Application Form For Inter-Connection
Application Form For Inter-Connection
All applicable items must be accurately completed in order that facilities may be effectively evaluated by
the Company for interconnection with the utility system.
GENERATING FACILITY
No. of Units: 1
Manufacturer: Deye
Ampere Rating:
15.1A
Frequency: 50/60 Hz
Normal Operation of Interconnection (examples: provide power to meet base load, demand
management, stand-by, back-up, others (please describe):
YES
One-line diagram attached? _____ Yes
YES
Layout sketch showing lockable, “visible” disconnect device. _______ Yes