0% found this document useful (0 votes)
97 views

Table 1

Uploaded by

Yamini Shinde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
97 views

Table 1

Uploaded by

Yamini Shinde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 91
cont 4.4.00 . 1 Gare eqoromans isan insictons Sooo Gi ied Pant Table of content cmvana. Regus veneer am (Cota dagen as catneanten agen Ge fenton nem depen Ge Crotty en in nnn ia Goeareromutrnenerticaicc pared 1a0t sar Sreccreetwwtnerbatverl basset peuvent 18024 Smear Say ond pp ge tamaz Somalequermmbreral wont tet pele Ming 1308 eo equipment witn mattresses Coy eaten ye 308 Somateurwertrtetrralbwblott tt sompe ints 1308 ngtatanouerucTons FoR He MaULATIN oF HOT setuuaouerres tests 8 va For oases uF + E208 ‘an Sameer 3) Bn ieoyeston tsa = an vomit ia seventh 6) es Piven oe cota prc ae moe Be renee 3s C tere eH) be =i ia fovea oa prtctooston cfg Ga INSTALLATION INSTRUCTIONS FOR THE INSULATION OF COLD INES, FITINGS AND EQUIPMENT. Flexible olastomerc eam (FEF + EPDM) asst Extruded polystyrene osm (XPS) 138 Polysooyanvrate fam (PIR) 1353 ‘celia ass (C6) 1358 ese (PL) 138s Instatation instructions fr he fishing of hemalinslaton oping anc 13.60, ‘Suipmestin the temperature ange fom #100" Io 60 C [REMARK : For the gooral requirements and inealtoninerutons fr aroutcinslaion : ‘elorence made 0 Tab 9. sumer cj opeu coves: woyrone sa oj ue pie sane oie (oeaxi 2) ovodiic ee, wusucirbe pve Budo NoliAEd pus WeueneeSLL eu 7 puja snenraurun oan sanegpocs WOURIea Ol / WOUAINEON OL swowounbos seruoyy BUDAPPS ‘nfo au peysiou ‘swwawsynbas mvoRpeY LoHFoYpads amu pepNIeN PLE SIP 0\"slomesp Io es wog Um ste Balas Macau OyoeeS GUNG seonp seer ssouyong uogenautepnau Sones! @ 50° Io u pocunsep se ‘saunssood uooadau pue anion uowedeu pur aye so adeauns ep fe pooner Alen Y FREED AND. aya 09 ye suo uoyensu ou suorznasu woRewes ORM upsooN AedS Sogou “person svovente educa eles Sone 9 revo ot 02 ‘2g svoreoyoeds Niven, su ct.) SeUeEW DeDNBS BU O topaods hodsuey puvabeo showWoMDOI OI — SAFES ut uogensy pode Kcunuo 90 use psojduace mous get usurp ou, pasa ouseg moden sunt ‘Sovoteu Bunsuy Teveeuuonensu avers Lonel aM eds UORSIauL “soa sree 0 powa| sues, 0 spew aq prays souagalssotidio4 ——_sussts Tsu uoiepsujosuscecu wos! vonensut toy svoju 80 a. any wopepau|sopun uosolee pu swore“ Cusae Uogeineu Eugenes eaGeurpwoumyoouleoa)joseare3 a mie, WL RUNGONS SOT LIND copa 5 soun‘o6ues xmas yun ou sae $5090.04 Sjo"eepeo uoteyieu eyes wbeed Yeo svoneuauC? veges _ovorepeu aistoce Vopr BuLnsiod uoREMEN ee walereu oH JoaUA Z 22 suodte9‘voesuebie pus seunpsoond ‘suoqeoypadshuedwoo yo Me Gusoonee: odoos fue AINE AO. | :paqosep 10 (gue peanut ay pnous suonsas Bune) sn uoneoyioeds soueuonfew io oof fea UL uoneoyjoeds eueuazuleyy 0 joe[oud feojuyooy, sexgenvos pve ous waar woreynsuc of a fyssod ‘sonpype sues 1 fou s90fd unto nay vo ayoeds Lone [ebuip} eo Sugopnuo} neg oy se oss) ‘uoteojoods eu SHI KIO Ul ‘aude pus Curae Accs ou eOes Aveo Ue uy uoqeoyede en ‘gp 2200 sono or papuounuooas st susyee Voeed| eh Jo Kg ty Sr IM “Sooddns odd pve son se wos swe Roquepou Jo UDA © sone ose ALE INO OL ‘euueu ogeanp sue eure eu pode ave sumsis Loans UREN 0) 3159 8 58 'SOMITE] SHI 1 PepURLLND og MONS oNgN sLOWeI Fs AED Turuouna oq goqosop fenuea ou sltensa seooon 0] wonepad|rsrace fue we ‘pues sorapey Dor seu orayace yo wdon 8 ]ceu emue IN OU lersuep wwe b oma ‘98n 10} uononsisuy Wool-tioz suowagiba sue sor IN D ; o1mi.201 . Genera requirements 2011-4001 dni bled t van 1 Heat insulation diagram wAteRiaL | |SPECRICATION an a a 1 a | saa GE EE fase or v y ¥ seer eacone fA) 4) Fae. soe “_ pean tf we }+Ge $A" frerciss sree ma [eae “| SETH a ——— <= fant a Remarks: Bey [Afar aan Joma ‘Heat insulation is based on the principle that the process temperature, f ier is equat to or higher than the ambient temperature vn — Fer definitions, see CIN! 0/05 Fra | oleae 2) The material selection in the seorch path is only based on the application wet temperature. Other selection criteria may prevail, such as thermal ree meas es conductivity, compressive strenght, fire resistance face 2a 3) For general requirements, see CIN 13.01 ts 1) Above stainless” steel piping, equipment, tanks, ect. no. zine containing ee a Materials Uke CW 3103 and CN 3104 shall’ be applied, in ercer to prevent the stainless steel from embrittlement by liquid zinc during a fire. 5) For auxiliary materials, see CIN 2.25.04 6) For the insulation of piping preferably pipe sections shall be used. 7) Piping and equipment with surface temperatures » 60°C shall be provided with personnel protection (PP). See installation instructions CIN 13.18, YOO OU RS 5 TE PATER, 8) The cassification "Fire hazardous situation" shall be determined by cox” snbpese Set Ea 010 Local conditions / safety-inspector 5) In case of combined heat insulation and acoustic insulation, see CIN 9.2.01 +5 102’ IND 28s ‘voyDynsuL a4sno20 puD uoLEINsUL pIOI pauIqUoD Jo asD> UI (L sojaadsul-Ajaj0s /Suoigipuo2 7020) fq pauiwss4ap aq yyoYs ,uoHyDn4Is snopiozoy ails, UOI4DIYISSD2 ay) (9 LO'SZ'E IND PUD Lo' 'Ay!AyanpuOD Jouusyy SD uns 'yorasd fow DWs9{LN9 UOy2eTEs JeyO -a’NyDVedUa} uolyoayddo ayy Uo pasog (Wu si} yjod y2voas ayy Ul Uoly2—}9s JDIWayOW ay] (Z aunypiedua} juaiquo Moyaq si juay4lWse}U) Jo snolUlyUo> ‘aunyosaduay ssanoid 2yj yyy e}dioud 24) Uo pasog s} UoyDInsUl PIO) | SHTOUEG CR +-—— rane erm CR ws S88 = a soni > o Seley ca sn ToS 7 1 ont ao 4 a 4 4 4 t ee) Tee |____ARGS] SRG] =] of @ Sie LO-ol-Lb0z oD) syewnanbaseseuen, . z07'F NID int Heat insulation General requements mattresses diagram ‘FILLING | FABRIC ‘FINISHING TARHOR) [“HATERAL en] (ES) SERS, vara] Taro ¥ + Y =e 7 ey F fees ao |__ pa a} <> oo (eee ow <=> Hd —— Gates, 3 ca _<¢>——_ =) fon al iy fea ; teat ga sews = i q = >a . (a [ca ‘on ‘ea Ea a} <> = <> feo ‘ea ran ‘oo , on ia fe = 0 Se 7 = ne = om on" HBRESS SE GD 02 comm 4.2.03, 2011-10-01 blad 1 van < | suas, fa SR ge eh Ta alae ony tor ane 26uer emmosndun ox 0 u09210 SU oN Suny rou oH Susy oH ‘anraue yop | Soy NO~ —_unilawwea Susy eu LON i Sexy rou oN Ss 00 UR (0983 - wojso1109 eproiy2 ssans ewso}x2) uone;Nsu) ZopUN [o—)s SE—IUIES Jo Uo!sO1HO9 BRE UT PROVEN Syveuymen| —amonae mound | #2 ia. vsi| wx [osu-o4s uronye pa vedg | STVEINO” nese suusuy ren orem ve} 01 | 0,000-9.008 Sunes wen | arene oud wer | oaa 2.008 9.00 souroa den owen | sargoodue, sunsnayyrourvoy | sancaneiss pe | 04 LIND vst Sm es eve wane veroninenino | (Sa | aweqsnoden | vo LeWa- — wersks wea | see mS uunpen | 2.03-0.8 ano ipo pom | zr LAD” wmEsE AUS ig auoms~ LE a 2 1 eons wer mo ‘voneinsut s9pun j2o1s uoqued jo wojsou0D 07 nan bie | _| sarees uoneinsus spun uofsou09 = IND. “ouuati pueuoypodsu "woyefs uokrsu oxo uogeo4d "uonuanad unsoH09 Bu 'wopoAREUDD yy ubsop op Buunp ‘olsun Jo uoquanald ay of UaND sl uopuaLe Ege | U asOYR YesoNde UUojfe yo Sue0U Aq panance 9Q UeD Auo Uoqe|elJopun Uosauoo jo UOQeO M10 ORES conrsuy pue uss uopmnau jo seo woqespu ve pu ures se01d uo posse uogoeoid wtsoni jo sth # 9 suaneumuns pede rysocon pas} Oe oe 9 ypecudde waneks wate on qu aan sow you Kyuonusony yay yonard oy owen snoden o yeu! & papuowioer 6 said} Semnord aa age a) Mfeuovseo00 aimed uogu ursnes 94) VTE YUM "9.09 PUP 20 oawog 91 sumereduysea00%d Tana) im Oe ul “uDJoa poguosap se Saunesadun, SO WIN "Sou gtosze ou op fe SoMa [20 psa! ulm SIRE ogee % papvounoon "vee Jopun uojauo® U jou Nevodun UE her! TOU! SOUS ossouno yo yegssod aig Aanbsavoo pus da pang yn woxsts weno fn apa youu you au fenoein vorans Ka waists ou JU ym ae YSOU exnsesusopuN St ‘romp pus sdoip uanepeu xq aunaard ox edo osoduat Seana xq yy, Buby on meh Song od Sneed Sq auMesoduay oq bm AsnoouRymu “sinendure s=50010 Oef9 aNd "Bits up Kqvorbosuca pus es wosOub0 Ou 4.058 3.020) ‘,82b pu 0.05 0 280) ameuoduay sg 1 UNOS AeOP 81 “sumeNadO, se8D0%4 0 LUE! i eins Topun vosotia joey oissod Jo suoZa.9 2 patel ov | au DUE we-De a ‘nunesodua,es300ud fom) raoane suo voudineap onsvan ue sau ones pun uoRDdIeId UoBSUAD, 1 8 ‘jeuatou uoqpsy uy s9puq0 jo vos tusoueD pu SyUp ay oem BR a ‘yes0d 08 ou 0 9p ope ues uouacuco apUOK YE} eaneD UoLzOD ow OAL (OOS) Uotaune epvonp seane fous fy Pavone oy ue> Uoteysu Japan (4.096 = 4.021) 9.948 ~ 9.05 3841 oomesodusy ou Usui pu wu jets ssaqsey eodnp 20 oneuoise) va~N4unO3ty oesieouna oud of aepuurane cjaauodw9 oNs0u00 uote UU sea NAS wed paynorduou vo Jaleos fe) op uofensuJopun suajte ye UaNg fe HISOLNO a S—IIE “Gusuoduno indna pus sapvons sm. Tepaess Loon Inu jew aU suoUD ONO. |p sovaeaid eu, room foe Mol bus fate ueqi2> Jo woyso40D S9BNED eI 4 FOADSRD VEO (epussqne 6 ujs.9 jo yeu a ‘semezadut s2sooid ao gs (4,058 Due 4.6) O,811 PUB 0,06" uoamag Bue ayneoduN ay Kade (jniog) 2998 sole € 3} syrnduiy Sead xy "uogeneu sapun wosauloo Ka peyeRe 9g UED und! pus oui payeraut ue suc uonsurcu stoaued Ueo sou eg sueedde y sone Toqeineo| pun UorsoU0) ToReINSUTTOpUN WOOT STRETOUUIGY SSS TORETOR ) i)’ can uomente emitsor Sori10-01 TIL General requirements for the thermal insulation of ies * ven 6 12 14 24 22 224 222 2a 2a1 2as2 ot" pipelines and equipment. GENERAL ‘Th specication covers the tactnical equremens forthe design and apicain of ternal inslaton on ng ad equiprort wil an operating temperature between the amet temperature ane 000°C For the thermal insulton of mattresses see CIN! 1.209. For the eosin protection of suid metal eutacas, coo Tab 7 ofthe CIN anual For thermansation n combination wih aousticnsualon, see Te @ ofthe CIN mans “The le shal have the mest eos eon of he CIN manus! valle, DESIGN General ‘The design of tharmal nsvtion f hat lplng and equementis based on + energy const; ‘empetire corel of processes in piping and eauipent {Uaronel sotucton Forhotincuaton syseme tis essential hat ro water penebates nto teint, Wierinan nation ste i vecie oan ae. yee ad proces {sturbarce onc unde lagging corrosion. ‘To prevent ings of wae nthe insulation system an sepropriate icing shllbe selected ‘nd executed accordance whe deta hen under Tab 4, Constuctone. hon selecing te frishing stall be considered that nsulton mates in outooe ‘ppicaone shall poteted against mechanical damage custo aces, hal bras, Incaes of jlo proce tamgestures he naulaton eystam must be exosted ae 3 cold Inculatonsjeom 9 meat CIN 1208 Insulation systems ‘Alpbing and eaupment shal be ineuated as one unin accordance wih to sain ‘raat aodmahg deta “Tae ator stl be supple and instal in accordance with he specications and Inetuctene ono rama Extent of insulations systems Gener ‘ihen hol nsulatin fs ppg, tbe ene ejstam shal be compeoy insite ncudng a ‘components such 2s png, natumeniater ines, cans stfaner, bs, nozles, a, whch Shall nave to sme reuiaton hiekees, as hdcahodi he applicable documents ravings nde neostionbnahing Stash Tob Esch ing het bo insult a a single uit Between the outa surface ofthe ulation and any ‘bstucton suchas sucutat steal, ping ooher sulted pipes petrably a minum ‘terre of gor, sabe pode mcr preveturtcssary Gc, cre oneratogutamerts giao . Soro: TL General requirements for the thermal insulation of bat 2 vn © ‘hot” pipelines and equipment 232. Supports 2521 Supporsinpipeincs canbe spi pin tee groups in respect finslton systems: 2) Foes Anchor supports, wich prevetsipaine movement in a suppor Gietons. ) Guided Sikingvorical suppots, allowing (estes) hozota Stopore. Movement ote pipet. Hanger suppor: suppot suszended roma structure. 2322 The nsstion systems for fued suppor and anchor suppots shal be designed othe spactic roguremens of proces inreratures and executon, mr coornaten wih he ppg ongeo. Several manufactures supply pre: enghee'ecneulied pipe suppor. 232.3 The nsuston systems for sing an hanger supports canbe spitin wo groups: ©) Sugera mn pac sre nde pein we ON 4 Beng. setecuamn ste see eta tioekycowredbygrscnon ions ineare iceceronta mn tro ne nr oa seta fa C fee esi lve shale ately etowtoy icultrace NS vot wn concensus ahh onprus cnbe ‘rare 1») Preto suppers. ‘These ae supports which are manufocued.os one uni. wt insulation and rackets Prefab supports ae many applied nig perature sytrr,wheraby te costs othe Support are compared agarnste cost of te energy loss or spect operations regurement 23.24 Thetsuiaon malariss f uid sling supports shall have an adequate compression stteng snd shall be resistant tothe opereing temperatures The reccet consis of v9 hal Shots whch ae fred aroun be nslabon maori by bol, such thatthe support moves wth the ppeine during contraction exparsion 2328 Thelsuiatontickness atthe supports shale the same asthe Ppng rslaton. 2.326 Thediensons of prefs supports shel bs calculated in dai. Covering actors canbe: + Te maamum design loed ofthe suppor, based on Wo span lengths {Compressive ctengh ofthe nslebon mati 1 Sait factor 1 for comprossvestengU al maxirum operating temperatures: 1 Lea Wanoteraasea on #0" tac stead 1 Lead epread underoath ie bracel lel support cracios during ing ofthe bots { Champing eco on te ipa ine, such hatte support moves wih he Boe, “gaghl i tae pate the apportion wh macnn rovenen i xparson he pene 29.27 Inetalition nen appiingbrecket r welded support the nultion system sha be aged aftr Instalaton and shallbe aepied ote ype of suspor. Incase of preted supports, dung the inealison of be pps he pela suppers shale {feed under supervaten of te neulon conten teal sage the macaton ysten can ve npd nd coma ot up, RES ee aoe mc spanner cnatine eee ee ee ee Stecinnie cea C 223 2392 234 24 CB 242 243 24a 246 enor quirements gausao. General requirements for the thermal insulation of Dist 3 ven 8 10" pipelines and equipment Expansion olnts Invcve ofp nul matali ehst ba detrminad onto base fa calculation whather 7s insulation and nisting metals sould be provided wih exces jms oabsa he ‘sparsion ferences been png oecupment ad nslaton and isin, Expansion ints and ther poston shal be designed based on he sxpecad expansion ‘been ping! equpment and insustion materal as ret of exe temoorstures, Incase eta piping nd equipment wit support ngs # expansion jolt shal be provided ner gach suppor ng Vatves ‘Vavessallbe preferably rouded wth an exendes pine se det CIN 41 2%. Valves ‘Spins n haan spn shal plata be sal Paranal of Sounward prevent ‘tat senotabon va be spindle shat Pumps and compressors ‘When panos and eomresecs eo be insulted, he eatin Ineatr shalbe insted atthe ‘outs af he nslsbon Personnel Protection (PP) Ping ar equpment wih a proces ianperatre of 60°C which donot require nsulaton fr Pct reason bt tin iy Deere! aca, alte eens auto See Non-contact insulation Nm contact meuition san ineuationeystom ita Imed contact between the bare surface ‘tthe pine scupment andthe rauson matrel and wich employed in easesthal eo ‘eal condone ie posal of corosuan under iavatn severe ‘inannulrspaca of 28 mm crated by means of pacers. ‘The annular gop shal ot vena. Theo he arrdar gp sale closed atthe topside ant ‘eowesshabe sole, such ha a al eah ake place, ‘The anlar opece wil ow condanead war sna coring rawatr tobe ceed via the lowest ptf te ieuation sya No coat insulation systems may be used on equpmentandpipng "ovoid ovonion unde nut t procsestmperature betean 950°C and +175°C {orlnulaon ayatrs dal mperature conan ra3cing processes. Insulation thickness: ‘The nln hcnese habe caculstd wih anindepencent ermal cali ogra ‘The nuit Nekoese shale excusted basedon 180 12241 ond Tab 0! be CIN anal cr accoring to CINICAL. ‘The insula thickness of ves, ings, tc shale the same as that onthe oling ing ‘The thickness ofthe insulation an equipment neacs shall be ho sarees onthe indica pars Were insulated pipes or ducts pass hough slaves or openings, the fl pec insulation {hoknese shal pats tough ranston: The as space Sswesn he nsession sytem ana {he suove shal at aa be aqalto the nslatonhickres eal forse ar movement anu proventhot spots. ‘To prevent lnton of ntammatie asses or vapours, i may te recess to insulate piping or Gaubprentin carta arose co bat to surface lomportreromeine bow th ion {omperaiure ot eee gases or vapours {nase piping or equpnent ar Insite (Hick), heel possby thatthe sutace snpefeture romain thatlow, tha condorsabn may ceca ence ote adn, peril whon the cladding jt Pas bee taped ot sealed ths phenomenon canbe etter Theor arn haus shalbe Pista athe tes ports the melaton syst. Gi corwatrequigments ote thoratieuaon of 2 247 37 “hot” pipelines and equipment Incase of posse svere condensation, 9. ato erocess temperatures, 2 gap can be ‘Seated between he mewaton materal and ie cadang by means of eid shea avy Inembrane, see CINI2 25008 par2 16. The condensation war con be cated crcl) Ve Grins in tha cdg, min 1 hole clarrter 20mm, see CINI 4.101 MATERIALS Ingulating materials according epecifications 2.1.01 ... 213.01. ‘Alinsulating and esting materals sal be re. tree of damage and conform tothe minimum ‘equrement ao stated inthe GNI metera specbeatons. (istarats ai a preecod agalnet weather ond most in anspor and storage, They shall bo delnare ana consroton stom ongnal unopened parkaping andi ised css of tegeue Ccentestes of gn, prosuct information sheets and MSDS sheet of aliasing a ishing ‘ratorais shall aston ‘Slore amateral a apciic he Pancipal ans he appcan hal ake coprizance othe Corin of he product formation shost and he oltog MSDS sect, Metallic jacketing in according specifications 3.4.04 ... 3.1.08. ‘Thickness ofthe cladding enacts [ Outside diameter Minimal thickness of the sheet in mm. insulation in mm. Txigrainum | Aluminized [Aluzine ] naa saor| $492 | as0s ee Floxible finishing materials ‘esorsng speceatens CIN'3.205 3.241 Tapes! Foils etecg epecestens CIN! 3304 ..2.2 and CIN|2 25.05 Fixing materials ‘Accorang spectesten CIN 22501 fr Insulating materi and thishing metre INSTALLATION General ‘Theinsaon, fastening ad eihing mates shat be soped professional in accordance ‘wth his speceabon anne station arucone See Inia ato. CIN 322 Before the insulation work is state. the surfaces tobe insulted sha be cles, dry and, sceseey, painted Provisions shat be made to ensure thatthe mateals oa lg be files under poo weather nations. Pet apleaton olhe ishing materi, any Wel aulaton motel shall be Fooled Inaulston ctites sal be completin on ay. Ife moet, ne reson sval bo covered empoady ith ater shestng, o be Namepsis, erence: end measuring pats fal ves chat romain operabe. "The edges ote rocenscs shal have 9 weatherproof tis, see CINI 4.2.16 and INI 43.08 rain vse at lines. Discharge andar oO oO oneal gutements cinita01 Soivioot TAL General requirements for the thermal insulation of 562 5 ven a8 ane aay ane 4110 42 424 49. 431 432 442 44a "not" pipelines and equipment {nsultion trough was, partons and ringioes shal be urintruped and of unom ‘hovmoee Incase the minimum space of $0 mm betwaan hs nelaon ising andthe cjacent surfaces (et par 231.2) canetbe realzod aurng he executor a suton sha be found Sonaitaion of he nce! Stifoners, rings, dorset sttchod to insulted columrs, tanks, vessels and heat excrangors ‘Shalhays ie same ineulaion Dieses a the equipment prope. anges, vas, and expansion betows asl hve the sam ineulaton thickness a th ing ‘rd ecipmont concerned “The sung box arate excluded fom heinauaton except the cave of vats wih eee snl (ee CN 4121, Pe insulation systms shal start at distance ot eng 30 mm-rom fangs o prevent ‘Samagets the nustion we opening na ange (cea CIN 47 1B) When veaced ond ‘te apple an or praumati tol are used te nsulaton shallbe removed bles ‘Around fangesin ppsinescontninng vide, which ay damage the inulin cx the coating {stem neat of leakage ia aavesd otal ange buts wi eck dtecion nips (ee ‘GNI'127 ete) Laewae tange bes ray prevent conusable products fom ponte ni the irsltion mate hus ereaing a fanmatie sation. ‘Application of insulation Inease steam or water aced piping wll ba insted wih lp sacions, oversized pipe ‘Sectone shale usd wih haelors otual te dlanetes of te pe pl he Vace (ee Gina o4 cox, ‘A‘alraced ppg het cosine hal be creted wi aluminum fo or angi ran (e8e INT ‘vok estar), ‘Avokeivealy aces ping pipe sections habe appied wih antral ameter equal the pe diameter coe CIN 10% deta, ca08 op wound Using» 2 en, veld poe ‘ketone (commerce! ss) aa be ued \inen insulating instrumentation nes or tubing, mineral woo! ope maybe app wih mastic Finch Aareatvely (UV-resistant) fenteelascmar fom (FE) maybe apled depending on themacmum operating emprature Application of stud sheot cavity membrane ‘The stud shetcavty meribrane tobe apple arouns the ieulsion mate wit the studs at tho lege Ovedop udaheet es 0 mem The membrane shee ia wih aie Siniatitape, ‘Subeequgnty the acing is app, niche provided ith rain ole, arte 20, 1 hole 8m Application of the metal finishing layer Hee ee a ee wont nascent cece ee rar oe reas emer eae arena Cesena nema cn Horizontal crounfrenal overlaps andi shal be arranged io sh ran wate nga’ jonte athe prevalirg wind sige may any be ported the constuston leaves no ‘Stornatve. Al the ant, be ck sal have craps of taal 0h or 30. {longtcia! nts sal vay be staggered. Forts on ping, see CIN 4 105 Forint on ‘equipment oe CIN 42 12 ‘The number of sagen requred forthe lading of insulated bends depends onthe radius {End ha external sulin ameter ooo GNI 4.145. The segment sabe provced wih ‘reunfrental swage, Lea swage and a carter. snage and ope downers ‘The benaing ecue pein, te bance shall lened win segments, Sends wth co sal <2enaingradus shave friched wins cono cap. T-poso ve CIN 13), caer gt oni t301 Sorvi0-bt TI cenorat requirements forthe thermal insulation of 20 P= © “hot” pipelines and equipment 444 Thoclassing salle instal sich hat melsure ae nice can be drained, Athonzont ‘bing in the milo bataoon to support, al holon! pat drain ole hel ba prove, ‘nin hlo6 m, lam 10 mm and athe lowest pant verieal ands, comecions ae 445. Fortheseaing of expansion bellows, ssa eles sheet cover hol be instal over th op atthe ees expansion secon to avai tetnauiton material cosrusing te acon of Gina 25 anc 126), 448. Toabeom nea expanicn caused by medium amperaturs fucuaons, xoansion joints shall be provdedin he cacang and suitor. The expansion mts shal be ncabed between te ‘ted points fe cacng to aconnodae the expansion. ‘Ring expansion jot eon sand shal be fd round the ovaapping cladding (209 CIN a 0send cIN'42 1 447, Thecladsing sal be ee of sherpeges, burs ete 448 Spots that do not pocude wstoring deste an accurate fish, 9. at seing plates around Potrislons pieces, ft edges on Cuts, et, shan be sealed ty means 0 ecora a able Saslomeric or sieone comps [Ne With coneourd sled ate shal be inspected andor epareson yar basi. ‘449 Around protusins in the outer lye minmun spgce shade cutcutin he rslaton cladang {Span poustiaexpanson Ths veces sabe isned win socurisyFng ssing patos ‘Sn hal be sealed (oso CIN 4207 ana GIN A203), 440 Foryerial tng Be meta net sa be supa by means", 6M “44.11 Ineguac surfaces hat cannot be ished weather prot by means of met! lading, such ‘Griprecsor tunes ele, shall be tnshed aftr approval by moans of wo weno: ‘ziti tnahing ler in acorcence wth spsctnonton CINI2.2.07 ‘a renforcoment ce fst yer a gins fab or poveser shall be embedded in th ayer ‘ihe st wet See also etlaionmatiesses CIN 303 ac specieatons CIN 33.01 45 Application of UV- curing glass flbre- reinforced polyester (GRP) finishing layer “The applcaion of GRP fishing lyeris dorbe in CIN 1.3.6. C oO ‘enara quirements om s028 . Sovi0.0r TAL General requirements for the thermal insulation of 1 ven © “cold” pipelines and equipment ‘GENERAL 1A Ths specication covers the tchricalrequrements forthe design and nstalton of hemal Inslaton ov piping nd equipment ith oper lorpeststes belwecn ambient epee ‘nd-200. 12 Coldseroe\s defined as piping and equipment t operating temperatures, continuous or Irtrtent, blow amber tomporaire, whore reducson cl het gan andor proventon ct ‘ino condoneaton i ceied 1.3. Themininum _Jmaxinum operating temperature sha oe statin topping equipment data es Inthe design ofthe nsulabon syste to oqueny othe occurence of hess eno lepertutes sta be akan rio conoderaion, ‘Attomperatures baow 160°C be mleton mato manufecurerchallbe conse. 1.4 Forte coeson protection of insted metal sutaces, se Tab7 of the CIN manual. 1.5 Foracombinaion of cldnsuiton systems wih acoustic insuson, see Tab 9 othe CII 16 Atthe constuction stea coy fhe latest eatin ofthe CIN manuel salle avaiable 2 DESIGN 24° General 24.4 The design of insulation of colt piping and equomentis based on + eld conservation (econ of xs of enemy), ‘impertute ental of processes in piping ans equert { poventon of condaneson onthe outed surface one nsuaton sya 242 Forcoldinsulaton systms it's essential hat no water or wate vapour peratrats int the ‘Rutt nie frm apo, gu ronan uation pte il nh i iuiting ‘alle ita eventual esto eamage fo ha ulton sytem ara undaggng carson, 2.13. Toproventingrss of water and water vapour hough he Insiation materi n aproprits ‘vapour barr sytem shal be selected, 2.14 tne insulation system vapour stops sal be applen erro vid he sytem na cosad companions and te prover water (apou) baneport between to etal euvoce an th inclaton materal toma darnaged avs no 9 sound seetono te rauiaton sytem. The Comparneriasaton peeraby shal conde wih senses suppor. Ineulation eyeteme: 21 General 2.1.1 Forcold ping temporary hang elevated operating temperatures cleaning I ieg Iemnpeares, FEF / EPDM, PIR and OG can bo aplea See the matora spedeators ere ‘moumum slowsbie temperate ofthe auton asa, an hing teas 2.24.2 Aol ystam shall consis of ne or mre lye of insulation mate hich 's covered atthe ‘Suisse onen-vapou" ight austen att, wna vapourbarer: he primary vapeur Tease of cellar glass upto a temperature of-$0°C, no vapour bane shal be requred but 2 on 9 “cold” pipelines and equipment 232.2 The nsulaton stems for feed suppers and anche suppors sallbe designed he speci requremant 2 conaaaton wth he ping engine Several mandates supply pre-enghesed nsuated poe supp, ‘Thadelgn of tose suppor pecly and shall oat tha equreren s insist inpar-232,7 Anovere of he rest comnon Weal pie saports ae cals ey CIN "ston 2.22.8 The insulation systems for sking and hanger supports const of nslaton material wih proper compressive sent, suchas PIR, OG or XPS, ised wif a Vapour bare ana extra! btacket Srackat are ormod by two sts! ha shal which ae camped around he notion ‘mataral by bot, suchinat he support motes win the paste Gung conection expansion See GINS. 09 ana CIN. 10 2.22.41 inulaton aystams fr skng and hanger supers canbe spin hee groupe: 9) Te crac support The pips insleton stam 9 apled un Interrupted slong he eng of tne pip. Ath po {ished neuaton, consttng of supooring cao, ed aroun te feuaton stor BY Mea ‘The leah of te crs rele ote compressive svengh ofthe suain rete, 1) The combined support ‘The sled pe lon systems interrupted athe pont of support and an inautn ae Inauston sje a anping sparta etl, conesting of wo Sta a sectone clamps ‘The length ete clamping supports smaller tan the rade suppor de othe higher compres length 300 en ©) The prot support ‘Thiele of supports ies ceminaon of high: denstynslaon teri and clamps and aere arierand aur chest. ‘The eannaon tthe pale to be executed in accordance wit etai/AofGINI 5.1.09 ané Cl she 2325 Tho insulation thickness eth suppers shall bo ho same 2s the ping insulation. 2326 Theater of he nutaton secs athe suppet, reterbly shar mat with te adaceet Inoultonsyetom doing soa sna atel win afigher compressa srengh conte ‘opld wit aighty aterent danty an thermal cotter 1232.7 Thedimensons ofthe supports sha be calculate in deal. Governing factors canbe: + The maximum design load of the support, based on Wo span length: {Gad spread uncemeats hnobractets ste! support cade ding ing of he bol, {Clamping foros on tho pipeline, euch hat tho suport moves wth he pie ‘oe the sopport nai a move ass the nsulobon system (een) and he pipe ‘Shall ot move ine the Insulation system: + Lengtof he bass lates oe spor bated on maxcnum cotati expansion ofthe sine 2.3268 Ineaation of supports rogues proper eoocinatonbstwaon the mechaical piping contactor ‘athe nition contactor Be gprs shal be praectd roprty apn! wate conona sing sorage a atr ‘ung tation of he pai fe pet ur aha be ntact tte ‘Paulsen eotactor. na at sage he nalaton ayer can be aplind and conneciod tothe ‘Supports, Very important thal he vapeur barr of te pipe nelson ly covers the capes of {he prefab suppor vapour barren, ‘Cas soporte are aa together with he inguton sytem of teppei. Therefore the ‘be shallbe sta at tomporary supports, coverages co 13.020 5 dori IAL General requirements for the thermal insulation of 82 4 ven & 2aze 2aaz 2aaa pase 2336 204 2344 2aa2 2358 236 24 2aa 242 “cold” pipelines and equipment {ae plates ot suppons alla cata tne conte ofthe pont ot support the length of ase sts shat be desig to accommo fr formal expansion! contacion moverrenf fe ote an the inslaton system Contraction joints and gaps Int ranualjnis and gape ae define 2 folows, 0 neste in CNIS. 1.01, CIN S 1.02 fend Oo 108 “Alone where to relation elements (bs, sections or prefonned pices meet sucha {St reumfrerta gn, onguaralonts and correction jot. «Asap sthe space cenieen an nadatonelment arte onsrying yer Contacto jit and hel postions shal be designed bases onthe expected ferent ontracton between pang epmentandinsuaton materal aba osut of exrome, ‘emperors, In rsuain systems of horizontal ping and equpmentcotracton joints shellbe appli 2s ‘neato n te Intalion ete, Intn cos fvertcat ling ond equipment wih super rings ¢ contacton ens shall be prov under each suppor rg. “The contraction of pine or ecuprent has mancnpa al the neta ayer resting [Pcompresave secs. Thorfere a contacto oct sol be nated the outer nouton layer Ine rer neuaton ayes the conracion ofthe sulaton materia n mally ‘ropertona tothe conracon ofthe pie o eaupment er #eorracon ont nt eceseay, nen sping prefaorcstes sectons on ping wh an operating temperature below 50°C, he Inner dma te secsose cha be evreze such an asta that a gap il ba formed ‘Between the seton and te unceryng pipe as nde in fe nstaltion instructions Valves and flanges Inthe casa of mul loyerinaulaton sym on velvos and anges esacondery vapour barr Bnotreaueed” Vane eyogeic services shal beprovdedvih an extended spn; sae CIN 5.1.25 and CIN 126 auch hat he sulleg box remain oo rom the nslaton. Spd of valves "oreontl ining profrti to bv rtalled cut of pmb, fo proven water peneaton via Ne {pie stat opr operon neve er al be posonea wth netaten oak ‘Pumps and compressors ‘nor pumps end somsxescor roo be isustd, thermal breaks shallbe proved elato {Ho pump basa rom the seo or concen foundation, ‘Therolationnitrsallbe tale theese of he etn, Personnel protection PP) ‘here preci prac spel for non-nsuited process ping snd equipment having Inelonal operating trperautes! 10°C ad blow ard whose econ posers a personnal ‘azard at sudenlfeezng, te surfaces sat proviced wih a eile pctecton toan extent, ‘Stlerined athe Conatucton stage, This shall generaly belted ota fe cotines of ‘mal wating ates bourded by datas of nat mare han 21 mverealy and/or O8 foraontly beyond accans ways lars, plaforme and Work arecs For personne! rolosionprelray wie rash meal gues areuna piping and equipment shat Delhatetes or hana ring lobe intaied a laos. Insulation thickness: “The nsuatonticknoss shal be calculted wih an independent thermal aluaton program. “The insulation icsness shal be calles awed on 90 12241 and Tab 8 tbe CN Menus or according te CINICAL “Te insulation thickness of vaves ad tings shal be the same as that on he axoring png. General rgutanenie com 13.020 me Sorioor TAL General requirements for the thermal insulation of ed 9 van 8 249 312 ana 345, 22 224 323 “cold” pipelines and equipment “The thickness ofthe insulation on equipment heads shalbe te same as one cic! pat, ‘wher insulted pipes o ucts pass rough sleeves or eperigs the fil specified insution thekness sha pace tough Be vanston ha contruoue vapou! bari Tho tos space betocen the nauon systam a the sloove shal atlaas be equal tothe heuston ness {Osow fr auticent a movement ano prevent condensation. In ebsence of stint fematin the olowing design cndons shai be used forinslason theknesseseltons (Gimatsconaiéon ropa [oderate [Ambentienperature [sec 250 Frum oo 30% Wins velosty jr mvaee | tm (Pemissble neat gai [swat | 28 Wine ‘Surace emssity [os 08 lect connor oa) MATERIALS Insulation matorials according specifications CINI 2.3.01 ..2.9.01, rk conor the minum ‘A insuling and iting mato shat bono, os of dara ‘eauremonts 9 stated nthe CINI materia spactonons. stele shal bo protect agai! wosther and most ring Yanepor and alorage. They shal corsrucon se nth oginal unopened packaging and be stored cea! of Certs of ign, sod fermion shee nd MSDS shea ofl iauating anc nishing ‘ates shallbe submited Before a mstotlis specified the Picpaland the appicantshaltake cognizance ofthe ‘ontets of he prose! nfomalion hee! and he felted MSDS shes, ‘Tne apped materials sha rot be corosive to each oher orto te envronment an hall ot ‘coms esbones, IR, XPS and FEF may be alec by UVradiaton and shal therefore be protected rom t ‘tng storage, banaport an talon. ‘Aor nation PIR and XPS hal roca bythe vapour bare. FEF shallbe provided sist ayer ten pp ousersandhen epledindos ety nde gash ps Vapour barriers Avapout bare consis of mater witha very low pereabty which apple in colt irsuation syste, fo revert or retard gress of water vepou. The mata of th vapour bare ts appied dapenda onthe select tation mate ‘AS vapour beret material amutipextolcen be applied on svstin materiale wth 0% ‘ose eal, ie PR and XPS, ‘vapour arses masta materi wehaeative scousconiteny, which forms, afar uring a venous barter and protec layer. Tis atts applied ong CS. ‘Combinstons of multlacol and masc rubber ae passive. See secriatonnTab3. ‘The primary vapour bate, sop ate ute ofthe nsutoneysem, shal be armupex (Gi, accordance wit ssctcaton Cin 2310, reat yer an doesn’ incor par 42, (' comtinaton ofboth, ‘Secandary vapour barr, which pple under the ousia nsulation Iyer, shall bo@ ‘mulpin olin accordance wn spasteston CII 3 10 i tnt ava Gi conotrequremens orto ematinetaon ot Fn 6 seat pts enn 33 Vapour stops ‘Vopour slop sallbespped with wo- component slr alae for he op lemperaures, os nated a specttetong OM 32 07, INS 208, CNI32 Inealatonnetrctons Incase tne operating treat is ot below he minnum sevice temperature ofthe vapour borer mast, tis mastismay alco be sppled ae vapour eon “ha vapeur sop shal be app in acordance wih INIS-108, 34 Finishing layers Depending on the quay requ erate dgreeto wich te vapour bari tobe potoctod ‘against machanicel dene one cf he olewing ising stare can be apps 2 exble or ape tis, as describes in CIN 32.11, CINIS 3.05 or INI 3.3.06; 1. amet jacket eo ecured by te Princpa (eg. fepreotn) Noe: Cen sass be fihod wih masts ax desorbed in CIN 1.356 38 Mota finishing materials according to specifications 3.4.04 3.1.05 . 351 Thilness ct eddng seats C ‘Aluelted otaip —_] Saiese outside ameter [atuminin Janine i=n| insulation in mm. .geivantzed oteet fema.401 S| costes fenwa..as =a ve _om —] os | 05 as 0300 38 ce | ce | oe a5 352 Inlocatone where proectonagsins fe requied, luinizodor tins soo cadsing shal De apbed, obs ntcated by the Principal 353. Gohanized classy shall nat be apied on or nee pling ard equpmentot (austntic) ‘Sainaos soe and ora nlcel aly ‘Gawvanized oasng ls onatveto corrosion especialy coastal areas, 36 Flexible finishing materials Inacsordance wih peciats CIN 3201.32.11 37 Tapes! Foil Inaczordance win specications CIN| 225.01. and3.2.01.. 33.12 38 Auxiliary materials Insecordance wih pe $28 er sneing ma 4 INSTALLATION 44 General ‘44.1 Theetiton, esorng nd trshingmaterals shal be app professional in accordance ‘wth his specication andthe Intalio Intec. tons INI 2.250 forinsulatng materiale ond specteaton INI 4.12 Beforeineaton of inutin, he ec tobe inauain aalbe lan, dy and pants. 4.12 Provisions shat be madeto ensure hat the materatscan alo ited cry under poor weather {anttons. Preto appbeton of he rising meri, ay wet suis mater shall be feploced ‘Altria apie on one day shall be completly Fchod on ho same day imprectial. the inedlation sal be covered tomporry wit wero and UV- oon baie fol. Thstalstaste | (_ — ae 7 2011-10-01 i cereregiamens tern nomalieion et Be ana 42 43 445 442 45 452 “cold” pipelines and equipment Ieontsicaton pistes, reference points and evel pois shal remain vise tl tes. The eoges ‘tthe recassae or asnge shale shed ouch at proper vapour bares bined. toe Ginnie 3 toansonis Soe, Trhocsssay- a dplesie entation plate shall be apple at the outside ofthe nslton. ‘Application of the insulating mater Inascordance wih ine nation neussons CIN 1.2.51. 4354, Seesons and cegmons eral be propery tod on ppg or squpment wih staggering ois ‘Allongiainl and cseurterent Jonis nthe cussige Rel ayer chat etry be ued oF falahod wih sealer ihe thar layers the pis skal netbe glued sled ‘Application of contraction joints Etch corazon ot shal be fed up wit elle insulting materi such 2s stp of lass frock wooloe FETT EPDM, coe CINI 5.1.05. Ta dogroo of compression cf Wi Hl mater hate as incleatos inthe netalaton warns. ‘Application ofthe vapour barrier ‘Tene ove suracoar heIneuton sha be covered wih a vapour baririn acorance whe nsiosonuctone nn ‘The mgzmim wae pou" pemreabiy othe (ory) vapour beef specie at [enh fr spect act 9908 Gm Re erate nah Application ofa multiplex fot ‘The multplx fl shal preferably be prefab apps athe outs insulation scton, without overap. Ineaee the mull fle spied nay, to fol shalbe cttn sae corecy and shal bo Insialed ih des of adhoswe sth subsutace, phy stetcned and witout a eluins. ‘The nts halle soled wih mutiplx ape, accord epeseaion GIN 3.311, Application ofa mastic layer 12 Aft ayorin the wet) hickness a inate, tobe carefuly applied onto he outsie Inslaton jer by means oa vowel glove by spraying, msueh sway halons and rogues se anti lied ara ect falco b_Thofabric shel be embedded inthe wat ack ayer suc tht no wrinkle ae fred and al Joris have a minum overiap of test 502, After est ayerhas cried, bts ti tacky, 2 eacen ayer wl be apple ne thekness neato A scth andl even ye shal be formed theatre sal uly ‘Snbedded unde suctre beayvsble {Toe matorasof tho rst and of ho second layer may have diferent clus. 4 Thatotal dy layer theknes sal conform tote yer thickness specif bythe supe ‘There shal ntbe ar crch, ols, tin spol x open osm tho vapour bari, Which Stalbeappied such that no parte ne nsuaton mates uncovered. The connectons ‘wih prisons andin comers sh bs catty bashes ‘Application of the finishing layer “Te protst he pray vapour bari’ against meckanca damage and infuence of westher {fnihng ayer salina ‘The alewing pes cf rising ayers canbe spp: “The application of UV- curing glass fibre reinforced polyester (GRP) “Tag appeston of UV- cing gsc fre renforoed polyester (GRP) fishing layer ie deserbed neni, ‘Application of metal eckating ‘Tha lasing sallbe without counter. sages and be constructed such hat any (condensation) ‘matt can drain fon ti lading. Therte dan hols shal bo provided attheTowest po, a8 Ines in INI 8108 enertraquramorts onu t.028 . Sonciogt TL General requirements for the thermal insulation of 8d 2 ven 8 “cold pipelines and equipment 4522 Te clasang i festened wih stains steel bands. For aluminum dling aluminum bands {nd fastenafs may be used. Stom Eands shal beinsalod on equipment concaion wih fhepmcps Seitappers or vets only may be applledin spell cases, such ns he underying vapour Barierhot wil be camaged (exe INI S207 dota A). 452.3 Horaonal joins stab installed watered. Longitudinal ents al he prevaling wind dracton ‘So onl are permed ti conatecton eaves re aterm. Arno jens te dadng shal have an ovetop af atleast 0 mn o 30mm The ongtuanal seams shal Be staggered See Geta INI. 1.05 for ppg ard CIN 5.2.03 or equipment 145.24 The numberof segments requred fer ebow Jckatng dgpends on he rai andthe ouside Sarat sco abl CIN 117. The cegmonts hal bo ean watored Ifthe rads permits, the eb may be tishes wih segment Ite fads Ito emallan end (ep pleco shallbe stalled see CNIS 16. 14525 The lading stall stale such hat mostra he inside canbe drained. Athoront ‘ping, nthe mig bosween two supa a he lowest po, aan has shal be provided, Frnt hole 8m, dam 10mm and ate lowest pont orial bends, connections ac Cc 4.26 The fished cladding tall roo of sharp edges, bree 1452.7 Forvertalcadang, ne metal anes shal be supported by means ofS cls, 5208, Nt 453. Appleaton ol ape! fol as ishing ayer (roid wih fetry applied adhesive layer 1 The surface tobe fished shale smooth, clean ane ». Thajoinisinhofnahing matt enl have an overapof in, 60 mm, The overlap shal be 2pplod watered. «:fpossil, ho oven shal be appl atthe shade side 6. Aer instalaon the tpe/ fl shalbe pressed by hard or wt rl. ¢. Formate space requrererts in elation tthe aplication, such as lemperature ang ‘erly ee rae plcatonon bert, connie ce nase ct ermandaret 454 Aoplcatonof past fishing layer suchas w 9. CPE (ult achesive ay) Thesis rhe se sco tan sn © 2 Tp neon atl bahar on vp in 5 Theol be Deeks « Theplnng yesh epledanothe eeu, hy sed nd wet mee «Tata matn scott rtp act hese sae ope. Afr soe ‘inten hd betes CS, Set sal mead er ard Eneaine proceed Tancredo nap sal be aed i abet ein aces, 19 Tees nF en Ree arcane oper peas «armatures tenth ptr, tempera od ies abet tect tach oe desu Bane hereto iC oer mavinnts mt s02e . Sorioor TAL General requirements for the thermal insulation of 5d? ven 9 as “cold” pipelines and equipment ‘Applcaton of but ribs tape flecked wha mutptoxto ishing layer. The surface lobe fishes shal be smooth, clean and dy 'b.Thejoipts inte ishing mateal sal have an oveiapof min. 40 mm. The vera sallbe Sepled waterbed ‘When appvng te tpe fl the pectecive ner between he tape fol ante subsurface is ‘raduly toraved, an at lds anc wiles ee avaded. «Ate spplleton the tape! sal be pressed by hand or wih le, «© For atari specie equrants in reaton tothe apleaton, such as temperature and ‘Romito. and he spaisaton on send, comachone st neustons ofthe manutacture ‘Shallbe adheres. ‘Apoeaton of a mast layer a fishing ayer er soclcalion of he ast vapour bait layer ae dscbodnperugrapn 412, ho aial adding or tobe apa tose os nlhing is ‘pple, following Socedure can ba spped. {2 On top oth enorcod mast vpour bart, ahi layer of mastic habe appl wit 2 ‘wot layertheknoss ae nacaoa, eforeea wit payester cin or gas fe bre Tho reinforced vapour baer layer, a8 dosebad par 4.4.2 tough d, canbe appl at {erminators soo CNIS. 107, nd pipe or aqupment supports, see GINS 301 ‘© Tha aint inthe insulation near a vapour ton ra teminton sal ba sealed with echecve ot sealer over amimur length a 180m. See CINIS 107 and CNIS 1.08, wis. a.02 oneal eouiwoents Zoro ‘Summary cold insulated pipe supports Pac Ten 2 Examples of typical pipe supports in cold insulation systems eon A = support 8 - sliding support C= guided support Gri ‘cones easranents ‘Summary cold insulated pipe supports 1D = anchor support tradte support F = hanger support G ~ Concept anchor with high load capacity H = Concept heavy duty pipe guide’ 12 13 16 24 ats 32 22 oer auitoments foeara] General requirements forthe thermal insulation of 2-H, 5 “hot” pipelines, fitings and equipment with mattresses: (GENERAL ‘This spoctication covers th tecnica requirements forthe design an appcaton of nglson ‘matvesoes on piping kgs ana equlpmert a neraingirpereures beeen he emser femperatte and 100°C “This specication i supplement to CIN 1.3. “The matress are exclusively spect forindustil equipment ans not er emergency or Aemeeray inulin ‘An loaulaton mates talor made insulation p ng oft layers of fabric fiche ether and lec wis an nulton ing To preven depiacerint ofthe ing the banka tutes resitng na rates congue, For sppleabonaupases the matroas 6 provided win slnieas soo Roots, wich ae connect to each eter win sabes sos! [As ata fastening method, barber ape, buckes wit raps, et. canbe sop ‘raxinum lanparature of eyntoueerape 6 100°C Insulin mates shale taos-made ant sauly, having he shape othe bjt oe Inslted ae mosh a posable, Matenses shal esly De tated removed DESIGN General Insuton matressoscan be used fr:

tam 1 Aiays comigsedcding shots be speed. 2 wet te anki stowed, pretence given ote weed system eg he mos simple roaster 2) Frowséng slowed» eipenson tem shale ape +The wal ile suspension systems the peered system cage shure wi so! tips canbe clamps sun ean wel wich can bea the thal epensontihetnkandineases ere ean contin ne iS +The outst suspension tani te prefer system cates whee the tanks teqenty cut serve sce his sti ior fete do fhe sped camping springs, bl ert aso lesa eto ngh wind ts. 1B Tanks with a diameter < 12m, 1 Corrugated oat sheet cladsing may be apped 2 Hwelaing to tris ewe, reference is given tothe welded system, fished wth corrugated coding, 3. ne welding slowes, suspension systom shal be appl. Stichting tsolatie Nederlandse tndustrle a, General requirements for the thermal insulation of “hot” storage tanks oN 13.04 in oes Oo 2224 poge 3 12 4 Smal ameter tanks may be frished wit at shocing {tank dameters <6 insulate os vertical equipment, provided tha suficint rovusions end supports ‘40 avaliable to the insulation system In cas of possbiehigh wed lads, fastening band may bo instled atthe back ofthe ckcunferotl joints, n sccardance with CIN45.0, deta B ~ tank lamsters between 6 and 12 m ad welding Is allowed the isuaton ays as ndicated in ‘iN 4.5.03 can be apo = tank dlameters between 6 and 12 m and no welding slowed: the insuston system as indicated on CIN 4504 canbe appt ‘Tank wats shal be insulated wth one or ore layers of miner wea slabs. For specfc cases the application of ferent materials may berequted. “The various lading eetome are brit deserted below: Cladting-suppor system wit welded spaces. System 1: wih comugated shoot claddg, see CINI4 5.01 “The horizon fastening rings consist of U-sectons, which are aches to the spacers welded tothe tank wal. The distance between the fastening rigs is determined by the eight of he tnk,wih.a maximum of 1000 mm. The cading ised tothe festoring stip with selsapping srews ‘Apoction: wih file nsubslon slabs (see 3.1.1 and 3.1.2) onal tank comets inthe case ofhigh wn! lads, storm bande willbe ques Systom2: wih Mat shest lading, see CIN 4.5.08, ‘The sytem conits of horzontal ste supports, welled radio he tank wal, having length coresponding tothe insulation thickness, Ate instaaton of the nul sla, fastaning band is Instat around the supports to which th lading is fxed wih setappng sores ‘Arplcation: wth igi insulation bs (6601.1 ard3.4.2) con tanks < 12m, the aytemis neta from axed scaling Stichting Isolate Nederlandse ndustrie FY) poe cenuroment forte thermal nsiton of ot storage tanks CN *308 i is 2000-4101 pesedor2 2.22.2 The ausie susponsion sytem with non-suppring spacers, System: wih corugaed sheet cladsing se CIN 4.8.08, “This sytem consis ofvral ele! sips, suspending rom the tank rot rainwater shield or ts supporting Sip onthe cuted othe nelson layer. regular nteval,hozontal fastening eps ar xed tothe _sspension sips 0 whic the potactve ding is attached ‘Athe back of the horizontal fastening sips, st regulary intervals spacers ae placed upto against the tank ‘wall ight hough he neuston sibs. The fastening sips are ersloned ith camping springs ‘Storm bands ere provid onthe ouside ofthe adling and tensiened wh tension springs, depending on meter and cael ation C Apoleation: with ld nsulton slabs (ee 3.1.1 and 31.2) Cn tank diameters >t2m, the varus components of the sytem shale calculated onthe basis f the proving ino the eytem instal from 8 Seating. ‘system 2: wth fataheet cladsing, ene CIN 4.5.04 and 49.03 “Tis eystom consis of vral ste! stp, suspending from ho fark eokinwater shel rts suporing +. At regular interval, harzona festering sips are fives tothe trip onthe outside o he nein _uspencion sips, o whlch he protective cladsng is ataches, “Te fastening ships ar tensioned wih clamping springs. Inthe cae of ih wn loads storm bands sal be roid onthe ouside fhe cng anctensoned (> with fonsion springs ‘Apoeation: with gd neuaton slabs (28831. and 31.2) on tank ameter 12m. the various components othe systm sal be calculated onthe baie of the provaling win ad the eystem canbe installed tom a standing scfldng or a suspended caf Tank roots “Terk oafs shall be insulate wth very gd mineral wool insulabon ela none or move layers. For spect cae the use of her materi may be equed Wh tank oof insulation certain degree of vention shal created in combination wit a poss of 80°C gaskets shall be installed between welded spacers and fastoning poties for thermal claconnecton Ire cladding materia andthe fastening prose cou lado galvanic action, 2 gasket shallbe instal st the outside of he fastening ng 2:38 The lading ofthe tank oot insulation shal be executed westherroo “The culation eyetems on tank oo shal alow fr vention. To his nd sufeint space wl be ead by the application of ary rgd ineltng sabe onthe welded anchoring sa “The cladding around reafnazaepotusons, manholes, et, eal be venting, a indicates in CINI AS. C a. a ( / a ee ini aera 28 264 ou poge 7 of12 Inte absence of sutfcient protons verilaon cops shel be instal. The numberof entiation openings ‘hallbe determined onthe bese ofthe folowng udeines £2, alton shal nave one vention point inthe mica, © tanks having a diameter botween 12 and25 x4 ventaton points, 2 m om the ile larger tanks: 2s sub b + one vention pot per 100 rot surfoce ae. Diamar veiaton opening = 2x suation ickness, “Te root slain shal be anchored to the welded epral wth clamping sip. The numberof clamping stipe tal be determined onthe basis of cleulaore, ulation thickness. ‘The insulatenthekness shallbe determined ss indented in CIN 1.3.01 Attempertires above 100° te insulation shal be provided in wo layers wit slaggered ins. Mechanical provisions Woite ‘To prevent water penetration l stale rouse shal be installed watershed, For nw tanks the stars hallbe constructed sich hat euficent space i lf forthe insulation andthe uber of prorsion iinet minimum. For exsing storage tanks redundant nozzes, leat, et. shall be removed. The lowermost insulation super ring shall be ntaled such thal ook wate can be drained, Roots Protrsion though tho rot insulin shallbe avoided as much ingress o contamination by product de to tank over possible sive those may cause water ‘The hand rang shall be netted to he sdeof he ainuate shield, a nseatod on CIN 4.9.01, Root edge shale executed as indicated onthe drawings. The distance shal equal he insulation thickness + the thickness of the comugated sheeting “The anchoring spa shall be sted onthe tank oo a indicated on drawing iN 4.8.07 (ir ° com s.3.04 anor! reqiements fo te thermal inebadon of “ht” storage tanks Ww 20.01 pegoeerte — ( 3 MATERIALS 34 Insulatlon materials 3:14 Glass woo! slab: n accordance wih IN! 2.10%, wth the lowing ational properties: fesibe slabs, wallinsuston: —_comgreeiv stenath at 10% compression 2KPa volumetie mas: igh? teva a 160°C: 308s vic = sabe, wal neuaon: eampresive eng t 10% compression kPa volume mass: 25 kgin? ovat a 180°C: 0.087 Wink. C 13412 Rockweol slab: accordance wih CINI22.01, wth flowing adeonal properties ‘xe ibe, walinsulaion: compressive strength st 10% compression 14 KPa volumetie mass: Sign? devalue a 180°C 070 Wink iol stabs, wat insulin compressive atength at 10% compression 4 KP@ volumetle mass: <0 %gin? devalue a 180°C 13.060 Wink very gd sae, rofinsulaton: campresse stength at % compression 304P3 volumetie mses 16049? devalue a 150°C: 0,060 Wire 8.19 Celllorgieas sabe for pectic appiatons, mn aocordence with CIN|2.3.0%, withthe folowing sional propertes: bot insuaton ats: compressive sterath 00-1200 KPa 32 Insulation finishing materiale 3.24 Metal fishing material for fat and comugsted shes. ‘uminum i accordance wih CIN 30%: fat wall sheeting: thickness 1,01, comugatad wall ahesing: thickness 0.7mm. ‘at oo shooting: thickness 10mm. ‘aluninized see! In secordance wth CIN 3.1.0: fat wal sheeting thickness 056mm, corrugated wal shesting: thickness 05mm too seoting thickness orm. stares steel fn aosrdance wih CIN 31.05: fat wall hosting thickness 0.5mm. comugated wall sheeting: thickness 0,smm. ; at 00 sheeting thekness 1.0m, C sichtingIelatie Nederlandse ndusteie =. ( / eee eee ae ne in ae 33 aad 4442 omi13.04 poge 02 Fastening structures for wallrootinsulaionctading ‘Sheet steel and profes may be appled pale, galvanized orin stale ste depending on condions are requirements, Aun section al be of Auinum Ag 910.5 22 Seltapping erewe wih EPOMtes washer: + foeshest sect comecton, —— dameter 48mm, = forsheeto constuction eanecton, lamer Simm, Le 30mm Blin vate for shestto sheet connection attankdmelrs 12m and at elevated operating temparatures, teas, ‘one expansin jit shall be apliod every 10 m, depending ont design (oe GIN 42.11), 44.5 _Forsuspendig insulation systems, nthe case of erorlng ings arcund the tank wal independent _systome shall be applied, at bot ids. The reinforcing eg eh be insulstd separa, depending one esign tra 44.8 The ding holes forthe shoe metal screws shall ave to be determined experimental, depaning on the thiknesses tobe oied, typeof material le, Sling serous eal ls be checked inthe wor 4117 Stainless sea storm bande 60.0.5 mm, sabe placed onthe Ouse of he wall tacg,steast one per shoot height, see INI 45.03, ‘The bands are secure to the casing wth clips, Tension springs shall be Insalto absorb the expancion 4.12 Around protrusions and nezze connections the cladding i out and tshed weather resistant wth 2 ‘seating plate and sealing compound. The seaing mateal shal have sufcint body to absorb movement Horizontal components of casings around protruding pas shallbe installed watershed, a both the tops C Stichting teoltie Nederlandse Industrie By peers reenter the tema reat of “hat” storage tanks CNIS ME IN an 2000.41.01 page i2oft2 (> ‘pd the boom sido, to provent water ingress. 4419 The topside of the wal Insulin sha be propel instal under the erate hil, nro case water fom the oof shal penetrate no the wal insulaton. 44.40. Aer the storage tank hasbeen iken in serve, al protslons nthe Insulation syst shall be epecte, ‘Als during operation, the nelson system shal egy be inspec for water tightness ana lose pat 42° Tankroots 421 Theineation Habs chal be nsalledsrugy on the tankroot ¢ 422 The roof lading wth raised edges shal be installed in accordance wth the designed aengement and be anchored to the roof withthe staniess ste clamping tips under the weed spiral 90" twisted, There where the spiral and raised edges coss, a camping stip shall be applied ‘rein cover shall be ntaed ove th aie edges and be ced wth tails steel Sere, 423 Prorusions tough the reofnsulation andlor the vnt holes shale nse watertight and ventlating 2 nested on CN 45.11 424 Aerie sorage tank has been takon serie, all pousions through the neu sytem and vent holes on the oot sal be inspected, Stichting Ilatie Nederlandse Industrie C AN Quality Contre of insulation Systems fra pope of 11 contents: 2 QUALITY PLAN 3 QUALITY CONTROL 4 MAINTENANCE. INSPECTION PLAN '5 INSULATION INSPECTION CHECKLIST GENERAL ‘The qually of insulation systems depends on 9 perfect application Ie. stiet stheterce to pecesions and singer supervion thoughout the execution af insulation job. The ree will be rected in the level of maintenance exper i the subsequent years. "Most of tho insulation has tobe Inia tt ond of project in a relatively sho tine and wth a large workforce. Tats tho sae fer new constuction project as wos in maintenance contions. ‘Shoe insulation werks consi of soveral successive sips, close supervision i eqied dng that paid to achieve s good ally sus. efore an rng the canton pase ofan nslton project an adequate cont asta shall be ropared and echered to, To entre the quay requkements, sated ia the speetizaons, sre ‘cteved,¢ numberof measzes shouldbe taken, seh 8 1). A tmstable shoud be made aan ear slag ana adapted as and when equted 2) Giese coordination wih over dscpines to enable an appropiate start the appliaton and to prevent, possible, damage othe installed insulation Fishing by is pars, ‘Avon ary stage It shoud be decided wheter flanges ned to be insula and when. This prevents tof damepeodupate work and he remring insulation canbe epted 4) rapecion departent eal be conse nora o ela what he tobe nepeced frelon to insulted suraces, end come fo mtu! sgreement sboit places where rove inulaton panes should be its much 9 QUALITY PLAN ‘The ‘nation contsctor thal prepare a Qusliy Plan belore commencing preabricaton of installon work, based an the oun Company Qusliy Pin, adapted o the Prncpts plan n sccordane to 150-0000. In there shall be ceeebed, 20, how to desl wth excapins tothe CIN specieatons ‘Alar sev ofthe Principal th contactor hal ub 2 ragistred copy ofthe Quality Panto he Pinca -Hlhting Commisse Laie Nederlandse Industrie cn .2.08 uatty Contra of mulation Systeme ee page Zot tt inl c In te Quality Pian shell be desemed the clagted responsbiies ofthe sever! sectone of Be works and i procedures, mahodslalements and iepecton& test plan (TP). In the method statoments shal be desorbed the execution plan, mses, rade and quay Procedures of al the appicabie insulation eytems, Inthe ITP al ho tet procedures shal be describe, such asthe numberof samples, holiness ons, test requencis,acceptencaooctoncreria ate Inspections shat be cate ct prior, during and ater completion of any stage ofthe work, begining wih matzils checks and encng wih rl performance hocks. ‘An example of 2 isuation Inspection Checkla ls oun in chaplr Soft speceston 3 QUALITY CONTROL C “The contactor inset i responsible or the quay fhe performed wa ‘Theceto he shal opoint 9 quality inepecor n his organisation, who Is net iveved in the daly organisation and execien f the inelaton werks, bit exchewely Ie occupied wth the Quaty ‘Assurance (QA) and the Quy Cntl (2) ofthe nsltin werk Ths quaty inspector sha in view of fis independent satus, report tat he GAC Manager inthe Conoco’ organization ated on the ually Pin the contactor shall prepare standard OG checkists in hese OC cheeks hodwiness points canbe denis and aroed In case f technical complex ems the Penal may requis epic QC check, indusing deta ring, Haacesacy, and posse deans tobe CIN speioatons ‘QC checks and rowing Sl Beene BT He a Te WOR In MEUKRION wi Tho QC checlits,propared by the contactor and under is esponbly, sal ne the compete process of aces: fo ecto the atl tothe very ofthe compte jo ard ine reed documentation, wih al itemedit slop an stapes, fe each wor ‘The contractor shall prepare for asch wer tactical devry cocument and subi the seme the Finca. Ths document sha ilude 20. the ere, the measurement isometics, bl of quettis, “The dotvery dort shal be approved by the conte, he pans and £0 ques, te supenisr ana engineering departments, a agreed inthe QC checklist. ‘Tha Principal may spotcheck the coniretors qvally ofthe work, ding the execution or afrwarss byymesna of ust _tlchting Comiese Katie Nederlands Indetrie cm .3.06 uty Control of insulation Systems Soooieoe pepe Sot 81 Quality Control during the execution 8:14 Inspection of he materia [AL materials shal comply to the minimum roquremenis os slated in the CIN Manual [At mates an application methods shalbe sutabie tothe oel washer conions. “The materi ehal be nepectad tara the suple’s wore oat eval on te Porto commencement of the work, dela sheets of the various rales aha be aubmited for ‘pproal together with the lboratry test criss frm independent ast laberatoes. In sion ‘he manufacturer Ineructons, te esety dota sheets ard method ttemns eal be eubmitod c ‘in te Quay Pon shal be deat nested how and in which stages mate et repr shall be ‘The folowing stages shallbe inated at he tne the mates arrive in storage onsite bore the mater aeprecssed or appa during epttion bore an during the insane the jcketing 812 Insosstin porto execution ‘The ulation conractr shall be involved ian eaty lage I the insalition of suai pipe supports by the mechan constr. Especially In case of cold Iaulsion supports Its very lmptan! hatte supports ae stale i proper manner and fished westherot ‘Te insuston contractor shall pecorm an prensuaton survey and measurement ofthe syste to vey the designed insulation syeom and the as-built situation ‘The insulation shal nat be inal, before the principals approval nas beon ecived, ning «equipment and ppaines, complete wh euppor re ready and pressure tested, ange connocton are accepts ad elged at, «all opening inthe ystam te closed to evo tat it ray penal nto the neuaton sytem, «the eosin protecton system hes been sopllad and i scented, + the surfaces tbe insisted ae clean addy, tee of grease, salt depos, cil and 3.13 tngpestion de Inspecons shal be card out on mses and eppleatlons during all execution f the works to ensure compliance wih the specications and precedes, a ald down nthe TP Bofrohand shal be eslblshed the steps in which the raulaion ystom chal be applied and which pase can be started ser prov Lethe holiness point 3146 ital ingpecton and ‘Aer completion of the insulation system or sections therect, al pares involved shall contuct a fal Inspection. Tho application shal be inspected to determine thatthe Insulation sof pepe thickness Hihting Commisse Toate Nederlandse Industrie a2 42 uaity Control of neulation Systems pues paged ott and thats mater, worimanehp en teisbes meet the specticatons ‘The reulaton contacor sal be kept responsble fe the parermance f insulation systems lhe ‘wareny period has expired, Damages sa be repaid by the insulatenconractor. Damages by ‘thc patos sha be reporid to the ping ‘Alor sarap, te therm performance ofthe het inelaton systems shal be verfled by messuring tne surface temparsture or by infer suneys. Cold inelton stam shall be subjcted to Inermegraptic surveys between 2-8 months afr inl startup to Went define DN 230 ‘Above ON 250 pe seston, svalable, ae permite CS shanotoe app ina damp envzonrant rin combination wih ow process tenperatires INSTALLATION General ‘The gonaalrequkerente for thelnaualon a hat ping and equipment (CINI1.3.01) are eppleabe. ‘The pipe eetons and sopment eal ft >roparty aound the pip, forge, ngs and around the sels ard tons ofeqursment To get a cosed ington aysam ie longline! ts a bo staggered (setches bond), ‘The ont sabe prope cbse For piping and equpmentwit temperatures higher than 300°C atleast we layers stallbe opted tha ave tn cicunfeent ns shal be ssggere, An ova of stless 189 mm belvesn tha jini nal be sppled Al sections, abs and segments shal be supped a acon peetomed pats ‘ey drags sabe pare hg cls scale coment. necsrarca Wath ne omant supterinstucions. ‘At hortzenta piping expansion ons stl be appt in every ots, intermediate and sce ‘Foulton lyon Trowel shall be lad vp with comgrosbed woo Se olowe Temperature] Expansion a "c Joint ever, 20 om 3360. 60 35m rs oral oecteaton N24 hr $650.. 1000] 20m ‘Aveta piping and equipment expansionjons shal be ite rect below te suppor. ‘Athorizontal equipment expansion joins shallbe provid in over oui, intrest, and ‘nate nesaion layer Thats ots shal be aed wih compressea wodl as Tempgatre] — Eagan a joint every 3.80 5am Ee a enero (ecteson N24 NI 3660, 1000[ 10m Bends, reducer, T- pices ee shat be inausled wih petomedinsuaton sectors or Stores ofthe somesnasaton motel di 219 2a 2as 232 a 22 gna .a42 Instaatoninsacions erro inaaion oft poaines and equipment 0110.01 Calcium silicate (CS) bad Syme Fiangos ad tings sallbe insulate wit pip sectons ana or sogents mae of te ame Iratetis a the ping inealaton. Thove mesation bones calle es over the corectea ne Insulation vera Setanc hat atest equalto te hciness othe pipe usin, Wiha rnenum 50mm, se CIN. 18 ‘Support of the Insulation Forsuppotol he aulaon andor nihing se CIN. 3 28, Fastening Fo: fastening ofthe inside ineulation sostons and segments on piping sans soe wi shall houses Ever pips section or segment of he inside ny shall be fasten wh las sainlss stot ‘es wih atcknage rm. The beta wr ends eval be preesedinto te insuation For The outside yer silos ste! bards 12 rm (7 x0. mm et. CN22501 par?) shal be ‘Ths bands shall be paced at 00 mm nerve, with aminimum of? bands pr poe secon or segment sch als or segment on equpment shel bo fstened wh at east 2 sans seal bands. For ‘hina ayer stamiee see bande ofmin. f2mm (2) 08 mm shal be used For the ‘use yer bande ofmin. 18 0c) x0:5mn shale wed, Bande shal be placed at 00 mn ava, with at eat 2 bands pe ib or segment FINISHING Clem lial nun shal ba tise ren appvng aluminium lig tis sheeting shal be lined ats inside wit pete Fimer some cong, lb prevent e sharin saaaing rom bsg atackod by caleum sista ‘eomponents S mitts nication stucsns arth insuiston efor ppelos ensequpmant $041 i801 Polyethylene foam tubing (PEF) went 12 24 2a4 216 22 2a 2as crmtas4 = asian natucions forthe suena hetppalresancequpment S041 i091 int Bod tant Vermiculite (ve) MATERIAL, KIND OF INSULATION: Vermiclite 20°. 1000%, ‘Vermictepipe actions, be and segments shall ben accordance wih CINI 26.0. Pipe sections fo appcaton <0 250. Segre for apphcaton » DN 280. ‘Above ON 250 fps sections, ¥ avaible, oe permite INSTALLATION General The geereqerens Sr neinon ott aig ansequene NI. 301) ae ‘The pips setons and segments shal be shaped such hat fey propery arouns te pipe, flanges, tings and curd the sels and forts tequement Ta gets coves wun stern thei shale staggered wth an Overy af aaa! 150 em. The hal propery oces Forging ara equement with emperaures higher then S00 a ial we yore shat bo pple {inal case tne ints sal be sisqgeed beth naa andin ail drecon an overlap of at Icaet 150mm stalloecoterea orbs ps ‘Al octon and segments shall te supplied as factory-profomed cynical pats ‘ay damage sate repaes wih © an Medan coment in accordance wih he vermiclte ‘Stppterstetons. _Ahorizent piping and squemont expansion jin stele proved in every oid, ‘Stomedate Sra ste layer! neuaion Thess ors salle les up wih oreressed woot ongue! eyua SS me | mmaacncmanen th vercal piping ané equipment expansion joins stab ited rect below the suppor. Bend, reducer, T-plces shale slated ty reans of preformed insulation sections. or ‘Segnents ofthe sare neuatin materia anges on tng ahi be nate wih pe acon an or scgete adel the came Traterals as the ping Inston “The fange austen shale tad over the connected pip nslaion ovr a stance tat i a Tenet equal tothe ckess of he pe nsuiston wih amiimum of Som, see CIN 418 ‘Supporting of the insulation Fovtuppoto! te ult endo fishing se CIN +523 Fastening For fastening of tho sis ncustion coctons and eogrments stances! wire shal bo ues. Every igs secton or sogmort fhe rsd aye sal be fastened wih) at ast 3 stiles steal ‘ied who hcknes of mn. The wistd whe an allo resed ines eulaton or Ue outse layer sales steal bards mn, 12m (2) x0.S rn ret CIM 225.01 p21) ios used Bands shal be pacod at 300 miners, wital leat 2 bande er ip Soaton or segment FINISHING “The verre oallon sh be ished.

You might also like