01 Company Profile
Milestones
1999 2003 2011 2017
Mould Checking Automation
Machining Equipment Vanto (Vasai)
Fixture
Our Main Business
Mould Machining Checking Fixture Automation Equipment
Introduction of Personnel Structure
Mould Machining
35 Employees in Vasai
82 EMployees in Shanghai
Checking Fixture
38 Employees
Automation Equipment
57 Employees
02 Mould Machining
Mould Machining Scope
Lighting Mould Bumper Dash Board
Manufacturing Facility In Vasai
Manufacturing Facility In Vasai
Key Manufacturing Facility In Shanghai
Key Manufacturing Facility In Shanghai
03 Checking Fixture
Checking Fixture
BMW Grille Frame
Checking Fixture
Grille
Checking Fixture
Left/Right AC Outlet
Checking Fixture
Land Rover Rear Cover Outer Panel
Checking Fixture
Left/Right Fender
Checking Fixture
BMW Rear Bumper Trim Panel
Fixtures
Laser weakening Cold cutter weakening Friction welding Door panel welding
Infrared heating Melting foam Alignment Hot Press edge
wrapping tool wrapping tool fixture folding tool
Measuring Equipment
Key Manufacturing Facility
DMG laser65 Switzerland AGIE GF1200
2 sets 4 sets
Maximum processing size: Maximum processing size:
ɸ800mm x 800mm x 800mm 1000mm x 1000mm x1000mm
Maximum load weight:2600kgs Maximum load weight:1700kgs
5-axis laser + milling, Dual multitasking mode 5-axis machining with high precision and high stability
5-axis machining with high precision and high stability
04 Automation Equipment
Auto Parts Automation Direction
Console
Dashboard
seat
TailGate
Bumper/Grille
Spoiler
carpet Wheel Brow
Door Panel
Product Categories Of Automation Equipment
Automatic Gluing System
Automatic Wrapping System
Automatic Welding system
Automatic Cutting System
Standard Automation Unit
Ultrasonic punch unit Booster cyclinder punch unit Ultrasonic weld unit
Bonding unit Punch & weld unit Punch & bond unit
Automatic Gluing System
Achievable Processing
Gluing
Bonding
Welding
Clamping
Assembly
Application Scope (Automatic Gluing System)
Full Plastic Tailgate Rear Spoiler Trunk Lid
Fender Power Battery Front & Rear Windshield
Application Case: FAW VW Project Full Plastic Tail Door
AUDI X99B GOLF A8
Lounge SUVE Flip bonding VW316
Automatic Wrapping System
Flame Treating
Glue Spray
Lamination
Cutting
Punching
Hemming
Milling
Application Scope (Automatic Wrapping System)
Door Trim Panel IP & Console Armrest Glove Box
Ceiling Backrest Plate Trunk
Application Case: Door Trim Panel
Process:Skin Layer Locating – Vacuum Absorption –
Infrared Heating - Lamination - Hemming
Automatic Punch & Weld System
Part Part
Booster cyclinder Punching Ultrasonic Welding
Loading Unloading
Automatic Punching Machine
Part (Station A) Slider (Station B) Slider Part
Loading Booster cyclinder Punching A-B Booster cyclinder Punching B-A Unloading
Application Case: Front Bumper
Part
Booster cyclinder Punching Ultrasonic Welding Part Unloading
Loading
Application Case: Front Bumper
6 Sensors
4 Sensors
Part
Booster cyclinder Punching
Loading
Booster cyclinder
Part Unloading
Punching
Application Case: Bumper Accessories Auto Welding Machine
Dual station ultrasonic welding machine
Suffix AA Suffix BA
Part (Station A) Slider (Station B) Slider Part
Loading Ultrasonic Welding A-B Ultrasonic Welding B-A Unloading
Automatic Cutting System
Achievable Processing
Laser Cutting
Ultrasonic Cutting
Waterjet Cutting
Mechanical Cutting
Application Scope (Automatic Cutting System)
Pillar
IP Door Trim
PP + Non-woven Fabrics
Automatic Laser Cutting in Double-Station
Audi C8
3D Photo of the equipment On site cutting
ABC column laser cutting
Dual-Robot Mechanical Cutting & Milling
Our Customers
05 Service Support
Project Process
Automation equipment project process
Confirm the project and understand
customer requirements
Understand part process
Analyze part and work out a proposal
Understand part dimensions and
incoming status
Determine the design scheme internally
Evaluate equipment efficiency
Confirm the scheme by customer Automation equipment debugging
Equipment parts processing and
Mechanical and electrical design Equipment assembly
standard parts purchasing
Guarantee Commitment
Warranty Period: 12 months (after acceptance)
Provide relevant technical data to buyer
Free spare parts ≈ 3% of the total cost
Contact Us
Cooperate Office
Mr. Dilshad
+91 9324 633549
[email protected]
Factory
Mr. Jesudas
+91 9819 631636
[email protected]
Address:- 9, Ehara Industrial Complex
Opp. Mutual Engineering Pvt. Ltd.
Village Waliv,
Vasai (East) – 401 208
District Palghar
Maharashtra
Visit Us at www.vanto-group.com