Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
46 views
Untitled
Uploaded by
vd jay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Untitled For Later
Download
Save
Save Untitled For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
46 views
Untitled
Uploaded by
vd jay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Untitled For Later
Carousel Previous
Carousel Next
Save
Save Untitled For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 6
Search
Fullscreen
PCL-LT(DS upto 20 kW) » 2) 3) 4) 5) Annexuro-"t A’ PUNJAB STATE POWER CORPORATION LIMITED saranans ‘APPLICATION AND AGREEMENT (A & A) FORM user ze For DS (Only Residential) up to 20 KW pica ‘oraory (To BE COMPLETED AND SIGNED BY APPLICANT) Name of apaeant (Sof attested copy of identity proof to be submited) a) Aadhaar Card No. Rares a) HousarPramises no 8) Steat na @)Arealeolany Ci Vilage @)_ Telephone Ne Mobi No Email Adsress Tategory Purpose of SUpRIY DS (Residential OV) ‘Schedule of electicity consuming apparatus: Category Daseription Na: Wattage | Total each | kW a) Light Ponts rani) By Fan Points ps(only | &) Wall sockets Residential) Smeg @ Power plugs ey ACs cal 250 Wate Oat 7_OtheriMotive Loads: Total Connected load (kW) Load iDeriand apolied (KWIKVA) a) Existing loadidemand Wany by Account no, @)_Adaitional loadidemand required a) Total feadidemand6) [Permanent application no7 7) [Processing fee receipt no. & date 8) [ Security (consumption) receiptno, & date 9) [Security (meter) receipt no, & date 10) | Tadieate if works are fo Be carried out by you Tor the service connection 11) Tadieate you want to instal your own meter of approved make 12)| Any electricity dues outstanding in PSPCL area Yast No of supply in consumer's name 18)| Any electricity dues aulstanding for the premises Yesi No for which connection’ additional load applied for 14)| Any electricity dues outstanding of PSPCL Yast No against any firm/company with which the consumer is associated as an Owner, Partner, Director or Managing Director NOTE : (For questions 12, 13 & 14 if the answer is ‘Yes! in any case please provide details on a separate sheet) 15) We declare on oath that a) Ie amfare major b) Ie amare the lawful owner of the premises or my/ourlowner of the premises agrees to my / our taking the said supply and his/their consent has been obtained (NO PROOF IS REQUIRED TO BE SUBMITTED) Me are the lawful occupier of the premises but it has not been possible for mefus to obtain consent from the owner of the premises and IWe hereby agree to keep the PSPCL indemnified and harmless against all ‘laims made and action and proceedings taken up by the owner of the premises or any person claiming through or under him by reason of ‘alving of this electric connection by the PSPCL to melus. ©) That all the electrical installation work within my/our premises is as per the provisions of Central Electricity Authority (Measures Relating to ‘Safety and Electrical Supply) Reg-2010 and as per relevant standards of BIS. Further, wiring has been carried out by an electrical contractor licensed in this behalf by the Government of Punjab and under the direct supervision of a person holding a certificate of competency and by a person holding a permit issued or recognized by the Government of Punjab and I/We have obtained a test report from electrical contractor in this regard and the Test Report is in myfour possession. ‘That [Me shall at all times be solely responsible for the maintenance of mylour installation in such condition as to be free from danger. ‘That [Me shall indemnify PSPCL against any loss to me/us accrued on this account. d) Ie hereby agree that We shall abide by the power cut restrictions! peak load hours restrictions. 2). There is no other electric connection running in the abave premises.or (One No. DSINRS electric connection is already existing in the above premises and We want to take second DS connection for which We are ready to comply with the conditions of the PSPCL, f) Lama Scheduled Caste/STIBCIBPL for which copy of relevant certificate is attached. 9) That the location of my premises does not fall in the restricted zone as declared by PUDA/Local Authority. h)_IMe have applied this electric connection for domestic purpose and no business actvity shall be carried out in this premises without prior approval from the PSPCL, VERIFICATION: liwe also declare that the above information is true to my /our knowledge and in case We violate any undertakinglinstructions or any other information is found to be false at any stage, my/our electric connection ‘may not be released and, if released, may be disconnected without prior notice and all charges deposited by melus be forfeited. Signature of the applicant(s) 16) We hereby request Punjab State Power Corporation Limited (herein-after referred to as the PSPCL) to give supply for load/demand mentioned in SNO.S above. IWe hereby further agree to pay for the said supply in accordance with the relevant Schedule of Tarif, as approved by the ‘Commission from time to time and also to pay all such other charges as may become due from melus. IWe also agree to abide by the provisions of Supply Code-2014, General Conditions of Tariff /Tariff Schedule Tarif (Orders and Electricity Act-2003 as amended from time to time. We further request you to supply me/us with the necessary meterimetering equipment. Me agree to deposit security (meter) and to pay monthly rentals for the meter / metering equipment as prescribed in the Schedule of General Charges {Signature of Applicant) Name. (Signature of load sanctioning authority) (Signature of officer/official verifying the with designation correctness of the application) (for and on behatf of the PSPCL) Name: Designation Date.FOR OFFICE USE ONLY 1) Name of Sub division 2) Applicants Name/Designation Signature of load 3) Is applicant a member of SC/STIBC/BPL 4) Security(Consumption) Receipt No. and Date a). Existing LoadiDemand, itany (KWIkVA) bb) Load /Demand applied (kWIKVA) €) Total Load/Demand Sanctioned (kWikva) 5) Supply voltage 6) Category of connection 7) Account no. ACKNOWLEDGEMENT Application (ABA Form) of (name of applicant) for - (purpose) is hereby received on (date). in this regard, the applicant is given a permanent A&A no. to be used for all future correspondence. Signature / Seal of PSPCL representative Name and Designation of oficial receiving the A&A FormGUIDELINES FOR APPLICANTS FOR RELEASE OF ELECTRIC CONNECTIONS / EXTENSION(s) IN| LOAD/DEMAND 1) The applicant shall sign each page of A&A form and submit the following documents, as may be applicable. a) Identity proof :Application (A&A form) for new connection shall be accompanied with a photograph and identity proof of the applicant. Any of the following documents shall be considered 2s acceptable proof of identity ifthe applicant is an individual () Voter identity card, Passport; (ii) Driving license; (iv) Ration card, (¥) Photo identity card issued by Government agency/PSU; (vi) Certincate of identity having photo issued by Gazetted officerTehsidar on letterhead: (vil) PAN card; and (will) Aadhaar Card b) Proof of OwnershipiOccupancy of Premises: The applicant shall submit proof of ownership/ ‘occupation of the premises for which the connection is applied. Any of the following documents shall Ibe acceptable as proof of ownership or accupaney of premises:~ 1) Copy of sale deed or lease deed or rent deed and in the case of agricultural connections iiy » ©) An foli 4) Cor a copy of khasra / girdawari | jamaband | fard ofthe land; Certificate from Panchayat etc. showing ownership of premises within phimilal lakir of village for DSINRS connection; )) Registered General Power of Attorney: )) Municipal tax receipt or demand notice or any other related document; Letter of allotment with possession letter, application by a Partnership firm, Company or a Trus/Society shall be accompanied by lowing documents: ‘An attested copy of the partnership deed signed by all the partners or by @ partner authorized to sign by other partners through a Special Power of Attomey duly notarized. ‘A private or a public limited company, shall while submitting an application, furnish certified copies (by the Chartered Accountant of the Company) of the resolution of the Board of Directors in favour of the person authorized to sign the A&A form and other documents. The signatures of the authorized signatory shall also bear the common seal of the company. In case of change in the Board of Directors, the consumer shall intimate the Distribution Licensee (PSPCL). ‘An application by a Trust or a Society shall be accompanied by a certified copy of its Constitution, is bye laws along with resolution in favour of the authorized signatory for signing the A&A form and ather dacuments. The names of the managing body of the Trust fr Society and their residential addresses shall also be furnished. The consumer shall intimate to the Distribution Licensee (PSPCL) every change in the managing body of the Trust or Society within one month, rlifcate from Sub Divisional Magistrate /Sub Divisional Officer (Civil) / Revenue Officer concerned regarding member of SC/ ST/ BC / BPL.2 3) 4) 5) For release of new connection/additional load/demand an applicant shall submit No Objection Certificate (NOC) from the competent authority in case it is required as per any State/Central government law/notified policy or regulations framed under the Electricity Act, 2003 or specific order ‘of any court issued from time to time restraining release of connections in any particular arealpremises. The Distribution Licensee (PSPCL) shall circulate the list of cases where NoC is, required, as per applicable law/policy, with the approval of the Commission, The application and agreement form duly filed in shail be submitted to the Consumer Clerk (CCV (RA) for further process. RA shall give details of amount on account of Security (consumption) and Security (meter) etc, to be deposited by the applicanVconsumer with the cashier. Connected load may be determined as per table given below and complete detail shall be given in the test report to be submitted at the time of compliance of demand notice. Category | Light | Fan point | Wall Power Air point socket | socket Conditioner {Single phase) DSIBS (DS | Actual or | Actual or [Actual or [Actual or | Actual — or purpose) | 40 Watts | 60 Watts | 60 Watts | 1000 Watts | 2500. Watts {half to | (one third | (one fourth | (one fourth | (half tobe be tobe to bel to be | counted) counted) | counted) counted) | counted) » NRE ‘Retual_or | Actual or | Actual or | Actuator |AS par Industria | 40 Watts |60 Watts | 60 Watts | 1000 Watts | name plate BS (NRSI | (all to be | (all to be | (one third | (half to be | (all to be Industrial" | counted) | counted) | {5" be | counted) | counted) purposes)! counted) AP High Tech. a) Three phase power sockets for NRS/Industrial purposes shall be taken as 6 kW each and half of the no. of sockets shall be counted. b) Any fraction of lamp / fan/socket/ AC shall be counted as one. ©) Either the standard wattage of the electric switch/plug/power plug or the load actually connected to such electric switch/plug/power plug shall be considered for calculating the connected load. d) Incase a single switch Is used for controlling more than one lamp/appliance, the sum of the total capacity of all the lamps/ appliances shall be taken into account for computing connected load, fe) The load of air conditioners/AC packagesicentralized AC systems bearing ISI mark/star labeled shall be taken as per their nameplate. For non-standard 1.5 ton ‘window/split air conditioners, the load of each shall be taken as 2.5 kW. f) The load of three phase power plugis) used for equipments temporarily connected for the maintenance and operation of a green house under AP High Technology category shall be considered as 6 kW per power plug.
You might also like
New Connection Application Form
PDF
No ratings yet
New Connection Application Form
3 pages
PCL LT - DS 20 KW - 1A APPLICATION AND AGREEMENT - A A - FORM
PDF
100% (1)
PCL LT - DS 20 KW - 1A APPLICATION AND AGREEMENT - A A - FORM
6 pages
Application Form - 1
PDF
No ratings yet
Application Form - 1
7 pages
Application and Agreement - A A - Form
PDF
No ratings yet
Application and Agreement - A A - Form
6 pages
PCL LT 1 Application and Agreement - A A - Form
PDF
0% (1)
PCL LT 1 Application and Agreement - A A - Form
6 pages
Dispensing Test Report and Ownership Proof 5-2016
PDF
No ratings yet
Dispensing Test Report and Ownership Proof 5-2016
6 pages
PCL-LT (Ap) Annexure-'1 B': (Two CFL Lamps of 20 Watt Each)
PDF
No ratings yet
PCL-LT (Ap) Annexure-'1 B': (Two CFL Lamps of 20 Watt Each)
5 pages
PSPCL Load Calculation For Home
PDF
50% (2)
PSPCL Load Calculation For Home
12 pages
Release of A New Connection of Electricity
PDF
No ratings yet
Release of A New Connection of Electricity
7 pages
A and A Form Other Than Domestic - After Noc Amendment and Simplification-Final
PDF
No ratings yet
A and A Form Other Than Domestic - After Noc Amendment and Simplification-Final
10 pages
Permanent_Supply_Of_Energy
PDF
No ratings yet
Permanent_Supply_Of_Energy
3 pages
Supplytconversion: Reductiontreconmection Namet5Httng-Tenpot
PDF
No ratings yet
Supplytconversion: Reductiontreconmection Namet5Httng-Tenpot
4 pages
Form
PDF
No ratings yet
Form
2 pages
Updated New Connection Declaration Form April 2020
PDF
No ratings yet
Updated New Connection Declaration Form April 2020
2 pages
New Connection Application Form: Notification No. CA No
PDF
No ratings yet
New Connection Application Form: Notification No. CA No
5 pages
NS_Application_Form_for_HT_Connection_28022018
PDF
No ratings yet
NS_Application_Form_for_HT_Connection_28022018
1 page
A 1 Form For Industrial Consumer
PDF
No ratings yet
A 1 Form For Industrial Consumer
2 pages
Form For New Connection
PDF
No ratings yet
Form For New Connection
5 pages
Bangalore EB Supply
PDF
No ratings yet
Bangalore EB Supply
5 pages
JBVNL LOAD INCREASE FORM
PDF
No ratings yet
JBVNL LOAD INCREASE FORM
4 pages
Consumer Services Group Application Form For New Connection
PDF
No ratings yet
Consumer Services Group Application Form For New Connection
12 pages
Attribute Change Form17
PDF
No ratings yet
Attribute Change Form17
2 pages
West Bengal State Electricity Distribution Company Limited: Application No.
PDF
No ratings yet
West Bengal State Electricity Distribution Company Limited: Application No.
6 pages
1009984
PDF
No ratings yet
1009984
4 pages
OSIMO - 2711 - Consent and Application For Direct PVVNL Connection PDF
PDF
No ratings yet
OSIMO - 2711 - Consent and Application For Direct PVVNL Connection PDF
5 pages
Electricity Connection Form
PDF
No ratings yet
Electricity Connection Form
8 pages
BSES Rajdhani Power Limited
PDF
No ratings yet
BSES Rajdhani Power Limited
4 pages
a & a
PDF
No ratings yet
a & a
2 pages
Form No.2
PDF
100% (1)
Form No.2
4 pages
Sex 3
PDF
No ratings yet
Sex 3
4 pages
New Connection Form BRPL Dt 26-08-2020
PDF
No ratings yet
New Connection Form BRPL Dt 26-08-2020
12 pages
Title
PDF
No ratings yet
Title
4 pages
Himachal Pradesh State Electricity Board Limited: (A State Government Undertaking)
PDF
No ratings yet
Himachal Pradesh State Electricity Board Limited: (A State Government Undertaking)
7 pages
Form
PDF
No ratings yet
Form
5 pages
Southern Power Distribution Company of Andhra Pradesh Limited Test Report Part - A
PDF
No ratings yet
Southern Power Distribution Company of Andhra Pradesh Limited Test Report Part - A
2 pages
A1 FORM RCI Part1
PDF
No ratings yet
A1 FORM RCI Part1
2 pages
New Connection Forms For Electricity Distribution Companies of Rajasthan
PDF
No ratings yet
New Connection Forms For Electricity Distribution Companies of Rajasthan
19 pages
Form_16_1_CHN10062011
PDF
No ratings yet
Form_16_1_CHN10062011
7 pages
Form A-1 - Industrial Connections
PDF
No ratings yet
Form A-1 - Industrial Connections
5 pages
HT Application Form Annexure II
PDF
No ratings yet
HT Application Form Annexure II
4 pages
LT Application Form PDF
PDF
No ratings yet
LT Application Form PDF
2 pages
West Bengal State Electricity Distribution Company Limited
PDF
No ratings yet
West Bengal State Electricity Distribution Company Limited
4 pages
HT A1 Form
PDF
No ratings yet
HT A1 Form
3 pages
Form
PDF
No ratings yet
Form
5 pages
Mo Bidyut
PDF
No ratings yet
Mo Bidyut
4 pages
Adani Change of Name - English
PDF
No ratings yet
Adani Change of Name - English
4 pages
Switchover Form - English
PDF
No ratings yet
Switchover Form - English
4 pages
Sex 2
PDF
No ratings yet
Sex 2
4 pages
AandA DS
PDF
No ratings yet
AandA DS
8 pages
NewConnectionForm1008149767
PDF
No ratings yet
NewConnectionForm1008149767
4 pages
UPCL New Connection Form
PDF
No ratings yet
UPCL New Connection Form
8 pages
Master - Eletricity - Details
PDF
No ratings yet
Master - Eletricity - Details
4 pages
Abswuw9 Ueiwjejbe Sid8e92b Jis4197406
PDF
No ratings yet
Abswuw9 Ueiwjejbe Sid8e92b Jis4197406
4 pages
New Connection Form 1005357454
PDF
No ratings yet
New Connection Form 1005357454
4 pages
Application For LT Supply
PDF
No ratings yet
Application For LT Supply
3 pages
Guideline For New Connection
PDF
No ratings yet
Guideline For New Connection
3 pages
BSES Rajdhani Power Limited
PDF
No ratings yet
BSES Rajdhani Power Limited
8 pages