100% found this document useful (2 votes)
452 views9 pages

Te13 Te17

This document provides specifications and installation instructions for a transmission converter/oil system. It details the system's capacity, recommended oil type and change schedule. It also outlines operating temperatures, pressures, filter specifications, electrical specifications, and installation steps for removing and installing the control valve. Installation drawings are included to illustrate the correct bolt torque sequence. Port locations and functions are diagrammed.

Uploaded by

Gabriel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
452 views9 pages

Te13 Te17

This document provides specifications and installation instructions for a transmission converter/oil system. It details the system's capacity, recommended oil type and change schedule. It also outlines operating temperatures, pressures, filter specifications, electrical specifications, and installation steps for removing and installing the control valve. Installation drawings are included to illustrate the correct bolt torque sequence. Port locations and functions are diagrammed.

Uploaded by

Gabriel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Sidan 1 av 9

TE13/17 DATA
Converter/Transmission Oil System:
Capacity 16,5L. Lines and cooler not included
Oil Type Î Only ATF Dexron III approved
viscosity at 40°C: 33 → 38 cSt
viscosity at 100°C: 7 → 8 cSt
Oil changeÎ 1000 hours
Filtration Î integral spin on change every 1000 hours
first change or after rebuild : 100 hours

Temperature specifications:
Normal operating temperature 70 - 120°C at temperature check port 71 converter out
Maximum allowed transmission temperature 120° C

Transmission regulator pressure :


25 -30 bar at 2200RPM

Clutch pressures:
At 2200 RPM 24-29Bar

Filter bypass:
valve set at 3.9 bar

Lube pressure:
In neutral 0 : 2.8-3.4 Bar at 80 l/m flow
In FWD 0 – REV 0 : 1.2-1.8 Bar at 80l/m flow

Internal leakage:
Converter : 1.0 -4.0 l/m
Each range clutch : 1.5-4.5 l/m
Each directional clutch : 5.5-9.0 l/m

Safety valve:
cracking pressure 7,5 bar

Converter out pressure (to cooler):


3.0 – 3.5 bar. at max stall speed

Pump flow:
At 2200 RPM : 90 to 110 lpm

Hydraulic cooler lines specifications:


Minimum 19 mm for the internal diameter of lines and fittings.
Suitable for operation from ambient to 120° C continuous operating temperature.
Must withstand 30 bar continuous pressure and 45 bar intermittent surges.
Conform SAE J1019 and SAE J517, 100RI.
Sidan 2 av 9

Electrical specifications:

Speed sensors:
Engine speed combined with oil temperature pick up located at pump gear
Turbine speed located on input gear forward
Drum speed located on low drum
Output speed located on output gear
Sidan 3 av 9

Coil recistance VFS Fwd/Rew/2nd/1st-3rd:


4,35 +/- 0,35 ohm at 25C°

Coil recistance On/Off solenoid TN & 1st/3rd


28 +/- 2ohm at 20C°
Sidan 4 av 9

Spicer Off-
Off-Highway Products Division
TE 13 & TE17

Control valve installation instruction


Removing the valve

1.Make sure that the area around the valve is clean and that no dirt can fall into
the valve during the disassembly procedure.

2.Unscrew the 7 bolts (marked green with a star on the drawing 1) until you
feel that the tension is out of the bolt. Do not remove them!

3.Unscrew the 20 other bolts (marked blue on drawing 1) some turns. When all
bolts are loose, you should be able to move the valve a bit

4.Remove 2 bolts (marked blue on drawing 1 )and replace with aligning studs.

5.Remove the 15 bolts (marked pink on drawing 2)

6.Remove the remaining bolts (marked blue on drawing 1) and remove valve,
note the sandwich plate between valve and housing

Spicer Off-
Off-Highway Products Division
TE 13 & TE17

Control valve installation instruction


Installing the valve
1.Unscrew the 7bolts (marked green with a star on drawing 1) untill all tension
is out of the bolt. Do not remove them!

2. Using aligning studs, install valve, sandwich plate and a new gaskets.

3. Hand tighten all bolts(marked blue and green on drawing 1) according to the
sequence you find on the drawing 1.

4. Torque all bolts in the same sequence as on drawing 1 to a torque of 25Nm

5. Hand tighten the 15 bolts(marked pink on, drawing 2 ) and torque to 25Nm to
the sequence as shown on drawing 2

6 Retorque all bolts (drawing 1 and 2) again after 20 minutes to the


sequences as shown

7. Recalibrate the transmission


Sidan 5 av 9

Spicer Off-
Off-Highway Products Division TE 13 & TE17

Control valve installation instruction

27* 26* 15* 16 18

25 8 17

14 7 9*
2
1*
13 6 3 10*

23* 5 4 11 19

24 22 12 20 21

Spicer Off-
Off-Highway Products Division TE 13 & TE17

Control valve installation instruction

15 2

14 3

13 4
12 5
11
6
10
9 8 7
Sidan 6 av 9

Spicer Off-
Off-Highway Products Division TE 13 & TE17

Check ports

Spicer Off-
Off-Highway Products Division TE 13 & TE17

Check ports
From cooler

Port 42 2nd clutch

Port 46
Pressure check port solenoid
Port 71
Port 31
Converter out temp.
Pressure check port regulator
Port 41 1st clutch
Port 43 3rd clutch

Magnetic drain
plug
Sidan 7 av 9

Spicer Off-
Off-Highway Products Division TE 13 & TE17

Check ports

To
cooler

Port 37
Safety valve
Safaty valve pressure
pressure
Safaty valve
mmmpressure

Spicer Off-
Off-Highway Products Division TE 13 & TE17

Check ports
Engine

Safaty valve
pressure
Sidan 8 av 9

Spicer Off-
Off-Highway Products Division TE 13 & TE17

Check ports

Port 46
Rev. clutch

Rev.
clutch

Pump
Pressure
Port 35

Spicer Off-
Off-Highway Products Division TE 13 & TE17

Check ports

Pressure
To cooler
Sidan 9 av 9

Spicer Off-
Off-Highway Products Division TE 13 & TE17

Check ports Control valve


VFS VFS 2nd VFS
REV Port 51 1st/3rd
Port 55 Port 50/52

VFS FWD
Port 54