Risk Assessment Table New Version

This 3 sentence summary provides an overview of the key details from the Huawei Hazard Identification & Risk Assessment Form: The form collects information about a site location such as the city, region, temperature, and political stability to assess potential hazards and risks for a team leader and members traveling to and working at the site for a specified duration and return time. It identifies 12 categories of potential hazards including site security, weather conditions, machinery, biological hazards from insects or animals, and assigns each a severity, likelihood of occurrence, and priority level for risk control measures.

Uploaded by

Mustafa Syed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views4 pages

Risk Assessment Table New Version

This 3 sentence summary provides an overview of the key details from the Huawei Hazard Identification & Risk Assessment Form: The form collects information about a site location such as the city, region, temperature, and political stability to assess potential hazards and risks for a team leader and members traveling to and working at the site for a specified duration and return time. It identifies 12 categories of potential hazards including site security, weather conditions, machinery, biological hazards from insects or animals, and assigns each a severity, likelihood of occurrence, and priority level for risk control measures.

Uploaded by

Mustafa Syed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Huawei Hazard Identification & Risk Assessment Form

Site ID: Site location City: Region location : 0 East ;


Temperature degree: Team leader name and Permit ID No:
Team member No: How far to site:
Date/Month / Year: Weather forecast:
Departure Time: Operation Duration: hours Return time:
Site landform: Target city political situation
0Urban 0Suburbs 0Desert 0Mountain 0No risk 0Religious sensitive 0 Violence Terrorist attack/War zoon
Severity Likelihood Priority (Results
Death/Major injury or major damage to
A
property or equipment
1 Likely to occur A1/A2/B1

Reportable injury (I.e. Over 3 days


B absence) or damage to property or 2 Possible to occur A3/B2/C1
equipment

Minor injury or minor damage to


C
property or equipment
3 Slight chance of occurring B3/C2/C3

hazard category EHS Risk EHS evaluation


1 Site security and journey to site.
2 EX. War zone - desert area - mountain area - bad
roads etc…..
3
4 Eegonomic hazards.
5 EX. Weather tempreture , work at night, wind
speed ,…
6
7 opertion physical hazaeds.
8 EX. Machinery (cranes – cutting tools ,….)
9
10 Bilogical hazards.
11 EX. insect bites – wild birds / animals – snakes
etc…..
Bilogical hazards.
EX. insect bites – wild birds / animals – snakes
etc…..
12

Remark:
sment Form

cation : 0 East ; 0 South ; 0 West a; 0 North ; 0 C entral

me:

t attack/War zoon
Priority (Results)
Unacceptable, Stop the work, immediate action to
reduce the risk, apply more control

Urgent attention to reduce risk

Attention is required , Frequent review to ensure risk is


controlled
Risk Control measures