F-PRD-03 4M Change Board

The document is a 4M change board template used by Rohit Enterprises to track planned, unplanned, and abnormal changes across machines and work stations. It includes columns to record the status of management, machine, method, and material changes using green or red colors as well as notes on using letters G for no change and R for changes along with recording the time. The template is to be filled out daily with the production signature.

Uploaded by

Rohit Quality
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views3 pages

F-PRD-03 4M Change Board

The document is a 4M change board template used by Rohit Enterprises to track planned, unplanned, and abnormal changes across machines and work stations. It includes columns to record the status of management, machine, method, and material changes using green or red colors as well as notes on using letters G for no change and R for changes along with recording the time. The template is to be filled out daily with the production signature.

Uploaded by

Rohit Quality
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Rohit Enterprises Format No.

F/PRD/03
Rev. No.& Date: 00
Origin Date: 01.11.2021
4M Change Board
Date: Location:
4M Planned Change status 4M Unplanned Change status 4M Abnormal Change status
SNO.
MACHINE NO./ MACHINE NAME/ (Green - No Change; Red - Change/Time) (Green - No Change; Red - Change/Time) (Green - No Change; Red - Change/Time) Production
WORK STATION NO. WORK STATION NAME Signature
MAN MACHINE METHOD MATERIAL MAN MACHINE METHOD MATERIAL MAN MACHINE METHOD MATERIAL

Note :
1. Mark/ Highlight cell with Green colour if No Change.
2. If change found, Highlight cell with red colour and time to be mentioned.
3. Indicate with letter G for No Change & R for Change.
Format No. F/PRD/08
Rev. No.& Date: 00
Origin Date: 01.04.2018
4M CHANGE BOARD

Date: Location:
4M CHANGE STATUS
MACHINE NO./ MACHINE NAME/ (Green - No Change; Red - Change/Time) Production
SNO. WORK STATION NO. WORK STATION NAME Signature
MAN MACHINE METHOD MATERIAL