SMP For DP Transmitter
SMP For DP Transmitter
Tools:
1. Multi meter
2. Spanner Set
3. Process Calibrator
4. Process Hand Pump if Required
5. Tube fittings as Required
Hazard Analysis:
Entering dust into lungs and eyes Wear safety goggles and nose mask
Leg Injury Carefully walk on staircase with help of handrail
Training needs:
1. First aid procedures
2. Operating procedures
3. Safety talk should be held between workmen and in-charge(TBT,HIRA)
Procedure:
Ø Obtain necessary work permit and LOTO procedures before carrying out maintenance work.
Ø Inform CCR related interlocks necessary.
Ø Isolate transmitter from the process line.
1/4
DALMIA CEMENT (B) LIMITED – CEMENT PLANT
BELGAVI
INSTRUMENTATION SMP
Issue No. 01 Rev. No: 00 Effective Date: 09.01.2016 SMP/INST/09
Issued By: Approved By: HOD
SMP FOR DP TRANSMITTER
2/4
DALMIA CEMENT (B) LIMITED – CEMENT PLANT
BELGAVI
INSTRUMENTATION SMP
Issue No. 01 Rev. No: 00 Effective Date: 09.01.2016 SMP/INST/09
Issued By: Approved By: HOD
SMP FOR DP TRANSMITTER
INPUT READING(mmh2O)
%SPAN ACTUAL RISING FALLING
ACTUAL % SPAN %ERROR ACTUAL % SPAN %ERROR
0
25
50
75
100
Records/Annexure:
1. Daily check list
2. SMP for operating procedure
3. Calibration Reports
JOB SAFETY ANALYSIS :(JSA)
Job Safety Analysis Job: Calibration of Date: 09 –01-- 2016 Analysis by: Reviewed by:
Rotor scale
Title of employee doing Supervisor: Section Department: Section: Instrument Approved by:
job: Instrument Mechanic Engineer Instrumentation
3/4
DALMIA CEMENT (B) LIMITED – CEMENT PLANT
BELGAVI
INSTRUMENTATION SMP
Issue No. 01 Rev. No: 00 Effective Date: 09.01.2016 SMP/INST/09
Issued By: Approved By: HOD
SMP FOR DP TRANSMITTER
Isolation and draining Hazardous gases, Draining should be done Skin burn, Train the technicians
from the process line Hot material with due care unconsciousness for isolation
due to hazardous procedures.
gases
4/4