Method Statement For Providing Pipe Sleeve Opening On R.C. Beam
Method Statement For Providing Pipe Sleeve Opening On R.C. Beam
Berkembar 2 Tingkat Dan 3 Tingkat Yang Mengandungi: − (A) 17 Unit 2 Tingkat Jenis A Di No
2, 6, 10, 11, 14, 15, 18, 19, 22, 26 Jalan U17/18E, Di No 2, 6, 10, 14, 18, 22, 26 Jalan
U17/18F; (B) 17 Unit 2 Tingkat Jenis A (M) Di No 4, 8, 9, 12, 13, 16, 17, 20, 24, 28 Jalan
U17/18E, Di No 4, 8, 12, 16, 20, 24, 28 Jalan U17/18F; (C) 15 Unit 3 Tingkat Jenis B Di No 3,
7, 11, 15, 19, 23, 27, 31 Jalan U17/18F, Di No 3, 7, 11, 15, 19, 23, 27 Jalan U17/18G; (D) 15
Unit 3 Tingkat Jenis B (M) Di No 1, 5, 9, 13, 17, 21, 25, 29 Jalan U17/18f, Di No 1, 5, 9, 13,
17, 21, 25 Jalan U17/18G Di Atas Lot PT 50681-50686 Dan Lot PT 50689-50746 (Di Atas
Sebahagian Lot 85632), Seksyen U17, 40160 Shah Alam, Selangor Darul Ehsan Untuk Tetuan
Unik Sejati Sdn. Bhd.
▪ Pipe sleeve (maximum 150mm Ø ) is placed in between links and steel bars
steel bar
link link
steel bar
▪ Additional rebars, T16 are added around the opening as per RC drawing, Standard Details
− 1 (ARSB-1716-STD-DTL-01-R/00) before casting of beam.