Sr. Survey-Engineer (High-way) Subrata Mallick Vill.-Mahesh danga Colony P.O.-Mahesh danga P.S.-Memari Dist.- Burdwan, PIN-713151.(W.B.) 07679441625 (Permanent) 08305156757 (Present,) [email protected] 15th December, 1976 Indian
CONTACT NO.
: : :
KEY QUALIFICATION : Has more than 11 years experience in the various construction fields. Also, experience in dealing with Clients and Consultants regarding various Contractual matters and preparation / finalization of contractors monthly RA Bill. ACADEMIC QUALIFICATION :
College/University
WB Industrial Training Institute, Hoogly WBCHSE WBBSE
Year of passing
2000 1998 1992
IBMS
Diploma in Civil
2010
EXTRA QUALIFICATION :
Sheet 2 of 5
Knowledge in Computer (MICROSOFT EXEL , WORD, & AUTOCAD 2007) . Total Station : Sokkia (Model No- 220R, 500, 610 , SET-2X & SET-1X)
RELEVANT ASSIGNMENTS :
Asst.Surveyor
Development of State High way In The State of Sikkim Packege No 08B. Sikkim { From Km 42 +000 To 93 +860 } CPWD Sikkim Under{RSVY} Development of National High way In The NHAI of NH-2 Package from Panagar to Palsit. West Bengal Corridor Development Project (ADB Loan No. 1870-IND) under State highway & Rural Access Road Component, Contract Package No. F-RAR/IV, Improvement of Gazzol-Hilli Road (SH-10) West Bengal Corridor Development Project (ADB Loan No. 1870-IND) under State highway & Rural Access Road Component, Contract Package No. F-RAR/IV, Improvement of KampaBarjaguli & Chackdah-Bangaon Road (SH-1) West Bengal Corridor Development Project (ADB Loan No. 1870-IND) under State highway & Rural Access Road Component, Contract Package No. F-RAR/VII, Improvement of Mira-Kaligang Road West Bengal Corridor Development Project (ADB Loan No. 1870-IND) under State highway & Rural Access Road Component, Contract Package No. F-RAR/VII, Improvement of Jirat-Habra Road High Speed Coal Conveyor for 6X660 MW Sasan Ultra Mega Power Project Limited.
Bhadurgang,Kishangang, Sikkim.
Juniour Surveyor
Febuary-2001 August-2003
Surveyor
Surveyor
Sr. Surveyor
Sr. Surveyor
Sr. Surveyor
Sasan,Singrali,M.P.
Sheet 3 of 5
: :
Sr. Surveyor Madhya Pradesh Corridor Development Project under High Speed Coal Conveyor 6x660 MW Sasan Ultra Mega Power Project Limited. . Client : RELIANCE INFRASTRUCTURE LIMITED.
Responsible for Traversing, TBM Fixing, Alignment making, retaining wall layout, layout of culvert & bridges, setting out of transition curves as per design specification, preparation of survey reports, verification of layouts etc. Checking and finalizing of working cross section.
: :
Sr. Surveyor West Bengal Corridor Development Project (ADB Loan No. 1870IND) under State highway & Rural Access Road Component, Contract Package No. F-RAR/VII, Improvement of Jirat-Habra Road . Client : PWD Consultant : CES
Responsible for Traversing, TBM Fixing, Alignment making, retaining wall layout, layout of culvert & bridges, setting out of transition curves as per design specification, preparation of survey reports, verification of layouts etc. Checking and finalizing of working cross section. FROM :JULY 2007 TO MAY 2009 EMPLOYER : M.K.Gupta & ABHUDHAY HOUSING Co. (JV) Sr. Surveyor : West Bengal Corridor Development Project (ADB Loan No. 1870-
Sheet 4 of 5 IND) under State highway & Rural Access Road Component, Contract Package No. F-RAR/VII, Improvement of Mira-Kaligang Road . Client : PWD Consultant : CES
Responsible for Traversing, TBM Fixing, Alignment making, retaining wall layout, layout of culvert & bridges, setting out of transition curves as per design specification, preparation of survey reports, verification of layouts etc. Checking and finalizing of working cross section. FROM MARCH 2006 TO JUNE 2007 EMPLOYER : : COAL MINS ASSOCIET TRADERS. Surveyor
: West Bengal Corridor Development Project (ADB Loan No. 1870IND) under State highway & Rural Access Road Component, Contract Package No. F-RAR/IV, Improvement of Kampa-Jaguli & Chackdah-Bangaon Road . Client : PWD. Consultant : CES
FROM SEPTEMBER 2003 TO FEBRUARY 2006 EMPLOYER : : : Mc NALLY BHARAT Eng. LTD. Surveyor West Bengal Corridor Development Project (ADB Loan No. 1870IND) under State highway & Rural Access Road Component, Contract Package No. E, Improvement of Gazzole-Hilli Road . Client : PWD. Consultant : CES
Name : Subrata Mallick EMPLOYER : : : Mc NALLY BHARAT Eng. LTD. Junior Surveyor
Sheet 5 of 5
Development of National High way In The NHAI of NH-2 Package from Panagar to Palsit. . Client : NHAI. Consultant : LASA.
FROM MARCH 2000 TO JANUARY 2001 EMPLOYER : : Sikkim PMGSY Phase - VI Asst. Surveyor Collection of Survey data & Lay out done in following condition : Entry point map with reference point and Bench Mark. Traverse along C/L of proposed road maintaining permissible gradient. Take spot levels only along C/L of proposed road. 3 number spot levels required at every 25 meter interval at straight portions or less (10 meter interval) at curve locations. Make reference point at every 200 meter interval.
CERTIFICATION : I, the undersigned, certify that, to the best of my knowledge and belief, this bio-data correctly describes myself, my qualifications and experience. Date : Place : (SUBRATA MALLICK)