This document provides the standard maintenance procedure for a DP transmitter at a cement plant in Belgaavi, India. It outlines the personal protective equipment, tools, hazards and mitigating measures, training needs, calibration procedure, emergency procedures, and job safety analysis for working on the transmitter. The key steps are to isolate the transmitter from the process line, drain any process material, clean and calibrate the transmitter using a process calibrator, check that readings are within specification, and return the transmitter to service informing operations personnel. Records of daily checks, operating procedures, and calibration reports must be maintained.

Uploaded by

ROHIT SINGH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views

SMP For DP Transmitter

This document provides the standard maintenance procedure for a DP transmitter at a cement plant in Belgaavi, India. It outlines the personal protective equipment, tools, hazards and mitigating measures, training needs, calibration procedure, emergency procedures, and job safety analysis for working on the transmitter. The key steps are to isolate the transmitter from the process line, drain any process material, clean and calibrate the transmitter using a process calibrator, check that readings are within specification, and return the transmitter to service informing operations personnel. Records of daily checks, operating procedures, and calibration reports must be maintained.

Uploaded by

ROHIT SINGH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

DALMIA

CEMENT (B) LIMITED – CEMENT PLANT


BELGAVI
INSTRUMENTATION SMP
Issue No. 01 Rev. No: 00 Effective Date: 09.01.2016 SMP/INST/09
Issued By: Approved By: HOD
SMP FOR DP TRANSMITTER

Scope/Purpose: This SMP is applicable for DP Transmitter.


Responsibility : Instrument section -Engineer
Accountability : Section In-Charge
PPE:
1. Safety Gloves
2. Safety shoes
3. Safety helmet
4. Safety goggles
5. Nose mask

Tools:

1. Multi meter
2. Spanner Set
3. Process Calibrator
4. Process Hand Pump if Required
5. Tube fittings as Required

Hazard Analysis:

Risks associated Mitigating Measures

Entering dust into lungs and eyes Wear safety goggles and nose mask
Leg Injury Carefully walk on staircase with help of handrail


Training needs:

1. First aid procedures
2. Operating procedures
3. Safety talk should be held between workmen and in-charge(TBT,HIRA)

Procedure:

Ø Obtain necessary work permit and LOTO procedures before carrying out maintenance work.
Ø Inform CCR related interlocks necessary.
Ø Isolate transmitter from the process line.

1/4
DALMIA CEMENT (B) LIMITED – CEMENT PLANT
BELGAVI
INSTRUMENTATION SMP
Issue No. 01 Rev. No: 00 Effective Date: 09.01.2016 SMP/INST/09
Issued By: Approved By: HOD
SMP FOR DP TRANSMITTER

Ø Drain process material from the drain line of the SS tube


Ø Clean transmitter body for dust and foreign material
Ø Note down Zero and Range values of transmitter
Ø Use Scandura process calibrator or Dead Weight tester for calibration
Ø Put pressure tube fitting at high (H) point of the transmitter and Keep Low (L) point to the
atmosphere.
Ø Apply pressure in the range of 0%,25%,50%,75% and 100%
Ø Note down the reading in the calibration report of the transmitter along with the error.
Ø Apply pressure in the range of 100%,75%,50%,25% and 0%
Ø Note down the reading in the calibration report of the transmitter along with the error.
Ø Check readings error within range of transmitter specification if not then go for Span and Zero
calibration.
Ø Keep both (High and low) ports open for transmitter, drain if process material in the manifold
line with the help of drain plug.
Ø Press zero button at the top of transmitter to make reading zero.
Ø Apply full range of transmitter pressure at high point of transmitter and press span button at
the top of transmitter.
Ø Recheck transmitter with 0 to 100 % measurement range.
Ø Remove all isolation and take transmitter on line in the process and inform operation person

2/4
DALMIA CEMENT (B) LIMITED – CEMENT PLANT
BELGAVI
INSTRUMENTATION SMP
Issue No. 01 Rev. No: 00 Effective Date: 09.01.2016 SMP/INST/09
Issued By: Approved By: HOD
SMP FOR DP TRANSMITTER

INPUT READING(mmh2O)
%SPAN ACTUAL RISING FALLING
ACTUAL % SPAN %ERROR ACTUAL % SPAN %ERROR
0
25
50
75
100

Emergency / Emergency Shut OFF:


1. If any unconsciousness is there, give First aid and inform to the Safety department or Call
Emergency number 7760996046.

Records/Annexure:
1. Daily check list
2. SMP for operating procedure
3. Calibration Reports

JOB SAFETY ANALYSIS :(JSA)
Job Safety Analysis Job: Calibration of Date: 09 –01-- 2016 Analysis by: Reviewed by:
Rotor scale

Title of employee doing Supervisor: Section Department: Section: Instrument Approved by:
job: Instrument Mechanic Engineer Instrumentation

Req’d/recommended PPE: Helmet, Safety shoes, Nose mask, Safety goggles



Sequence of Basic Job Recommended Safe What Could Go
Potential Hazards Corrective Action
Steps Job Procedure Wrong

3/4
DALMIA CEMENT (B) LIMITED – CEMENT PLANT
BELGAVI
INSTRUMENTATION SMP
Issue No. 01 Rev. No: 00 Effective Date: 09.01.2016 SMP/INST/09
Issued By: Approved By: HOD
SMP FOR DP TRANSMITTER

Isolation and draining Hazardous gases, Draining should be done Skin burn, Train the technicians
from the process line Hot material with due care unconsciousness for isolation
due to hazardous procedures.
gases

Leakage from manifold or Ensuring the


Pressure of fluid Ensure the tightness of
SS tube fitting the tube fitting Injury Tightness of tube
fittings before
carrying out work