Grand Summary: 5% REBATE (Including 15% VAT)
Grand Summary: 5% REBATE (Including 15% VAT)
Contract Amount
DIVISION / DESCRIPTION
(Including VAT)
Contract Amount
DIVISION / DESCRIPTION
(Birr)
Total 2,973,110.00
15% VAT 445,966.50
TOTAL (including VAT) 3,419,076.50
PRELIMINARIES
SPEC UNIT TOTAL
REF ITEM DESCRIPTION UNIT QTY. RATE PRICE
p PRELIMINARIES
Cost of providing Health and Safety Facilities on
the Project (for the duration of the Project). This
is a Lump Sum Amount (not be adjusted for
whatever reason) and is to be paid proportionally
via Interim Payment Certificates over the
duration of the Project). Proportional payments
to be in line with the Birr (%) complete value of a
given interim payment certificate. (Inc.
protection(Safety net around all elevations of the
P1 building,) LS 1 100,000.00 100,000.00
Cost of Trail Mix designs , Concrete and
reinforcement bars testing and related works
facilitation works for the duration of the Project.
This is to be paid proportionally via Interim
Payment Certificates over the duration of the
P2 Project).
a)For mix design LS 1 200,000.00 200,000.00
b)For Concrete cube test LS 1 100,000.00 100,000.00
c)For rebar test LS 1 100,000.00 100,000.00
Total (Carried to Summary). 500,000.00
CBOH-BOQ Based on CSI Format January 2022
DIVISION 03 - CONCRETE WORKS
BILL No -1 MAIN BUILDING
Foundation
a)In Mat Foundation m3 193.11 8,000.00 1,544,880.00
b)In Lift shaft Foundation m3 3.70 8,000.00 29,600.00
c)In Mat Beam m3 156.00 8,000.00 1,248,000.00
Beam
a)In ground floor beam m3 3.55 8,000.00 28,400.00
Slab
a)In Basement floor Slab m3 61.42 8,000.00 491,360.00
b)In ground floor Slab m3 134.26 8,000.00 1,074,080.00
Stair Case
a)In Stair case extending from Basement slab to
bottom of Ground floor slab. m3 8.21 8,000.00 65,680.00
In septic tank m3 33.70 8,000.00 269,600.00
Reinforced concrete in class C-40 with a minimum
28day characteristic cube compressive strength of
40MPa poured in place and vibrated around steel
03300.03
reinforcement. Steel and formwork measured
separately:-
Column
a)In Foundation column extending from Basement
slab to bottom of Ground floor slab. m3 17.47 9,000.00 157,230.00
Shear Wall
a)In Foundation shear wall extending from
Basement slab to bottom of Ground floor slab. m3 21.85 9,000.00 196,650.00
Retaining Wall
g)In retaining wall extending from Basement slab
to bottom of Ground floor slab. m3 39.48 9,000.00 355,320.00
Foundation
a)In Mat Foundation m2 - -
b)In Lift shaft Foundation m2 - -
c)In Mat Beam m2 189.01 1,000.00 189,010.00
Beam
a)In ground floor beam m2 28.49 1,000.00 28,490.00
Slab
a)In ground floor slab m2 594.24 1,000.00 594,240.00
Column
a)In Foundation column extending from Basement
slab to bottom of Ground floor slab. m2 142.07 1,000.00 142,070.00
Shear Wall
a)In Foundation shear wall extending from
1,000.00
Basement slab to bottom of Ground floor slab. m2 149.99 149,990.00
Retaining Wall
a)In retaining wall extending from Basement slab
to bottom of Ground floor slab. m2 273.89 1,000.00 273,890.00
Stair Case
a)In Stair case m2 51.04 1,000.00 51,040.00
In septic tank m2 232.16 1,000.00 232,160.00
Steel reinforcement with a minimum yield
strength Fyk of 500MPa.Reinforcement shall be
according to structural Drawings and Technical
03300.04
Specifications. Price shall include cutting,
bending, placing in position and tying wires.
Foundation
a)In Mat Foundation
Diam 8mm Deformed bar. kg 848.42 170.00 144,231.40
Diam 10mm Deformed bar. kg 5,704.34 170.00 969,737.80
Diam 12mm Deformed bar. kg 2,324.43 170.00 395,153.10
Diam 14mm Deformed bar. kg 993.34 170.00 168,867.80
Diam 16mm Deformed bar. kg 1,848.69 170.00 314,277.30
Diam 20mm Deformed bar. kg 5,828.61 170.00 990,863.70
Diam 24mm Deformed bar. kg 23,870.82 170.00 4,058,039.40
b)In Lift shaft footing
Diam 8mm Deformed bar. kg - -
Diam 10mm Deformed bar. kg - -
Diam 12mm Deformed bar. kg - -
Diam 14mm Deformed bar. kg - -
Diam 16mm Deformed bar. kg - -
Diam 20mm Deformed bar. kg 173.65 170.00 29,520.50
Diam 24mm Deformed bar. kg 1,043.58 170.00 177,408.60
c)In Mat beam
Diam 8mm Deformed bar. kg - -
Diam 10mm Deformed bar. kg 1,446.47 170.00 245,899.90
Diam 12mm Deformed bar. kg 15,085.70 170.00 2,564,569.00
Diam 14mm Deformed bar. kg 123.92 170.00 21,066.40
Diam 16mm Deformed bar. kg - -
Diam 20mm Deformed bar. kg 3,050.73 170.00 518,624.10
Diam 24mm Deformed bar. kg 18,894.68 170.00 3,212,095.60
Beam
a)In ground Floor Beam
Diam 8mm Deformed bar. kg 133.43 170.00 22,683.10
Diam 10mm Deformed bar. kg - -
Diam 12mm Deformed bar. kg 9.98 170.00 1,696.60
Diam 14mm Deformed bar. kg 294.02 170.00 49,983.40
Diam 16mm Deformed bar. kg - -
Diam 20mm Deformed bar. kg 136.60 170.00 23,222.00
Diam24mmDeformed bar. kg - -
Slab
a)In Basement floor slab.
Diam 8mm Deformed bar. kg 1,834.38 170.00 311,844.60
Diam 10mm Deformed bar. kg - -
Diam 12mm Deformed bar. kg - -
Diam 14mm Deformed bar. kg - -
Diam 16mm Deformed bar. kg - -
Diam 20mm Deformed bar. kg - -
Diam 24mmDeformed bar. kg - -
Stair Case
a)In Stair case extending from Basement slab to
bottom of Ground floor slab.
Diam 8mm Deformed bar. kg 268.75 170.00 45,687.50
Diam 10mm Deformed bar. kg 25.93 170.00 4,408.10
Diam 12mm Deformed bar. kg 478.79 170.00 81,394.30
Diam 14mm Deformed bar. kg 72.69 170.00 12,357.30
Diam 16mm Deformed bar. kg - -
Diam 20mm Deformed bar. kg 156.49 170.00 26,603.30
Diam 24mm Deformed bar. kg - -
In Septic tank
Diam 8mm Deformed bar. kg 733.04 170.00 124,616.80
Diam 10mm Deformed bar. kg 744.10 170.00 126,497.00
Diam 12mm Deformed bar. kg 990.30 170.00 168,351.00
Diam 14mm Deformed bar. kg - -
Diam 16mm Deformed bar. kg - -
Diam 20mm Deformed bar. kg - -
Diam 24mm Deformed bar. kg - -
Column
a)In Foundation column starter rebar
Diam 8mm Deformed bar. - -
Diam 10mm Deformed bar. - -
Diam 12mm Deformed bar. - -
Diam 14mm Deformed bar. kg 98.78 170.00 16,792.60
Diam 16mm Deformed bar. kg 148.43 170.00 25,233.10
Diam 20mm Deformed bar. kg 271.33 170.00 46,126.10
Diam 24mm Deformed bar. kg 717.15 170.00 121,915.50
b)In Basement column extending from Basement
slab to bottom of Ground floor slab.
Shear Wall
a)In Foundation shear wall Starter rebar
Diam 8mm Deformed bar. kg - -
Diam 10mm Deformed bar. kg - -
Diam 12mm Deformed bar. kg - -
Diam 14mm Deformed bar. kg - -
Retaining Wall
a)In Retaining wall extending from Basement slab
to bottom of Ground floor slab.
c) In staircase
Ground Floor Stair case C-30 concrete m3 8.82 8,000.00 70,560.00
1st Floor Stair case C-30 concrete m3 6.08 8,000.00 48,640.00
c)In staircase
G Ground Floor Stair case m2 55.70 1,000.00 55,700.00
1 1st Floor Stair case m2 38.36 1,000.00 38,360.00
2 2nd Floor Stair case m2 44.05 1,000.00 44,050.00
3 3rd Floor Stair case m2 44.05 1,000.00 44,050.00
4 4th Floor Stair case m2 44.05 1,000.00 44,050.00
5 5th Floor Stair case m2 44.05 1,000.00 44,050.00
6 6th Floor Stair case m2 16.80 1,000.00 16,800.00
d)In Reinforced Concrete Wall
M Ground Floor m2 99.97 1,000.00 99,970.00
f)In staircase
G Ground Floor staircase
G Diam 8mm Deformed bar. kg 251.55 170.00 42,763.50
G Diam 10mm Deformed bar. kg 25.93 170.00 4,408.10
G Diam 12mm Deformed bar. kg 482.29 170.00 81,989.30
G Diam 14mm Deformed bar. kg 72.69 170.00 12,357.30
G Diam 16mm Deformed bar. kg - -
G Diam 20mm Deformed bar. kg 110.70 170.00 18,819.00
G Diam24mmDeformed bar. kg 107.41 170.00 18,259.70