Sump Estimates
Sump Estimates
b Haunch concrete
Sump-2 0.5 1 36.000 0.300 0.300 1.62
Pump Room area
0.5 1 24.000 0.300 0.300 1.08
Steps for staircase 0.5 23 1.000 0.300 0.165 0.57
3.27
SAY 3.30 CUM
c 375 mm thick side walls - botoom width
500mm and top width 250mm
11 External plastering
Pump room internal 1 26.120 2.525 65.95
Deductions
R/S -1 2.300 2.020 -4.65
D -1 1.000 2.020 -2.02
W -1 1.200 1.200 -1.44
Sl. Unit
Description of Work Quantity
No. (in words)
1 i Earth work excavation for foundations (Mechanical Means) for 117 ONE CUM
buildings in ordinary soils and depositing on bank for all lifts and with an
initial lead of 10m and up to 3m depth including all
operational,incidental, labour charges such as shoring, sheeting,
planking, strutting etc., and overheads & contractors profit complete for
finished item of work excluding dewatering charges etc., as per SS 20
B(APSS 308)
2 Filling with carted gravel in trenches,sides of foundations and basement 137 ONE CUM
with initial lead in layers not exceeding 15cm thick,watering and ramming
including cost and conveyance of water to work site and all
peraitonal,incidental, labour charges,hire charges of T&P etc., and
overheads & contractors profit complete for fnished item of work(APSS
NO.309&310)
3 Supply and placing of Plain Cement Concrete M 7.5 grade for 43 ONE CUM
foundations using coarse aggregate 40mm size hard, machine crushed
granite from approved quarry using batching and mixing plant of 15 cum
per hour capacity including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site including all
operational, incidental and labour charges, transporting concrete in transit
mixer, curing etc., and overheads & contractors profit complete for
finished item of work (APSS No. 402)
a) Sump Roof beams upto 3.66 mts level 4.9 ONE CUM
c) Sump Slabs 125 mm thick upto an un-supported height of 3.66m 144 ONE SQM
7 Providing Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500 D 14.86 ONE MT
grade as per IS 1786-1979) of different diameters for RCC works
including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved
materials and size and tying and lap-splicing with binding wire of 18
SWG, forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars including cost
and conveyance of binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending, placing in position,
tying etc., and overheads & contractors profit complete for finished item
of work.( APSS No.126)
8 Providing impervious coat to exposed RCC roof slab surfaces of 386 ONE SQM
sump , sump side wall,sump bottom slab,in side of septic tank , in
sunken slabs etc. to required slopes with CM (1:3) prop. using screened
sand 12mm thick mixed with integral cement water proofing liquid
confirming to IS: 2645-2003 manufactured by reputed manufacturers as
approved by Engineer-in-charge at 200ml per one bag of cement, laid
over roof slab when it is green, finished smooth with a floating coat of
neat cement and thread lining at regular intervals of 45cmx45cm where
ever necessary including cost and conveyance of all materials like
cement, sand, water proofing compound, water etc., to site, operational,
incidental, and labour charges for mixing mortar, laying, lift charges,
rendering smooth and thread lining, curing including rounding off
junctions of wall and slab etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 901 & 903).
1 Ornamental ceiling plastering 12mm thick single coat in CM (1:5) 36 ONE SQM
using screened sand including cost and conveyance of all materials like
cement, sand, water etc., to site and all operational, incidental charges on
materials and including cost of all labour charges for mixing mortar,
finishing, curing as directed by Engineer-in-charge etc., and overheads &
contractors profit complete for finished item of work.(SS 901,903 & 904)
2 Plastering 12mm thick in two coats using screened sand with base coat 46 ONE SQM
of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with
dubara sponge finishing including cost and conveyance of all materials
like cement, sand, water etc., to site and all operational, incidental
charges on materials and including cost of all labour charges for mixing
mortar, finishing, scaffolding, lift charges, curing, including cutting
grooves as directed by Engineer - in - charge etc., and overheads &
contractors profit complete for finished item of work for internal walls. (SS
901,903 & 904)
3 Plastering 12mm thick in two coats using screened sand with base coat
of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with
dubara sponge finishing including cost and conveyance of all materials
like cement, sand, water etc., to site and all operational, incidental
charges on materials and including cost of all labour charges for mixing
mortar, finishing, scaffolding, lift charges, curing, including cutting
grooves as directed by Engineer - in - charge etc., and overheads &
contractors profit complete for finished item of work for external walls.
(SS 901,903 & 904)
4 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine 4.6 ONE SQM
rolled CRCA laths, interlocked together through their entire length and
jointed together at the ends by end-locks, mounted on specially designed
pipe shaft of 50mm dia nominal bore MS B class pipe with brackets,
plates, guide channels, stoppers, bottom locking plates and
arrangements for inside & outside locking with push-pull operations
including cost of hood cover and springs complete, painted with one coat
of approved steel primer, locks, ball bearings, all accessories etc.,
overheads & contractors profit complete for finished item of work as per
special spn: 1108
5 Supply and fixing doors as per drawings with medium teak wood
frame of section 100mm x 65 mm and ISI marked flush door shutters of
30 mm thick double shutters with bond wood solid block board type
Core having cross bands and face veneers, hot pressed bonded with
water proof phenol formaldehyde synthetic resin factory made conforming
to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on
all sides, fixing 1mm thick mat finish laminated sheet to full width
and height of the flush shutter both sides including cost and
conveyance to site of teak wood frame, flush shutter, laminate sheet
including
5 Providing and fixing factory made uPVC white colour sliding glazed
window comprising of uPVC multi-chambered frame with in-built roller
track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick
galvanized mild steel section made from roll forming process of required
length (shape & size according to uPVC profile), appropriate dimension of
uPVC extruded glazing beads and uPVC extruded interlocks, EPDM
gasket, wool pile, zinc alloy (white powder coated) touch locks with hook,
zinc alloy body with single nylon rollers (weight bearing capacity to be 40
kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and
necessary stainless steel screws etc. Profile of frame & sash shall be
mitred cut and fusion
welded at all corners, including drilling of holes for fixing hardware's and
drainage of water etc. After fixing frame the gap between frame and
adjacent finished wall shall be filled with weather proof silicon sealent
over backer rod of required size and of approved quality, all complete as
per approved drawing & direction of Engineer-in-Charge inclusive of cost
of Single / double glass panes of 4mm thick pin headed glass, wire mesh
and silicon sealent . Note: For uPVC frame and sash extruded profiles
minus 5% tolerancein dimension i.e. in depth & width of profile shall be
acceptable.Variation in profile dimension in higher side shall be accepted.
But no extra payment on this account shall be made.
Two track two panels sliding window made of frame 67 x 50 mm & 1.44 ONE SQM
sash 46 x 62 mm both having wall thickness of 2.3 ± 0.2 mm and single
glazing bead / double glazing bead of appropriate dimension .
6 Painting to new wood work and flush shutters with lappam finish ,
over a primary coat and painting two coats of synthetic enamel
paint Grade-I VOC (Volatile Organic Compound) content less than 50
grams/litre of approved shade including cost and conveyance of all
materials to site cost of primer coat and all labour charges etc. complete
including applying sand paper on lappam coats for neat finish and
overheads & contractors profit complete in all floors (APSS No.1200,
1207 & 1211).
3 ONE SQM
7 Painting two coats with synthetic enamel paint Grade-II VOC (Volatile
Organic Compound) content less than 50 grams/litre over primer coat of
red oxide to new iron work including cost and conveyance of all
materials to site, incidental, operational and all labour charges etc., and
overheads & contractors profit complete for finished item of work in all
floors. (SS No. 1201, 1212 & 1207).
16 ONE SQM
8 White washing two coats with white cement to ceiling to give an even
shade after thouroughly brushing the surface to remove all dirt and
remains of loose powdered materials including cost of all materials ,
labour charges and incidental such as scaffolding , lift charges etc., and
overheads & contractors profit complete for finished item of work in all
floors.
36 ONE SQM
9 Supply & application of one coat water based cement primer of 46 ONE SQM
interior grade I and two coats of synthetic polymer luxury plastic
emulsion paint of superior grade having VOC (Volatile Organic
Compound) content less than 50 grams/litre for internal walls including
cost and conveyance of all materials to site, incidental, operational and all
labour charges etc., and overheads & contractors profit complete for
finished item of work in all floors.
10 Supply & application of one coat water based cement primer of 38 ONE SQM
exterior grade II and two coats of synthetic polymer luxury plastic
emulsion paint of superior grade having VOC (Volatile Organic
Compound) content less than 50 grams/litre for exterior walls including
cost and conveyance of all materials to site, incidental, operational and all
labour charges etc., and overheads & contractors profit complete for
finished item of work in all floors.
11 Supplying and fixing of stainless steel (grade 304) hand railing as 7.1 ONE SQM
per approved drawing with top rail of 50mm dia pipe and 2mm thick
medium class and vertical posts of 25mm dia and 1.6mm thick medium
class 1 No for each step fixed with base plate of 25mm dia using
bonding agent and anchor fastner and welding, drilling of 25mm dia
holes with pneumatic compressor for fixing railing, buffing, polishing all
members of the railing thouroughly , lacquer finishing to present
seamless finish including cost and conveyance of all materials,
electrodes, welding charges, cost of all consumables, labour charges ,
overheads & contractors profit etc., complete for finished item of work.
Rate Amount
In Figures (Rs.)
0
DETAILED ESTIMATE OF 1.00 LAKHS LITRES RCC SUMP & PUMP ROOM
S.No Description Nos L B D Quantity Unit
1 Earth work excavation
Sump 1 20.60 8.30 0.50 85.49
Pump Room Portion 1 7.90 7.90 0.50 31.21
116.70
Say 117.00 Cum
2 Earth work excavation
Sump 1 20.60 8.30 1.00 170.98
Pump Room Portion 1 7.90 7.90 1.00 62.41
233.39
Say 234.00 Cum
3 Earth work excavation
Sump 1 20.60 8.30 1.00 170.98
Pump Room Portion 1 7.90 7.90 1.00 62.41
233.39
Say 234.00 Cum
b Haunch concrete
Sump-2 0.5 1 36.00 0.30 0.30 1.62
11 External plastering
Pump room internal 1 26.12 1.63 42.45
Deductions
R/S -1 2.30 1.12 -2.58
D -1 1.00 1.12 -1.12
W -1 1.20 1.20 -1.44
37.31
SAY 38.00 Sqm
13 Ceiling plastering
Pump room 1 6.00 6.00 36.00
36.00
SAY 36.00 Sqm