100% found this document useful (1 vote)
419 views

Application Form For Inter-Connection

This document is an application form for interconnecting a renewable energy facility to the MERALCO distribution grid. It requests information such as the owner's name and address, contact information, facility address, equipment details including the number of units, manufacturer, type, fuel source, power ratings, voltage, frequency, and expected energization date. It also asks whether the facility plans to export power and if so, the maximum expected amount. Diagrams and modeling values from the manufacturer are required. The completed form will allow the utility to effectively evaluate the proposed interconnection.

Uploaded by

Dennis Fiel
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
419 views

Application Form For Inter-Connection

This document is an application form for interconnecting a renewable energy facility to the MERALCO distribution grid. It requests information such as the owner's name and address, contact information, facility address, equipment details including the number of units, manufacturer, type, fuel source, power ratings, voltage, frequency, and expected energization date. It also asks whether the facility plans to export power and if so, the maximum expected amount. Diagrams and modeling values from the manufacturer are required. The completed form will allow the utility to effectively evaluate the proposed interconnection.

Uploaded by

Dennis Fiel
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Application Form for Inter-connection of Renewable Energy Facility

to the MERALCO Distribution Grid

Name: Name of Owner


Address: Address of Owner

Contact Person: Contact Name of Person to Assist in Net Metering

Telephone Number: Contact of Person to Assist in Net Metering

Service Point Address:

Information Prepared and Submitted by (Name and Address):

Signature: Owner Name & Signature

All applicable items must be accurately completed in order that facilities may be effectively evaluated by
the Company for interconnection with the utility system.

GENERATING FACILITY
No. of Units: 1

Manufacturer: Deye

Type (Synchronous/Induction/Inverter): Inverter


Fuel Source Type (Solar, Biogas, Wind, etc.): Solar

kW Rating (95F at location) 8Kw

Kilovolt-Ampere Rating (95F at location): 0.34KVA

Power factor: 0.8 leading to 0.8 lagging

Voltage rating: 230V

Ampere Rating:
15.1A

Number of Phases: 1 Phase

Frequency: 50/60 Hz

Yes Yes ______ No


Do you plan to export power: ______
50%
If yes, maximum amount expected ___________

Pre-Certification label or Type Number: 2620/0211-E1-CER

Expected Energizing and Start-up Date: ASAP

Normal Operation of Interconnection (examples: provide power to meet base load, demand
management, stand-by, back-up, others (please describe):

YES
One-line diagram attached? _____ Yes

YES Yes (Note that answer


Has the Manufacturer supplied its dynamic modelling values to the DU? _____
here requires “Yes” for complete application. For Pre-certified Equipment, answer is Yes.)

YES
Layout sketch showing lockable, “visible” disconnect device. _______ Yes

Company ---------------------------------------------------------- Customer Name


Wextrends ICT & Solar Solutions OPC (Customer Name)
By: _____________________________ By: _____________________________

Title: _____________________________ Title: _____________________________


05/04/2023
Date: _____________________________ Date: _____________________________

You might also like