Projects

This document contains a project log with details on various projects including Madina Schools, Pathology, Tiba Restaurant, Rajhy buildings. It lists project names, details of work, locations, dates and notes. Key projects mentioned include revisions to BOQs and quotations for Madina Schools, purchase orders for earth works, lighting and utilities at Pathology, and quotations for first and second fix works at Tiba Restaurant and Rajhy buildings in Khobar and Narges.

Uploaded by

eng/Ahmed Moharm
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views

Projects

This document contains a project log with details on various projects including Madina Schools, Pathology, Tiba Restaurant, Rajhy buildings. It lists project names, details of work, locations, dates and notes. Key projects mentioned include revisions to BOQs and quotations for Madina Schools, purchase orders for earth works, lighting and utilities at Pathology, and quotations for first and second fix works at Tiba Restaurant and Rajhy buildings in Khobar and Narges.

Uploaded by

eng/Ahmed Moharm
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

date in project name details location date out note

1/Jan/23 Pathology PO for earth & lightning 2-PATHOLOGGY\MR 2/Jan/23


2/Jan/23 Pathology PO for AHU cabels 2-PATHOLOGGY\Power for Exhaust Fans 3/Jan/23
3/Jan/23 Pathology PO for utility wires 2-PATHOLOGGY\utility wires 4/Jan/23
3/Jan/23 madina schools PO for lighting fixtures 1-MADINA SCHOOLS\Q.S From Shop Drawings-modified waiting karrim for new item
4/Jan/23 tiba restaurant qs for 1st &2nd fix or restaurant 3-Tiba resturant\1st&2nd fix qs 4/Jan/23
5/Jan/23 madina schools Revised BOQ as per shopdrawings 1-MADINA SCHOOLS\revised BOQ
11/1/2023 madina shcools qs for cables thamad 1-MADINA SCHOOLS\2022.09.15\03.SITE LAYOUT\18 11/1/2023
12/1/2023 madina shcools qs for cables madina 28 1-MADINA SCHOOLS\2022.09.15\03.SITE LAYOUT\28 12/1/2023
14/1/2023 ‫ طلب‬revised boq (‫)اــلمناقلهـ‬ 1-MADINA SCHOOLS\revised BOQ 14/1/2023
14/1/2023 madina shcools PR for earthing (karrim) 1-MADINA SCHOOLS\PO\Earthing(karrim) EDITED AND RESENT
15/1/2023 madina shcools Ac Roof power 1-MADINA SCHOOLS\2022.09.15\roof-28-acpower-sld-FAS 15/1/2023
16/1/2023 rajhy-sadah V.O for data system AL-Rajhi AL-Sadah\DATA V.O 16/1/2023 wait for bahnawy edit
16/1/2023 rajhy-narges rev 1 on po for lighting ‫الراجحي النرجس‬ HOLD
19/1/2023 rajhy-khobar qs from tender Y022-072 - RAJHI OFFICE BUILDING - KHOBAR\qs from tender 19/1/2023
21/1/2023 rajhy-khobar 1ST FIX QS Y022-072 - RAJHI OFFICE BUILDING - KHOBAR\qs from tender 21/1/2023
21/1/2023 madina shcools PR FOR SITE CONDUITS 1-MADINA SCHOOLS\PR\SITE CONDUITS 21/1/2023 EDITED AND RESENT
22/1/2023 tiba corridors pr for FAS for corridors TIBA CORRIDORS 22/1/2023
23/1/2023 madina shcools project summary Z:\00-For All\13-Planning Department\01-PROJECTS\09. Scope Control\00. Projects Overall Status, Master Sheets\Y021-136, Overall Status, Madinah
23/1/2023 HOLIDAY INN 1ST FIX QS H IN
24/1/2023 madina shcools lightning qs for 28 school ROOF
24/1/2023 madina shcools pending mr for project Z:\00-For All\13-Planning Department\01-PROJECTS\09. Scope Control\00. Projects Overall Status, Master Sheets\Y021-136, Overall Status, Madinah
24/1/2023 pathology project summary Z:\00-For All\13-Planning Department\01-PROJECTS\09. Scope Control\00. Projects Overall Status, Master Sheets\Y018-021, Project Overall Status, Pathology
24/1/2023 tiba project summary Z:\00-For All\13-Planning Department\01-PROJECTS\09. Scope Control\00. Projects Overall Status, Master Sheets\Y021-201, Overall Status, Taiba
25/1/2023 rajhy-narjis project summary Z:\00-For All\13-Planning Department\01-PROJECTS\09. Scope Control\00. Projects Overall Status, Master Sheets\Y021-211, Overall Status, Al-Narjis
25/1/2023 madina shcools pr for public adress 1-MADINA SCHOOLS\PR\PA ‫ ال يوجد‬raiser diaqgram
29/1/2023 HOLIDAY INN pr for cctv H IN\PR\cctv
29/1/2023 rajhy-narges pr for cable tray ‫الراجحي النرجس‬pr \pr
29//1/2023 madina shcools qs for tray and conduits Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS\Q.S From Shop Drawings -modified \Main‫مواد‬ Building
‫التأسيس\ مسودة‬
30/1/2023 amala qs for first and second fix Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\amalaa\QS
30/1/2023 rajhy-narjis pr for cable tray ‫الراجحي النرجس‬pr \pr
30/1/2023 madina shcools qs for tray and conduits Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS\Q.S From Shop Drawings -modified \Main‫مواد‬ Building
‫التأسيس\ مسودة‬
1/2/2023 madina shcools qs for non approved dwg 1-MADINA SCHOOLS\not approved.xlsx
1/2/2023 correction log correction log for pr all month Z:\00-For All\13-Planning Department\01-PROJECTS\07. PCs Logs\Corrective Actions Log\Corrective Actions Log, Master Sheet, 2023 (MEP).xlsx
1/2/2023 madina shcools new and replaced items Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS\New and Replaced Items (Madina &Thmad) Schools
2/2/2023 correction log correction log for pr all month Z:\00-For All\13-Planning Department\01-PROJECTS\07. PCs Logs\Corrective Actions Log\Corrective Actions Log, Master Sheet, 2023 (MEP).xlsx
2/2/2023 HOLIDAY INN pr for data systems H IN\PR\‫الداتا‬
4/2/2023 HOLIDAY INN pr for data systems H IN\PR\‫اــلداتا‬
4/2/2023 madina shcools qs for AC wires 1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Main‫مواد‬ Building
‫التأسيس\ مسودة‬
4/2/2023 rajhy-narjis pr for cables and MDB ‫النرجس‬ ‫الراجحي‬prCables
\pr\Cabl es
5/2/2023 madina shcools qs for LC Cables at site 1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Main Building
5/2/2023 correction log correction log for data pr‫هوليداي‬ Z:\00-For All\13-Planning Department\01-PROJECTS\07. PCs Logs\Corrective Actions Log\Corrective Actions Log, Master Sheet, 2023 (MEP).xlsx
5/2/2023 rajhy-narjis pr for cables and MDB ‫النرجس‬ ‫الراجحي‬prCables
\pr\Cabl es
6/2/2023 madina shcools qs for lightning Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Main Building\QS FOR LIGHTNING-30.xlsx
6/2/2023 tiba 4 $ ‫ مستخلص‬Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\TIBA CORRIDORS ‫الباطن\ مقاولين‬
6/2/2023 look ahead update for narjes
6/2/2023 look ahead update for saddah
8/2/2023 HOLIDAY INN VO H IN\VO for lights and cams
9/2/2023 madina shcools qs for old tray in roof 28 1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Main‫مواد‬ Building
‫التأسيس\ مسودة‬
9/2/2023 madina shcools PR FOR PANELS 1-MADINA SCHOOLS\PR\panel boards
9/2/2023 madina shcools MODIFY REVISED BOQ
12/2/2023 madina shcools PR FOR PANELS 1-MADINA SCHOOLS\PR\panel boards
12/2/2023 madina shcools PR FOR tray roof 1-MADINA SCHOOLS\PR\tray roof
12/2/2023 madina shcools MODIFY REVISED BOQ 1-MADINA SCHOOLS ‫النهائي\الحصر‬
13/2/2023 madina shcools MODIFY REVISED BOQ 1-MADINA SCHOOLS ‫النهائي\الحصر‬
13/2/2023 amala MODIFY METHOD OF STATEMENTS Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\amalaa\mos ‫تم تعديل التنسيق‬
13/2/2023 madina shcools PR FOR ROOF CONDUITS + Remain 1-
‫مواسير‬
MADINA
‫استكمال‬SCHOOLS
+ ‫مواسير السطح‬
\PR\‫المباني‬
18/2/2023 madina shcools qs for lightning Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Main Building\QS FOR LIGHTNING-30.xlsx
18/2/2023 madina shcools MODIFY REVISED BOQ
18/2/2023 TBC office creating mos Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\TBC Offices\mos
21/2/2023 madina shcools pr for lightning 1-MADINA SCHOOLS\PR\lightning
22/2/2023 TBC office creating ITP Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\TBC Offices\mos
22/2/2023 madina shcools pr for lightning 1-MADINA SCHOOLS\PR\lightning
23/2/2023 madina shcools create letter for ac control box 1-MADINA SCHOOLS\samman requirements for AC control Box.docx
23/2/2023 TBC office creating ITP Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\TBC Offices\mos
25/2/2023 hilton double tree pr for led profile hilton double tree\pr
25/2/2023 madina shcools modifing qs for f14 with wx1 1-MADINA SCHOOLS ‫الحصر‬madinaelecTNEWFORMMAINBUILDINGT‫تركيباتاإلــــنارة‬
\ma
\‫النهائي‬
dinaelec\T05-28 NEW FORM \M AIN BUILDING 2 (T 05 28)\1187 -‫رة‬ ‫ا‬‫لإن‬‫تا‬ ‫ركيبا‬
‫ت‬ ‫ تم تعديل الطلب لرقم‬ver02
26/2/2023 madina shcools modify letter for ac control box to include capacitor 1-MADINA SCHOOLS\samman requirements for AC control Box.docx
26/2/2023 HOLIDAY INN VO H IN\VO for lights and cams
26/2/2023 pathology pr for panel boards
27/2/2023 madina shcools modify qs for A1-A2 1-MADINA SCHOOLS ‫الحصر‬madinaelec
\ma
\‫النهائي‬
dinaelec
27/2/2023 fitness irqaa creating operation maniual Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\OPERATION MANUALS ‫متوقفين على المعماري‬
27/2/2023 madina shcools project summary Z:\00-For All\13-Planning Department\01-PROJECTS\09. Scope Control\00. Projects Overall Status, Master Sheets\Y021-136, Overall Status, Madinah
28/2/2023 fitness irqaa creating operation maniual Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\OPERATION MANUALS
28/2/2023 PROJECT SUMMARY project summary
1/3/2023 amaala days work Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\amalaa\day work
1/3/2023 madina shcools ecodial calculation D:\A.M\1-MADINA SCHOOLS\SC calc
5/3/20223 madina shcools wires qs 1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Main Building\Madina Schools - wires.xlsx ‫تم االرسال لكارم‬
5/3/20223 HOLIDAY INN pr for spot lighting remainig H IN\PR\spot light
8/3/2023 taiba hotel ‫ نموذج استثناء لطلب شراء منظومة الحريق‬TIBA CORRIDORS\‫استثناء‬
8/3/2023 amaala pr for 1st fix & snd fix Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\amalaa\pr ‫تم تعليق الطلب لحين اعتماد اسالك االضاءة‬
8/3/2023 amaala pr for lc cables Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\amalaa\pr
8/3/2023 HOLIDAY INN vo for active components for lc H IN\VO\vo for active comp
8/3/2023 madina shcools pr for wires 1-MADINA SCHOOLS\PR\wires for 1st & 2nd
9/3/2023 madina shcools revise qs for power sys 1-MADINA SCHOOLS\karim\Q.S From Shop Drawings-modified
11/3/2023 madina shcools revise qs for power sys 1-MADINA SCHOOLS\karim\Q.S From Shop Drawings-modified
12/3/2023 AMAALA CREATING ITP Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\amalaa\itp
13/3/2023 rajhy-narjis pr for elec ‫النرجس‬ ‫الراجحي‬prNewfolder
\pr\New fol
der
13/3/2023 madina shcools pr for wires 1-MADINA SCHOOLS\PR\wires for 1st & 2nd
14/3/223 hilton double tree pr for ramadan light hilton double tree\pr\ramadan light
14/3/2032 madina shcools coloring qs Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS\‫تلوين‬
15/3/2023 madina shcools pr for wires 1-MADINA SCHOOLS\PR\wires for 1st & 2nd
15/3/2023 madina shcools pr for public adress 1-MADINA SCHOOLS\PR\PA
15/3/2023 tiba 4 $ ‫ مستخلص‬Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\TIBA CORRIDORS
‫الباطن\ مقاولين‬
19/3/2023 madina shcools pr for dissconnect switches 1-MADINA SCHOOLS\PR\dissconnect switch ‫تم االعتماد‬
19/3/2023 magmaa creating mos AL magmaa\mos ‫ ناقص‬matv-pas-cctv-ac
19/3/2023 madina shcools pr for 1st fix loazem 1-MADINA SCHOOLS ‫فليكسبل‬
\PR\‫مواسير‬ ‫تم االعتماد‬
20/3/2023 madina shcools modify pr for dissconnect switches 1-MADINA SCHOOLS\PR\dissconnect switch ‫تم االعتماد واالرسال‬
20/3/2023 amaala pr for 1st&2nd fix for lighting and power amalaa\pr ‫تم االرسال ل م عمرو‬
20/3/2023 magmaa creating mos AL magmaa\mos ‫تم االنتهاء من االعداد‬
20/3/2023 madina shcools pr for data systems 1-MADINA SCHOOLS\PR\data system\new pr ‫تم االرسال ل م عمرو‬
21/3/2023 madina shcools modifing qs for all schools Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS‫النهائي\الحصر‬ ‫تم االرسال لكارم‬
21/3/2023 fitness irqaa creating operation maniual Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\OPERATION MANUALS
22/3/2023 fitness irqaa MODIFING OPERATION MANIUAL irqah
22/3/2023 magmaa creating itp AL magmaa\ITP
22/3/2023 madina shcools modifing qs for all schools Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS‫النهائي\الحصر‬
26/3/2023 fitness irqaa MODIFING OPERATION MANIUAL irqah
26/3/2023 Pathology make exception pathology
‫المولدات\استثناء‬
26/3/2023
30/3/2023 madina schools qs for ancillary wires Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Ancillary Building\Ancillary Second Fix.xlsx
30/3/2023 madina shcools creating pr for remaining wires 1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Main Building\pr for finall wires.xlsx
30/3/2023 fitness irqaa MODIFING OPERATION MANIUAL irqah ‫تم االرسال ل م حمد عاف‬
1/4/2023 madina shcools qs for remainig wires 1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Main Building\pr for finall wires.xlsx
3/4/2023 madina schools actual qs for cables site -building Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\QS FOR CABLES qs modified
4/4/2023 madina shcools compare wiring devices pr with qs ‫مقارنة طلب شراء بالحصر النهائي‬
4/4/2023 madina shcools qs for wiring devices all schools Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Main Building\WIRING DEVICES ‫حصر لجميع االفياش‬
4/4/2023 madina shcools qs for Fire Alarm all schools Z:\00-For All\13-Planning Department\Team members\AHMED MOharam\PROJECTS\1-MADINA SCHOOLS\Q.S From Shop Drawings-modified\Main Building\Fire Alarm