Bill of Quantities: Fire Suppression Services

This document provides a bill of quantities for fire suppression services for LUMHS Hospital. It lists 21 line items with descriptions of materials, labor rates, quantities, and total costs. The main components include fire hose cabinets, roof manifolds, pipes in various diameters, fire extinguishers, a fire pump set, control panels, and electrical works for power and monitoring. The total cost covers supply, installation, testing and commissioning of the fire suppression system as per specifications and consultant instructions.

Uploaded by

Noting
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views

Bill of Quantities: Fire Suppression Services

This document provides a bill of quantities for fire suppression services for LUMHS Hospital. It lists 21 line items with descriptions of materials, labor rates, quantities, and total costs. The main components include fire hose cabinets, roof manifolds, pipes in various diameters, fire extinguishers, a fire pump set, control panels, and electrical works for power and monitoring. The total cost covers supply, installation, testing and commissioning of the fire suppression system as per specifications and consultant instructions.

Uploaded by

Noting
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Bill of Quantities

Fire Suppression Services

LUMHS Hospital Rev.02


C7MC+692, Jamshoro-Sindh Date: 12-10-2022

Material Labour Total


S.No. Description Unit Qty
Rate Amount Rate Amount Amount
FIRE FIGHTING SERVICES
Supply, installation, testing & commissioning of fire
suppression system including all equipment, pipe works
and accessories ready to operate as per specifications,
drawings and instructions of consultants.
1 Fire hose cabinet double height 800 x 1500 x 350 mm,
stainless steel front, powder coated back including 25 dia x
30 metres. rubber hose reel, nozzle guide, lock shield
valve, pressure regulating valve (minimum pressure 4.5
bar) automatic operation 180 deg. swing type, with 65 mm
dia size landing valve, 2-fire extinguishers as shown on
i. Type FHC-LV Nos. 14
2 Fire hose cabinet size 1050 x 900 x 300 mm for spare
hose pipes including 4 Nos. 65 mm x 30 meters. synthetic
hose pipe, jet/spray/fog nozzle with aluminum
instantaneous coupling, 2-Nos. fire blanket 1500 mm X
1500 mm, fireman's axe, 2-pairs of fire proof gloves, front
breakable glass, lock and all other accessories as
specified, complete in all respects as per drawings,
i. specified.
Type FHC-S No. 1
3 2-ways roof manifold, 2 x 65 mm size outlet with hydrant
valve and quick connection blank cap with chain, 100 mm
size inlet connection, complete in all respects ready to Nos. 2
4 operate.
Fire department breeching connection 2 ways as per BSS
5041-3 including cabinet with breakable glass, SS frame &
drain plug. No. 1

SEM Engineers Page 1 of 4


Bill of Quantities
Fire Suppression Services

LUMHS Hospital Rev.02


C7MC+692, Jamshoro-Sindh Date: 12-10-2022

Material Labour Total


S.No. Description Unit Qty
Rate Amount Rate Amount Amount
5 MS Sch-40 seamless pipes including all specials fittings UL
listed & FM approved, threaded, welded joints, flexible
pipe, flanges, coupling, masking plates, bends, tees,
clamps, supports and hangers, sleeves, masking plates
chiseling, cutting holes, making good where required,
painting and protection treatment etc. Complete in all
i. Dia 32 mm (Threaded fitting) Rm. 20
ii. Dia 65 mm (Welded joints fitting) Rm. 20
iii. Dia 100 mm (Welded joints fitting) Rm. 80
iv. Dia 150 mm (Welded joints fitting) Rm. 6
6 Polyethylene (HDPE) PN-16 (SDR-11) pipes with thrust
block and molded fittings with butt fusion joint along with all
type of tees, bends, elbows, sockets, flanges, clamps,
making holes making good, excavation, dewatering
bedding with sand, backfilling as required complete in all
respect (pump discharge).
i. Dia OD 125 mm Rm. 110
ii. Dia OD 200 mm Rm. 140
7 Fire extinguishers with fixing accessories.
i. Type Class A, B & C FX-1 (6 Litres. Water Mist) Nos. 26
ii. Type Class B & C FX-3 (5 Kg. CO2 Carbon Dioxide Gas) Nos. 26
8 Alarm Check valve assembly with alarm gong, pipe work
and retard chamber.
i. Size. 150 mm No. 1
Automatic air relief valve, 25 mm connection with gate
9
valve. Nos. 4
10 Float Switch for low water level cut off. No. 1
11 Anti vortex suction plate for 150 mm dia. suction pipe. No. 1

SEM Engineers Page 2 of 4


Bill of Quantities
Fire Suppression Services

LUMHS Hospital Rev.02


C7MC+692, Jamshoro-Sindh Date: 12-10-2022

Material Labour Total


S.No. Description Unit Qty
Rate Amount Rate Amount Amount
12 Flow meter 150 mm dia. No. 1
13 OS & Y gate valve with matching flanges and tempering
switch.
i. Size. 100 mm No. 1
ii. Size. 150 mm Nos. 3
14 C.I body Globe valve with matching flanges.
i. Size. 150 mm No. 1
15 C.I body Check valve with matching flanges.
i. Size. 100 mm No. 1
16 Construction of CC valve chambers with material
including, excavation, base top, Rcc pipe, Rcc slab and CI
cover with frame, complete in all respects. (SR cement
shall be used).
i. Size. 1200 x 1200 mm No. 1
17 Fire Pump Set 500 gpm @ 10 bar comprising of 1 No.
multistage in line Jockey Pump + 1 No. main end suction
pump with electrical motor including pump controllers
mounted on common MS skid, inter connecting pipes,
wiring, OS&Y valve, check valves and all accessories as
per requirement of NFPA 20, drawings and engineer
instruction. Set. 1
18 Supervisory Fire Control Panel for sensing and monitoring
of flow and monitoring OS&Y valves switching with true
alarm including batteries and charger. Job. 1
19 MS insulated Diesel Engine Flue pipe up to outside the
building as per Consultant's approval. Job. 1

SEM Engineers Page 3 of 4


Bill of Quantities
Fire Suppression Services

LUMHS Hospital Rev.02


C7MC+692, Jamshoro-Sindh Date: 12-10-2022

Material Labour Total


S.No. Description Unit Qty
Rate Amount Rate Amount Amount
20 Allied electrical work including power cables to pumps
motors, control cables and wires from sensing monitoring
and indicating devices and switches to Electrical Control
Panel and Fire Control Panel and supervisory switch
including GI/PVC conduits and tray, termination, luxes and
all accessories complete in all respects.
Note: Contractor shall perform allied electrical works within the pump
room. Power to the pump room shall be provided by the client. Job. 1
21 Supply & installation of fire stop material (for passive fire
fighting / smoke barrier) in all openings and penetrations,
either in slab or wall, complete in all respects, ready to
operate as per fire stopper recommended material, and as
per instruction of Consultant. Job. 1
22 Making of As-Built & Shop Drawings on AutoCAD 2018 or
latest version with sectional details complete in all respects
as per instructions of consultant. Job. 1
23 Painting, identification and tagging to the installations and
equipments. Job. 1
24 Flushing of entire fire pipe work according to (NFPA-13). Job. 1
25 Testing, and commissioning of entire fire fighting
installation as per Consultant's approval. Job. 1
Total Cost of Fire Suppression Services Rs.

Note:
1) Contractor is instructed to visit the site, understand the nature of work & then fill the rates accordingly and submit the
quotation. No argument and discussion will be entertained after awarding of work.
2) Miscellaneous work which was not included in BOQ but necessary to complete the project in all respects and ready to
operate as per instructions of Consultant. (Bidder should mentioned the type of works).