0% found this document useful (0 votes)
63 views

DMS2

This document contains codes and descriptions for various engineering document types. There are over 100 entries listed with a code, description, and abbreviated description for each document type. Common document types include design drawings, reports, procedures, requests, and specifications.

Uploaded by

Ahmed Hany
Copyright
© © All Rights Reserved
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views

DMS2

This document contains codes and descriptions for various engineering document types. There are over 100 entries listed with a code, description, and abbreviated description for each document type. Common document types include design drawings, reports, procedures, requests, and specifications.

Uploaded by

Ahmed Hany
Copyright
© © All Rights Reserved
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 5

x

3DM H_3D Model Review 17 3D Model Review 15 B2X


Col.Engin&ProjMan.
ACT H_Action Plan 13 Action Plan 11 BAM Bank Account Doc
ANR H_Analyses Report 17 Analyses Report 15 BVO Object
Master CH
ARB H_Arbitration 13 Arbitration 11 BVV Contract
ASB H_As Built Drawings 19 As Built Drawings 17 CPT
AUF H_Quality Audit F-Up 20 Quality Audit F-Up 18 D01
Print List
AUR H_Quality Audit Rep. 20 Quality Audit Rep. 18 DBE
Cover Sheet
AUS H_Safety Audit ChLst 20 Safety Audit ChLst 18 DBV
Cover Sheet Template
BAR H_Bar Bending List 18 Bar Bending List 16 DMO Demo
Document
BBQ H_Basic Design Boq 18 Basic Design Boq 16 DRF PRT
Eng/Des. Drawing
BCD H_Basic Drawings 16 Basic Drawings 14 DRW Engin/Des.
Drawing
BCL H_Batch Plant Ch.Lst 20 Batch Plant Ch.Lst 18 EBE
Acknowl. of Receipt
BDT H_Basic Design TNote 20 Basic Design TNote 18 EBR
Batch record
BFD H_Block Flow Diagram 20 Block Flow Diagram 18 EBV
Acknow. template
BNL H_Bunch List 12 Bunch List 10 FOL Folder
BOM H_Bill Of Material 18 Bill Of Material 16 IBD
Inbound Document
BOQ H_Bill Of Quantities 20 Bill Of Quantities 18 INF
Info Document
CAL H_Design Calc/Sheets 20 Design Calc/Sheets 18 INV
ICMS4 Document type
CAS H_Calibration Sched. 20 Calibration Sched. 18 KPR
Engin/Des. Drawing
CCP H_Cost Control Plan 19 Cost Control Plan 17 L01 Layout
document
CCR H_Cost Control Reprt 20 Cost Control Reprt 18 LFS
CDD H_Concept Design Drw 20 Concept Design Drw 18 MPO
Maint. Prog. Object
CDR H_Concept Design Rep 20 Concept Design Rep 18 MSP
MS Project for CEP
CLA H_Claims 8 Claims 6 OHD Occup. Health Doc.
COD H_Contract Agree/Doc 20 Contract Agree/Doc 18 PAC
Packing Steps
COM H_Commissioning Proc 20 Commissioning Proc 18 PPA
Prepayment Agreement
COR H_Concrete Request 18 Concrete Request 16 PPE
Documents PPE
CPA H_Corr & Prev Action 20 Corr & Prev Action 18 PRD
Operating Facilities
CPR H_Concrete Pour Rep 19 Concrete Pour Rep 17 PST PS
Text
CRC H_Calibr Record Card 20 Calibr Record Card 18 Q00
QM Manual
CRP H_Construction Reprt 20 Construction Reprt 18 Q01
Q-Agreement / MM-PUR
CTC H_Construction Calcu 20 Construction Calcu 18 Q02
DelivTerms / MM-PUR
CTM H_Concrete Trial Mix 20 Concrete Trial Mix 18 Q03
Q-Agreement / SD
DBQ H_Detail Design Boq 19 Detail Design Boq 17 Q04
Delivery Terms / SD
DCR H_Docs Control Reprt 20 Docs Control Reprt 18 RMS
Recipe Documents
DCT H_Design Crit T.Note 20 Design Crit T.Note 18 RSI
Recurr Supplier Invc
DDD H_Detail Design Draw 20 Detail Design Draw 18 RST
Recurr Supplier Invc
DDG H_Design Drawings 17 Design Drawings 15 RTB Building
Block
DDR H_Detail Design Rprt 20 Detail Design Rprt 18 SAB
Bank Acct Statement
DDS H_Detail Drawings 17 Detail Drawings 15 SBE Final
Version Report
DDT H_Detail Design T.No 20 Detail Design T.No 18 SBR
Raw Version Report
DGM H_Diagrams 10 Diagrams 8 SBS Base SDS
DNT H_Design Notes 14 Design Notes 12 SBV Report
Template
DOC H_Document Submittal 20 Document Submittal 18 SBX
ESComXML File
DRP H_Daily Report 14 Daily Report 12 SEH EHS
Documents
DSH H_Eng. Data Sheets 18 Eng. Data Sheets 16 SPC
Product Compliance
DWG H_Shop Drawings 15 Shop Drawings 13 TAR
EDL H_Eng. Delivrbl List 20 Eng. Delivrbl List 18 TAT
Attachments of TM
EIR H_Enviro Inspct Rprt 20 Enviro Inspct Rprt 18 TBN
Thumbnail
ELV H_Elevations/Profile 20 Elevations/Profile 18 THE
EML H_Email 7 Email 5 THX Hedge-Documentation
END H_Eng. Drawings 15 Eng. Drawings 13 TMS Trial
Documents
EPR H_Eng. Procedure 16 Eng. Procedure 14 TST Test
Document
EQL H_Equipment List 16 Equipment List 14 VED
ERP H_Engineering Report 20 Engineering Report 18 XEM
Environ. Compliance
ESC H_Eng. Specification 20 Eng. Specification 18 {L}
Ship. Order Template
ESH H_Eng. Schedules 16 Eng. Schedules 14 {R} Rept
Shipping Order
EST H_Eng. Summery Table 20 Eng. Summery Table 18
ETN H_Eng. Tech. Note 17 Eng. Tech. Note 15
FAC H_Final Accpt Certif 20 Final Accpt Certif 18
FAI H_First Aid Inj Rprt 20 First Aid Inj Rprt 18
FAX H_Fax 5 Fax 3
FCC H_F-UP Concrete Cube 20 F-UP Concrete Cube 18
FCR H_Field CR Change Rq 20 Field CR Change Rq 18
FNP H_Fabnrication Plan 19 Fabnrication Plan 17
FNR H_Fabrication Record 20 Fabrication Record 18
FTM H_Field Trnsmit Memo 20 Field Trnsmit Memo 18
GNA H_General Arrangment 20 General Arrangment 18
GRP H_Design Report 15 Design Report 13
HAC H_Hazard Area Clsify 20 Hazard Area Clsify 18
HSE H_EHS Procedures 16 EHS Procedures 14
ICL H_Instrument Calc. 18 Instrument Calc. 16
ICR H_Incident Report 17 Incident Report 15
IER H_Instrument Eqp Reg 20 Instrument Eqp Reg 18
IHU H_Inst/Process H-Ups 20 Inst/Process H-Ups 18
INR H_Inspct Notif Rprt 19 Inspct Notif Rprt 17
INV H_Invoices 10 Invoices 8
IPH H_Inst/Process H-Ups 20 Inst/Process H-Ups 18
IRQ H_Inspection Request 20 Inspection Request 18
IRR H_Inspct Requst Rprt 20 Inspct Requst Rprt 18
ISO H_Isometric Drawings 20 Isometric Drawings 18
ITP H_Inspct & Test Plan 20 Inspct & Test Plan 18
JHA H_Job Hazard Analysi 20 Job Hazard Analysi 18
JPG H_Photos 8 Photos 6
LDG H_Loop Drawings 15 Loop Drawings 13
LER H_Lifting Eqp Regist 20 Lifting Eqp Regist 18
LET H_Letter 8 Letter 6
LFP H_Lifting Plan 14 Lifting Plan 12
LLD H_Logic And Loop Diagram 24 Logic And Loop Diagram 22
LOI H_Letter Of Intent 18 Letter Of Intent 16
LOT H_Letter Of Transmittal 23 Letter Of Transmittal 21
MAG H_Meeting Agenda 16 Meeting Agenda 14
MAR H_Mat. Reqisition 17 Mat. Reqisition 15
MCR H_Mat. Control Rprt 19 Mat. Control Rprt 17
MDL H_Mat. Delivery Log 19 Mat. Delivery Log 17
MDR H_Mat. Delivery Rprt 20 Mat. Delivery Rprt 18
MDS H_Mat. Data Sheet 17 Mat. Data Sheet 15
MEM H_Memorandum 12 Memorandum 10
MFR H_Mat. F-Up Rprt 16 Mat. F-Up Rprt 14
MIL H_Mat. Inspct Log 17 Mat. Inspct Log 15
MIR H_Mat. Inspct Rprt 18 Mat. Inspct Rprt 16
MOF H_Material Offers 17 Material Offers 15
MOM H_Minutes Of Meeting 20 Minutes Of Meeting 18
MOS H_Method Of Statemnt 20 Method Of Statemnt 18
MPR H_Monthly Progress Rprt 23 Monthly Progress Rprt 21
MSD H_Mat. Selection Diagram 24 Mat. Selection Diagram 22
MSL H_Material Submittal 20 Material Submittal 18
MSP H_Mat. Specification 20 Mat. Specification 18
MSR H_Mat. Sampling Rprt 20 Mat. Sampling Rprt 18
NCR H_Non-Conformance Rprt 22 Non-Conformance Rprt 20
NMI H_Near Miss Report 18 Near Miss Report 16
NMR H_Non-Conformance Monitoring Rprt 33 Non-Conformance Monitoring Rprt
31
OMM H_O&M Manuals 13 O&M Manuals 11
ORG H_Organization Chart 20 Organization Chart 18
OSP H_Operative Shipping Procedure 30 Operative Shipping Procedure 28

OUT H_Close Out Report 18 Close Out Report 16


PAL H_Plans And Layout 18 Plans And Layout 16
PCC H_Partial Completion Certificate 32 Partial Completion Certificate
30
PCM H_Precommissioning Procedure 28 Precommissioning Procedure 26

PDD H_Preliminary Design Drawings 29 Preliminary Design Drawings 27

PDP H_Proj. Design Plan 19 Proj. Design Plan 17


PDR H_Preliminary Design Rprt 25 Preliminary Design Rprt 23
PFD H_Process Flow Diagram 22 Process Flow Diagram 20
PID H_Piping And Instrument Diagram 31 Piping And Instrument Diagram 29
PKL H_Packing List 14 Packing List 12
PLP H_Plot Plan 11 Plot Plan 9
POR H_Concrete Pouring Request 26 Concrete Pouring Request 24

PPO H_Purchase Orders 17 Purchase Orders 15


PPR H_Procurement Procedure 23 Procurement Procedure 21
PPT H_Presentation 14 Presentation 12
PSD H_Pipe Support Drawings 23 Pipe Support Drawings 21
PTR H_Performance Test Rprts 24 Performance Test Rprts 22
PTW H_Permit To Work 16 Permit To Work 14
QAP H_Quality Assurance Program 27 Quality Assurance Program 25

QAS H_Quality Audit Schedule 24 Quality Audit Schedule 22


QMP H_Quality Management Plan 25 Quality Management Plan 23
QPR H_Quality Procedures 20 Quality Procedures 18
QRC H_Quality Records 17 Quality Records 15
QRP H_Quality Report 16 Quality Report 14
QSC H_Quality Specifications 24 Quality Specifications 22
QSD H_Qs Daily Report 17 Qs Daily Report 15
QSM H_Qs Monthly Report 19 Qs Monthly Report 17
QSW H_Qs Weekly Report 18 Qs Weekly Report 16
RFI H_Request For Information 25 Request For Information 23
RFP H_Request For Proposal 22 Request For Proposal 20
RFQ H_Request For Quotation 23 Request For Quotation 21
RSK H_Risk Assessment 17 Risk Assessment 15
SAD H_Section And Detail 20 Section And Detail 18
SAR H_Subcontractor Approval Request 32 Subcontractor Approval Request
30
SBS H_Subcontractor Supervision 27 Subcontractor Supervision 25

SCD H_Schematic / Interconnection Diagram 37 Schematic / Interconnection


Diagram 35
SCH H_Schedules 11 Schedules 9
SCR H_Sketch And Construction Rigging Drawings 42 Sketch And Construction
Rigging Drawings 40
SIC H_Safety Inspct Ch.Lst 22 Safety Inspct Ch.Lst 20
SID H_Schematic/Interconnection Diagram 35 Schematic/Interconnection Diagram
33
SKE H_Sketches 10 Sketches 8
SLD H_Singl Line Diagram 20 Singl Line Diagram 18
SNA H_Start New Activity 20 Start New Activity 18
SOD H_Subcontract Agreement/Documents 33 Subcontract Agreement/Documents
31
SOP H_Statement Of Prequalification 31 Statement Of Prequalification 29

SPL H_Spare Parts List 18 Spare Parts List 16


SRP H_Safety Report 15 Safety Report 13
STD H_Standard And Typical Detail 29 Standard And Typical Detail 27

STN H_Site Notice 13 Site Notice 11


STR H_S.T.A.R.T Briefing 20 S.T.A.R.T Briefing 18
SUD H_Supplier Documents 20 Supplier Documents 18
SUF H_Surveying Form 16 Surveying Form 14
SUL H_Subcontractor List 20 Subcontractor List 18
SUP H_Subcontractor Prequalif 25 Subcontractor Prequalif 23
SUR H_Survey Records 16 Survey Records 14
SWP H_Site Work Procdure 20 Site Work Procdure 18
TBT H_Tool Box Talk 15 Tool Box Talk 13
TDL H_Transit Damage Log 20 Transit Damage Log 18 SBV
TDR H_Transit Damage Rep 20 Transit Damage Rep 18 SBX
TST H_Lab Test Report 17 Lab Test Report 15 SEH
TWP H_Temp. Work Plan 17 Temp. Work Plan 15 SPC
VDL H_Vendors List 14 Vendors List 12 TAR
VOD H_Variation Orders 18 Variation Orders 16 TAT
VOR H_Var. Order Request 20 Var. Order Request 18 TBN
WHR H_Weekly Hse Report 19 Weekly Hse Report 17 THE
WRP H_Weekly Report 15 Weekly Report 13 THX
WWL H_Weekly Waste Log 18 Weekly Waste Log 16 TMS
TST
VED
XEM
{L}
{R}

You might also like