48-Request For Installation of Passenger Elevator

This document is a request form for the installation of a passenger elevator. It lists the various components needed for installation including guide rails, machine beams, car panels, control panels, wiring, and other electrical and mechanical parts. The contractor requests approval by listing the installation location and components to be checked by project supervisors and quality control teams before the scheduled installation.

Uploaded by

koyangi jagiya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views

48-Request For Installation of Passenger Elevator

This document is a request form for the installation of a passenger elevator. It lists the various components needed for installation including guide rails, machine beams, car panels, control panels, wiring, and other electrical and mechanical parts. The contractor requests approval by listing the installation location and components to be checked by project supervisors and quality control teams before the scheduled installation.

Uploaded by

koyangi jagiya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

F - ABCD - 43FLBLDG - 48

ABC Construction Corporation


Project :
TYPE YOUR PROJECT NAME

REQUEST FOR INSTALLATION Date Prepared Request No.


PASSENGER ELEVATOR
Buffer/ Base Stopper Support Door Jamb / Hall Assy. Wireway / trunking
Guide Rails and Bracket Main, Sub-Weight Assy. Supervisory Panel
Machine Beams / Support Car, Panel Assy. Remote Contol Conduit/ Wiring
Traction Machine and Sheave Assy. Control Panel Assy. Shaft Wireway / Wiring
Power / Travelling Rope Assy. Power System Wiring Others
Car Sheave Assy. Control Wiring

REQUESTED BY : Name/ Designation :


Contractor : Signature :

Note : All signatories should print their name and sign.


AREA (Pls. enclose key plan) GRIDLINE/LOCATION LEVEL STRUCTURE

NOTED BY CHECKED BY INSPECTED BY


CHECK ITEMS
CONTRACTOR PROJECT SUPERVISOR QC

ELECTRICAL/ FDAS

PLUMBING/SANITARY

FIRE PROTECTION

ARCHITECTURAL

Concrete Topping

Wall Partitioning

Ceiling

Waterprooofing
Painting

Others

REMARKS :

REVIEWED BY : NOTED :

PROJECT SUPERVISOR QC

APPROVED BY : NOTED BY:

VP-CONSTRUCTION OPERATIONS

NOTE : This form must be submitted to The QC TEAM, duly accomplished and signed by the corresponding
Contractor's Personnel-in-charge at least 24 hours before actual installation.

Rev. 0 August 27,2019