Api Ágil - Erros Nos Simulados
Api Ágil - Erros Nos Simulados
Você acertou 90 %
Você acertou 90 %
SIMULADO 6
SIMULADO EXTRA
Você acertou 96 %
1. You are the Scrum master for 4 teams working on the same
product backlog. Several of the developers have come to you
complaining that the work identified for the next two sprints
will require the full-time commitment of an expert outside
the teams. What should the Scrum master consider in this
situation? (Choose the two best answers)
A) 1 - The need to have enough work to keep all developers busy / 2 - The desire
to maintain a steady speed
B) 1 - The advantage of developers finding a solution for themselves / 2 - The
ability of Scrum teams to produce integrated increments
C) None of them