be situated on standalone
opto-input board, or on an opto-input board that is part of the input module. Separate opto-input boards can
simply be replaced. If, however, the faulty opto-input board is part of the input module, the complete input
module should be replaced. This is because the analogue input module cannot be individually replaced
without dismantling the module and recalibration of the IED.
692 P54x1Z-TM-EN-1
P54x1Z Chapter 25 - Maintenance and Troubleshooting
and backup protection will operate, if configured to do so. Further information about the status of the
signalling channels can be found in MEASUREMENTS 4 column.
P54x1Z-TM-EN-1 693
Chapter 25 - Maintenance and Troubleshooting P54x1Z
694 P54x1Z-TM-EN-1
TECHNICAL SPECIFICATIONS
CHAPTER 26
Chapter 26 - Technical Specifications P54x1Z
696 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
1 CHAPTER OVERVIEW
This chapter describes the technical specifications of the product.
This chapter contains the following sections:
Chapter Overview 697
Interfaces 698
Protection Functions 703
Monitoring, Control and Supervision 709
Measurements and Recording 711
Ratings 712
Input / Output Connections 715
Mechanical Specifications 717
Type Tests 718
Environmental Conditions 719
Electromagnetic Compatibility 720
Standards Compliance 723
P54x1Z-TM-EN-1 697
Chapter 26 - Technical Specifications P54x1Z
2 INTERFACES
698 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
P54x1Z-TM-EN-1 699
Chapter 26 - Technical Specifications P54x1Z
700 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
Optical budget
850nm MM 1300 nm MM 1300 nm SM 1550 nm SM
Minimum transmit output level (average
-19.8 dBm -6 dBm -6 dBm -6 dBm
power)
Receiver sensitivity (average power) -25.4 dBm -49 dBm -49 dBm -49 dBm
Optical budget 5.6 dB 43 dB 43 dB 43 dB
Less safety margin (3 dB) 2.6 dB 40 dB 40 dB 40 dB
P54x1Z-TM-EN-1 701
Chapter 26 - Technical Specifications P54x1Z
702 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
3 PROTECTION FUNCTIONS
Accuracy
Pick-up Formula +/- 10%
Drop-off 0.75 x Formula +/- 10%
IDMT characteristic shape +/- 5% or 40 ms, whichever is greater
DT operation +/- 2% or 20 ms, whichever is greater
Typical instantaneous operation with default settings,
back-to-back propagation delay included
50 Hz, 1 p.u. ≤ relay current < 2 p.u. <35 ms
60 Hz, 1 p.u. ≤ relay current < 2 p.u. <30 ms
50 Hz, relay current ≥ 2 p.u. <30 ms
60 Hz, relay current ≥ 2 p.u. <25 ms
Reset time <60 ms
Repeatability +/- 2.5%
UK curves IEC 60255-3 – 1998
Characteristic
US curves IEEE C37.112 – 1996
Vector compensation No affect on accuracy
Current transformer ratio compensation No affect on accuracy
High set characteristic setting No affect on accuracy
Three ended scheme operation No affect on accuracy
Accuracy
Pick-up Formula +/- 10%
Drop-off 0.75 x Formula +/- 10%
DT operation +/- 2% or 40 ms, whichever is greater
Typical instantaneous operation with default settings
and IN Differential > 50% above threshold
50 Hz 30-50 ms
60 Hz 25-42 ms
Repeatability +/- 2.5%
Current transformer ratio compensation No affect on accuracy
Three ended scheme operation No affect on accuracy
P54x1Z-TM-EN-1 703
Chapter 26 - Technical Specifications P54x1Z
Tripping characteristics
50 Hz, SIR = 5
60 Hz, SIR = 5
Accuracy
+/- 5% for on-angle fault (on the set line angle)
+/- 10% for off-angle fault
Characteristic shape, up to SIR = 30
Example: For a 70 degree set line angle, injection testing at 40 degrees
would be referred to as "off-angle".
Zone time delay deviations +/- 20 ms or 2%, whichever is greater
Accuracy
Accuracy of zones and timers As per Distance
704 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
Accuracy
Accuracy of zones and timers As per Distance
Operating range Up to 7 Hz
The table below shows the minimum and maximum transfer time for InterMiCOM64 (IM64). The times are
measured from opto initialization (with no opto filtering) to relay standard output and include a small
propagation delay for back-back test (2.7 ms for 64 kbits/s and 3.2 ms for 56 kbits/s).
IDiff IM64 indicates InterMiCOM64 signals working in conjunction with the differential protection fibre optic
communications channel. IM64 indicates InterMiCOM64 signals working as a standalone feature.
Configuration Permissive op times (ms) Direct op times (ms)
IM64 at 64 k 13 - 18 17 - 20
IM64 at 56 k 15 - 20 19 - 22
IDiff IM64 at 64 k 22 - 24 23 - 25
IDiff IM64 at 56 k 24 - 26 25 - 27
Accuracy
Timers +/- 20 ms or 2%, whichever is greater
Accuracy
IDMT pick-up 1.05 x Setting +/-5%
DT pick-up Setting +/-5%
Drop-off (IDMT and DT) 0.95 x setting +/-5%
IDMT operate +/-5% of expected operating time or 40 ms, whichever is greater*
IEEE reset +/-5% or 40 ms, whichever is greater
DT operate +/-2% of setting or 40 ms, whichever is greater
DT reset Setting +/-5%
Repeatability <5%
Characteristic UK IEC 60255-3 1998
Characteristic US IEEE C37.112 1996
Note:
*Reference conditions: TMS = 1, TD = 7, I> = 1A, operating range = 2-20In
P54x1Z-TM-EN-1 705
Chapter 26 - Technical Specifications P54x1Z
Additional tolerance due to increasing X/R ratios +/-5% over the X/R ratio of 1 to 90
Overshoot of overcurrent elements < 30 ms
Accuracy
IDMT pick-up 1.05 x Setting +/-5%
DT pick-up Setting +/-5%, or 20 mA, whichever is greater
Drop-off (IDMT and DT) 0.95 x setting +/-5%
IDMT Operate +/-5% or 40 ms, whichever is greater*
IEEE reset +/-10% or 40 ms, whichever is greater
Repeatability < 5%
DT operate +/-2% or 50 ms, whichever is greater
DT reset +/- 5% or 50 ms, whichever is greater
Note:
Reference conditions: TMS = 1, TD = 1, IN> = 1A, operating range = 2-20In.
706 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
Note:
Reference conditions: TMS = 1, TD = 1, IN> setting = 100 mA with operating range of 2-20Is.
Wattmetric SEF
Pick-up P = 0 W ISEF > +/-5% or 5 mA
Pick-up P > 0 W P > +/-5%
Drop-off P = 0 W 0.95 x ISEF> +/- 5% or 5 mA
Drop-off P > 0 W 0.9 x P> +/- 5% or 5 mA
Boundary accuracy +/-5% with hysteresis < 1°
Repeatability < 1%
P54x1Z-TM-EN-1 707
Chapter 26 - Technical Specifications P54x1Z
Note:
Operating time measured with applied current of 20% above thermal setting.
708 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
Accuracy
I1> Pick-up Setting +/- 5%
I1> Drop-off 0.9 x setting +/- 5%
I2/I1> Pick-up Setting +/- 5%
I2/I1> Drop-off 0.9 x setting +/-5%
I2/I1>> Pick-up Setting +/- 5%
I2/I1 >> Drop-off 0.9 x setting +/-5%
Time delay operation Setting +/-2% or 20 ms, whichever is greater
CTS block diff operation < 1 cycle
CTS reset < 35 ms
Accuracy
Timers +/- 40 ms or 2%, whichever is greater
Broken current accuracy +/- 5%
Reset time < 30 ms
P54x1Z-TM-EN-1 709
Chapter 26 - Technical Specifications P54x1Z
710 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
5.1 GENERAL
Accuracy
+/- 2% of line length
Fault Location
Reference conditions: solid fault applied on line
P54x1Z-TM-EN-1 711
Chapter 26 - Technical Specifications P54x1Z
6 RATINGS
AC Measuring Inputs
Nominal frequency 50 Hz or 60 Hz (settable)
Operating range 45 to 65 Hz
Phase rotation ABC or CBA
AC Voltage Inputs
Nominal voltage 100 V to 120 V
Nominal burden per phase < 0.1 VA at Vn
2 x Vn (continuous operation)
Thermal withstand
2.6 x Vn (for 10 seconds)
Linear up to 200 V (100/120 V supply)
Linearity
Linear up to 800 V (380/400 V supply)
712 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
Quiescent burden 11 W
2nd rear communications port 1.25 W
Each relay output burden 0.13 W per output relay
Each opto-input burden (24 – 27 V) 0.065 W max
Each opto-input burden (30 – 34 V) 0.065 W max
Each opto-input burden (48 – 54 V) 0.125 W max
Each opto-input burden (110 – 125 V) 0.36 W max
Each opto-input burden (220 – 250 V) 0.9 W max
P54x1Z-TM-EN-1 713
Chapter 26 - Technical Specifications P54x1Z
Note:
Maximum loading = all inputs/outputs energised.
Note:
Quiescent or 1/2 loading = 1/2 of all inputs/outputs energised.
714 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
Nominal battery
Logic levels: 60-80% DO/PU Logic Levels: 50-70% DO/PU
voltage
24/27 V Logic 0 < 16.2V, Logic 1 > 19.2V Logic 0 <12V, Logic 1 > 16.8V
30/34 Logic 0 < 20.4V, Logic 1 > 24V Logic 0 < 15V, Logic 1 > 21V
48/54 Logic 0 < 32.4V, Logic 1 > 38.4V Logic 0 < 24V, Logic 1 > 33.6V
110/125 Logic 0 < 75V, Logic 1 > 88V Logic 0 < 55.V, Logic 1 > 77V
220/250 Logic 0 < 150V, Logic 1 > 176V Logic 0 < 110V, Logic 1 > 154V
Note:
Filter is required to make the opto-inputs immune to induced AC voltages.
In addition to the above thresholds, some models of this product provide the following threshold levels for
FSK applications:
● For 220/250 voltage inputs: Logic 0 < 145V, Logic 1 > 165V
P54x1Z-TM-EN-1 715
Chapter 26 - Technical Specifications P54x1Z
Make, carry and break, dc inductive 0.5 A for 1 s, 10000 operations (subject to the above limits)
Make, carry and break ac resistive 30 A for 200 ms, 2000 operations (subject to the above limits)
Make, carry and break ac inductive 10 A for 1.5 s, 10000 operations (subject to the above limits)
Loaded contact 1000 operations min.
Unloaded contact 10000 operations min.
Operate time < 5 ms
Reset time < 10 ms
716 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
8 MECHANICAL SPECIFICATIONS
40TE
Case Types* 60TE
80TE
Weight (40TE case) 7 kg – 8 kg (depending on chosen options)
Weight (60TE case) 9 kg – 12 kg (depending on chosen options)
Weight (80TE case) 13 kg - 16 kg (depending on chosen options)
Dimensions in mm (w x h x l) (40TE case) W: 206.0 mm H: 177.0 mm D: 243.1 mm
Dimensions in mm (w x h x l) (60TE case) W: 309.6 mm H: 177.0 mm D: 243.1 mm
Dimensions in mm (w x h x l) (80TE case) W 413.2 mm H 177.0 mm D 243.1 mm
Mounting Panel, rack, or retrofit
Note:
*Case size is product dependent.
Against dust and dripping water (front face) IP52 as per IEC 60529:2002
Protection against dust (whole case) IP50 as per IEC 60529:2002
Protection for sides of the case (safety) IP30 as per IEC 60529:2002
Protection for rear of the case (safety) IP10 as per IEC 60529:2002
P54x1Z-TM-EN-1 717
Chapter 26 - Technical Specifications P54x1Z
9 TYPE TESTS
9.1 INSULATION
Note:
Exceptions are communications ports and normally-open output contacts, where applicable.
718 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
10 ENVIRONMENTAL CONDITIONS
P54x1Z-TM-EN-1 719
Chapter 26 - Technical Specifications P54x1Z
11 ELECTROMAGNETIC COMPATIBILITY
IEC 60255-22-4: 2008 and EN61000-4-4:2004. Test severity level lll and lV,
Compliance
IEC 60255-26:2013
Applied to communication inputs Amplitude: 2 kV, burst frequency 5 kHz and 100 KHz (level 4)
Applied to power supply and all other
Amplitude: 4 kV, burst frequency 5 kHz and 100 KHz (level 4)
inputs except for communication inputs
720 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
P54x1Z-TM-EN-1 721
Chapter 26 - Technical Specifications P54x1Z
Note:
Compliance is achieved using the opto-input filter.
722 P54x1Z-TM-EN-1
P54x1Z Chapter 26 - Technical Specifications
12 STANDARDS COMPLIANCE
Compliance with the European Commission Directive on EMC and LVD is demonstrated by self certification
against international standards.
Protective Class
IEC 60255-27: 2005 Class 1 (unless otherwise specified in equipment documentation). This equipment
requires a protective conductor (earth) to ensure user safety.
Installation category
IEC 60255-27: 2005 Overvoltage Category 3. Equipment in this category is qualification tested at 5kV peak,
1.2/50 mS, 500 Ohms, 0.5 J, between all supply circuits and earth and also between independent circuits.
Environment
IEC 60255-27: 2005, IEC 60255-26:2009. The equipment is intended for indoor use only. If it is required for
use in an outdoor environment, it must be mounted in a cabinet with the appropriate degree of ingress
protection.
P54x1Z-TM-EN-1 723
Chapter 26 - Technical Specifications P54x1Z
724 P54x1Z-TM-EN-1
WIRING DIAGRAMS
CHAPTER 27
Chapter 27 - Wiring Diagrams P54x1Z
726 P54x1Z-TM-EN-1
P54x1Z Chapter 27 - Wiring Diagrams
1 CHAPTER OVERVIEW
This chapter contains the wiring diagrams for all possible situations.
This chapter contains the following sections:
Chapter Overview 727
Communication Connections 728
P543: I/O Options A to R - External Connection Diagram 729
P543: I/O Options A to R - Default Mapping 730
P543: I/O Options S to Z - External Connection Diagram 731
P543: I/O Options S to Z - Default Mapping 732
P545: I/O Options A to R - External Connection Diagram 733
P545: I/O Options A to R - Default Mapping 734
P545: I/O Options S to Z and 0 to 5 - External Connection Diagram 735
P545: I/O Options S to Z and 0 to 5 - Default Mapping 736
P54x1Z-TM-EN-1 727
2
728
10Px4001-1J
W02329
Chapter 27 - Wiring Diagrams
REAR
PORT 1:
EIA485/
KBUS
PORT
IRIG-B INPUT
(OPTIONAL)
NOTE: FOR TERMINAL BLOCK CONNECTION
IRIG-B INPUT IRIG-B INPUT
REFER TO RELEVANT EXTERNAL CONNECTION DIAGRAM. SERIAL PORT
(OPTIONAL)
(ALWAYS ON PSL BLOCK)
FAULT
STATUS RELAY
10 BASE-T/
OR
DATA READY 100 BASE-TX
DATA FIBRE OPTIC
COMMUNICATION CONNECTIONS
ACKNOWLEDGE COMMUNICATION
(OPTIONAL) OR OR
OR
EXTERNAL 100 BASE-FX
RESET
DOWNLOAD
IRIG-B INPUT
COMMAND
FRONT (OPTIONAL)
TEST/ 10 BASE-FL
DOWNLOAD OR
EIA232 100 BASE-FX
100 BASE-FX
SERIAL PORT
NOT
CONNECTED
# PERMANENTLY ACTIVE
FRONT IRIG-B BOARD SINGLE PORT ETHERNET BOARD REAR COMMS BOARD DUAL PORT REDUNDANT ETHERNET BOARD
EIA232
SERIAL PORT
Figure 294: Communication boards (when fitted for single or redundant applications only)
P54x1Z-TM-EN-1
P54x1Z
P54x1Z Chapter 27 - Wiring Diagrams
W02395
Figure 295: P543 Current Differential Protection IED with 16 inputs and 14 outputs
P54x1Z-TM-EN-1 729
Chapter 27 - Wiring Diagrams P54x1Z
W02396
Figure 296: P543 Current Differential Protection IED with 16 inputs and 14 outputs
730 P54x1Z-TM-EN-1
P54x1Z Chapter 27 - Wiring Diagrams
W02397
Figure 297: P543 Current Differential Protection IED with 16 inputs and 11 outputs (4 High Break)
P54x1Z-TM-EN-1 731
Chapter 27 - Wiring Diagrams P54x1Z
6 10P54303-2D
P543: I/O OPTIONS S TO Z - DEFAULT MAPPING
W02398
Figure 298: P543 Current Differential Protection IED with 16 inputs and 11 outputs (4 High Break)
732 P54x1Z-TM-EN-1
P54x1Z Chapter 27 - Wiring Diagrams
W02399
Figure 299: P545 Current Differential Protection IED with 24 inputs and 32 outputs
P54x1Z-TM-EN-1 733
Chapter 27 - Wiring Diagrams P54x1Z
W02401
Figure 300: P545 Current Differential Protection IED with 24 inputs and 32 outputs
734 P54x1Z-TM-EN-1
P54x1Z Chapter 27 - Wiring Diagrams
W02402
Figure 301: P545 Current Differential Protection IED with 24 inputs and 24 outputs (8 High Break)
P54x1Z-TM-EN-1 735
736
10
10P54503-2C
W02403
DEFAULT SETTING E1
-
E2 M11
+ WATCHDOG
E3 M12 CONTACT
- M13
E4 WATCHDOG
+ M14 CONTACT DEFAULT SETTING
E5
- L1
E6 SEE NOTE 1 SEE NOTE 1 L2 RELAY 1
+
E7 L3
-
SEE NOTE 1 L4 RELAY 2
E8
+
E9 L5
- L6 RELAY 3
E10
+ L7
E11 RELAY 4
- L8
E12 L9
Chapter 27 - Wiring Diagrams
+
E13 L10 RELAY 5
-
E14 L11
+ L12 RELAY 6
E15
- L13
E16
+ L14 RELAY 7
E17
L15
E18 L16
C1 (PART) L17
- RELAY 8
C2 L18
+
C3 K1
-
K2 RELAY 9
C4
+ K3
C5
- K4 RELAY 10
C6
+ K5
C7 RELAY 11
- K6
C8 K7
+
C9 K8 RELAY 12
-
C10 K9
+ K10 RELAY 13
C11
- K11
C12 RELAY 14
+ K12
C13
- K13
C14 K14
+ RELAY 15
C15 K15
-
C16 K16
+
C17 K17 RELAY 16
K18
C18
J3
G1 RELAY 17
- J4
G2
+ J7
G3
- RELAY 18
G4 J8
+ HIGH BREAK
G5 J11 CONTACTS
-
G6 RELAY 19
+ J12
G7
- J15
G8
+ RELAY 20
G9 J16
-
G10 H3
+
G11 RELAY 21
- H4
G12
+ H7
G13
- RELAY 22
G14 H8
+ HIGH BREAK
G15 H11 CONTACTS
-
G16 RELAY 23
+ H12
G17
COMMON H15
CONNECTION G18
RELAY 24
H16
NOTE1:
ONLY FOR RELAYS WITH DISTANCE PROTECTION OPTION.
P545: I/O OPTIONS S TO Z AND 0 TO 5 - DEFAULT MAPPING
Figure 302: P545 Current Differential Protection IED with 24 inputs and 24 outputs (8 High Break)
P54x1Z-TM-EN-1
P54x1Z
ORDERING OPTIONS
APPENDIX A
Appendix A - Ordering Options P54x1Z
738 P54x1Z-TM-EN-1
P54x1Z Appendix A - Ordering Options
In/Vn rating
In = 1A/5A ; Vn = 100-120Vac 1
Product Options
Ch1=850nm multi-mode, Ch2=850nm multi-mode A
Ch1=1300nm single-mode, Ch2=not fitted (2 Terminal only) B
Ch1=1300nm single-mode, Ch2=1300nm single-mode C
Ch1=1300nm multi-mode, Ch2=not fitted (2 Terminal only) D
Ch1=1300nm multi-mode, Ch2=1300nm multi-mode E
Ch1=1550nm single-mode, Ch2=not fitted (2 Terminal only) F
Ch1=1550nm single-mode, Ch2=1550nm single-mode G
Ch1=850nm multi-mode, Ch2=1300nm single-mode * H
Ch1=850nm multi-mode, Ch2=1300nm multi-mode * J
Ch1=850nm multi-mode, Ch2=1550nm single-mode * K
Ch1=1300nm single-mode, Ch2=850nm multi-mode * L
Ch1=1300nm multi-mode, Ch2=850nm multi-mode * M
Reserved for future single channel N
Reserved for future single channel P
Ch1 1550nm single-mode, Ch2 850nm multi-mode * R
Ch1=850nm multi-mode, Ch2=850nm multi-mode + High Break ** S
Ch1=1300nm single-mode, Ch2=not fitted (2 Terminal only) + High Break ** T
Ch1=1300nm single-mode , Ch2=1300nm single-mode + High Break ** U
Ch1=1300nm multi-mode, Ch2=not fitted (2 Terminal only) + High Break ** V
Ch1=1300nm multi-mode, Ch2=1300nm multi-mode + High Break ** W
Ch1=1550nm single-mode, Ch2=not fitted (2 Terminal only) + High Break ** X
Reserved - was used for RWE special Y
Ch1=1550nm single-mode, Ch2=1550nm single-mode + High Break ** Z
Ch1=850nm multi-mode, Ch2=1300nm single-mode + High Break ** 0
Ch1=850nm multi-mode, Ch2=1300nm multi-mode + High Break ** 1
Ch1=850nm multi-mode, Ch2=1550nm single-mode + High Break ** 2
Ch1=1300nm single-mode, Ch2=850nm multi-mode + High Break ** 3
Ch1=1300nm multi-mode, Ch2=850nm multi-mode + High Break ** 4
Ch1 1550nm single-mode, Ch2 850nm multi-mode + High Break ** 5
Reserved for future single channel 6
Reserved for future single channel 7
Mounting
Flush/Panel Mounting with Harsh Environment Coating M
Flush/Panel mounting with harsh environment coating P
P54x1Z-TM-EN-1 A1
Appendix A - Ordering Options P54x1Z
Software version
Without Distance 4*/6*
With Distance 5/7/8*
Hardware version
Phase 2 Enhanced Coprocessor, wide range opto B
Enhanced Main Processor (CPU2) with hotkeys G
As G plus dual characteristic optos J
Extended main processor (XCPU2) With Function Keys & Tri-colour LEDs K
As K plus increased main processor memory (XCPU3), Cyber Security M
A2 P54x1Z-TM-EN-1
P54x1Z Appendix A - Ordering Options
In/Vn rating
In = 1A/5A ; Vn = 100-120Vac 1
P54x1Z-TM-EN-1 A3
Appendix A - Ordering Options P54x1Z
Mounting
Flush/Panel Mounting with Harsh Environment Coating M
Rack Mounting with Harsh Environmental Coating N
Flush/panel mounting with harsh environment coating P
Rack mounting with harsh environmental coating Q
Language
English, French, German, Spanish 0
English, French, German, Russian * 5
English, Italian, Polish and Portuguese *** 7
Chinese, English or French via HMI, with English or French only via Communications port ** C
Software version
Without Distance 4/6/8*
With Distance 5/7/8*
Hardware version
Phase 2 Enhanced Coprocessor, wide range opto B
Enhanced Main Processor (CPU2) with hotkeys G
As G plus dual characteristic optos J
Extended main processor (XCPU2) With Function Keys & Tri-colour LEDs K
As K plus increased main processor memory (XCPU3), Cyber Security M
A4 P54x1Z-TM-EN-1
SETTINGS AND SIGNALS
APPENDIX B
Appendix B - Settings and Signals P54x1Z
Tables, containing a full list of settings, measurement data and DDB signals for each product model, are
provided in a separate interactive PDF file attached as an embedded resource.
Tables are organized into a simple menu system allowing selection by language (where available), model
and table type, and may be viewed and/or printed using an up-to-date version of Adobe Reader.
740 P54x1Z-TM-EN-1
Alstom Grid
www.alstom.com/grid/contactcentre/
www.alstom.com